83_FR_17624 83 FR 17547 - Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions; Goodyear Lake Hydro, LLC

83 FR 17547 - Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions; Goodyear Lake Hydro, LLC

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 77 (April 20, 2018)

Page Range17547-17548
FR Document2018-08267

Federal Register, Volume 83 Issue 77 (Friday, April 20, 2018)
[Federal Register Volume 83, Number 77 (Friday, April 20, 2018)]
[Notices]
[Pages 17547-17548]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-08267]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2788-017]


Notice of Application Ready for Environmental Analysis and 
Soliciting Comments, Recommendations, Terms and Conditions, and 
Prescriptions; Goodyear Lake Hydro, LLC

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Subsequent Minor License.
    b. Project No.: 2788-017.
    c. Date filed: February 27, 2017.
    d. Applicant: Goodyear Lake Hydro, LLC (Goodyear Lake Hydro).
    e. Name of Project: Colliersville Hydroelectric Project.
    f. Location: On the Susquehanna River, in the Town of Milford, 
Otsego County, New York. The project does not occupy lands of the 
United States.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Mr. Kevin Webb, Hydro Licensing Manager; Enel 
Green Power North America, Inc., 100 Brickstone Square, Suite 300, 
Andover, MA 01810; (978) 935-6039; [email protected].
    i. FERC Contact: Emily Carter, (202) 502-6512 or 
[email protected].
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions: 60 days from the issuance date of this 
notice; reply comments are due 105 days from the issuance date of this 
notice.
    The Commission strongly encourages electronic filing. Please file 
comments, recommendations, terms and conditions, and prescriptions 
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-2788-017.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted, and is ready for 
environmental analysis at this time.
    l. The Colliersville Hydroelectric Project consists of: (1) A 200-
foot-long, 35-foot-high reinforced-concrete Ambursen-type dam; (2) a 
364-acre reservoir (Goodyear Lake) with a gross storage capacity of 
7,800 acre-feet at a normal pool elevation of 1,150.22 feet National 
Geodetic Vertical Datum of 1929; (3) a 550-foot-long reinforced 
concrete power canal, approximately 50 feet wide and 6 feet deep at the 
head gates, extending from a head gate structure adjacent to the dam 
(i.e., the intake) to the powerhouse; (4) a 103-foot-long by 33-foot-
wide reinforced concrete powerhouse with trash racks with a clear 
spacing of 1.5 inches, and containing two turbines rated at 850 
horsepower (HP) and 1,150 HP, and two generators having a rated 
capacity of 650 kilowatts (kW) and 850 kW, respectively; (5) a 300-
foot-long and approximately 50- to 60-foot-wide tailrace; (6) 
approximately 80-foot-long, 4.16-kilovolt underground generator leads 
or transmission lines from the powerhouse to an adjacent substation 
owned by the New York State Electric and Gas Corporation; and (7) 
appurtenant facilities.
    Goodyear Lake Hydro operates the project in a run-of-river mode. 
The project experiences substantial seasonal and annual variations in 
generation, and generates an annual average of 5,985 megawatt-hours. 
Goodyear Lake Hydro proposes to continue to operate the project in run-
of-river mode.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's website at http://www.ferc.gov using the eLibrary link. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. For assistance, contact FERC 
Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    All filings must (1) bear in all capital letters the title 
COMMENTS, REPLY COMMENTS, RECOMMENDATIONS, TERMS AND CONDITIONS, or 
PRESCRIPTIONS; (2) set forth in the heading the name of the applicant 
and the project number of the application to which the filing responds; 
(3) furnish the name, address, and telephone number of the person 
submitting the filing; and (4) otherwise comply with the requirements 
of 18 CFR 385.2001 through 385.2005. All comments, recommendations, 
terms and conditions or prescriptions must set forth their evidentiary 
basis and otherwise comply with the requirements of 18 CFR 4.34(b). 
Agencies may obtain copies of the application directly from the 
applicant. Each filing must be accompanied by proof of service on all 
persons listed on the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.
    o. Procedural schedule: The application will be processed according 
to the following schedule. Revisions to the schedule will be made as 
appropriate.

------------------------------------------------------------------------
                 Milestone                           Target date
------------------------------------------------------------------------
Deadline for Filing Comments,               June 2018.
 Recommendations, and Agency Terms and
 Conditions/Prescriptions.
Deadline for filing Reply Comments........  July 2018.
Commission issues EA......................  November 2018.

[[Page 17548]]

 
Comments due on EA........................  December 2018.
------------------------------------------------------------------------


    Dated: April 16, 2018.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2018-08267 Filed 4-19-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                          Federal Register / Vol. 83, No. 77 / Friday, April 20, 2018 / Notices                                                                                 17547

                                                FERCOnlineSupport@ferc.gov. or call                                     at http://www.ferc.gov/docs-filing/                                     megawatt-hours. Goodyear Lake Hydro
                                                (866) 208–3676 (toll free). For TTY, call                               ecomment.asp. You must include your                                     proposes to continue to operate the
                                                (202) 502–8659.                                                         name and contact information at the end                                 project in run-of-river mode.
                                                  Dated: April 16, 2018.                                                of your comments. For assistance,                                          m. A copy of the application is
                                                Nathaniel J. Davis, Sr.,
                                                                                                                        please contact FERC Online Support at                                   available for review at the Commission
                                                                                                                        FERCOnlineSupport@ferc.gov, (866)                                       in the Public Reference Room or may be
                                                Deputy Secretary.
                                                                                                                        208–3676 (toll free), or (202) 502–8659                                 viewed on the Commission’s website at
                                                [FR Doc. 2018–08307 Filed 4–19–18; 8:45 am]                             (TTY). In lieu of electronic filing, please                             http://www.ferc.gov using the eLibrary
                                                BILLING CODE 6717–01–P                                                  send a paper copy to: Secretary, Federal                                link. Enter the docket number excluding
                                                                                                                        Energy Regulatory Commission, 888                                       the last three digits in the docket
                                                                                                                        First Street NE, Washington, DC 20426.                                  number field to access the document.
                                                DEPARTMENT OF ENERGY                                                    The first page of any filing should                                     For assistance, contact FERC Online
                                                                                                                        include docket number P–2788–017.                                       Support. A copy is also available for
                                                Federal Energy Regulatory
                                                                                                                           The Commission’s Rules of Practice
                                                Commission                                                                                                                                      inspection and reproduction at the
                                                                                                                        require all intervenors filing documents
                                                                                                                                                                                                address in item h above.
                                                [Project No. 2788–017]                                                  with the Commission to serve a copy of
                                                                                                                        that document on each person on the                                        All filings must (1) bear in all capital
                                                Notice of Application Ready for                                         official service list for the project.                                  letters the title COMMENTS, REPLY
                                                Environmental Analysis and Soliciting                                   Further, if an intervenor files comments                                COMMENTS, RECOMMENDATIONS,
                                                Comments, Recommendations, Terms                                        or documents with the Commission                                        TERMS AND CONDITIONS, or
                                                and Conditions, and Prescriptions;                                      relating to the merits of an issue that                                 PRESCRIPTIONS; (2) set forth in the
                                                Goodyear Lake Hydro, LLC                                                may affect the responsibilities of a                                    heading the name of the applicant and
                                                                                                                        particular resource agency, they must                                   the project number of the application to
                                                  Take notice that the following
                                                                                                                        also serve a copy of the document on                                    which the filing responds; (3) furnish
                                                hydroelectric application has been filed
                                                                                                                        that resource agency.                                                   the name, address, and telephone
                                                with the Commission and is available
                                                                                                                           k. This application has been accepted,                               number of the person submitting the
                                                for public inspection.
                                                                                                                        and is ready for environmental analysis                                 filing; and (4) otherwise comply with
                                                  a. Type of Application: Subsequent
                                                                                                                        at this time.                                                           the requirements of 18 CFR 385.2001
                                                Minor License.
                                                                                                                           l. The Colliersville Hydroelectric                                   through 385.2005. All comments,
                                                  b. Project No.: 2788–017.
                                                  c. Date filed: February 27, 2017.                                     Project consists of: (1) A 200-foot-long,                               recommendations, terms and conditions
                                                  d. Applicant: Goodyear Lake Hydro,                                    35-foot-high reinforced-concrete                                        or prescriptions must set forth their
                                                LLC (Goodyear Lake Hydro).                                              Ambursen-type dam; (2) a 364-acre                                       evidentiary basis and otherwise comply
                                                  e. Name of Project: Colliersville                                     reservoir (Goodyear Lake) with a gross                                  with the requirements of 18 CFR 4.34(b).
                                                Hydroelectric Project.                                                  storage capacity of 7,800 acre-feet at a                                Agencies may obtain copies of the
                                                  f. Location: On the Susquehanna                                       normal pool elevation of 1,150.22 feet                                  application directly from the applicant.
                                                River, in the Town of Milford, Otsego                                   National Geodetic Vertical Datum of                                     Each filing must be accompanied by
                                                County, New York. The project does not                                  1929; (3) a 550-foot-long reinforced                                    proof of service on all persons listed on
                                                occupy lands of the United States.                                      concrete power canal, approximately 50                                  the service list prepared by the
                                                  g. Filed Pursuant to: Federal Power                                   feet wide and 6 feet deep at the head                                   Commission in this proceeding, in
                                                Act 16 U.S.C. 791 (a)–825(r).                                           gates, extending from a head gate                                       accordance with 18 CFR 4.34(b) and
                                                  h. Applicant Contact: Mr. Kevin                                       structure adjacent to the dam (i.e., the                                385.2010.
                                                Webb, Hydro Licensing Manager; Enel                                     intake) to the powerhouse; (4) a 103-                                      You may also register online at http://
                                                Green Power North America, Inc., 100                                    foot-long by 33-foot-wide reinforced                                    www.ferc.gov/docs-filing/
                                                Brickstone Square, Suite 300, Andover,                                  concrete powerhouse with trash racks                                    esubscription.asp to be notified via
                                                MA 01810; (978) 935–6039;                                               with a clear spacing of 1.5 inches, and                                 email of new filings and issuances
                                                kevin.webb@enel.com.                                                    containing two turbines rated at 850                                    related to this or other pending projects.
                                                  i. FERC Contact: Emily Carter, (202)                                  horsepower (HP) and 1,150 HP, and two                                   For assistance, contact FERC Online
                                                502–6512 or emily.carter@ferc.gov.                                      generators having a rated capacity of                                   Support.
                                                   j. Deadline for filing comments,                                     650 kilowatts (kW) and 850 kW,
                                                recommendations, terms and                                              respectively; (5) a 300-foot-long and                                      n. A license applicant must file no
                                                conditions, and prescriptions: 60 days                                  approximately 50- to 60-foot-wide                                       later than 60 days following the date of
                                                from the issuance date of this notice;                                  tailrace; (6) approximately 80-foot-long,                               issuance of this notice: (1) A copy of the
                                                reply comments are due 105 days from                                    4.16-kilovolt underground generator                                     water quality certification; (2) a copy of
                                                the issuance date of this notice.                                       leads or transmission lines from the                                    the request for certification, including
                                                   The Commission strongly encourages                                   powerhouse to an adjacent substation                                    proof of the date on which the certifying
                                                electronic filing. Please file comments,                                owned by the New York State Electric                                    agency received the request; or (3)
                                                recommendations, terms and                                              and Gas Corporation; and (7)                                            evidence of waiver of water quality
                                                conditions, and prescriptions using the                                 appurtenant facilities.                                                 certification.
                                                Commission’s eFiling system at http://                                     Goodyear Lake Hydro operates the                                        o. Procedural schedule: The
                                                www.ferc.gov/docs-filing/efiling.asp.                                   project in a run-of-river mode. The                                     application will be processed according
                                                Commenters can submit brief comments                                    project experiences substantial seasonal                                to the following schedule. Revisions to
sradovich on DSK3GMQ082PROD with NOTICES




                                                up to 6,000 characters, without prior                                   and annual variations in generation, and                                the schedule will be made as
                                                registration, using the eComment system                                 generates an annual average of 5,985                                    appropriate.

                                                                                                                                 Milestone                                                                                              Target date

                                                Deadline for Filing Comments, Recommendations, and Agency Terms and Conditions/Prescriptions .................................                                                      June 2018.
                                                Deadline for filing Reply Comments ........................................................................................................................................         July 2018.
                                                Commission issues EA ............................................................................................................................................................   November 2018.



                                           VerDate Sep<11>2014        17:44 Apr 19, 2018       Jkt 244001      PO 00000       Frm 00028       Fmt 4703      Sfmt 4703      E:\FR\FM\20APN1.SGM             20APN1


                                                17548                                       Federal Register / Vol. 83, No. 77 / Friday, April 20, 2018 / Notices

                                                                                                                                Milestone                                                                                              Target date

                                                Comments due on EA .............................................................................................................................................................   December 2018.



                                                  Dated: April 16, 2018.                                                  Docket Numbers: ER10–3297–013.                                          Applicants: Trustees of Princeton
                                                Kimberly D. Bose,                                                         Applicants: Powerex Corp.                                            University.
                                                Secretary.                                                                Description: Compliance filing:                                         Description: Form 556 of Trustees of
                                                [FR Doc. 2018–08267 Filed 4–19–18; 8:45 am]                            Compliance Filing to March 29 Letter                                    Princeton University [Plainsboro].
                                                BILLING CODE 6717–01–P                                                 Order to be effective 3/29/2018.                                           Filed Date: 2/8/18.
                                                                                                                          Filed Date: 4/16/18.                                                    Accession Number: 20180208–5154.
                                                                                                                          Accession Number: 20180416–5129.                                        Comments Due: Non Applicable.
                                                DEPARTMENT OF ENERGY                                                      Comments Due: 5 p.m. ET 5/7/18.                                         The filings are accessible in the
                                                                                                                          Docket Numbers: ER11–3917–001;                                       Commission’s eLibrary system by
                                                Federal Energy Regulatory                                              ER10–2774–004.                                                          clicking on the links or querying the
                                                Commission                                                                Applicants: Mojave Solar LLC,                                        docket number.
                                                                                                                       Arizona Solar One LLC.                                                     Any person desiring to intervene or
                                                Notice of Effectiveness of Exempt                                         Description: Notice of Change in
                                                Wholesale Generator Status                                                                                                                     protest in any of the above proceedings
                                                                                                                       Status of Mojave Solar LLC, et al.                                      must file in accordance with Rules 211
                                                                                                   Docket Nos.            Filed Date: 4/13/18.                                                 and 214 of the Commission’s
                                                                                                                          Accession Number: 20180413–5302.                                     Regulations (18 CFR 385.211 and
                                                GSP Lost Nation LLC ....................          EG18–27–000             Comments Due: 5 p.m. ET 5/4/18.
                                                GSP Merrimack LLC .....................           EG18–28–000                                                                                  385.214) on or before 5:00 p.m. Eastern
                                                GSP Newington LLC .....................           EG18–29–000             Docket Numbers: ER18–1375–000.                                       time on the specified comment date.
                                                GSP Schiller LLC ..........................       EG18–30–000             Applicants: PJM Interconnection,                                     Protests may be considered, but
                                                GSP White Lake LLC ....................           EG18–31–000          L.L.C.                                                                  intervention is necessary to become a
                                                Gray Hawk Solar, LLC ..................           EG18–32–000
                                                Gregory Power Partners LLC ........               EG18–33–000             Description: § 205(d) Rate Filing:                                   party to the proceeding.
                                                Montpelier Generating Station,                    EG18–34–000          Original WMPA SA No. 5052; Queue                                           eFiling is encouraged. More detailed
                                                  LLC.                                                                 No. AD1–028 to be effective 4/5/2018.                                   information relating to filing
                                                Monument Generating Station,                      EG18–35–000             Filed Date: 4/16/18.
                                                  LLC.
                                                                                                                                                                                               requirements, interventions, protests,
                                                O.H. Hutchings CT, LLC ...............            EG18–36–000             Accession Number: 20180416–5075.                                     service, and qualifying facilities filings
                                                Sidney, LLC ...................................   EG18–37–000             Comments Due: 5 p.m. ET 5/7/18.                                      can be found at: http://www.ferc.gov/
                                                Tait Electric Generating Station,                 EG18–38–000             Docket Numbers: ER18–1376–000.                                       docs-filing/efiling/filing-req.pdf. For
                                                  LLC.
                                                Yankee Street, LLC .......................        EG18–39–000
                                                                                                                          Applicants: Midcontinent                                             other information, call (866) 208–3676
                                                                                                                       Independent System Operator, Inc.                                       (toll free). For TTY, call (202) 502–8659.
                                                  Take notice that during the month of                                    Description: § 205(d) Rate Filing:                                     Dated: April 16, 2018.
                                                March 2018, the status of the above-                                   2018–04–16_SA 1558 Forward Energy-                                      Nathaniel J. Davis, Sr.,
                                                captioned entities as Exempt Wholesale                                 ATC 8th Rev LGIA (G368) to be effective
                                                                                                                                                                                               Deputy Secretary.
                                                Generators became effective by                                         4/2/2018.
                                                                                                                                                                                               [FR Doc. 2018–08305 Filed 4–19–18; 8:45 am]
                                                operation of the Commission’s                                             Filed Date: 4/16/18.
                                                                                                                          Accession Number: 20180416–5159.                                     BILLING CODE 6717–01–P
                                                regulations. 18 CFR 366.7(a)(2017).
                                                                                                                          Comments Due: 5 p.m. ET 5/7/18.
                                                Nathaniel J. Davis, Sr.,
                                                                                                                          Docket Numbers: ER18–1377–000.                                       DEPARTMENT OF ENERGY
                                                Deputy Secretary.                                                         Applicants: Bayonne Plant Holding,
                                                [FR Doc. 2018–08306 Filed 4–19–18; 8:45 am]                            L.L.C.                                                                  Federal Energy Regulatory
                                                BILLING CODE 6717–01–P                                                    Description: Tariff Cancellation:                                    Commission
                                                                                                                       Notice of Cancellation to be effective 6/
                                                                                                                       1/2018.                                                                 [Project No. 2337–077]
                                                DEPARTMENT OF ENERGY                                                      Filed Date: 4/16/18.
                                                                                                                          Accession Number: 20180416–5165.                                     Notice of Availability of Final
                                                Federal Energy Regulatory
                                                                                                                          Comments Due: 5 p.m. ET 5/7/18.                                      Environmental Assessment;
                                                Commission
                                                                                                                          Take notice that the Commission                                      PacifiCorp
                                                Combined Notice of Filings #1                                          received the following electric securities
                                                                                                                                                                                                 In accordance with the National
                                                                                                                       filings:
                                                   Take notice that the Commission                                                                                                             Environmental Policy Act of 1969 and
                                                                                                                          Docket Numbers: ES18–29–000.                                         the Federal Energy Regulatory
                                                received the following electric corporate
                                                                                                                          Applicants: Orange and Rockland                                      Commission’s (Commission)
                                                filings:
                                                                                                                       Utilities, Inc.                                                         regulations, 18 CFR part 380, the Office
                                                   Docket Numbers: EC18–84–000.                                           Description: Application of Orange
                                                   Applicants: Star Energy Partners, LLC.                                                                                                      of Energy Projects has reviewed the
                                                   Description: Application for                                        and Rockland Utilities, Inc. for an Order                               application for new license for the
                                                Authorization Under Section 203 of the                                 Authorizing the Issue and Sale of Short-                                Prospect No. 3 Hydroelectric Project,
                                                                                                                       term Debt.                                                              located on the South Fork Rogue River
sradovich on DSK3GMQ082PROD with NOTICES




                                                Federal Power Act, et al. of Star Energy
                                                Partners, LLC.                                                            Filed Date: 4/16/18.                                                 in Jackson County, Oregon, and has
                                                   Filed Date: 4/16/18.                                                   Accession Number: 20180416–5092.                                     prepared a Final Environmental
                                                   Accession Number: 20180416–5095.                                       Comments Due: 5 p.m. ET 5/7/18.                                      Assessment (FEA) for the project. The
                                                   Comments Due: 5 p.m. ET 5/7/18.                                        Take notice that the Commission                                      project currently occupies 32.4 acres of
                                                   Take notice that the Commission                                     received the following qualifying                                       federal land managed by the U.S. Forest
                                                received the following electric rate                                   facility filings:                                                       Service as part of the Rogue River-
                                                filings:                                                                  Docket Numbers: QF18–610–000.                                        Siskiyou National Forest.


                                           VerDate Sep<11>2014         17:44 Apr 19, 2018         Jkt 244001   PO 00000       Frm 00029      Fmt 4703      Sfmt 4703      E:\FR\FM\20APN1.SGM             20APN1



Document Created: 2018-04-20 00:03:29
Document Modified: 2018-04-20 00:03:29
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 17547 