83_FR_1358 83 FR 1350 - Great River Energy; Notice of Institution of Section 206 Proceeding

83 FR 1350 - Great River Energy; Notice of Institution of Section 206 Proceeding

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 8 (January 11, 2018)

Page Range1350-1350
FR Document2018-00327

Federal Register, Volume 83 Issue 8 (Thursday, January 11, 2018)
[Federal Register Volume 83, Number 8 (Thursday, January 11, 2018)]
[Notices]
[Page 1350]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-00327]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL18-45-000]


Great River Energy; Notice of Institution of Section 206 
Proceeding

    On January 5, 2018, the Commission issued an order in Docket No. 
EL18-45-000, pursuant to section 206 of the Federal Power Act, 16 
U.S.C. 824e (2012), instituting an investigation into whether Great 
River Energy's cost-based revenue requirements for providing reactive 
power from certain of its generating units located in the Midcontinent 
Independent System Operator, Inc. region may be unjust and 
unreasonable. Great River Energy, 162 FERC 61,006 (2018).
    Any interested person desiring to be heard in Docket No. EL18-45-
000 must file a notice of intervention or motion to intervene, as 
appropriate, with the Federal Energy Regulatory Commission, 888 First 
Street NE, Washington, DC 20426, in accordance with Rule 214 of the 
Commission's Rules of Practice and Procedure, 18 CFR 385.214, within 21 
days of the date of issuance of the order.

    Dated: January 5, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-00327 Filed 1-10-18; 8:45 am]
BILLING CODE 6717-01-P



                                                1350                          Federal Register / Vol. 83, No. 8 / Thursday, January 11, 2018 / Notices

                                                and 3 of the Natural Gas Act (NGA) and                  Notice of Schedule for Environmental                   filed by other parties or issued by the
                                                the Federal Energy Regulatory                           Review will serve to notify federal and                Commission (except for the mailing of
                                                Commission’s (Commission)                               state agencies of the timing for the                   environmental documents issued by the
                                                regulations, requesting authorization for               completion of all necessary reviews, and               Commission) and will not have the right
                                                the construction and operation of                       the subsequent need to complete all                    to seek court review of the
                                                Sierrita Compressor Expansion Project                   federal authorizations within 90 days of               Commission’s final order.
                                                (Project) located in Pima County,                       the date of issuance of the Commission
                                                Arizona. Concurrent with this Section                   staff’s FEIS or EA.                                       The Commission strongly encourages
                                                7(c) application, Sierrita has filed a                     There are two ways to become                        electronic filings of comments, protests
                                                Section 3 application to amend existing                 involved in the Commission’s review of                 and interventions in lieu of paper using
                                                Presidential Permit, all as more fully                  this project. First, any person wishing to             the eFiling link at http://www.ferc.gov.
                                                described in the application which is on                obtain legal status by becoming a party                Persons unable to file electronically
                                                file with the Commission and open to                    to the proceedings for this project                    should submit an original and 5 copies
                                                public inspection. The filing may also                  should, on or before the comment date                  of the protest or intervention to the
                                                be viewed on the web at http://                         stated below file with the Federal                     Federal Energy Regulatory Commission,
                                                www.ferc.gov using the ‘‘eLibrary’’ link.               Energy Regulatory Commission, 888                      888 First Street NE, Washington, DC
                                                Enter the docket number excluding the                   First Street NE, Washington, DC 20426,                 20426.
                                                last three digits in the docket number                  a motion to intervene in accordance                       Comment Date: 5:00 p.m. Eastern
                                                field to access the document. For                       with the requirements of the
                                                                                                                                                               Time on January 26, 2018.
                                                assistance, contact FERC at                             Commission’s Rules of Practice and
                                                FERCOnlineSupport@ferc.gov or call                      Procedure (18 CFR 385.214 or 385.211)                    Dated: January 5, 2018.
                                                toll-free, (866) 208–3676 or TTY, (202)                 and the Regulations under the NGA (18                  Kimberly D. Bose,
                                                502–8659.                                               CFR 157.10). A person obtaining party                  Secretary.
                                                   Specifically, in Docket No. CP18–37–                 status will be placed on the service list              [FR Doc. 2018–00329 Filed 1–10–18; 8:45 am]
                                                000, Sierrita’s Section 7(c) Project                    maintained by the Secretary of the
                                                                                                                                                               BILLING CODE 6717–01–P
                                                consists of: (1) Installing one new Solar               Commission and will receive copies of
                                                Mars 100 turbine/compressor unit that                   all documents filed by the applicant and
                                                is ISO rated at 15,900 horsepower (HP)                  by all other parties. A party must submit
                                                                                                                                                               DEPARTMENT OF ENERGY
                                                located at approximately Milepost (MP)                  7 copies of filings made in the
                                                6 on Line No. 2177; (2) installing an                   proceeding with the Commission and                     Federal Energy Regulatory
                                                additional gas meter at the existing San                must mail a copy to the applicant and
                                                                                                                                                               Commission
                                                Joaquin Meter Station on Line No. 2177;                 to every other party. Only parties to the
                                                and (3) relocating an existing Mainline                 proceeding can ask for court review of
                                                Valve 2 (MLV 2) and inspection tool                     Commission orders in the proceeding.                   [Docket No. EL18–45–000]
                                                launcher and receiver from MP 1.2 to                       However, a person does not have to
                                                MP 6.5 on Line No. 2177; all located in                 intervene in order to have comments                    Great River Energy; Notice of
                                                Pima County, Arizona. Additionally, in                  considered. The second way to                          Institution of Section 206 Proceeding
                                                Docket No. CP18–38–000 Sierrita is                      participate is by filing with the
                                                requesting an amendment to its Section                  Secretary of the Commission, as soon as                   On January 5, 2018, the Commission
                                                3 authorization and its Presidential                    possible, an original and two copies of                issued an order in Docket No. EL18–45–
                                                Permit for increased design capacity to                 comments in support of or in opposition                000, pursuant to section 206 of the
                                                627,000 Mcf/Day at its border crossing                  to this project. The Commission will                   Federal Power Act, 16 U.S.C. 824e
                                                into Mexico near the town of Sasabe,                    consider these comments in                             (2012), instituting an investigation into
                                                Arizona, also in Pima County.                           determining the appropriate action to be               whether Great River Energy’s cost-based
                                                   Any questions regarding this                         taken, but the filing of a comment alone               revenue requirements for providing
                                                application should be directed to                       will not serve to make the filer a party               reactive power from certain of its
                                                Francisco Tarin, Regulatory Director,                   to the proceeding. The Commission’s                    generating units located in the
                                                Sierrita Gas Pipeline LLC, P.O. Box                     rules require that persons filing                      Midcontinent Independent System
                                                1087, Colorado Springs, CO 80944, or                    comments in opposition to the project                  Operator, Inc. region may be unjust and
                                                call (719) 667–7517, or email:                          provide copies of their protests only to               unreasonable. Great River Energy, 162
                                                SierritaRegulatoryAffairs@                              the party or parties directly involved in              FERC 61,006 (2018).
                                                kindermorgan.com.                                       the protest.
                                                   Pursuant to section 157.9 of the                        Persons who wish to comment only                       Any interested person desiring to be
                                                Commission’s rules, 18 CFR 157.9,                       on the environmental review of this                    heard in Docket No. EL18–45–000 must
                                                within 90 days of this Notice the                       project should submit an original and                  file a notice of intervention or motion to
                                                Commission staff will either: Complete                  two copies of their comments to the                    intervene, as appropriate, with the
                                                its environmental assessment (EA) and                   Secretary of the Commission.                           Federal Energy Regulatory Commission,
                                                place it into the Commission’s public                   Environmental commentors will be                       888 First Street NE, Washington, DC
                                                record (eLibrary) for this proceeding; or               placed on the Commission’s                             20426, in accordance with Rule 214 of
                                                issue a Notice of Schedule for                          environmental mailing list, will receive               the Commission’s Rules of Practice and
                                                Environmental Review. If a Notice of                    copies of the environmental documents,                 Procedure, 18 CFR 385.214, within 21
                                                Schedule for Environmental Review is                    and will be notified of meetings                       days of the date of issuance of the order.
srobinson on DSK9F5VC42PROD with NOTICES




                                                issued, it will indicate, among other                   associated with the Commission’s
                                                                                                                                                                 Dated: January 5, 2018.
                                                milestones, the anticipated date for the                environmental review process.
                                                Commission staff’s issuance of the final                Environmental commentors will not be                   Nathaniel J. Davis, Sr.,
                                                environmental impact statement (FEIS)                   required to serve copies of filed                      Deputy Secretary.
                                                or EA for this proposal. The filing of the              documents on all other parties.                        [FR Doc. 2018–00327 Filed 1–10–18; 8:45 am]
                                                EA in the Commission’s public record                    However, the non-party commentors                      BILLING CODE 6717–01–P
                                                for this proceeding or the issuance of a                will not receive copies of all documents


                                           VerDate Sep<11>2014   00:05 Jan 11, 2018   Jkt 244001   PO 00000   Frm 00024   Fmt 4703   Sfmt 9990   E:\FR\FM\11JAN1.SGM   11JAN1



Document Created: 2018-01-11 04:53:57
Document Modified: 2018-01-11 04:53:57
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 1350 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR