82_FR_9589 82 FR 9565 - Commission Information Collection Activities (FERC-725R); Comment Request

82 FR 9565 - Commission Information Collection Activities (FERC-725R); Comment Request

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 24 (February 7, 2017)

Page Range9565-9566
FR Document2017-02448

In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the information collection FERC- 725R (Mandatory Reliability Standards: BAL Reliability Standards) which will be submitted to the Office of Management and Budget (OMB) for review of the information collection requirements.

Federal Register, Volume 82 Issue 24 (Tuesday, February 7, 2017)
[Federal Register Volume 82, Number 24 (Tuesday, February 7, 2017)]
[Notices]
[Pages 9565-9566]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-02448]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RD17-1-000]


Commission Information Collection Activities (FERC-725R); Comment 
Request

AGENCY: Federal Energy Regulatory Commission.

ACTION: Notice of information collection and request for comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is soliciting public comment on the information collection FERC-
725R (Mandatory Reliability Standards: BAL Reliability Standards) which 
will be submitted to the Office of Management and Budget (OMB) for 
review of the information collection requirements.

DATES: Comments on the collection of information are due by April 10, 
2017.

ADDRESSES: You may submit comments (identified by Docket No. RD17-1-
000) by the following methods:
     eFiling at Commission's Web site: http://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE., 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at [email protected], or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
[email protected], by telephone at (202) 502-8663, and by fax at 
(202) 273-0873.

SUPPLEMENTARY INFORMATION:
    Title: FERC-725R, Mandatory Reliability Standards: BAL Reliability 
Standards.
    OMB Control No.: 1902-0268.
    Type of Request: Three-year approval of FERC-725R information 
collection requirement, as modified.
    Abstract: On November 10, 2016, the North American Electric 
Reliability Corporation (NERC) filed a petition for Commission approval 
of retirement, pursuant to section 215(d)(1) of the Federal Power Act 
(FPA) and Section 39.5 of the Commission's regulations, of currently-
effective Reliability Standard BAL-004-0 (Time Error Correction). NERC 
explains that since Reliability Standard BAL-004-0 became effective, 
improvements have been made to mandatory Reliability Standards (such as 
the development of Reliability Standards BAL-003-1.1 and BAL-001-2 and 
the Interconnection Reliability Operations and Coordination (IRO) 
Standards) that help ensure continued adherence to frequency 
approximating 60 Hertz over long-term averages and make Reliability 
Standard BAL-004-0 redundant.
    Type of Respondents: Public utilities.
    Estimate of Annual Burden \1\: The Commission estimates the 
reduction (due to the retirement of Reliability Standard BAL-004-0) in 
the annual public reporting burden for the information collection as 
follows:
---------------------------------------------------------------------------

    \1\ Burden is defined as the total time, effort, or financial 
resources expended by persons to generate, maintain, retain, or 
disclose or provide information to or for a Federal agency. For 
further explanation of what is included in the information 
collection burden, refer to 5 Code of Federal Regulations 1320.3.

[[Page 9566]]



--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                         Number of
 FERC 725R, reductions due to RD17-1-    Number of  respondents \2\   responses  per   Total number    Average burden hours &     Annual burden hours &
                  000                                                    respondent    of responses    cost per  response \3\       total annual cost
                                        (1).........................             (2)     (1) x (2) =  (4).....................  (3) x (4) = (5)
                                                                                                 (3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Retirement of current standard BAL-004- BA 99; RC 11................              -1            -110  (Eng.) 2 hrs. ($129);     -330 hrs. (-220 Eng., -
 0 currently in (FERC-725R).                                                                           (R.K.) 1 hr. ($38).       110 R.K.); -$18,370 (-
                                                                                                                                 $14,190 Eng., -$4,180
                                                                                                                                 R.K.)
                                                                                     ----------------                          -------------------------
    TOTAL REDUCTION (Rounded).........  ............................  ..............       -110 hrs.  ........................  -110
                                                                                                                                -$18,370
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Total annual burden and cost will be reduced by 110 hours and 
$18,370.
---------------------------------------------------------------------------

    \2\ The estimated number of respondents is based on the NERC 
compliance registry as of December 12, 2016. According to the NERC 
compliance registry, there are 99 U.S. balancing authorities (BA) 
and 11 reliability coordinators (RC).
    \3\ The estimates for cost per response are derived using the 
following formula: Burden Hours per Response * $/hour = Cost per 
Response. The $64.29/hour figure for an engineer and the $37.75/hour 
figure for a record clerk (rounded to $38.00) are based on the 
average salary plus benefits data from the Bureau of Labor 
Statistics. (https://www.bls.gov/oes/current/naics2_22.htm), May 
2015, Section 22, Utilities. In the burden table, engineering is 
abbreviated as ``Eng.'' and record keeping is abbreviated as 
``R.K.''.
---------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Whether the collection of 
information are necessary for the proper performance of the functions 
of the Commission, including whether the information will have 
practical utility; (2) the accuracy of the agency's estimates of the 
burden and cost of the collection of information, including the 
validity of the methodology and assumptions used; (3) ways to enhance 
the quality, utility and clarity of the information collection; and (4) 
ways to minimize the burden of the collection of information on those 
who are to respond, including the use of automated collection 
techniques or other forms of information technology.

    Dated: February 1, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-02448 Filed 2-6-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                          Federal Register / Vol. 82, No. 24 / Tuesday, February 7, 2017 / Notices                                                      9565

                                             241–6932; email: Melyssa.Noe@                           information related to the board’s work               FERC Online Support by email at
                                             orem.doe.gov. Or visit the Web site at                  and needs to be conveyed in a timely                  ferconlinesupport@ferc.gov, or by phone
                                             www.energy.gov/orssab.                                  manner.                                               at: (866) 208–3676 (toll-free), or (202)
                                             SUPPLEMENTARY INFORMATION: Purpose of                     Minutes: Minutes will be available by               502–8659 for TTY.
                                             the Board: The purpose of the Board is                  writing or calling Melyssa P. Noe at the                 Docket: Users interested in receiving
                                             to make recommendations to DOE–EM                       address and phone number listed above.                automatic notification of activity in this
                                             and site management in the areas of                     Minutes will also be available at the                 docket or in viewing/downloading
                                             environmental restoration, waste                        following Web site: www.energy.gov/                   comments and issuances in this docket
                                             management, and related activities.                     orssab.                                               may do so at http://www.ferc.gov/docs-
                                                                                                       Issued at Washington, DC, on February 1,            filing/docs-filing.asp.
                                             Tentative Agenda                                        2017.
                                                                                                                                                           FOR FURTHER INFORMATION CONTACT:
                                             • Welcome and Announcements                             LaTanya R. Butler,
                                             • Comments from the Deputy                                                                                    Ellen Brown may be reached by email
                                                                                                     Deputy Committee Management Officer.                  at DataClearance@FERC.gov, by
                                                Designated Federal Officer (DDFO)
                                                and Environmental Protection Agency
                                                                                                     [FR Doc. 2017–02558 Filed 2–3–17; 11:15 am]           telephone at (202) 502–8663, and by fax
                                                and Tennessee Department of
                                                                                                     BILLING CODE 6450–01–P                                at (202) 273–0873.
                                                Environment and Conservation                                                                               SUPPLEMENTARY INFORMATION:
                                                Liaisons                                             DEPARTMENT OF ENERGY                                     Title: FERC–725R, Mandatory
                                             • Public Comment Period                                                                                       Reliability Standards: BAL Reliability
                                             • Discussion: Waste Disposal Capacity                   Federal Energy Regulatory                             Standards.
                                                on the Oak Ridge Reservation                         Commission                                               OMB Control No.: 1902–0268.
                                             • Additions/Approval of Agenda
                                             • Motions/Approval of January 11, 2017                  [Docket No. RD17–1–000]                                  Type of Request: Three-year approval
                                                Meeting Minutes                                                                                            of FERC–725R information collection
                                             • Responses to Recommendations and                      Commission Information Collection                     requirement, as modified.
                                                Alternate DDFO Report                                Activities (FERC–725R); Comment                          Abstract: On November 10, 2016, the
                                             • Committee Reports                                     Request                                               North American Electric Reliability
                                             • Additions to Agenda and Open                          AGENCY: Federal Energy Regulatory                     Corporation (NERC) filed a petition for
                                                Discussion                                           Commission.                                           Commission approval of retirement,
                                             • Adjourn                                                                                                     pursuant to section 215(d)(1) of the
                                                                                                     ACTION: Notice of information collection
                                                Public Participation: The EM SSAB,                                                                         Federal Power Act (FPA) and Section
                                                                                                     and request for comments.
                                             Oak Ridge, welcomes the attendance of                                                                         39.5 of the Commission’s regulations, of
                                             the public at its advisory committee                    SUMMARY:    In compliance with the                    currently-effective Reliability Standard
                                             meetings and will make every effort to                  requirements of the Paperwork                         BAL–004–0 (Time Error Correction).
                                             accommodate persons with physical                       Reduction Act of 1995, the Federal                    NERC explains that since Reliability
                                             disabilities or special needs. If you                   Energy Regulatory Commission                          Standard BAL–004–0 became effective,
                                             require special accommodations due to                   (Commission or FERC) is soliciting                    improvements have been made to
                                             a disability, please contact Melyssa P.                 public comment on the information                     mandatory Reliability Standards (such
                                             Noe in advance of the meeting at the                    collection FERC–725R (Mandatory                       as the development of Reliability
                                             phone number listed above. Written                      Reliability Standards: BAL Reliability                Standards BAL–003–1.1 and BAL–001–
                                             statements may be filed with the Board                  Standards) which will be submitted to                 2 and the Interconnection Reliability
                                             either before or after the meeting.                     the Office of Management and Budget                   Operations and Coordination (IRO)
                                             Individuals who wish to make oral                       (OMB) for review of the information                   Standards) that help ensure continued
                                             statements pertaining to the agenda item                collection requirements.                              adherence to frequency approximating
                                             should contact Melyssa P. Noe at the                    DATES: Comments on the collection of                  60 Hertz over long-term averages and
                                             address or telephone number listed                      information are due by April 10, 2017.                make Reliability Standard BAL–004–0
                                             above. Requests must be received prior                  ADDRESSES: You may submit comments
                                                                                                                                                           redundant.
                                             to the meeting and reasonable provision                 (identified by Docket No. RD17–1–000)                    Type of Respondents: Public utilities.
                                             will be made to include the presentation                by the following methods:                                Estimate of Annual Burden 1: The
                                             in the agenda. The Deputy Designated                       • eFiling at Commission’s Web site:                Commission estimates the reduction
                                             Federal Officer is empowered to                         http://www.ferc.gov/docs-filing/                      (due to the retirement of Reliability
                                             conduct the meeting in a fashion that                   efiling.asp.                                          Standard BAL–004–0) in the annual
                                             will facilitate the orderly conduct of                     • Mail/Hand Delivery/Courier:                      public reporting burden for the
                                             business. Individuals wishing to make                   Federal Energy Regulatory Commission,                 information collection as follows:
                                             public comments will be provided a                      Secretary of the Commission, 888 First
                                             maximum of five minutes to present                      Street NE., Washington, DC 20426.                        1 Burden is defined as the total time, effort, or

                                             their comments. Publishing this notice                     Instructions: All submissions must be              financial resources expended by persons to
                                             less than 15 day is due to unforeseen                   formatted and filed in accordance with                generate, maintain, retain, or disclose or provide
                                                                                                                                                           information to or for a Federal agency. For further
                                             administrative procedures during the                    submission guidelines at: http://                     explanation of what is included in the information
                                             transition. This meeting will allow the                 www.ferc.gov/help/submission-                         collection burden, refer to 5 Code of Federal
                                             public and the Board to hear critical                   guide.asp. For user assistance contact                Regulations 1320.3.
Lhorne on DSK30JT082PROD with NOTICES




                                        VerDate Sep<11>2014   14:31 Feb 06, 2017   Jkt 241001   PO 00000   Frm 00007   Fmt 4703   Sfmt 4703   E:\FR\FM\07FEN1.SGM   07FEN1


                                             9566                          Federal Register / Vol. 82, No. 24 / Tuesday, February 7, 2017 / Notices

                                                                                                                        Number of                                      Average burden
                                                 FERC 725R, reductions due to                 Number of                  responses                Total number         hours & cost per                 Annual burden hours & total
                                                        RD17–1–000                          respondents 2                   per                   of responses           response 3                            annual cost
                                                                                                                        respondent

                                                                                                    (1)                        (2)                (1) × (2) = (3)                 (4)                         (3) × (4) = (5)

                                             Retirement of current standard BAL–           BA 99; RC 11                                 ¥1                   ¥110   (Eng.) 2 hrs. ($129);               ¥330 hrs. (¥220 Eng.,
                                               004–0 currently in (FERC–725R).                                                                                        (R.K.) 1 hr. ($38).                ¥110 R.K.); ¥$18,370
                                                                                                                                                                                                         (¥$14,190 Eng., ¥$4,180
                                                                                                                                                                                                         R.K.)

                                                  TOTAL REDUCTION (Rounded)                ........................   ........................        ¥110 hrs.     .................................   ¥110
                                                                                                                                                                                                        ¥$18,370



                                               Total annual burden and cost will be                       Regulatory Commission’s (Commission                                facilities would occur in Pennsylvania;
                                             reduced by 110 hours and $18,370.                            or FERC) regulations, Commission staff                             and
                                               Comments: Comments are invited on:                         has prepared this final General                                      • in North Carolina and South
                                             (1) Whether the collection of                                Conformity Determination (GCD) for the                             Carolina, supplemental odorization,
                                             information are necessary for the proper                     Atlantic Sunrise Project (Project)                                 odor detection, and/or odor masking/
                                             performance of the functions of the                          proposed by Transcontinental Gas                                   deodorization equipment would be
                                             Commission, including whether the                            Pipeline Company, LLC (Transco).                                   installed at 56 meter stations, regulator
                                             information will have practical utility;                        The FERC staff concludes that the                               stations, and ancillary facilities.
                                             (2) the accuracy of the agency’s                             Project would achieve conformity with                                For additional information on the
                                             estimates of the burden and cost of the                      the Pennsylvania State Implementation                              Project, the public can view the final
                                             collection of information, including the                     Plan in Lancaster County through the                               environmental impact statement on our
                                             validity of the methodology and                              transfer of Emission Reduction Credits.                            Web site at https://www.ferc.gov/
                                             assumptions used; (3) ways to enhance                           The Project would involve the                                   industries/gas/enviro/eis/2016/12-30-
                                             the quality, utility and clarity of the                      construction and operation of about                                16-FEIS.asp. The complete final General
                                             information collection; and (4) ways to                      199.4 miles of pipeline facilities and                             Conformity Determination, which also
                                             minimize the burden of the collection of                     appurtenant aboveground facilities,                                contains our responses to public
                                             information on those who are to                              including:                                                         comments on the draft General
                                             respond, including the use of automated                         • 185.9 miles of new natural gas                                Conformity Determination, may be
                                             collection techniques or other forms of                      pipeline in Columbia, Lancaster,                                   found on FERC’s elibrary system under
                                             information technology.                                      Lebanon, Luzerne, Northumberland,                                  the above referenced Docket number.
                                               Dated: February 1, 2017.                                   Schuylkill, Susquehanna, and Wyoming                                 For further information, contact Eric
                                             Kimberly D. Bose,                                            Counties, Pennsylvania (58.7 miles of                              Tomasi by telephone at 202–502–8097
                                             Secretary.                                                   30-inch-diameter and 127.3 miles of 42-                            or by email at Eric.Tomasi@ferc.gov.
                                             [FR Doc. 2017–02448 Filed 2–6–17; 8:45 am]
                                                                                                          inch-diameter pipeline);                                             Dated: January 17, 2017.
                                                                                                             • 11.0 miles of new pipeline looping                            Kimberly D. Bose,
                                             BILLING CODE 6717–01–P
                                                                                                          in Clinton and Lycoming Counties,
                                                                                                                                                                             Secretary.
                                                                                                          Pennsylvania (2.5 miles of 36-inch-
                                                                                                                                                                             [FR Doc. 2017–02480 Filed 2–6–17; 8:45 am]
                                             DEPARTMENT OF ENERGY                                         diameter and 8.5 miles of 42-inch-
                                                                                                                                                                             BILLING CODE 6717–01–P
                                                                                                          diameter pipeline);
                                             Federal Energy Regulatory                                       • 2.5 miles of 30-inch-diameter
                                             Commission                                                   pipeline replacements in Prince William
                                                                                                                                                                             DEPARTMENT OF ENERGY
                                                                                                          County, Virginia;
                                             [Docket No. CP15–138–000]                                       • two new compressor stations in                                Federal Energy Regulatory
                                             Atlantic Sunrise Project; Notice of                          Columbia and Wyoming Counties,                                     Commission
                                             Availability of Final General                                Pennsylvania (Compressor Stations 610
                                                                                                          and 605);                                                          [Project No. 2035–099]
                                             Conformity Analysis
                                                                                                             • additional compression and related
                                               In accordance with the National                            modifications to two existing                                      City and County of Denver, Colorado;
                                             Environmental Policy Act of 1969, the                        compressor stations in Columbia and                                Notice of Application Accepted For
                                             Clean Air Act, and the Federal Energy                        Lycoming Counties, Pennsylvania                                    Filing, Ready for Environmental
                                                                                                          (Compressor Stations 517 and 520) and                              Analysis, Soliciting Comments,
                                               2 The estimated number of respondents is based
                                                                                                          one in Howard County, Maryland                                     Motions To Intervene, Protests,
                                             on the NERC compliance registry as of December               (Compressor Station 190);                                          Recommendations, Terms and
                                             12, 2016. According to the NERC compliance                                                                                      Conditions, and Fishway Prescriptions
                                             registry, there are 99 U.S. balancing authorities (BA)          • other modifications would be taking
                                             and 11 reliability coordinators (RC).                        place at Compressor Stations 145, 150,                               Take notice that the following
                                               3 The estimates for cost per response are derived          155, 160, 170, 185, and 190 across                                 hydroelectric application has been filed
                                             using the following formula: Burden Hours per                Maryland, North Carolina, and Virginia;
                                             Response * $/hour = Cost per Response. The
                                                                                                                                                                             with the Commission and is available
                                                                                                             • two new meter stations and three
Lhorne on DSK30JT082PROD with NOTICES




                                             $64.29/hour figure for an engineer and the $37.75/                                                                              for public inspection:
                                             hour figure for a record clerk (rounded to $38.00)           new regulator stations would be                                      a. Type of Application: Amendment
                                             are based on the average salary plus benefits data           constructed and operated in                                        of License.
                                             from the Bureau of Labor Statistics. (https://               Pennsylvania. There would also be                                    b. Project No.: 2035–099.
                                             www.bls.gov/oes/current/naics2_22.htm), May
                                             2015, Section 22, Utilities. In the burden table,
                                                                                                          modifications at an existing meter                                   c. Date Filed: November 25, 2016.
                                             engineering is abbreviated as ‘‘Eng.’’ and record            station, and the construction and                                    d. Applicant: City and County of
                                             keeping is abbreviated as ‘‘R.K.’’.                          operation of additional ancillary                                  Denver, Colorado acting through its


                                        VerDate Sep<11>2014   14:31 Feb 06, 2017   Jkt 241001   PO 00000        Frm 00008       Fmt 4703         Sfmt 4703   E:\FR\FM\07FEN1.SGM         07FEN1



Document Created: 2017-02-07 00:27:10
Document Modified: 2017-02-07 00:27:10
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of information collection and request for comments.
DatesComments on the collection of information are due by April 10, 2017.
ContactEllen Brown may be reached by email at [email protected], by telephone at (202) 502-8663, and by fax at (202) 273-0873.
FR Citation82 FR 9565 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR