83_FR_10521 83 FR 10474 - Empire Pipeline, Inc.; Notice of Application

83 FR 10474 - Empire Pipeline, Inc.; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 47 (March 9, 2018)

Page Range10474-10475
FR Document2018-04778

Federal Register, Volume 83 Issue 47 (Friday, March 9, 2018)
[Federal Register Volume 83, Number 47 (Friday, March 9, 2018)]
[Notices]
[Pages 10474-10475]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-04778]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-89-000]


Empire Pipeline, Inc.; Notice of Application

    Take notice that on February 16, 2018, Empire Pipeline, Inc. 
(Empire), 6363 Main Street, Williamsville, New York 14221, filed an 
application in Docket No. CP18-89-000 an application pursuant to 
sections 7(b) and 7(c) of the Natural Gas Act (NGA) for its Empire 
North Project. Specifically, Empire proposes to: (i) Construct a new 
21,068 horsepower (hp) compressor station in Tioga County, 
Pennsylvania; (ii) construct a new 32,000 hp compressor station in 
Ontario County, New York; (iii) modify its New Victor Regulator Station 
in Ontario County, New York; (iv) modify its Jackson Meter and 
Regulator Station in Tioga County, Pennsylvania; (v) abandon by removal 
certain related facilities; and (vi) uprate the maximum allowable 
operating pressure of the Empire Connector Pipeline. Empire states that 
the project will provide 205,000 dekatherms per day of firm 
transportation service. Empire estimates the cost of the project to be 
approximately $142,390,912, all as more fully set forth in the 
application which is on file with the Commission and open to public 
inspection. The filing is available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's website at 
http://www.ferc.gov using the eLibrary link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC at 
[email protected] or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    Any questions concerning this application may be directed to 
Margaret M. Duggan, Attorney, Empire Pipeline, Inc., 6363 Main Street, 
Williamsville, New York 14221, or by telephone at (716) 857-7066.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the EA for this proposal. The filing of the EA in the Commission's 
public record for this proceeding or the issuance of a Notice of 
Schedule for Environmental Review will serve to notify federal and 
state agencies of the timing for the completion of all necessary 
reviews, and the subsequent need to complete all federal authorizations 
within 90 days of the date of issuance of the Commission staff's EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit seven copies of filings made in the proceeding with the 
Commission and must mail a copy to the applicant and to every other 
party. Only parties to the proceeding can ask for court review of 
Commission orders in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the eFiling link at 
http://www.ferc.gov.

[[Page 10475]]

Persons unable to file electronically should submit an original and 7 
copies of the protest or intervention to the Federal Energy regulatory 
Commission, 888 First Street NE, Washington, DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on March 16, 2018.

    Dated: March 5, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-04778 Filed 3-8-18; 8:45 am]
 BILLING CODE 6717-01-P



                                             10474                           Federal Register / Vol. 83, No. 47 / Friday, March 9, 2018 / Notices

                                                Description: § 205(d) Rate Filing:                   No. CP18–89–000 an application                        this project. First, any person wishing to
                                             OATT—Revise Tax Rate & Attachment                       pursuant to sections 7(b) and 7(c) of the             obtain legal status by becoming a party
                                             K, AEPTX Rate Update to be effective                    Natural Gas Act (NGA) for its Empire                  to the proceedings for this project
                                             12/31/9998.                                             North Project. Specifically, Empire                   should, on or before the comment date
                                                Filed Date: 3/5/18.                                  proposes to: (i) Construct a new 21,068               stated below file with the Federal
                                                Accession Number: 20180305–5007.                     horsepower (hp) compressor station in                 Energy Regulatory Commission, 888
                                                Comments Due: 5 p.m. ET 3/26/18.                     Tioga County, Pennsylvania; (ii)                      First Street NE, Washington, DC 20426,
                                                Docket Numbers: ER18–955–000.                        construct a new 32,000 hp compressor                  a motion to intervene in accordance
                                                Applicants: NorthWestern                             station in Ontario County, New York;                  with the requirements of the
                                             Corporation.                                            (iii) modify its New Victor Regulator                 Commission’s Rules of Practice and
                                                Description: § 205(d) Rate Filing: SA                Station in Ontario County, New York;                  Procedure (18 CFR 385.214 or 385.211)
                                             642 6th Rev—NITSA with General Mills                    (iv) modify its Jackson Meter and                     and the Regulations under the NGA (18
                                             Operations LLC to be effective 5/1/2018.                Regulator Station in Tioga County,                    CFR 157.10). A person obtaining party
                                                Filed Date: 3/5/18.                                  Pennsylvania; (v) abandon by removal                  status will be placed on the service list
                                                Accession Number: 20180305–5008.                     certain related facilities; and (vi) uprate           maintained by the Secretary of the
                                                Comments Due: 5 p.m. ET 3/26/18.                     the maximum allowable operating                       Commission and will receive copies of
                                                Docket Numbers: ER18–956–000.                        pressure of the Empire Connector                      all documents filed by the applicant and
                                                Applicants: PJM Interconnection,                     Pipeline. Empire states that the project              by all other parties. A party must submit
                                             L.L.C.                                                  will provide 205,000 dekatherms per                   seven copies of filings made in the
                                                Description: § 205(d) Rate Filing:                   day of firm transportation service.                   proceeding with the Commission and
                                             Amendment to ISA SA No. 4525; Queue                     Empire estimates the cost of the project              must mail a copy to the applicant and
                                             No. Z2–089/AA2–099 (Consent to                          to be approximately $142,390,912, all as              to every other party. Only parties to the
                                             Assign) to be effective 8/8/2016.                       more fully set forth in the application               proceeding can ask for court review of
                                                Filed Date: 3/5/18.                                  which is on file with the Commission                  Commission orders in the proceeding.
                                                Accession Number: 20180305–5017.                     and open to public inspection. The                       However, a person does not have to
                                                Comments Due: 5 p.m. ET 3/26/18.                     filing is available for review at the                 intervene in order to have comments
                                                                                                     Commission in the Public Reference                    considered. The second way to
                                                The filings are accessible in the
                                                                                                     Room or may be viewed on the                          participate is by filing with the
                                             Commission’s eLibrary system by
                                                                                                     Commission’s website at http://                       Secretary of the Commission, as soon as
                                             clicking on the links or querying the
                                                                                                     www.ferc.gov using the eLibrary link.                 possible, an original and two copies of
                                             docket number.
                                                                                                     Enter the docket number excluding the                 comments in support of or in opposition
                                                Any person desiring to intervene or
                                                                                                     last three digits in the docket number                to this project. The Commission will
                                             protest in any of the above proceedings
                                                                                                     field to access the document. For                     consider these comments in
                                             must file in accordance with Rules 211
                                                                                                     assistance, contact FERC at                           determining the appropriate action to be
                                             and 214 of the Commission’s
                                                                                                     FERCOnlineSupport@ferc.gov or call                    taken, but the filing of a comment alone
                                             Regulations (18 CFR 385.211 and
                                                                                                     toll-free, (886) 208–3676 or TYY, (202)               will not serve to make the filer a party
                                             385.214) on or before 5:00 p.m. Eastern
                                                                                                     502–8659.                                             to the proceeding. The Commission’s
                                             time on the specified comment date.
                                                                                                        Any questions concerning this                      rules require that persons filing
                                             Protests may be considered, but
                                                                                                     application may be directed to Margaret               comments in opposition to the project
                                             intervention is necessary to become a                   M. Duggan, Attorney, Empire Pipeline,                 provide copies of their protests only to
                                             party to the proceeding.                                Inc., 6363 Main Street, Williamsville,                the party or parties directly involved in
                                                eFiling is encouraged. More detailed
                                                                                                     New York 14221, or by telephone at                    the protest.
                                             information relating to filing                          (716) 857–7066.                                          Persons who wish to comment only
                                             requirements, interventions, protests,                     Pursuant to section 157.9 of the                   on the environmental review of this
                                             service, and qualifying facilities filings              Commission’s rules, 18 CFR 157.9,                     project should submit an original and
                                             can be found at: http://www.ferc.gov/                   within 90 days of this Notice the                     two copies of their comments to the
                                             docs-filing/efiling/filing-req.pdf. For                 Commission staff will either: Complete                Secretary of the Commission.
                                             other information, call (866) 208–3676                  its environmental assessment (EA) and                 Environmental commentors will be
                                             (toll free). For TTY, call (202) 502–8659.              place it into the Commission’s public                 placed on the Commission’s
                                               Dated: March 5, 2018.                                 record (eLibrary) for this proceeding; or             environmental mailing list, will receive
                                             Nathaniel J. Davis, Sr.,                                issue a Notice of Schedule for                        copies of the environmental documents,
                                             Deputy Secretary.                                       Environmental Review. If a Notice of                  and will be notified of meetings
                                             [FR Doc. 2018–04737 Filed 3–8–18; 8:45 am]              Schedule for Environmental Review is                  associated with the Commission’s
                                             BILLING CODE 6717–01–P
                                                                                                     issued, it will indicate, among other                 environmental review process.
                                                                                                     milestones, the anticipated date for the              Environmental commentors will not be
                                                                                                     Commission staff’s issuance of the EA                 required to serve copies of filed
                                             DEPARTMENT OF ENERGY                                    for this proposal. The filing of the EA               documents on all other parties.
                                                                                                     in the Commission’s public record for                 However, the non-party commentors
                                             Federal Energy Regulatory                               this proceeding or the issuance of a                  will not receive copies of all documents
                                             Commission                                              Notice of Schedule for Environmental                  filed by other parties or issued by the
                                                                                                     Review will serve to notify federal and               Commission (except for the mailing of
                                             [Docket No. CP18–89–000]
                                                                                                     state agencies of the timing for the                  environmental documents issued by the
amozie on DSK30RV082PROD with NOTICES




                                             Empire Pipeline, Inc.; Notice of                        completion of all necessary reviews, and              Commission) and will not have the right
                                             Application                                             the subsequent need to complete all                   to seek court review of the
                                                                                                     federal authorizations within 90 days of              Commission’s final order.
                                               Take notice that on February 16, 2018,                the date of issuance of the Commission                   The Commission strongly encourages
                                             Empire Pipeline, Inc. (Empire), 6363                    staff’s EA.                                           electronic filings of comments, protests
                                             Main Street, Williamsville, New York                       There are two ways to become                       and interventions in lieu of paper using
                                             14221, filed an application in Docket                   involved in the Commission’s review of                the eFiling link at http://www.ferc.gov.


                                        VerDate Sep<11>2014   16:47 Mar 08, 2018   Jkt 244001   PO 00000   Frm 00052   Fmt 4703   Sfmt 4703   E:\FR\FM\09MRN1.SGM   09MRN1


                                                                             Federal Register / Vol. 83, No. 47 / Friday, March 9, 2018 / Notices                                             10475

                                             Persons unable to file electronically                   year period through April 30, 2018.1                  ENVIRONMENTAL PROTECTION
                                             should submit an original and 7 copies                  The existing rates provide sufficient                 AGENCY
                                             of the protest or intervention to the                   revenue to pay all annual costs,
                                             Federal Energy regulatory Commission,                                                                         [EPA–HQ–OPP–2017–0756; FRL–9972–86]
                                                                                                     including interest expense, and repay
                                             888 First Street NE, Washington, DC                     required investment within the                        Pesticide Experimental Use Permit;
                                             20426.                                                  allowable period consistent with the                  Receipt of Application; Comment
                                               Comment Date: 5:00 p.m. Eastern                       cost recovery criteria set forth in DOE               Request
                                             Time on March 16, 2018.                                 Order RA 6120.2. In accordance with 10
                                               Dated: March 5, 2018.                                 CFR part 903.23(a), WAPA is proposing                 AGENCY: Environmental Protection
                                             Kimberly D. Bose,                                       to extend the existing rates under Rate               Agency (EPA).
                                             Secretary.                                              Schedules INT–FT5 and INT–NFT4 for                    ACTION: Notice.
                                             [FR Doc. 2018–04778 Filed 3–8–18; 8:45 am]              the period from May 1, 2018 through
                                                                                                                                                           SUMMARY:   This notice announces EPA’s
                                             BILLING CODE 6717–01–P                                  September 30, 2020. Extending these
                                                                                                                                                           receipt of an application 93167–EUP–R
                                                                                                     rate schedules through September 30,
                                                                                                                                                           from Oxitec Ltd. requesting an
                                                                                                     2020 will provide WAPA and its                        experimental use permit (EUP) for the
                                             DEPARTMENT OF ENERGY                                    customers time to evaluate the potential              OX513A Aedes aegypti mosquitoes
                                                                                                     benefits of combining transmission                    expressing tetracycline Trans-Activator
                                             Western Area Power Administration                       service rates on Federal transmission                 Variant (tTAV) protein. The Agency has
                                                                                                     projects in the Desert Southwest Region.              determined that the permit may be of
                                             Pacific Northwest-Pacific Southwest
                                             Intertie Project—Rate Order No.                            By Delegation Order No. 00–037.00B,                regional and national significance.
                                             WAPA–181                                                effective November 19, 2016, the                      Therefore, because of the potential
                                                                                                     Secretary of Energy delegated: (1) The                significance, EPA is seeking comments
                                             AGENCY: Western Area Power                              authority to develop power and                        on this application.
                                             Administration, DOE.                                    transmission rates to WAPA’s                          DATES: Comments must be received on
                                             ACTION: Notice of proposed extension of                 Administrator; (2) the authority to                   or before April 9, 2018.
                                             transmission service rates.                             confirm, approve, and place such rates                ADDRESSES: Submit your comments,
                                                                                                     into effect on an interim basis to the                identified by docket identification (ID)
                                             SUMMARY:  The Western Area Power
                                                                                                     Deputy Secretary of Energy; and (3) the               number EPA–HQ–OPP–2017–0756, by
                                             Administration (WAPA) proposes to
                                             extend the existing Pacific Northwest-                  authority to confirm, approve, and place              one of the following methods:
                                             Pacific Southwest Intertie Project                      into effect on a final basis, to remand or              • Federal eRulemaking Portal: http://
                                             transmission service rates through                      to disapprove such rates to FERC.                     www.regulations.gov. Follow the online
                                             September 30, 2020. The existing Rate                      In accordance with 10 CFR                          instructions for submitting comments.
                                             Schedules INT–FT5 and INT–NFT4                                                                                Do not submit electronically any
                                                                                                     903.23(a)(2), WAPA will not hold public
                                             expire April 30, 2018.                                                                                        information you consider to be
                                                                                                     information or public comment forums
                                                                                                                                                           Confidential Business Information (CBI)
                                             DATES: A consultation and comment                       but is providing a 30-day consultation
                                                                                                                                                           or other information whose disclosure is
                                             period starts with the publication of this              and comment period to receive                         restricted by statute.
                                             notice and will end on April 9, 2018.                   comments on the proposed rate                            • Mail: OPP Docket, Environmental
                                             WAPA will accept written comments                       extension. Comments must be received                  Protection Agency Docket Center (EPA/
                                             any time during the consultation and                    by the end of the consultation and                    DC), (28221T), 1200 Pennsylvania Ave.
                                             comment period.                                         comment period to be considered by                    NW, Washington, DC 20460–0001.
                                             ADDRESSES: Send written comments to:                    WAPA in its decision process. WAPA                       • Hand Delivery: To make special
                                             Mr. Ronald E. Moulton, Regional                         will post comments received to its                    arrangements for hand delivery or
                                             Manager, Desert Southwest Customer                      website, https://www.wapa.gov/regions/                delivery of boxed information, please
                                             Service Region, Western Area Power                      DSW/Rates/Pages/intertie-rates.aspx.                  follow the instructions at http://
                                             Administration, P.O. Box 6457,                          After considering public comments,                    www.epa.gov/dockets/contacts.html.
                                             Phoenix, AZ 85005–6457, or email                        WAPA will take further action on the                     Additional instructions on
                                             moulton@wapa.gov. WAPA will post                        proposed rate extension consistent with               commenting or visiting the docket,
                                             information about the proposed                          10 CFR 903.23(a).                                     along with more information about
                                             transmission service rate extension and                                                                       dockets generally, is available at http://
                                                                                                      Dated: January 25, 2018.
                                             written comments received on its                                                                              www.epa.gov/dockets.
                                             website at https://www.wapa.gov/                        Mark A. Gabriel,
                                                                                                                                                           FOR FURTHER INFORMATION CONTACT:
                                             regions/DSW/Rates/Pages/intertie-                       Administrator.
                                                                                                                                                           Robert McNally, Biopesticides and
                                             rates.aspx.                                             [FR Doc. 2018–04797 Filed 3–8–18; 8:45 am]            Pollution Prevention Division (7511P),
                                             FOR FURTHER INFORMATION CONTACT:   Ms.                  BILLING CODE 6450–01–P                                Office of Pesticide Programs,
                                             Tina Ramsey, Rates Manager, Desert                                                                            Environmental Protection Agency, 1200
                                             Southwest Customer Service Region,                                                                            Pennsylvania Ave. NW, Washington, DC
                                             Western Area Power Administration,                                                                            20460–0001; main telephone number:
                                             P.O. Box 6457, Phoenix, AZ 85005–                                                                             (703) 305–7090; email address:
                                             6457, (602) 605–2565, or email ramsey@                                                                        BPPDFRNotices@epa.gov.
amozie on DSK30RV082PROD with NOTICES




                                             wapa.gov.                                                                                                     SUPPLEMENTARY INFORMATION:
                                             SUPPLEMENTARY INFORMATION: Rate                                                                               I. General Information
                                                                                                       1 FERC confirmed and approved Rate Order No.
                                             Schedules INT–FT5 and INT–NFT4 for
                                                                                                     WAPA–157 on August 22, 2013, in Docket No.            A. Does this action apply to me?
                                             Rate Order No. WAPA–157 were                            EF13–4–000. See Order Confirming and Approving
                                             approved by the Federal Energy                          Rate Schedules on a Final Basis, 144 FERC               This action is directed to the public
                                             Regulatory Commission (FERC) for a 5-                   ¶ 61,143.                                             in general. Although this action may be


                                        VerDate Sep<11>2014   16:47 Mar 08, 2018   Jkt 244001   PO 00000   Frm 00053   Fmt 4703   Sfmt 4703   E:\FR\FM\09MRN1.SGM   09MRN1



Document Created: 2018-03-09 03:48:05
Document Modified: 2018-03-09 03:48:05
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on March 16, 2018.
FR Citation83 FR 10474 

2025 Federal Register | Disclaimer | Privacy Policy