The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 1 to Regulatory Guide (RG) 1.158, ``Qualification of Safety- Related Vented Lead-Acid Storage Batteries for Nuclear Power Plants.'' RG 1.158 endorses (with clarifying regulatory positions) the Institute of Electrical and Electronics Engineers (IEEE) Standard (Std.) 535- 2013, ``IEEE Standard for Qualification of Class 1E Vented Lead Acid Storage Batteries for Nuclear Power Generating Stations.'' IEEE 535- 2013 contains procedures for qualifying batteries with duty cycles of less than 8 hours and also for batteries with duty cycles longer than 8 hours.

Federal Register, Volume 83 Issue 48 (Monday, March 12, 2018)
[Federal Register Volume 83, Number 48 (Monday, March 12, 2018)]
[Notices]
[Page 10755]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-04828]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2017-0130]


Qualification of Safety-Related Lead Storage Batteries for 
Nuclear Power Plants

AGENCY: Nuclear Regulatory Commission.

ACTION: Regulatory guide; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing 
Revision 1 to Regulatory Guide (RG) 1.158, ``Qualification of Safety-
Related Vented Lead-Acid Storage Batteries for Nuclear Power Plants.'' 
RG 1.158 endorses (with clarifying regulatory positions) the Institute 
of Electrical and Electronics Engineers (IEEE) Standard (Std.) 535-
2013, ``IEEE Standard for Qualification of Class 1E Vented Lead Acid 
Storage Batteries for Nuclear Power Generating Stations.'' IEEE 535-
2013 contains procedures for qualifying batteries with duty cycles of 
less than 8 hours and also for batteries with duty cycles longer than 8 
hours.

DATES: Revision 1 to RG 1.158 is available on March 12, 2018.

ADDRESSES: Please refer to Docket ID NRC-2017-0130 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking website: Go to http://www.regulations.gov and search for Docket ID NRC-2017-0130. Address 
questions about NRC dockets to Jennifer Borges; telephone: 301-287-
9127; email: Jennifer.Borges@nrc.gov. For technical questions, contact 
the individuals listed in the FOR FURTHER INFORMATION CONTACT section 
of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.
    Regulatory guides are not copyrighted, and NRC approval is not 
required to reproduce them.

FOR FURTHER INFORMATION CONTACT: Lilliana Ramadan, telephone: 301-415-
2463, email: Liliana.Ramadan@nrc.gov, or Stephen Burton, telephone: 
301-415-7000, email: Stephen.Burton@nrc.gov. Both are staff of the 
Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001.

SUPPLEMENTARY INFORMATION: 

I. Discussion

    The NRC is issuing a revision to an existing guide in the NRC's 
``Regulatory Guide'' series. This series was developed to describe and 
make available to the public information regarding methods that are 
acceptable to the NRC staff for implementing specific parts of the 
agency's regulations, techniques that the NRC staff uses in evaluating 
specific issues or postulated events, and data that the NRC staff needs 
in its review of applications for permits and licenses.
    Revision 1 of RG 1.158 was issued with a temporary identification 
of Draft Regulatory Guide, DG-1338. This revision provides updated 
guidance on the methods and type-test procedures for two different 
battery applications. One application is for batteries with duty cycles 
equal to or less than 8 hours and the other application is for 
batteries with duty cycles longer than 8 hours. The 2013 revision of 
IEEE Std. 535 provides a qualification process for both applications to 
ensure battery performance and provides a normative annex with example 
testing regimens. The NRC staff determined that RG 1.158 should be 
revised to endorse the 2013 version of IEEE Std. 535 to support new 
reactor license applications, design certifications, and applications 
for license amendments.

II. Additional Information

    The NRC published a notice of the availability of DG-1338 in the 
Federal Register on May 31, 2017 (82 FR 24996) for a 60-day public 
comment period. The public comment period closed on July 31, 2017. 
Public comments on DG-1338 and the staff responses to the public 
comments are available under ADAMS under Accession No. ML17256A103.

III. Congressional Review Act

    This RG is a rule as defined in the Congressional Review Act (5 
U.S.C. 801-808). However, the Office of Management and Budget has not 
found it to be a major rule as defined in the Congressional Review Act.

IV. Backfitting and Issue Finality

    Revision 1 to RG 1.158 endorses, with certain clarifications, the 
2013 revision of IEEE Std. 535 which refines the methods and type-test 
procedures for two different battery applications. One application is 
for batteries with duty cycles equal to or less than 8 hours and the 
other application is for batteries with duty cycles longer than 8 
hours. The 2013 revision of IEEE Std. 535 demonstrates and outlines the 
qualifying process for both applications to ensure battery performance. 
It also provides a comprehensive document for qualifying batteries with 
additional normative annexes.
    Issuance of Revision 1 to RG 1.158 does not constitute backfitting 
as defined in 10 CFR 50.109 (the Backfit Rule) and is not otherwise 
inconsistent with the issue finality provisions in 10 CFR part 52, 
``Licenses, Certifications and Approvals for Nuclear Power Plants.'' 
The subject of this regulatory guide, as described above, is an NRC-
defined process which does not fall within the purview of subjects 
covered by either the Backfit Rule or the issue finality provisions in 
10 CFR part 52.

    Dated at Rockville, Maryland, this 6th day of March 2018.

    For the Nuclear Regulatory Commission.
Thomas H. Boyce,
Chief, Regulatory Guidance and Generic Issues Branch, Division of 
Engineering, Office of Nuclear Regulatory Research.
[FR Doc. 2018-04828 Filed 3-9-18; 8:45 am]
 BILLING CODE 7590-01-P



                                                                           Federal Register / Vol. 83, No. 48 / Monday, March 12, 2018 / Notices                                                   10755

                                             braille, large print), please notify                    email: Jennifer.Borges@nrc.gov. For                   applications to ensure battery
                                             Kimberly Meyer-Chambers, NRC                            technical questions, contact the                      performance and provides a normative
                                             Disability Program Manager, at 301–                     individuals listed in the FOR FURTHER                 annex with example testing regimens.
                                             287–0739, by videophone at 240–428–                     INFORMATION CONTACT section of this                   The NRC staff determined that RG 1.158
                                             3217, or by email at Kimberly.Meyer-                    document.                                             should be revised to endorse the 2013
                                             Chambers@nrc.gov. Determinations on                        • NRC’s Agencywide Documents                       version of IEEE Std. 535 to support new
                                             requests for reasonable accommodation                   Access and Management System                          reactor license applications, design
                                             will be made on a case-by-case basis.                   (ADAMS): You may obtain publicly-                     certifications, and applications for
                                             *     *      *    *      *                              available documents online in the                     license amendments.
                                                Members of the public may request to                 ADAMS Public Documents collection at                  II. Additional Information
                                             receive this information electronically.                http://www.nrc.gov/reading-rm/
                                             If you would like to be added to the                    adams.html. To begin the search, select                  The NRC published a notice of the
                                             distribution, please contact the Nuclear                ‘‘ADAMS Public Documents’’ and then                   availability of DG–1338 in the Federal
                                             Regulatory Commission, Office of the                    select ‘‘Begin Web-based ADAMS                        Register on May 31, 2017 (82 FR 24996)
                                             Secretary, Washington, DC 20555 (301–                   Search.’’ For problems with ADAMS,                    for a 60-day public comment period.
                                             415–1969), or you may email                             please contact the NRC’s Public                       The public comment period closed on
                                             Patricia.Jimenez@nrc.gov or                             Document Room (PDR) reference staff at                July 31, 2017. Public comments on DG–
                                             Wendy.Moore@nrc.gov.                                    1–800–397–4209, 301–415–4737, or by                   1338 and the staff responses to the
                                                                                                     email to pdr.resource@nrc.gov. The                    public comments are available under
                                               Dated: March 7, 2018.                                                                                       ADAMS under Accession No.
                                                                                                     ADAMS accession number for each
                                             Denise L. McGovern,                                                                                           ML17256A103.
                                                                                                     document referenced (if it is available in
                                             Policy Coordinator Office of the Secretary.
                                                                                                     ADAMS) is provided the first time that                III. Congressional Review Act
                                             [FR Doc. 2018–04980 Filed 3–8–18; 11:15 am]             it is mentioned in this document.                        This RG is a rule as defined in the
                                             BILLING CODE 7590–01–P                                     • NRC’s PDR: You may examine and
                                                                                                                                                           Congressional Review Act (5 U.S.C.
                                                                                                     purchase copies of public documents at                801–808). However, the Office of
                                                                                                     the NRC’s PDR, Room O1–F21, One                       Management and Budget has not found
                                             NUCLEAR REGULATORY                                      White Flint North, 11555 Rockville
                                             COMMISSION                                                                                                    it to be a major rule as defined in the
                                                                                                     Pike, Rockville, Maryland 20852.                      Congressional Review Act.
                                             [NRC–2017–0130]                                            Regulatory guides are not
                                                                                                     copyrighted, and NRC approval is not                  IV. Backfitting and Issue Finality
                                             Qualification of Safety-Related Lead                    required to reproduce them.                              Revision 1 to RG 1.158 endorses, with
                                             Storage Batteries for Nuclear Power                     FOR FURTHER INFORMATION CONTACT:                      certain clarifications, the 2013 revision
                                             Plants                                                  Lilliana Ramadan, telephone: 301–415–                 of IEEE Std. 535 which refines the
                                             AGENCY:  Nuclear Regulatory                             2463, email: Liliana.Ramadan@nrc.gov,                 methods and type-test procedures for
                                             Commission.                                             or Stephen Burton, telephone: 301–415–                two different battery applications. One
                                             ACTION: Regulatory guide; issuance.                     7000, email: Stephen.Burton@nrc.gov.                  application is for batteries with duty
                                                                                                     Both are staff of the Office of Nuclear               cycles equal to or less than 8 hours and
                                             SUMMARY:    The U.S. Nuclear Regulatory                 Regulatory Research, U.S. Nuclear                     the other application is for batteries
                                             Commission (NRC) is issuing Revision 1                  Regulatory Commission, Washington,                    with duty cycles longer than 8 hours.
                                             to Regulatory Guide (RG) 1.158,                         DC 20555–0001.                                        The 2013 revision of IEEE Std. 535
                                             ‘‘Qualification of Safety-Related Vented                SUPPLEMENTARY INFORMATION:                            demonstrates and outlines the
                                             Lead-Acid Storage Batteries for Nuclear                                                                       qualifying process for both applications
                                             Power Plants.’’ RG 1.158 endorses (with                 I. Discussion                                         to ensure battery performance. It also
                                             clarifying regulatory positions) the                      The NRC is issuing a revision to an                 provides a comprehensive document for
                                             Institute of Electrical and Electronics                 existing guide in the NRC’s ‘‘Regulatory              qualifying batteries with additional
                                             Engineers (IEEE) Standard (Std.) 535–                   Guide’’ series. This series was                       normative annexes.
                                             2013, ‘‘IEEE Standard for Qualification                 developed to describe and make                           Issuance of Revision 1 to RG 1.158
                                             of Class 1E Vented Lead Acid Storage                    available to the public information                   does not constitute backfitting as
                                             Batteries for Nuclear Power Generating                  regarding methods that are acceptable to              defined in 10 CFR 50.109 (the Backfit
                                             Stations.’’ IEEE 535–2013 contains                      the NRC staff for implementing specific               Rule) and is not otherwise inconsistent
                                             procedures for qualifying batteries with                parts of the agency’s regulations,                    with the issue finality provisions in 10
                                             duty cycles of less than 8 hours and also               techniques that the NRC staff uses in                 CFR part 52, ‘‘Licenses, Certifications
                                             for batteries with duty cycles longer                   evaluating specific issues or postulated              and Approvals for Nuclear Power
                                             than 8 hours.                                           events, and data that the NRC staff                   Plants.’’ The subject of this regulatory
                                             DATES: Revision 1 to RG 1.158 is                        needs in its review of applications for               guide, as described above, is an NRC-
                                             available on March 12, 2018.                            permits and licenses.                                 defined process which does not fall
                                             ADDRESSES: Please refer to Docket ID                      Revision 1 of RG 1.158 was issued                   within the purview of subjects covered
                                             NRC–2017–0130 when contacting the                       with a temporary identification of Draft              by either the Backfit Rule or the issue
                                                                                                     Regulatory Guide, DG–1338. This                       finality provisions in 10 CFR part 52.
                                             NRC about the availability of
                                             information regarding this document.                    revision provides updated guidance on                    Dated at Rockville, Maryland, this 6th day
                                             You may obtain publicly-available                       the methods and type-test procedures                  of March 2018.
amozie on DSK30RV082PROD with NOTICES




                                             information related to this document                    for two different battery applications.                  For the Nuclear Regulatory Commission.
                                             using any of the following methods:                     One application is for batteries with                 Thomas H. Boyce,
                                                • Federal Rulemaking website: Go to                  duty cycles equal to or less than 8 hours             Chief, Regulatory Guidance and Generic
                                             http://www.regulations.gov and search                   and the other application is for batteries            Issues Branch, Division of Engineering, Office
                                             for Docket ID NRC–2017–0130. Address                    with duty cycles longer than 8 hours.                 of Nuclear Regulatory Research.
                                             questions about NRC dockets to Jennifer                 The 2013 revision of IEEE Std. 535                    [FR Doc. 2018–04828 Filed 3–9–18; 8:45 am]
                                             Borges; telephone: 301–287–9127;                        provides a qualification process for both             BILLING CODE 7590–01–P




                                        VerDate Sep<11>2014   18:12 Mar 09, 2018   Jkt 244001   PO 00000   Frm 00100   Fmt 4703   Sfmt 4703   E:\FR\FM\12MRN1.SGM   12MRN1



Document Created: 2018-11-01 08:51:19
Document Modified: 2018-11-01 08:51:19
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionRegulatory guide; issuance.
DatesRevision 1 to RG 1.158 is available on March 12, 2018.
ContactLilliana Ramadan, telephone: 301-415- 2463, email: [email protected], or Stephen Burton, telephone: 301-415-7000, email: [email protected] Both are staff of the Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
FR Citation83 FR 10755 