DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers

Federal Register Volume 83, Issue 77 (April 20, 2018)

Page Range17540-17541
FR Document2018-08292

Section 7001 of Water Resources Reform and Development Act (WRRDA) 2014 requires that the Secretary of the Army annually submit to the Congress a report (Annual Report) that identifies feasibility reports, proposed feasibility studies submitted by non-Federal interests, and proposed modifications to an authorized water resources development project or feasibility study that meet certain criteria. The Annual Report is to be based, in part, upon requests for proposals submitted by non-Federal interests.

Federal Register, Volume 83 Issue 77 (Friday, April 20, 2018)
[Federal Register Volume 83, Number 77 (Friday, April 20, 2018)]
[Notices]
[Pages 17540-17541]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-08292]



[[Page 17540]]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Army, Corps of Engineers


Proposals by Non-Federal Interests, for Feasibility Studies and 
for Modifications to an Authorized Water Resources Development Project 
or Feasibility Study, for Inclusion in the Annual Report to Congress on 
Future Water Resources Development

AGENCY: U.S. Army Corps of Engineers, DoD.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: Section 7001 of Water Resources Reform and Development Act 
(WRRDA) 2014 requires that the Secretary of the Army annually submit to 
the Congress a report (Annual Report) that identifies feasibility 
reports, proposed feasibility studies submitted by non-Federal 
interests, and proposed modifications to an authorized water resources 
development project or feasibility study that meet certain criteria. 
The Annual Report is to be based, in part, upon requests for proposals 
submitted by non-Federal interests.

DATES: Proposals must be submitted online by August 20, 2018.

ADDRESSES: Submit proposals online at: http://www.usace.army.mil/Missions/CivilWorks/ProjectPlanning/WRRDA7001Proposals.aspx. If a 
different method of submission is required, use the further information 
below to arrange an alternative submission process.

FOR FURTHER INFORMATION CONTACT: Send an email to the help desk at 
WRRDA7001Proposal@usace.army.mil or call Lisa Kiefel, Planning and 
Policy Division, Headquarters, USACE, Washington, DC at 202-761-0626.

SUPPLEMENTARY INFORMATION: Section 7001 of WRRDA 2014 requires the 
publication of a notice in the Federal Register to request proposals by 
non-Federal interests for feasibility studies and modifications to an 
authorized USACE water resources development project or feasibility 
study. Project feasibility reports that have successfully completed 
Executive Branch review, but have not been authorized will be included 
in the Annual Report table by the Secretary of the Army and these 
proposals do not need to be submitted in response to this notice.
    Proposals by non-Federal interests must be entered online and 
require the following information:
    1. The name of all non-Federal interests planning to act as the 
sponsor, including any non-Federal interest that has contributed to or 
is expected to contribute toward the non-Federal share of the proposed 
feasibility study or modification.
    2. State if this proposal is for a feasibility study or a 
modification to an authorized USACE water resources development project 
or feasibility study and, if a modification, specify the authorized 
water resources development project or study that is proposed for 
modification.
    3. State the specific project purpose(s) of the proposed study or 
modification.
    4. Provide an estimate, to the extent practicable, of the total 
cost, and the Federal and non-Federal share of those costs, of the 
proposed study and, separately, an estimate of the cost of construction 
or modification.
    5. Describe, to the extent applicable and practicable, an estimate 
of the anticipated monetary and non-monetary benefits of the proposal 
with regard to benefits to the protection of human life and property; 
improvement to transportation; the national economy; the environment; 
or the national security interests of the United States.
    6. Describe if local support exists for the proposal.
    7. State if the non-Federal interest has the financial ability to 
provide the required cost share, reference ER 1105-2-100.
    8. Upload a letter or statement of support from each associated 
non-Federal interest.
    All provided information may be included in the Annual Report to 
Congress on Future Water Resources Development. Therefore, information 
that is Confidential Business Information, information that should not 
be disclosed because of statutory restrictions, or other information 
that a non-Federal interest would not want to appear in the Annual 
Report should not be included.
    Process: Proposals received within the time frame set forth in this 
notice will be reviewed by the Army and will be presented in one of two 
tables. The first table will be in the Annual Report itself, and the 
second table will be in an appendix. To be included in the Annual 
Report table, the proposals must meet the following criteria:
    1. Are related to the missions and authorities of the USACE;
    Involves a proposed or existing USACE water resources project or 
effort whose primary purpose is flood and storm damage reduction, 
commercial navigation, or aquatic ecosystem restoration. Following 
long-standing USACE practice, related proposals such as for recreation, 
hydropower, or water supply, are eligible for inclusion if undertaken 
in conjunction with such a project or effort.
    2. Require specific congressional authorization, including by an 
Act of Congress;
    Comprise the following cases:
    a. Requires Construction Authorization.
     Signed Chief's Reports
     Non-Federal feasibility reports submitted to the Secretary 
of the Army under Section 203 of WRDA 1986, as amended, under 
Administration review,
     Ongoing feasibility studies that are expected to result in 
a Chief's Report, and
     Proposed modifications to environmental infrastructure 
projects that were authorized prior to the date of enactment of the 
Water Resources Development Act of 2016 (December 16, 2016) pursuant to 
Section 219 of WRDA 1992, as amended; and
     Proposed modifications to authorized water resources 
development projects requested by non-Federal interests through the 
Section 7001 of WRRDA 2014 process.
    b. Seeking Study Authorization.
     New feasibility studies proposed by non-Federal interests 
through the Section 7001 of WRRDA 2014 process will be evaluated by the 
USACE to determine whether or not there is existing study authority, 
and
     Proposed modifications to studies requested by non-Federal 
interests through the Section 7001 of WRRDA 2014 process will be 
evaluated by the USACE to determine whether or not there is existing 
study authority.
    c. The following cases are NOT ELIGIBLE to be included in the 
Annual Report and will be included in the appendix for transparency:
     Proposals for modifications to non-Federal projects where 
USACE has provided previous technical assistance. Authorization to 
provide technical assistance does not provide authorization of a water 
resources development project.
     Proposals for construction of a new water resources 
development project that is not the subject of a currently authorized 
USACE project or a complete or ongoing feasibility study.
     Proposals that do not include a request for a potential 
future water resources development project through completed 
feasibility reports, proposed feasibility studies, and proposed 
modifications to authorized projects or studies.
    3. Have not been congressionally authorized;
    4. Have not been included in the Annual Report table of any 
previous

[[Page 17541]]

Annual Report to Congress on Future Water Resources Development; and
     If the proposal was included in the Annual Report table in 
a previous Report to Congress on Future Water Resources Development, 
then the proposal is not eligible to be included in the Annual Report 
table. If a proposal was previously included in an appendix it may be 
re-submitted.
    5. If authorized, could be carried out by the USACE.
     Whether following the USACE Chief's Report process or 
Section 7001 of WRRDA 2014, a proposal for a project or a project 
modification would need a current decision document to provide updated 
information on the scope of the potential project and demonstrate a 
clear Federal interest. This determination would include an assessment 
of whether the proposal is:

--Technically sound, economically viable and environmentally 
acceptable.
--Compliant with environmental and other laws including but not limited 
to National Environmental Policy Act, Endangered Species Act, Coastal 
Zone Management Act, and the National Historic Preservation Act.
--Compliant with statutes and regulations related to water resources 
development including various water resources provisions related to the 
authorized cost of projects, level of detail, separable elements, fish 
and wildlife mitigation, project justification, matters to be addressed 
in planning, and the 1958 Water Supply Act.

    Feasibility study proposals submitted by non-Federal interests are 
for the study only. If Congressional authorization of a feasibility 
study results from inclusion in the Annual Report, it is anticipated 
that such authorization would be for the study, not for construction. 
Once a decision document is completed in accordance with Executive 
Branch policies and procedures, the Secretary will determine whether to 
recommend the project for authorization.
    All water resources development projects must meet certain 
requirements before proceeding to construction. These requirements 
include: (1) That the project is authorized for construction by 
Congress; (2) that the Secretary, or other appropriate official, has 
approved a current decision document; and, (3) that the funds for 
project construction have been appropriated and are available.
    Section 902 of WRDA 1986 establishes a maximum authorized cost for 
projects (902 limit). A Post Authorization Change Report (PACR) is 
required to be completed to support potential modifications, updates to 
project costs, and an increase to the 902 limit. Authority to undertake 
a 902 study is inherent in the project authority, so no authority is 
required to proceed with the study. Since these PACRs support project 
modifications, they may be considered for inclusion in the Annual 
Report if a report's recommendation requires Congressional 
authorization.
    The Secretary shall include in the Annual Report to Congress on 
Future Water Resources Development a certification stating that each 
feasibility report, proposed feasibility study, and proposed 
modification to an authorized water resources development project or 
feasibility study included in the Annual Report meets the criteria 
established in Section 7001 of WRRDA 2014.
    Please contact the appropriate district office or use the contact 
information above for assistance in researching and identifying 
existing authorizations and existing USACE decision documents. Those 
proposals that do not meet the criteria will be included in an appendix 
table included in the Annual Report to Congress on Future Water 
Resources Development. Proposals in the appendix table will include a 
description of why those proposals did not meet the criteria.

    Dated: April 13, 2018.
James C. Dalton,
Director of Civil Works.
[FR Doc. 2018-08292 Filed 4-19-18; 8:45 am]
 BILLING CODE 3720-58-P



                                                17540                            Federal Register / Vol. 83, No. 77 / Friday, April 20, 2018 / Notices

                                                DEPARTMENT OF DEFENSE                                   including any non-Federal interest that               supply, are eligible for inclusion if
                                                                                                        has contributed to or is expected to                  undertaken in conjunction with such a
                                                Department of the Army, Corps of                        contribute toward the non-Federal share               project or effort.
                                                Engineers                                               of the proposed feasibility study or                    2. Require specific congressional
                                                                                                        modification.                                         authorization, including by an Act of
                                                Proposals by Non-Federal Interests,                        2. State if this proposal is for a                 Congress;
                                                for Feasibility Studies and for                         feasibility study or a modification to an               Comprise the following cases:
                                                Modifications to an Authorized Water                    authorized USACE water resources                        a. Requires Construction
                                                Resources Development Project or                        development project or feasibility study              Authorization.
                                                Feasibility Study, for Inclusion in the                 and, if a modification, specify the                     • Signed Chief’s Reports
                                                Annual Report to Congress on Future                     authorized water resources development                  • Non-Federal feasibility reports
                                                Water Resources Development                             project or study that is proposed for                 submitted to the Secretary of the Army
                                                                                                        modification.                                         under Section 203 of WRDA 1986, as
                                                AGENCY:    U.S. Army Corps of Engineers,                                                                      amended, under Administration review,
                                                                                                           3. State the specific project purpose(s)
                                                DoD.                                                                                                            • Ongoing feasibility studies that are
                                                                                                        of the proposed study or modification.
                                                ACTION:   Notice.                                          4. Provide an estimate, to the extent              expected to result in a Chief’s Report,
                                                                                                        practicable, of the total cost, and the               and
                                                SUMMARY:    Section 7001 of Water                                                                               • Proposed modifications to
                                                Resources Reform and Development Act                    Federal and non-Federal share of those
                                                                                                        costs, of the proposed study and,                     environmental infrastructure projects
                                                (WRRDA) 2014 requires that the                                                                                that were authorized prior to the date of
                                                Secretary of the Army annually submit                   separately, an estimate of the cost of
                                                                                                        construction or modification.                         enactment of the Water Resources
                                                to the Congress a report (Annual Report)                                                                      Development Act of 2016 (December 16,
                                                                                                           5. Describe, to the extent applicable
                                                that identifies feasibility reports,                                                                          2016) pursuant to Section 219 of WRDA
                                                                                                        and practicable, an estimate of the
                                                proposed feasibility studies submitted                                                                        1992, as amended; and
                                                                                                        anticipated monetary and non-monetary
                                                by non-Federal interests, and proposed                                                                          • Proposed modifications to
                                                                                                        benefits of the proposal with regard to
                                                modifications to an authorized water                                                                          authorized water resources development
                                                                                                        benefits to the protection of human life
                                                resources development project or                                                                              projects requested by non-Federal
                                                                                                        and property; improvement to
                                                feasibility study that meet certain                                                                           interests through the Section 7001 of
                                                                                                        transportation; the national economy;
                                                criteria. The Annual Report is to be                                                                          WRRDA 2014 process.
                                                                                                        the environment; or the national
                                                based, in part, upon requests for                                                                               b. Seeking Study Authorization.
                                                                                                        security interests of the United States.
                                                proposals submitted by non-Federal                         6. Describe if local support exists for              • New feasibility studies proposed by
                                                interests.                                              the proposal.                                         non-Federal interests through the
                                                DATES:  Proposals must be submitted                        7. State if the non-Federal interest has           Section 7001 of WRRDA 2014 process
                                                online by August 20, 2018.                              the financial ability to provide the                  will be evaluated by the USACE to
                                                ADDRESSES: Submit proposals online at:                  required cost share, reference ER 1105–               determine whether or not there is
                                                http://www.usace.army.mil/Missions/                     2–100.                                                existing study authority, and
                                                CivilWorks/ProjectPlanning/                                8. Upload a letter or statement of                   • Proposed modifications to studies
                                                WRRDA7001Proposals.aspx. If a                           support from each associated non-                     requested by non-Federal interests
                                                different method of submission is                       Federal interest.                                     through the Section 7001 of WRRDA
                                                required, use the further information                      All provided information may be                    2014 process will be evaluated by the
                                                below to arrange an alternative                         included in the Annual Report to                      USACE to determine whether or not
                                                submission process.                                     Congress on Future Water Resources                    there is existing study authority.
                                                                                                        Development. Therefore, information                     c. The following cases are NOT
                                                FOR FURTHER INFORMATION CONTACT:
                                                                                                        that is Confidential Business                         ELIGIBLE to be included in the Annual
                                                Send an email to the help desk at                       Information, information that should                  Report and will be included in the
                                                WRRDA7001Proposal@usace.army.mil                        not be disclosed because of statutory                 appendix for transparency:
                                                or call Lisa Kiefel, Planning and Policy                restrictions, or other information that a               • Proposals for modifications to non-
                                                Division, Headquarters, USACE,                          non-Federal interest would not want to                Federal projects where USACE has
                                                Washington, DC at 202–761–0626.                         appear in the Annual Report should not                provided previous technical assistance.
                                                SUPPLEMENTARY INFORMATION: Section                      be included.                                          Authorization to provide technical
                                                7001 of WRRDA 2014 requires the                            Process: Proposals received within the             assistance does not provide
                                                publication of a notice in the Federal                  time frame set forth in this notice will              authorization of a water resources
                                                Register to request proposals by non-                   be reviewed by the Army and will be                   development project.
                                                Federal interests for feasibility studies               presented in one of two tables. The first               • Proposals for construction of a new
                                                and modifications to an authorized                      table will be in the Annual Report itself,            water resources development project
                                                USACE water resources development                       and the second table will be in an                    that is not the subject of a currently
                                                project or feasibility study. Project                   appendix. To be included in the Annual                authorized USACE project or a complete
                                                feasibility reports that have successfully              Report table, the proposals must meet                 or ongoing feasibility study.
                                                completed Executive Branch review, but                  the following criteria:                                 • Proposals that do not include a
                                                have not been authorized will be                           1. Are related to the missions and                 request for a potential future water
                                                included in the Annual Report table by                  authorities of the USACE;                             resources development project through
                                                the Secretary of the Army and these                        Involves a proposed or existing
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                              completed feasibility reports, proposed
                                                proposals do not need to be submitted                   USACE water resources project or effort               feasibility studies, and proposed
                                                in response to this notice.                             whose primary purpose is flood and                    modifications to authorized projects or
                                                  Proposals by non-Federal interests                    storm damage reduction, commercial                    studies.
                                                must be entered online and require the                  navigation, or aquatic ecosystem                        3. Have not been congressionally
                                                following information:                                  restoration. Following long-standing                  authorized;
                                                  1. The name of all non-Federal                        USACE practice, related proposals such                  4. Have not been included in the
                                                interests planning to act as the sponsor,               as for recreation, hydropower, or water               Annual Report table of any previous


                                           VerDate Sep<11>2014   17:44 Apr 19, 2018   Jkt 244001   PO 00000   Frm 00021   Fmt 4703   Sfmt 4703   E:\FR\FM\20APN1.SGM   20APN1


                                                                                 Federal Register / Vol. 83, No. 77 / Friday, April 20, 2018 / Notices                                          17541

                                                Annual Report to Congress on Future                     Authorization Change Report (PACR) is                 to the new Roller Compacted Concrete
                                                Water Resources Development; and                        required to be completed to support                   (RCC) berm structure at the saddle dam,
                                                   • If the proposal was included in the                potential modifications, updates to                   all for the purpose of lowering risk at
                                                Annual Report table in a previous                       project costs, and an increase to the 902             Center Hill Dam, DeKalb County,
                                                Report to Congress on Future Water                      limit. Authority to undertake a 902                   Tennessee.
                                                Resources Development, then the                         study is inherent in the project                      DATES: Comments regarding the NOI
                                                proposal is not eligible to be included                 authority, so no authority is required to             must be received by USACE within 30
                                                in the Annual Report table. If a proposal               proceed with the study. Since these                   days of publication of the NOI on or
                                                was previously included in an appendix                  PACRs support project modifications,                  before May 20, 2018.
                                                it may be re-submitted.                                 they may be considered for inclusion in               ADDRESSES: USACE-Nashville District,
                                                   5. If authorized, could be carried out               the Annual Report if a report’s                       110 9th Avenue South, RM 405A,
                                                by the USACE.                                           recommendation requires Congressional                 Nashville, Tennessee 37203–3817.
                                                   • Whether following the USACE                        authorization.
                                                                                                                                                              FOR FURTHER INFORMATION CONTACT:
                                                Chief’s Report process or Section 7001                    The Secretary shall include in the
                                                                                                                                                              Please direct your comments to Joy
                                                of WRRDA 2014, a proposal for a project                 Annual Report to Congress on Future
                                                                                                                                                              Broach, Aquatic Biologist, (615) 736–
                                                or a project modification would need a                  Water Resources Development a
                                                                                                                                                              7956; email: joy.i.broach@
                                                current decision document to provide                    certification stating that each feasibility
                                                                                                                                                              usace.army.mil. Written comments can
                                                updated information on the scope of the                 report, proposed feasibility study, and
                                                                                                                                                              be mailed to the address above.
                                                potential project and demonstrate a                     proposed modification to an authorized
                                                                                                                                                              SUPPLEMENTARY INFORMATION: 1.
                                                clear Federal interest. This                            water resources development project or
                                                determination would include an                          feasibility study included in the Annual              Background Information. Center Hill
                                                assessment of whether the proposal is:                  Report meets the criteria established in              Dam was designed in the 1930s,
                                                                                                        Section 7001 of WRRDA 2014.                           constructed in the 1940s, and
                                                —Technically sound, economically                                                                              impounded in the early 1950s. The dam
                                                   viable and environmentally                             Please contact the appropriate district
                                                                                                        office or use the contact information                 was built on karst geology using
                                                   acceptable.                                                                                                accepted engineering practices of the
                                                —Compliant with environmental and                       above for assistance in researching and
                                                                                                        identifying existing authorizations and               day. Center Hill Dam consists of a 248′
                                                   other laws including but not limited                                                                       high by 1,400′ long combination earthen
                                                   to National Environmental Policy Act,                existing USACE decision documents.
                                                                                                        Those proposals that do not meet the                  embankment and concrete main dam,
                                                   Endangered Species Act, Coastal Zone                                                                       and a 125′ high by 800′ long earthen
                                                   Management Act, and the National                     criteria will be included in an appendix
                                                                                                        table included in the Annual Report to                embankment auxiliary dam referred to
                                                   Historic Preservation Act.                                                                                 as the saddle dam. The main dam has
                                                —Compliant with statutes and                            Congress on Future Water Resources
                                                                                                        Development. Proposals in the appendix                eight 34′ x 57′ spillway gates that rotate
                                                   regulations related to water resources                                                                     upward to safely pass flow during and
                                                   development including various water                  table will include a description of why
                                                                                                        those proposals did not meet the                      after large rainfall events. To comply
                                                   resources provisions related to the                                                                        with updated design flood guidance, a
                                                   authorized cost of projects, level of                criteria.
                                                                                                                                                              self-eroding fuse plug section was
                                                   detail, separable elements, fish and                   Dated: April 13, 2018.                              retrofitted into the top of the saddle dam
                                                   wildlife mitigation, project                         James C. Dalton,                                      in 1992 to serve as an emergency
                                                   justification, matters to be addressed               Director of Civil Works.                              spillway. The fuse plug operation
                                                   in planning, and the 1958 Water                      [FR Doc. 2018–08292 Filed 4–19–18; 8:45 am]           almost doubles Center Hill’s total
                                                   Supply Act.                                          BILLING CODE 3720–58–P                                spillway capacity to keep the main dam
                                                   Feasibility study proposals submitted                                                                      from overtopping during an extreme
                                                by non-Federal interests are for the                                                                          flood event. A Dam Safety Modification
                                                study only. If Congressional                            DEPARTMENT OF THE DEFENSE                             Study to reduce the risk of a foundation
                                                authorization of a feasibility study                                                                          seepage dam failure was approved in
                                                results from inclusion in the Annual                    Department of the Army, Corps of                      late 2006 and consisted of three major
                                                Report, it is anticipated that such                     Engineers                                             construction contracts beginning in
                                                authorization would be for the study,                                                                         2008. The first contract injected
                                                not for construction. Once a decision                   Intent To Prepare a Draft                             concrete grout into the foundation of the
                                                document is completed in accordance                     Environmental Impact Statement for                    main dam embankment (soil portion of
                                                with Executive Branch policies and                      the Dam Safety Modification Study                     the dam) and was completed in 2010.
                                                procedures, the Secretary will                          Report for Center Hill Dam, DeKalb                    The second contract installed a concrete
                                                determine whether to recommend the                      County, Tennessee                                     barrier wall into the main dam
                                                project for authorization.                              AGENCY:    U.S. Army Corps of Engineers,              embankment and was completed in
                                                   All water resources development                      DoD.                                                  2015. This concrete barrier wall is the
                                                projects must meet certain requirements                 ACTION:   Notice of Intent.                           permanent seepage barrier protection for
                                                before proceeding to construction.                                                                            the main dam embankment. The third
                                                These requirements include: (1) That                    SUMMARY:   Pursuant to the National                   major contract for construction of a
                                                the project is authorized for                           Environmental Policy Act (NEPA) of                    Roller Compacted Concrete (RCC) berm
                                                construction by Congress; (2) that the                  1969, as amended, the U.S. Army Corps                 below the saddle dam began in
                                                Secretary, or other appropriate official,               of Engineers, Nashville District (USACE)              September 2016 and is on-going. The
sradovich on DSK3GMQ082PROD with NOTICES




                                                has approved a current decision                         is preparing a draft Environmental                    purpose of the RCC berm is to reduce
                                                document; and, (3) that the funds for                   Impact Statement (EIS) to support the                 the risk of saddle dam failure caused by
                                                project construction have been                          Dam Safety Modification Study Report                  under-seepage or overtopping during an
                                                appropriated and are available.                         (DSMSR) for Center Hill Dam. The study                extreme flood event. A Post
                                                   Section 902 of WRDA 1986                             would evaluate the main dam spillway                  Implementation Evaluation (PIE) was
                                                establishes a maximum authorized cost                   gate operability, the saddle dam fuse                 completed in 2017 to assess the
                                                for projects (902 limit). A Post                        plug operation, and spillway additions                effectiveness of the above construction


                                           VerDate Sep<11>2014   17:44 Apr 19, 2018   Jkt 244001   PO 00000   Frm 00022   Fmt 4703   Sfmt 4703   E:\FR\FM\20APN1.SGM   20APN1



Document Created: 2018-04-20 00:03:02
Document Modified: 2018-04-20 00:03:02
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice.
DatesProposals must be submitted online by August 20, 2018.
ContactSend an email to the help desk at [email protected] or call Lisa Kiefel, Planning and Policy Division, Headquarters, USACE, Washington, DC at 202-761-0626.
FR Citation83 FR 17540 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR