83_FR_1357 83 FR 1349 - Watterra Energy, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene

83 FR 1349 - Watterra Energy, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 8 (January 11, 2018)

Page Range1349-1349
FR Document2018-00331

Federal Register, Volume 83 Issue 8 (Thursday, January 11, 2018)
[Federal Register Volume 83, Number 8 (Thursday, January 11, 2018)]
[Notices]
[Page 1349]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-00331]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14864-000]


Watterra Energy, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments and Motions To Intervene

    On November 29, 2017, Watterra Energy, LLC filed an application for 
a preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of the Barren River Lake Dam 
Hydroelectric Project (project), to be located at the existing U.S. 
Army Corps of Engineers' Barren River Lake Dam on the Barren River near 
the City of Bowling Green, Barren County, Kentucky. The sole purpose of 
a preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project would consist of the following: (1) A 960-
foot-long, 14-foot-diameter steel penstock lining the existing concrete 
conduit; (2) a 14-foot-long, 14-foot-wide bifurcation structure 
attached to the proposed penstock, with one 265-foot-long branch 
extending to the proposed powerhouse, and the other 86-foot-long branch 
extending to the existing stilling basin to provide an outlet point for 
the release of floodwaters; (3) a 70-foot-long, 55-foot-wide powerhouse 
containing two Kaplan generating units with a total capacity of 11.63 
megawatts; (4) a 75-foot-long tailrace; (5) a 50-foot-long, 50-foot-
wide switchyard; and (6) a 4,210-foot-long, 12.5-kilovolt transmission 
line. The estimated annual generation of the project would be 41.64 
gigawatt-hours, and would operate as directed by the U.S. Army Corps of 
Engineers.
    Applicant Contact: Mr. Craig Dalton, Watterra Energy, LLC, 220 West 
Main Street, Hamilton, MT 59840; phone: (406) 384-0080.
    FERC Contact: Navreet Deo; phone: (202) 502-6304.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-14864-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the eLibrary link of 
Commission's website at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14864) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: January 5, 2018.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2018-00331 Filed 1-10-18; 8:45 am]
BILLING CODE 6717-01-P



                                                                              Federal Register / Vol. 83, No. 8 / Thursday, January 11, 2018 / Notices                                                  1349

                                                DEPARTMENT OF ENERGY                                    website that enables subscribers to                    hours, and would operate as directed by
                                                                                                        receive email notification when a                      the U.S. Army Corps of Engineers.
                                                Federal Energy Regulatory                               document is added to a subscribed                         Applicant Contact: Mr. Craig Dalton,
                                                Commission                                              docket(s). For assistance with any FERC                Watterra Energy, LLC, 220 West Main
                                                [Docket No. EL18–55–000]                                Online service, please email                           Street, Hamilton, MT 59840; phone:
                                                                                                        FERCOnlineSupport@ferc.gov, or call                    (406) 384–0080.
                                                EDF Renewables Energy, Inc. v.                          (866) 208–3676 (toll free). For TTY, call                 FERC Contact: Navreet Deo; phone:
                                                Midcontinent Independent System                         (202) 502–8659.                                        (202) 502–6304.
                                                Operator, Inc.; Notice of Complaint                       Comment Date: 5:00 p.m. Eastern                         Deadline for filing comments, motions
                                                                                                        Time on January 24, 2018.                              to intervene, competing applications
                                                   Take notice that on January 4, 2018,                                                                        (without notices of intent), or notices of
                                                pursuant to sections 206 and 306 of the                   Dated: January 5, 2018.
                                                                                                        Kimberly D. Bose,
                                                                                                                                                               intent to file competing applications: 60
                                                Federal Power Act, 16 U.S.C. 824(e),                                                                           days from the issuance of this notice.
                                                825e, and Rule 206 of the Federal                       Secretary.
                                                                                                                                                               Competing applications and notices of
                                                Energy Regulatory Commission’s                          [FR Doc. 2018–00330 Filed 1–10–18; 8:45 am]
                                                                                                                                                               intent must meet the requirements of 18
                                                (Commission) Rules of Practice and                      BILLING CODE 6717–01–P                                 CFR 4.36.
                                                Procedure, 18 CFR 385.206, EDF
                                                                                                                                                                  The Commission strongly encourages
                                                Renewables Energy, Inc. (Complainant)
                                                                                                                                                               electronic filing. Please file comments,
                                                filed a formal complaint against                        DEPARTMENT OF ENERGY
                                                                                                                                                               motions to intervene, notices of intent,
                                                Midcontinent Independent System
                                                                                                        Federal Energy Regulatory                              and competing applications using the
                                                Operator, Inc. (MISO or Respondent)
                                                                                                        Commission                                             Commission’s eFiling system at http://
                                                alleging that MISO’s Tariff is no longer
                                                                                                                                                               www.ferc.gov/docs-filing/efiling.asp.
                                                just and reasonable because MISO                        [Project No. 14864–000]                                Commenters can submit brief comments
                                                cannot deliver interconnection studies
                                                                                                                                                               up to 6,000 characters, without prior
                                                and a generation interconnection                        Watterra Energy, LLC; Notice of                        registration, using the eComment system
                                                agreement in sufficient advanced time                   Preliminary Permit Application                         at http://www.ferc.gov/docs-filing/
                                                to allow proposed wind generation                       Accepted for Filing and Soliciting                     ecomment.asp. You must include your
                                                projects to achieve commercial                          Comments and Motions To Intervene                      name and contact information at the end
                                                operation as needed to benefit from the
                                                                                                           On November 29, 2017, Watterra                      of your comments. For assistance,
                                                Federal Production Tax Credit, all as
                                                                                                        Energy, LLC filed an application for a                 please contact FERC Online Support at
                                                more fully explained in the complaint.
                                                   Complainant certify that copies of the               preliminary permit, pursuant to section                FERCOnlineSupport@ferc.gov, (866)
                                                complaint were served on the contacts                   4(f) of the Federal Power Act (FPA),                   208–3676 (toll free), or (202) 502–8659
                                                for MISO as listed on the Commission’s                  proposing to study the feasibility of the              (TTY). In lieu of electronic filing, please
                                                list of Corporate Officials.                            Barren River Lake Dam Hydroelectric                    send a paper copy to: Secretary, Federal
                                                   Any person desiring to intervene or to               Project (project), to be located at the                Energy Regulatory Commission, 888
                                                protest this filing must file in                        existing U.S. Army Corps of Engineers’                 First Street NE, Washington, DC 20426.
                                                accordance with Rules 211 and 214 of                    Barren River Lake Dam on the Barren                    The first page of any filing should
                                                the Commission’s Rules of Practice and                  River near the City of Bowling Green,                  include docket number P–14864–000.
                                                Procedure (18 CFR 385.211, 385.214).                    Barren County, Kentucky. The sole                         More information about this project,
                                                Protests will be considered by the                      purpose of a preliminary permit, if                    including a copy of the application, can
                                                Commission in determining the                           issued, is to grant the permit holder                  be viewed or printed on the eLibrary
                                                appropriate action to be taken, but will                priority to file a license application                 link of Commission’s website at http://
                                                not serve to make protestants parties to                during the permit term. A preliminary                  www.ferc.gov/docs-filing/elibrary.asp.
                                                the proceeding. Any person wishing to                   permit does not authorize the permit                   Enter the docket number (P–14864) in
                                                become a party must file a notice of                    holder to perform any land-disturbing                  the docket number field to access the
                                                intervention or motion to intervene, as                 activities or otherwise enter upon lands               document. For assistance, contact FERC
                                                appropriate. The Respondent’s answer                    or waters owned by others without the                  Online Support.
                                                and all interventions, or protests must                 owners’ express permission.                              Dated: January 5, 2018.
                                                be filed on or before the comment date.                    The proposed project would consist of               Kimberly D. Bose,
                                                The Respondent’s answer, motions to                     the following: (1) A 960-foot-long, 14-                Secretary.
                                                intervene, and protests must be served                  foot-diameter steel penstock lining the                [FR Doc. 2018–00331 Filed 1–10–18; 8:45 am]
                                                on the Complainants.                                    existing concrete conduit; (2) a 14-foot-
                                                                                                                                                               BILLING CODE 6717–01–P
                                                   The Commission encourages                            long, 14-foot-wide bifurcation structure
                                                electronic submission of protests and                   attached to the proposed penstock, with
                                                interventions in lieu of paper using the                one 265-foot-long branch extending to                  DEPARTMENT OF ENERGY
                                                ‘‘eFiling’’ link at http://www.ferc.gov.                the proposed powerhouse, and the other
                                                Persons unable to file electronically                   86-foot-long branch extending to the                   Federal Energy Regulatory
                                                should submit an original and 5 copies                  existing stilling basin to provide an                  Commission
                                                of the protest or intervention to the                   outlet point for the release of
                                                                                                        floodwaters; (3) a 70-foot-long, 55-foot-              [Docket Nos. CP18–37–000, CP18–38–000]
                                                Federal Energy Regulatory Commission,
                                                888 First Street NE, Washington, DC                     wide powerhouse containing two
srobinson on DSK9F5VC42PROD with NOTICES




                                                                                                                                                               Sierrita Gas Pipeline LLC; Notice of
                                                20426.                                                  Kaplan generating units with a total                   Applications
                                                   This filing is accessible on-line at                 capacity of 11.63 megawatts; (4) a 75-
                                                http://www.ferc.gov, using the eLibrary                 foot-long tailrace; (5) a 50-foot-long, 50-              Take notice that on December 21,
                                                link and is available for electronic                    foot-wide switchyard; and (6) a 4,210-                 2017, Sierrita Gas Pipeline, LLC
                                                review in the Commission’s Public                       foot-long, 12.5-kilovolt transmission                  (Sierrita), P.O. Box 1087, Colorado
                                                Reference Room in Washington, DC.                       line. The estimated annual generation of               Springs, Colorado 80944, has filed two
                                                There is an eSubscription link on the                   the project would be 41.64 gigawatt-                   applications, pursuant to sections 7(c)


                                           VerDate Sep<11>2014   00:05 Jan 11, 2018   Jkt 244001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\11JAN1.SGM   11JAN1



Document Created: 2018-01-11 04:54:21
Document Modified: 2018-01-11 04:54:21
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 1349 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR