DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #2

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-1532-003; ER10-1541-004; ER10-1642-005; ER10-
1763-003; ER10-1766-003; ER10-1767-003; ER13-2349-002; ER13-2350-002; 
ER16-221-001; ER17-1757-001.
    Applicants: Entergy Arkansas, Inc., Entergy Louisiana, LLC, Entergy 
Mississippi, Inc., Entergy New Orleans, LLC, Entergy Texas, Inc., 
Entergy Nuclear Palisades, LLC, Entergy Power, LLC, EWO Marketing, LLC, 
EAM Nelson Holding, LLC, RS Cogen, LLC, Entergy Services, Inc.
    Description: Supplement to December 28, 2017 Triennial Market Power 
Update for the Central Region of the Entergy MBR Utilities.
    Filed Date: 3/1/18.
    Accession Number: 20180301-5319.
    Comments Due: 5 p.m. ET 3/22/18.

    Docket Numbers: ER17-481-000.
    Applicants: CPV Maryland, LLC.
    Description: Report Filing: Refund Report to be effective N/A.
    Filed Date: 3/5/18.
    Accession Number: 20180305-5323.
    Comments Due: 5 p.m. ET 3/26/18.

    Docket Numbers: ER18-958-000.
    Applicants: Duke Energy Florida, LLC.
    Description: Sec.  205(d) Rate Filing: DEF-DEF E&P Agreement--
Hamilton Solar to be effective 3/6/2018.
    Filed Date: 3/5/18.
    Accession Number: 20180305-5284.
    Comments Due: 5 p.m. ET 3/26/18.

    Docket Numbers: ER18-959-000.
    Applicants: Bayonne Plant Holding, L.L.C.
    Description: Tariff Cancellation: Notice of Cancellation of Rate 
Schedule and Request for Waiver to be effective 6/1/2018.

[[Page 10470]]

    Filed Date: 3/5/18.
    Accession Number: 20180305-5286.
    Comments Due: 5 p.m. ET 3/26/18.

    Docket Numbers: ER18-961-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original Service Agreement 
No. 4955--NITSA among PJM and AEP EP to be effective 6/1/2014.
    Filed Date: 3/5/18.
    Accession Number: 20180305-5288.
    Comments Due: 5 p.m. ET 3/26/18.

    Docket Numbers: ER18-962-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original Service Agreement 
No. 4956--NITSA among PJM and AEPSC to be effective 1/1/2017.
    Filed Date: 3/5/18.
    Accession Number: 20180305-5290.
    Comments Due: 5 p.m. ET 3/26/18.

    Docket Numbers: ER18-963-000.
    Applicants: Southern Maryland Electric Cooperative, Inc., PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: SMECO submits revisions to 
OATT, Att. H-9C re: Transmission Revenue Requirement to be effective 5/
1/2018.
    Filed Date: 3/5/18.
    Accession Number: 20180305-5293.
    Comments Due: 5 p.m. ET 3/26/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: http://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: March 5, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-04738 Filed 3-8-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                             Federal Register / Vol. 83, No. 47 / Friday, March 9, 2018 / Notices                                                  10469

                                             1001 Louisiana Street, Suite 1000,                      stated below, file with the Federal                   888 First Street NE, Washington, DC
                                             Houston, TX 77002 and National Fuel                     Energy Regulatory Commission, 888                     20426. See, 18 CFR 385.2001(a) (1) (iii)
                                             Gas Supply Corporation (National Fuel),                 First Street NE, Washington, DC 20426,                and the instructions on the
                                             6363 Main Street, Williamsville, NY                     a motion to intervene in accordance                   Commission’s website under the e-
                                             14221, jointly filed an application in                  with the requirements of the                          Filing link.
                                             Docket No. CP18–84–000 pursuant to                      Commission’s Rules of Practice and                      Comment Date: 5:00 p.m. Eastern
                                             section 7(c) of the Natural Gas Act                     Procedure (18 CFR 385.214 or 385.211)                 Time on March 15, 2018.
                                             (NGA), and Part 157 of the                              and the Regulations under the NGA (18                   Dated: February 22, 2018.
                                             Commission’s regulations, for a                         CFR 157.10). A person obtaining party
                                                                                                                                                           Kimberly D. Bose,
                                             certificate of public convenience and/or                status will be placed on the service list
                                                                                                                                                           Secretary.
                                             necessity requesting authorization to                   maintained by the Secretary of the
                                             establish a protective boundary around                  Commission and will receive copies of                 [FR Doc. 2018–04708 Filed 3–8–18; 8:45 am]
                                             the active limit of the Ellisburg Storage               all documents filed by the applicant and              BILLING CODE 6717–01–P
                                             Pool located in Potter, Pennsylvania.                   by all other parties. A party must submit
                                             The proposed expansion would                            7 copies of filings made with the
                                             establish a 2,000-foot buffer area around               Commission and must mail a copy to                    DEPARTMENT OF ENERGY
                                             the reservoir containing 6,394.57 acres,                the applicant and to every other party in
                                                                                                                                                           Federal Energy Regulatory
                                             all as more fully set forth in the                      the proceeding. Only parties to the
                                                                                                                                                           Commission
                                             application which is on file with the                   proceeding can ask for court review of
                                             Commission and open for public                          Commission orders in the proceeding.                  Combined Notice of Filings #2
                                             inspection. The filing may also be                         However, a person does not have to
                                             viewed on the web at http://                            intervene in order to have comments                      Take notice that the Commission
                                             www.ferc.gov using the ‘‘eLibrary’’ link.               considered. The second way to                         received the following electric rate
                                             Enter the docket number excluding the                   participate is by filing with the                     filings:
                                             last three digits in the docket number                  Secretary of the Commission, as soon as                  Docket Numbers: ER10–1532–003;
                                             field to access the document. For                       possible, an original and two copies of               ER10–1541–004; ER10–1642–005;
                                             assistance, contact FERC at                             comments in support of or in opposition               ER10–1763–003; ER10–1766–003;
                                             FERCOnlineSupport@ferc.gov or call                      to this project. The Commission will                  ER10–1767–003; ER13–2349–002;
                                             toll-free, (866) 208–3676 or TTY, (202)                 consider these comments in                            ER13–2350–002; ER16–221–001; ER17–
                                             502–8659.                                               determining the appropriate action to be              1757–001.
                                                Any questions regarding this                         taken, but the filing of a comment alone                 Applicants: Entergy Arkansas, Inc.,
                                             application may be directed to Matthew                  will not serve to make the filer a party              Entergy Louisiana, LLC, Entergy
                                             R. Bley, Director, Gas Transmission                     to the proceeding. The Commission’s                   Mississippi, Inc., Entergy New Orleans,
                                             Certificates, Dominion Energy                           rules require that persons filing                     LLC, Entergy Texas, Inc., Entergy
                                             Transmission, Inc., 707 East Main                       comments in opposition to the project                 Nuclear Palisades, LLC, Entergy Power,
                                             Street, Richmond, Virginia 23219, or by                 provide copies of their protests only to              LLC, EWO Marketing, LLC, EAM Nelson
                                             calling 866–319–3382, or email at                       the party or parties directly involved in             Holding, LLC, RS Cogen, LLC, Entergy
                                             Matthew.R.Bley@DominionEnergy.com.                      the protest.                                          Services, Inc.
                                                Pursuant to section 157.9 of the                        Persons who wish to comment only                      Description: Supplement to December
                                             Commission’s rules, 18 CFR 157.9,                       on the environmental review of this                   28, 2017 Triennial Market Power
                                             within 90 days of this Notice the                       project should submit an original and                 Update for the Central Region of the
                                             Commission staff will either: Complete                  two copies of their comments to the                   Entergy MBR Utilities.
                                             its environmental assessment (EA) and                   Secretary of the Commission.                             Filed Date: 3/1/18.
                                             place it into the Commission’s public                   Environmental commenter’s will be                        Accession Number: 20180301–5319.
                                             record (eLibrary) for this proceeding; or               placed on the Commission’s                               Comments Due: 5 p.m. ET 3/22/18.
                                             issue a Notice of Schedule for                          environmental mailing list, will receive
                                                                                                     copies of the environmental documents,                   Docket Numbers: ER17–481–000.
                                             Environmental Review. If a Notice of
                                                                                                                                                              Applicants: CPV Maryland, LLC.
                                             Schedule for Environmental Review is                    and will be notified of meetings
                                                                                                                                                              Description: Report Filing: Refund
                                             issued, it will indicate, among other                   associated with the Commission’s
                                                                                                     environmental review process.                         Report to be effective N/A.
                                             milestones, the anticipated date for the
                                                                                                     Environmental commenter’s will not be                    Filed Date: 3/5/18.
                                             Commission staff’s issuance of the final
                                                                                                     required to serve copies of filed                        Accession Number: 20180305–5323.
                                             environmental impact statement (FEIS)
                                                                                                     documents on all other parties.                          Comments Due: 5 p.m. ET 3/26/18.
                                             or EA for this proposal. The filing of the
                                             EA in the Commission’s public record                    However, the non-party commentary,                       Docket Numbers: ER18–958–000.
                                             for this proceeding or the issuance of a                will not receive copies of all documents                 Applicants: Duke Energy Florida,
                                             Notice of Schedule for Environmental                    filed by other parties or issued by the               LLC.
                                             Review will serve to notify federal and                 Commission (except for the mailing of                    Description: § 205(d) Rate Filing:
                                             state agencies of the timing for the                    environmental documents issued by the                 DEF–DEF E&P Agreement—Hamilton
                                             completion of all necessary reviews, and                Commission) and ill not have the right                Solar to be effective 3/6/2018.
                                             the subsequent need to complete all                     to seek court review of the                              Filed Date: 3/5/18.
                                             federal authorizations within 90 days of                Commission’s final order.                                Accession Number: 20180305–5284.
                                             the date of issuance of the Commission                     The Commission strongly encourages                    Comments Due: 5 p.m. ET 3/26/18.
amozie on DSK30RV082PROD with NOTICES




                                             staff’s FEIS or EA.                                     electronic filings of comments, protests                 Docket Numbers: ER18–959–000.
                                                There are two ways to become                         and interventions in lieu of paper using                 Applicants: Bayonne Plant Holding,
                                             involved in the Commission’s review of                  the eFiling link at http://www.ferc.gov.              L.L.C.
                                             this project. First, any person wishing to              Persons unable to file electronically                    Description: Tariff Cancellation:
                                             obtain legal status by becoming a party                 should submit an original and 5 copies                Notice of Cancellation of Rate Schedule
                                             to the proceedings for this project                     of the protest or intervention to the                 and Request for Waiver to be effective
                                             should, on or before the comment date                   Federal Energy Regulatory Commission,                 6/1/2018.


                                        VerDate Sep<11>2014   16:47 Mar 08, 2018   Jkt 244001   PO 00000   Frm 00047   Fmt 4703   Sfmt 4703   E:\FR\FM\09MRN1.SGM   09MRN1


                                             10470                           Federal Register / Vol. 83, No. 47 / Friday, March 9, 2018 / Notices

                                                Filed Date: 3/5/18.                                  DEPARTMENT OF ENERGY                                    Dated: February 22, 2018.
                                                Accession Number: 20180305–5286.                                                                           Kimberly D. Bose,
                                                                                                     Federal Energy Regulatory                             Secretary.
                                                Comments Due: 5 p.m. ET 3/26/18.                     Commission                                            [FR Doc. 2018–04707 Filed 3–8–18; 8:45 am]
                                                Docket Numbers: ER18–961–000.                        [Docket No. CP18–42–000]                              BILLING CODE 6717–01–P
                                                Applicants: PJM Interconnection,
                                             L.L.C.                                                  Transcontinental Gas Pipe Line
                                                Description: § 205(d) Rate Filing:                   Company, LLC; Notice of Filing                        DEPARTMENT OF ENERGY
                                             Original Service Agreement No. 4955—                       Take notice that on January 2, 2018,               Federal Energy Regulatory
                                             NITSA among PJM and AEP EP to be                        pursuant to Rule 212 of the                           Commission
                                             effective 6/1/2014.                                     Commission’s Rules of Practice and
                                                                                                                                                           [Docket No. PF17–8–000]
                                                Filed Date: 3/5/18.                                  Procedure (18 CFR 385.212), the North
                                                Accession Number: 20180305–5288.                     Carolina Utilities Commission (NCUC)                  Commonwealth LNG LLC; Notice of
                                                                                                     filed a motion for order to show cause                Intent To Prepare an Environmental
                                                Comments Due: 5 p.m. ET 3/26/18.
                                                                                                     regarding: (1) Whether Transcontinental               Impact Statement for the Planned
                                                Docket Numbers: ER18–962–000.                        Gas Pipe Line Company, LLC (Transco)                  Commonwealth LNG Project, Request
                                                Applicants: PJM Interconnection,                     has been operating, and is continuing to              for Comments on Environmental
                                             L.L.C.                                                  operate, its Eminence Salt Dome Storage               Issues, and Notice of Public Scoping
                                                Description: § 205(d) Rate Filing:                   Field, located near the Town of                       Session
                                             Original Service Agreement No. 4956—                    Seminary in Covington County,
                                                                                                     Mississippi, in accordance with the                      The staff of the Federal Energy
                                             NITSA among PJM and AEPSC to be                                                                               Regulatory Commission (FERC or
                                             effective 1/1/2017.                                     amended certificate issued in Docket
                                                                                                     No. CP11–151; 1 and, (2) whether                      Commission) will prepare an
                                                Filed Date: 3/5/18.                                  Transco should be allowed to assess                   environmental impact statement (EIS)
                                                Accession Number: 20180305–5290.                     demand charges for the amount of firm                 that will discuss the environmental
                                                Comments Due: 5 p.m. ET 3/26/18.                     service from the Eminence Salt Dome                   impacts of the Commonwealth LNG
                                                                                                     Storage Field under Rate Schedule ESS                 Project involving construction and
                                               Docket Numbers: ER18–963–000.                         and Rate Schedule EESWS that Transco                  operation of facilities by
                                               Applicants: Southern Maryland                         allegedly has been and is currently                   Commonwealth LNG LLC
                                             Electric Cooperative, Inc., PJM                         unable to provide given the revised                   (Commonwealth LNG) in Cameron
                                             Interconnection, L.L.C.                                 operating parameters of the Eminence                  Parish, Louisiana. The Commission will
                                               Description: § 205(d) Rate Filing:                    Salt Dome Storage Field.                              use this EIS in its decision-making
                                             SMECO submits revisions to OATT, Att.                      The filing may also be viewed on the               process to determine whether the
                                             H–9C re: Transmission Revenue                           web at http://www.ferc.gov using the                  project is in the public interest.
                                             Requirement to be effective 5/1/2018.                   eLibrary link. Enter the docket number                   This notice announces the opening of
                                                                                                     excluding the last three digits in the                the scoping process the Commission
                                               Filed Date: 3/5/18.                                                                                         will use to gather input from the public
                                                                                                     docket number field to access the
                                               Accession Number: 20180305–5293.                      document. For assistance, please contact              and interested agencies on the project.
                                               Comments Due: 5 p.m. ET 3/26/18.                      FERC Online Support at                                You can make a difference by providing
                                                                                                     FERCOnlineSupport@ferc.gov or toll                    us with your specific comments or
                                                The filings are accessible in the                                                                          concerns about the project. Your
                                             Commission’s eLibrary system by                         free at (866) 208–3676, or TTY, contact
                                                                                                     (202) 502–8659.                                       comments should focus on the potential
                                             clicking on the links or querying the                                                                         environmental effects, reasonable
                                             docket number.                                             Any person wishing to obtain legal
                                                                                                     status by becoming a party to this                    alternatives, and measures to avoid or
                                                Any person desiring to intervene or                  proceeding should, on or before the                   lessen environmental impacts. Your
                                             protest in any of the above proceedings                 comment date listed below, file with the              input will help the Commission staff
                                             must file in accordance with Rules 211                  Federal Energy Regulatory Commission,                 determine what issues they need to
                                             and 214 of the Commission’s                             888 First Street NE, Washington, DC                   evaluate in the EIS. To ensure that your
                                             Regulations (18 CFR 385.211 and                         20426, a motion to intervene in                       comments are timely and properly
                                             385.214) on or before 5:00 p.m. Eastern                 accordance with the requirements of the               recorded, please send your comments so
                                             time on the specified comment date.                     Commission’s Rules of Practice and                    that the Commission receives them in
                                             Protests may be considered, but                         Procedure (18 CFR 385.214).                           Washington, DC on or before March 26,
                                             intervention is necessary to become a                      The Commission strongly encourages                 2018.
                                             party to the proceeding.                                electronic filings of comments, protests                 If you sent comments on this project
                                                eFiling is encouraged. More detailed                 and interventions in lieu of paper using              to the Commission before the opening of
                                             information relating to filing                          the eFiling link at http://www.ferc.gov.              this docket on July 28, 2017, you will
                                             requirements, interventions, protests,                  Persons unable to file electronically                 need to file those comments in Docket
                                             service, and qualifying facilities filings              should submit an original and five                    No. PF17–8–000 to ensure they are
                                             can be found at: http://www.ferc.gov/                   copies of the protest or intervention to              considered as part of this proceeding.
                                             docs-filing/efiling/filing-req.pdf. For                 the Federal Energy Regulatory                            This notice is being sent to the
                                             other information, call (866) 208–3676                  Commission, 888 First Street NE,                      Commission’s current environmental
amozie on DSK30RV082PROD with NOTICES




                                             (toll free). For TTY, call (202) 502–8659.              Washington, DC 20426.                                 mailing list for this project. State and
                                                                                                        Comment Date: 5:00 p.m. Eastern                    local government representatives should
                                               Dated: March 5, 2018.
                                                                                                     Time on March 15, 2018.                               notify their constituents of this planned
                                             Nathaniel J. Davis, Sr.,                                                                                      project and encourage them to comment
                                             Deputy Secretary.                                                                                             on their areas of concern.
                                                                                                       1 Transcontinental Gas Pipe Line Co., LLC, 142
                                             [FR Doc. 2018–04738 Filed 3–8–18; 8:45 am]              FERC 61,095 (2013), order on reh’g, 147 FERC             A fact sheet prepared by the FERC
                                             BILLING CODE 6717–01–P                                  61,091 (2014).                                        entitled An Interstate Natural Gas


                                        VerDate Sep<11>2014   16:47 Mar 08, 2018   Jkt 244001   PO 00000   Frm 00048   Fmt 4703   Sfmt 4703   E:\FR\FM\09MRN1.SGM   09MRN1



Document Created: 2018-03-09 03:48:33
Document Modified: 2018-03-09 03:48:33
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates3/1/18.
FR Citation83 FR 10469 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR