83_FR_1354 83 FR 1346 - Northwest Pipeline LLC; Notice of Schedule for Environmental Review of the North Seattle Lateral Upgrade Project

83 FR 1346 - Northwest Pipeline LLC; Notice of Schedule for Environmental Review of the North Seattle Lateral Upgrade Project

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 8 (January 11, 2018)

Page Range1346-1347
FR Document2018-00328

Federal Register, Volume 83 Issue 8 (Thursday, January 11, 2018)
[Federal Register Volume 83, Number 8 (Thursday, January 11, 2018)]
[Notices]
[Pages 1346-1347]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-00328]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP17-441-000 and CP17-441-001]


Northwest Pipeline LLC; Notice of Schedule for Environmental 
Review of the North Seattle Lateral Upgrade Project

    On May 11, 2017, Northwest Pipeline LLC (Northwest) filed an 
application with the Federal Energy Regulatory Commission (Commission 
or FERC) in docket number CP17-441-000 requesting a Certificate of 
Public Convenience and Necessity pursuant to Sections 7(b) and 7(c) of 
the Natural Gas Act to construct and operate certain natural gas 
pipeline facilities. The proposed project is known as the North Seattle 
Lateral Upgrade Project (Project), and would replace an existing 8-
inch-diameter pipeline with a 20-inch-diameter pipeline, increasing the 
design capacity on Northwest's system to serve Puget Sound Energy.
    On October 23, 2017, Northwest filed an amendment to its 
application, and on November 2, 2017, the Commission the issued a 
Notice of Amendment to the Application for the revised Project. Among 
other things, that notice alerted agencies issuing federal 
authorizations of the requirement to complete all necessary reviews and 
to reach a final decision on a request for a federal authorization 
within 90 days of the date of issuance of the Commission staff's 
Environmental Assessment (EA) for the Project. This instant notice 
identifies the FERC staff's planned schedule for the completion of the 
EA for the Project.

Schedule for Environmental Review

    Issuance of EA: February 12, 2018.
    90-day Federal Authorization Decision Deadline: May 13, 2018.
    If a schedule change becomes necessary, additional notice will be 
provided so that the relevant agencies are kept informed of the 
Project's progress.

Project Description

    Northwest proposes to remove approximately 5.8 miles of the 8-inch-
diameter North Seattle Lateral pipeline in Snohomish County, Washington 
and replace it with 20-inch-diameter pipeline, primarily in the same 
trench. The North Seattle Lateral Upgrade Project would consist of the 
following facilities:
     Replace 5.8-miles of 8-inch-diameter pipeline with 20-
inch-diameter pipeline;
     rebuild the existing North Seattle/Everett meter station 
in order to accommodate the increased delivery capacity of the North 
Seattle Lateral;
     relocate an existing 8-inch pig launcher and a 20-inch pig 
receiver; \1\ and
---------------------------------------------------------------------------

    \1\ A pig is a tool that the pipeline company inserts into and 
pushes through the pipeline for cleaning the pipeline, conducting 
internal inspections, or other purposes.
---------------------------------------------------------------------------

     replace an existing 8-inch mainline valve with a 20-inch 
valve.

Background

    On June 21, 2017, the FERC issued a Notice of Intent to Prepare an 
Environmental Assessment for the Proposed North Seattle Lateral Upgrade 
Project, Request for Comments on Environmental Issues, and Notice of 
Public Scoping Session (NOI) in Docket No. CP17-441-000. The NOI was 
mailed to 409 parties, including affected landowners; federal, state, 
and local government representatives and agencies; elected officials; 
environmental and public interest groups; Native American tribes; other 
interested parties; and local libraries. We also held a public scoping 
comment session in the Project area on July 13, 2017.
    The primary issues raised by commenters were impacts on residences 
(including noise, dust, drainage, and vegetation clearing), biological 
and water resources impacts, alternative routings for crossing the 
Fritch Mill property, pipeline safety, and impacts on adjacent utility 
easements and infrastructure.
    On October 23, 2017 Northwest amended its application, reducing the 
Project's incremental firm capacity from 196,311 to 159,299 dekatherms 
per day; reducing the length of the replacement 20-inch-diameter 
pipeline by about 1 mile; locating the replacement pig launcher/
receiver at milepost 7.76; and changing the pipeline route between 
mileposts 2.1 and 2.2 so as to divert its pipeline system around the 
Fritch Mill. Accordingly, on November 21, 2017 we issued a Supplemental 
Notice of Intent to Prepare an Environmental Assessment for the Amended 
North Seattle Lateral Upgrade Project and Request for Comments on 
Environmental Issues (NOI) in Docket No. CP17-441-001. The Supplemental 
NOI was mailed to 312 parties, including affected landowners; federal, 
state, and local government representatives and agencies; elected 
officials; environmental and public interest groups; Native American 
tribes; other interested parties; and local libraries.

[[Page 1347]]

    Comments on the Supplemental NOI concerned the need for relocating 
the pipeline off the existing right-of-way; impacts to springs, 
wetlands, and mature forest from the newly routed segment, and 
alternatives.

Additional Information

    In order to receive notification of the issuance of the EA and to 
keep track of all formal issuances and submittals in specific dockets, 
the Commission offers a free service called eSubscription. This can 
reduce the amount of time you spend researching proceedings by 
automatically providing you with notification of these filings, 
document summaries, and direct links to the documents. Go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Additional information about the Project is available from the 
Commission's Office of External Affairs at (866) 208-FERC or on the 
FERC website (www.ferc.gov). Using the eLibrary link, select General 
Search from the eLibrary menu, enter the selected date range and Docket 
Number excluding the last three digits (i.e., CP17-441), and follow the 
instructions. For assistance with access to eLibrary, the helpline can 
be reached at (866) 208-3676, TTY (202) 502-8659, or at 
FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC website also 
provides access to the texts of formal documents issued by the 
Commission, such as orders, notices, and rule makings.

    Dated: January 5, 2018.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2018-00328 Filed 1-10-18; 8:45 am]
BILLING CODE 6717-01-P



                                                1346                          Federal Register / Vol. 83, No. 8 / Thursday, January 11, 2018 / Notices

                                                the facility’s experience with energy                   DEPARTMENT OF ENERGY                                     • rebuild the existing North Seattle/
                                                management—collected in the SEP                                                                                Everett meter station in order to
                                                Enrollment Form; (2) Basic facility                     Federal Energy Regulatory                              accommodate the increased delivery
                                                information about its energy use, energy                Commission                                             capacity of the North Seattle Lateral;
                                                consumption, and energy performance                                                                              • relocate an existing 8-inch pig
                                                                                                        [Docket Nos. CP17–441–000 and CP17–441–
                                                indicators—collected in the SEP                         001]                                                   launcher and a 20-inch pig receiver; 1
                                                Application Form; (3) Information on                                                                           and
                                                                                                        Northwest Pipeline LLC; Notice of                        • replace an existing 8-inch mainline
                                                energy performance improvement in
                                                                                                        Schedule for Environmental Review of                   valve with a 20-inch valve.
                                                SEP-certified facilities—collected in the
                                                SEP Energy Performance Improvement                      the North Seattle Lateral Upgrade                      Background
                                                Report; (4) Information on the costs and                Project
                                                                                                                                                                  On June 21, 2017, the FERC issued a
                                                benefits of participating in SEP                           On May 11, 2017, Northwest Pipeline                 Notice of Intent to Prepare an
                                                (optional; not required for SEP                         LLC (Northwest) filed an application                   Environmental Assessment for the
                                                certification)—collected in the SEP                     with the Federal Energy Regulatory                     Proposed North Seattle Lateral Upgrade
                                                Voluntary Costs/Benefits Form. 50001                    Commission (Commission or FERC) in                     Project, Request for Comments on
                                                Ready collects only a subset of the same                docket number CP17–441–000                             Environmental Issues, and Notice of
                                                types of information in categories (1),                 requesting a Certificate of Public                     Public Scoping Session (NOI) in Docket
                                                (2), and (3), and without the need for                  Convenience and Necessity pursuant to                  No. CP17–441–000. The NOI was
                                                external audit.                                         Sections 7(b) and 7(c) of the Natural Gas              mailed to 409 parties, including affected
                                                                                                        Act to construct and operate certain                   landowners; federal, state, and local
                                                  Background data will primarily be                                                                            government representatives and
                                                                                                        natural gas pipeline facilities. The
                                                used to track basic information about                                                                          agencies; elected officials;
                                                                                                        proposed project is known as the North
                                                SEP and 50001 Ready participants and                                                                           environmental and public interest
                                                                                                        Seattle Lateral Upgrade Project (Project),
                                                identify opportunities to provide                       and would replace an existing 8-inch-                  groups; Native American tribes; other
                                                participants with technical assistance.                 diameter pipeline with a 20-inch-                      interested parties; and local libraries.
                                                Basic information about a facility’s                    diameter pipeline, increasing the design               We also held a public scoping comment
                                                energy use, energy consumption, and                     capacity on Northwest’s system to serve                session in the Project area on July 13,
                                                energy performance indicators will be                   Puget Sound Energy.                                    2017.
                                                used to administer SEP and 50001                           On October 23, 2017, Northwest filed                   The primary issues raised by
                                                Ready. Information on energy                            an amendment to its application, and on                commenters were impacts on residences
                                                performance improvement will be used                    November 2, 2017, the Commission the                   (including noise, dust, drainage, and
                                                by DOE to manage and track                              issued a Notice of Amendment to the                    vegetation clearing), biological and
                                                participation cycles, and to track the                  Application for the revised Project.                   water resources impacts, alternative
                                                results of participation in SEP and                     Among other things, that notice alerted                routings for crossing the Fritch Mill
                                                50001 Ready. For SEP, optional                          agencies issuing federal authorizations                property, pipeline safety, and impacts
                                                information on costs and benefits of SEP                of the requirement to complete all                     on adjacent utility easements and
                                                participation will be used to conduct                   necessary reviews and to reach a final                 infrastructure.
                                                                                                        decision on a request for a federal                       On October 23, 2017 Northwest
                                                and refine analysis on the costs and                                                                           amended its application, reducing the
                                                benefits of SEP participation. Responses                authorization within 90 days of the date
                                                                                                        of issuance of the Commission staff’s                  Project’s incremental firm capacity from
                                                to the DOE’s Information Collection                                                                            196,311 to 159,299 dekatherms per day;
                                                Request will be voluntary.                              Environmental Assessment (EA) for the
                                                                                                        Project. This instant notice identifies the            reducing the length of the replacement
                                                  (5) Annual Estimated Number of                        FERC staff’s planned schedule for the                  20-inch-diameter pipeline by about 1
                                                Respondents: 575;                                       completion of the EA for the Project.                  mile; locating the replacement pig
                                                  (6) Annual Estimated Number of                                                                               launcher/receiver at milepost 7.76; and
                                                                                                        Schedule for Environmental Review                      changing the pipeline route between
                                                Total Responses: 475;
                                                                                                          Issuance of EA: February 12, 2018.                   mileposts 2.1 and 2.2 so as to divert its
                                                  (7) Annual Estimated Number of                                                                               pipeline system around the Fritch Mill.
                                                                                                          90-day Federal Authorization
                                                Burden Hours: 650;                                      Decision Deadline: May 13, 2018.                       Accordingly, on November 21, 2017 we
                                                  (8) Annual Estimated Reporting and                      If a schedule change becomes                         issued a Supplemental Notice of Intent
                                                Recordkeeping Cost Burden: $31,295.                     necessary, additional notice will be                   to Prepare an Environmental
                                                                                                        provided so that the relevant agencies                 Assessment for the Amended North
                                                  Statutory Authority: Accelerating                                                                            Seattle Lateral Upgrade Project and
                                                Investment in Industrial Energy Efficiency.             are kept informed of the Project’s
                                                                                                        progress.                                              Request for Comments on
                                                Executive Order 13624, 77 FR 54779 (Aug.                                                                       Environmental Issues (NOI) in Docket
                                                30, 2012); 42 U.S.C. 16191.                             Project Description                                    No. CP17–441–001. The Supplemental
                                                Paul Scheihing,                                           Northwest proposes to remove                         NOI was mailed to 312 parties,
                                                Technology Manager, Advanced                            approximately 5.8 miles of the 8-inch-                 including affected landowners; federal,
                                                Manufacturing Office.                                   diameter North Seattle Lateral pipeline                state, and local government
                                                                                                        in Snohomish County, Washington and                    representatives and agencies; elected
                                                [FR Doc. 2018–00361 Filed 1–10–18; 8:45 am]
                                                                                                        replace it with 20-inch-diameter                       officials; environmental and public
srobinson on DSK9F5VC42PROD with NOTICES




                                                BILLING CODE 6450–01–P
                                                                                                        pipeline, primarily in the same trench.                interest groups; Native American tribes;
                                                                                                        The North Seattle Lateral Upgrade                      other interested parties; and local
                                                                                                        Project would consist of the following                 libraries.
                                                                                                        facilities:
                                                                                                          • Replace 5.8-miles of 8-inch-
                                                                                                                                                                 1 A pig is a tool that the pipeline company inserts

                                                                                                                                                               into and pushes through the pipeline for cleaning
                                                                                                        diameter pipeline with 20-inch-                        the pipeline, conducting internal inspections, or
                                                                                                        diameter pipeline;                                     other purposes.



                                           VerDate Sep<11>2014   00:05 Jan 11, 2018   Jkt 244001   PO 00000   Frm 00020   Fmt 4703   Sfmt 4703   E:\FR\FM\11JAN1.SGM   11JAN1


                                                                              Federal Register / Vol. 83, No. 8 / Thursday, January 11, 2018 / Notices                                             1347

                                                  Comments on the Supplemental NOI                         Description: Compliance filing: 2018–                  Filed Date: 1/4/18.
                                                concerned the need for relocating the                   01–04_2017–08–01_Compliance filing                        Accession Number: 20180104–5156.
                                                pipeline off the existing right-of-way;                 re MISO–PJM JOA pseudo tie revisions                      Comments Due: 5 p.m. ET 1/25/18.
                                                impacts to springs, wetlands, and                       to be effective 10/1/2017.                                Docket Numbers: ER18–601–000.
                                                mature forest from the newly routed                        Filed Date: 1/4/18.                                    Applicants: Southern California
                                                segment, and alternatives.                                 Accession Number: 20180104–5143.                    Edison Company.
                                                                                                           Comments Due: 5 p.m. ET 1/25/18.                       Description: § 205(d) Rate Filing: Four
                                                Additional Information
                                                                                                           Docket Numbers: ER17–2513–001.                      SGIAs Monolith 4, 5 6, 7 Projects Terra-
                                                   In order to receive notification of the                 Applicants: Public Service Company                  Gen 251 Wind, LLC to be effective
                                                issuance of the EA and to keep track of                 of New Mexico.                                         1/17/2018.
                                                all formal issuances and submittals in                     Description: Compliance filing: Notice                 Filed Date: 1/4/18.
                                                specific dockets, the Commission offers                 of Effective Date to be effective N/A.                    Accession Number: 20180104–5163.
                                                a free service called eSubscription. This                  Filed Date: 1/5/18.                                    Comments Due: 5 p.m. ET 1/25/18.
                                                can reduce the amount of time you                          Accession Number: 20180105–5039.
                                                spend researching proceedings by                                                                                  Docket Numbers: ER18–602–000.
                                                                                                           Comments Due: 5 p.m. ET 1/26/18.
                                                automatically providing you with                                                                                  Applicants: Southwest Power Pool,
                                                                                                           Docket Numbers: ER18–597–000.                       Inc.
                                                notification of these filings, document                    Applicants: ITC Midwest LLC.
                                                summaries, and direct links to the                                                                                Description: § 205(d) Rate Filing:
                                                                                                           Description: § 205(d) Rate Filing:                  Central Power Electric Cooperative
                                                documents. Go to www.ferc.gov/docs-                     Filing of a Master JUA for Distribution
                                                filing/esubscription.asp.                                                                                      Depreciation Rates to be effective
                                                                                                        Underbuild with SW IA Rural Elec Coop                  1/1/2016.
                                                   Additional information about the                     to be effective 3/5/2018.
                                                Project is available from the                                                                                     Filed Date: 1/4/18.
                                                                                                           Filed Date: 1/4/18.                                    Accession Number: 20180104–5165.
                                                Commission’s Office of External Affairs                    Accession Number: 20180104–5139.
                                                at (866) 208–FERC or on the FERC                                                                                  Comments Due: 5 p.m. ET 1/25/18.
                                                                                                           Comments Due: 5 p.m. ET 1/25/18.
                                                website (www.ferc.gov). Using the                                                                                 Docket Numbers: ER18–603–000.
                                                                                                           Docket Numbers: ER18–598–000.
                                                eLibrary link, select General Search                                                                              Applicants: Southern California
                                                                                                           Applicants: Midcontinent
                                                from the eLibrary menu, enter the                                                                              Edison Company.
                                                                                                        Independent System Operator, Inc.
                                                selected date range and Docket Number                                                                             Description: § 205(d) Rate Filing: GIA
                                                                                                           Description: § 205(d) Rate Filing:
                                                excluding the last three digits (i.e.,                                                                         and Distrib Serv Agmt Wintec Energy,
                                                                                                        2018–01–04_SA 3081 UMERC–ATC GIA
                                                CP17–441), and follow the instructions.                                                                        LTD—Wintec Palm Project WDT1506 to
                                                                                                        (J704) to be effective 12/19/2017.
                                                For assistance with access to eLibrary,                    Filed Date: 1/4/18.                                 be effective 1/2/2018.
                                                the helpline can be reached at (866)                       Accession Number: 20180104–5147.                       Filed Date: 1/5/18.
                                                208–3676, TTY (202) 502–8659, or at                        Comments Due: 5 p.m. ET 1/25/18.                       Accession Number: 20180105–5010.
                                                FERCOnlineSupport@ferc.gov. The                                                                                   Comments Due: 5 p.m. ET 1/26/18.
                                                                                                           Docket Numbers: ER18–599–000.
                                                eLibrary link on the FERC website also                     Applicants: Southwest Power Pool,                      Docket Numbers: ER18–604–000.
                                                provides access to the texts of formal                  Inc.                                                      Applicants: New York Independent
                                                documents issued by the Commission,                        Description: § 205(d) Rate Filing: 3388             System Operator, Inc.
                                                such as orders, notices, and rule                       East River Electric/Otter Tail Power/                     Description: Petition for Temporary
                                                makings.                                                MISO Int Agr to be effective 1/1/2018.                 Tariff Waivers of New York
                                                  Dated: January 5, 2018.                                  Filed Date: 1/4/18.                                 Independent System Operator, Inc.
                                                Kimberly D. Bose,                                          Accession Number: 20180104–5153.                       Filed Date: 1/4/18.
                                                Secretary.                                                 Comments Due: 5 p.m. ET 1/25/18.                       Accession Number: 20180104–5178.
                                                                                                           Docket Numbers: ER18–599–000.                          Comments Due: 5 p.m. ET 1/11/18.
                                                [FR Doc. 2018–00328 Filed 1–10–18; 8:45 am]
                                                BILLING CODE 6717–01–P
                                                                                                           Applicants: Southwest Power Pool,                      Docket Numbers: ER18–605–000.
                                                                                                        Inc.                                                      Applicants: Mid-Atlantic Interstate
                                                                                                           Description: § 205(d) Rate Filing: 3388             Transmission, LLC, PJM
                                                DEPARTMENT OF ENERGY                                    East River Electric/Otter Tail Power/                  Interconnection, L.L.C.
                                                                                                        MISO Int Agr to be effective 1/1/2018.                    Description: § 205(d) Rate Filing:
                                                Federal Energy Regulatory                                  Filed Date: 1/4/18.                                 MAIT submits Operating and
                                                Commission                                                 Accession Number: 20180104–5154.                    Interconnection Agreements SA Nos.
                                                                                                           Comments Due: 5 p.m. ET 1/25/18.                    4577 and 4578 to be effective 3/7/2018.
                                                Combined Notice of Filings #1                              Docket Numbers: ER18–600–000.                          Filed Date: 1/5/18.
                                                   Take notice that the Commission                         Applicants: Midcontinent                               Accession Number: 20180105–5038.
                                                received the following electric rate                    Independent System Operator, Inc.,                        Comments Due: 5 p.m. ET 1/26/18.
                                                filings:                                                Otter Tail Power Company.                                 The filings are accessible in the
                                                   Docket Numbers: ER17–2218–002.                          Description: § 205(d) Rate Filing:                  Commission’s eLibrary system by
                                                   Applicants: PJM Interconnection,                     2018–01–04_SA 3080 OTP-East River                      clicking on the links or querying the
                                                L.L.C.                                                  T–T (Blair) to be effective 1/1/2018.                  docket number.
                                                   Description: Compliance filing:                         Filed Date: 1/4/18.                                    Any person desiring to intervene or
                                                Compliance Filing to 12.29.17 Order in                     Accession Number: 20180104–5155.                    protest in any of the above proceedings
                                                ER17–2218—Revisions to PJM–MISO                            Comments Due: 5 p.m. ET 1/25/18.                    must file in accordance with Rules 211
srobinson on DSK9F5VC42PROD with NOTICES




                                                JOA to be effective 10/1/2017.                             Docket Numbers: ER18–600–000.                       and 214 of the Commission’s
                                                   Filed Date: 1/5/18.                                     Applicants: Midcontinent                            Regulations (18 CFR 385.211 and
                                                   Accession Number: 20180105–5011.                     Independent System Operator, Inc.,                     385.214) on or before 5:00 p.m. Eastern
                                                   Comments Due: 5 p.m. ET 1/26/18.                     Otter Tail Power Company.                              time on the specified comment date.
                                                   Docket Numbers: ER17–2220–002.                          Description: § 205(d) Rate Filing:                  Protests may be considered, but
                                                   Applicants: Midcontinent                             2018–01–04_SA 3080 OTP-East River                      intervention is necessary to become a
                                                Independent System Operator, Inc.                       T–T (Blair) to be effective 1/1/2018.                  party to the proceeding.


                                           VerDate Sep<11>2014   00:05 Jan 11, 2018   Jkt 244001   PO 00000   Frm 00021   Fmt 4703   Sfmt 4703   E:\FR\FM\11JAN1.SGM   11JAN1



Document Created: 2018-01-11 04:54:23
Document Modified: 2018-01-11 04:54:23
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 1346 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR