DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 89 (May 8, 2018)

Page Range20804-20806
FR Document2018-09720

Federal Register, Volume 83 Issue 89 (Tuesday, May 8, 2018)
[Federal Register Volume 83, Number 89 (Tuesday, May 8, 2018)]
[Notices]
[Pages 20804-20806]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-09720]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-118-000]


Rover Pipeline LLC; Notice of Intent To Prepare an Environmental 
Assessment for the Proposed UGS-Crawford Meter Station Project, and 
Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the UGS-Crawford Meter Station 
Project involving construction and operation of facilities by Rover 
Pipeline LLC (Rover) in Jefferson County, Ohio. The Commission will use 
this EA in its decision-making process to determine whether the project 
is in the public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. You can make a difference by providing us with 
your specific comments or concerns about the project. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
Your input will help the Commission staff determine what issues they 
need to evaluate in the EA. To ensure that your comments are timely and 
properly recorded, please send your comments so that the Commission 
receives them in Washington, DC on or before 5:00 p.m. Eastern Time on 
May 31, 2018.
    If you sent comments on this project to the Commission before the 
opening of this docket on March 15, 2018, you will need to file those 
comments in Docket No. CP18-118-000 to ensure they are considered as 
part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable agreement. However, if 
the Commission approves the project, that approval conveys with it the 
right of eminent domain. Therefore, if easement negotiations fail to 
produce an agreement, the pipeline company could initiate condemnation 
proceedings where compensation would be determined in accordance with 
state law.
    Rover provided landowners with a fact sheet prepared by the FERC 
entitled An Interstate Natural Gas Facility On My Land? What Do I Need 
To Know? This fact sheet addresses a number of typically asked 
questions, including the use of eminent domain and how to participate 
in the Commission's proceedings. It is also available for viewing on 
the FERC website (www.ferc.gov).

Public Participation

    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has expert staff available to assist you at 
(202) 502-8258 or [email protected]. Please

[[Page 20805]]

carefully follow these instructions so that your comments are properly 
recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's website (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's website (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
eRegister. If you are filing a comment on a particular project, please 
select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(CP18-118-000) with your submission: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, 
Washington, DC 20426.

Summary of the Proposed Project

    Rover proposes to construct, own, and operate a new meter station 
on its Burgettstown Lateral in Jefferson County, Ohio. The UGS-Crawford 
Meter Station Project would receive up to 350 million cubic feet per 
day of natural gas. According to Rover, its project would respond to 
proven market demand for additional receipt point facilities from the 
Marcellus and Utica Shale supply areas.
    The UGS-Crawford Meter Station Project would consist of an 
ultrasonic meter skid and ancillary facilities, as well as a new 
permanent access road.
    The general location of the project facility is shown in appendix 
1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called eLibrary or from the Commission's Public 
Reference Room, 888 First Street NE, Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed facilities would disturb about 3.6 
acres of land for the aboveground facility. Following construction, 
Rover would maintain about 0.9 acre for permanent operation of the 
project's facilities; the remaining acreage would be restored and 
revert to former uses. In addition, a new permanent access road, 
approximately 25 feet wide and 100 feet long (covering approximately 
0.1 acre of land), would be constructed and maintained. The proposed 
Project site and all workspaces would be within the existing 
Burgettstown Lateral right-of-way.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\2\ to discover and address concerns the public may have about 
proposals. This process is referred to as ``scoping.'' The main goal of 
the scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. We will 
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------

    \2\ We, us, and our refer to the environmental staff of the 
Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the proposed project under these 
general headings:
     Geology and soils;
     vegetation and wildlife;
     endangered and threatened species;
     cultural resources;
     land use;
     air quality and noise;
     public safety; and
     cumulative impacts

    We will also evaluate reasonable alternatives to the proposed 
project or portions of the project, and make recommendations on how to 
lessen or avoid impacts on the various resource areas.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may publish and 
distribute the EA to the public for an allotted comment period. We will 
consider all comments on the EA before making our recommendations to 
the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section, beginning on page 2.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues of 
this project to formally cooperate with us in the preparation of the 
EA.\3\ Agencies that would like to request cooperating agency status 
should follow the instructions for filing comments provided under the 
Public Participation section of this notice.
---------------------------------------------------------------------------

    \3\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the applicable State Historic Preservation Office (SHPO), and to 
solicit their views and those of other government agencies, interested 
Indian tribes, and the public on the project's potential effects on 
historic properties.\4\ We will define the project-specific Area of 
Potential Effects (APE) in consultation with the SHPO as the project 
develops. On natural gas facility projects, the APE at a minimum 
encompasses all areas subject to ground disturbance (examples include 
construction right-of-way, contractor/pipe storage yards, compressor 
stations, and access roads). Our EA for this project will document our 
findings on the impacts on historic properties and summarize the status 
of consultations under section 106.
---------------------------------------------------------------------------

    \4\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; Native 
American Tribes; and local libraries. This list also includes all 
affected landowners (as defined in the Commission's regulations) who 
are potential right-of-way grantors, whose property may be used 
temporarily for project purposes, or who own homes within certain 
distances of aboveground facilities, and anyone who submits comments on 
the project. We will update the environmental mailing list as the 
analysis proceeds to ensure that we send the information related to 
this environmental review to all individuals, organizations, and 
government entities interested in and/or potentially affected by the 
proposed project.
    If we publish and distribute the EA, copies of the EA will be sent 
to the

[[Page 20806]]

environmental mailing list for public review and comment. If you would 
prefer to receive a paper copy of the document instead of the CD 
Version, or would like to remove your name from the mailing list, 
please return the attached Information Request (appendix 2).

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an intervenor which is an official party to the Commission's 
proceeding. Intervenors play a more formal role in the process and are 
able to file briefs, appear at hearings, and be heard by the courts if 
they choose to appeal the Commission's final ruling. An intervenor 
formally participates in the proceeding by filing a request to 
intervene. Instructions for becoming an intervenor are in the Document-
less Intervention Guide under the e-filing link on the Commission's 
website. Motions to intervene are more fully described at http://www.ferc.gov/resources/guides/how-to/intervene.asp.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website at www.ferc.gov using the eLibrary link. Click on the 
eLibrary link, click on General Search and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., CP18-
118). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, public sessions or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: May 1, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-09720 Filed 5-7-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                20804                           Federal Register / Vol. 83, No. 89 / Tuesday, May 8, 2018 / Notices

                                                define the project-specific Area of                     Additional Information                                   This notice announces the opening of
                                                Potential Effects (APE) in consultation                    Additional information about the                   the scoping process the Commission
                                                with the SHPOs as the project develops.                 project is available from the                         will use to gather input from the public
                                                On natural gas facility projects, the APE               Commission’s Office of External Affairs,              and interested agencies on the project.
                                                at a minimum encompasses all areas                      at (866) 208–FERC, or on the FERC                     You can make a difference by providing
                                                subject to ground disturbance (examples                 website at www.ferc.gov using the                     us with your specific comments or
                                                include construction right-of-way,                      eLibrary link. Click on the eLibrary link,            concerns about the project. Your
                                                contractor/pipe storage yards,                          click on General Search and enter the                 comments should focus on the potential
                                                compressor stations, and access roads).                 docket number, excluding the last three               environmental effects, reasonable
                                                Our EA for this project will document                   digits in the Docket Number field (i.e.,              alternatives, and measures to avoid or
                                                our findings on the impacts on historic                 CP18–46). Be sure you have selected an                lessen environmental impacts. Your
                                                properties and summarize the status of                  appropriate date range. For assistance,               input will help the Commission staff
                                                consultations under section 106.                        please contact FERC Online Support at                 determine what issues they need to
                                                                                                        FercOnlineSupport@ferc.gov or toll free               evaluate in the EA. To ensure that your
                                                Environmental Mailing List                                                                                    comments are timely and properly
                                                                                                        at (866) 208–3676, or for TTY, contact
                                                                                                                                                              recorded, please send your comments so
                                                   The environmental mailing list                       (202) 502–8659. The eLibrary link also
                                                                                                                                                              that the Commission receives them in
                                                includes: Federal, state, and local                     provides access to the texts of formal
                                                                                                                                                              Washington, DC on or before 5:00 p.m.
                                                government representatives and                          documents issued by the Commission,
                                                                                                                                                              Eastern Time on May 31, 2018.
                                                agencies; elected officials;                            such as orders, notices, and                             If you sent comments on this project
                                                environmental and public interest                       rulemakings.                                          to the Commission before the opening of
                                                groups; Native American Tribes; other                      In addition, the Commission offers a
                                                                                                                                                              this docket on March 15, 2018, you will
                                                interested parties; and local libraries.                free service called eSubscription which
                                                                                                                                                              need to file those comments in Docket
                                                This list also includes all affected                    allows you to keep track of all formal
                                                                                                                                                              No. CP18–118–000 to ensure they are
                                                landowners (as defined in the                           issuances and submittals in specific
                                                                                                                                                              considered as part of this proceeding.
                                                Commission’s regulations) who are                       dockets. This can reduce the amount of                   This notice is being sent to the
                                                potential right-of-way grantors, whose                  time you spend researching proceedings                Commission’s current environmental
                                                property may be used temporarily for                    by automatically providing you with                   mailing list for this project. State and
                                                project purposes, or who own homes                      notification of these filings, document               local government representatives should
                                                within certain distances of aboveground                 summaries, and direct links to the                    notify their constituents of this
                                                facilities, and anyone who submits                      documents. Go to www.ferc.gov/docs-                   proposed project and encourage them to
                                                comments on the project. We will                        filing/esubscription.asp.                             comment on their areas of concern.
                                                update the environmental mailing list as                   Finally, public sessions or site visits               If you are a landowner receiving this
                                                the analysis proceeds to ensure that we                 will be posted on the Commission’s                    notice, a pipeline company
                                                send the information related to this                    calendar located at www.ferc.gov/                     representative may contact you about
                                                environmental review to all individuals,                EventCalendar/EventsList.aspx along                   the acquisition of an easement to
                                                organizations, and government entities                  with other related information.                       construct, operate, and maintain the
                                                interested in and/or potentially affected                 Dated: May 1, 2018.                                 proposed facilities. The company would
                                                by the proposed project.                                Kimberly D. Bose,                                     seek to negotiate a mutually acceptable
                                                   Copies of the EA will be sent to the                 Secretary.                                            agreement. However, if the Commission
                                                environmental mailing list for public                   [FR Doc. 2018–09719 Filed 5–7–18; 8:45 am]            approves the project, that approval
                                                review and comment. If you would                        BILLING CODE 6717–01–P
                                                                                                                                                              conveys with it the right of eminent
                                                prefer to receive a paper copy of the                                                                         domain. Therefore, if easement
                                                document instead of the CD version or                                                                         negotiations fail to produce an
                                                would like to remove your name from                     DEPARTMENT OF ENERGY                                  agreement, the pipeline company could
                                                the mailing list, please return the                                                                           initiate condemnation proceedings
                                                                                                        Federal Energy Regulatory                             where compensation would be
                                                attached Information Request (appendix
                                                                                                        Commission                                            determined in accordance with state
                                                4).
                                                                                                        [Docket No. CP18–118–000]
                                                                                                                                                              law.
                                                Becoming an Intervenor                                                                                           Rover provided landowners with a
                                                                                                        Rover Pipeline LLC; Notice of Intent To               fact sheet prepared by the FERC entitled
                                                   In addition to involvement in the EA                                                                       An Interstate Natural Gas Facility On
                                                                                                        Prepare an Environmental Assessment
                                                scoping process, you may want to                                                                              My Land? What Do I Need To Know?
                                                                                                        for the Proposed UGS-Crawford Meter
                                                become an ‘‘intervenor’’ which is an                                                                          This fact sheet addresses a number of
                                                                                                        Station Project, and Request for
                                                official party to the Commission’s                                                                            typically asked questions, including the
                                                                                                        Comments on Environmental Issues
                                                proceeding. Intervenors play a more                                                                           use of eminent domain and how to
                                                formal role in the process and are able                   The staff of the Federal Energy                     participate in the Commission’s
                                                to file briefs, appear at hearings, and be              Regulatory Commission (FERC or                        proceedings. It is also available for
                                                heard by the courts if they choose to                   Commission) will prepare an                           viewing on the FERC website
                                                appeal the Commission’s final ruling.                   environmental assessment (EA) that will               (www.ferc.gov).
                                                An intervenor formally participates in                  discuss the environmental impacts of
                                                the proceeding by filing a request to                   the UGS-Crawford Meter Station Project                Public Participation
sradovich on DSK3GMQ082PROD with NOTICES




                                                intervene. Instructions for becoming an                 involving construction and operation of                 For your convenience, there are three
                                                intervenor are in the ‘‘Document-less                   facilities by Rover Pipeline LLC (Rover)              methods you can use to submit your
                                                Intervention Guide’’ under the ‘‘e-filing’’             in Jefferson County, Ohio. The                        comments to the Commission. The
                                                link on the Commission’s website.                       Commission will use this EA in its                    Commission encourages electronic filing
                                                Motions to intervene are more fully                     decision-making process to determine                  of comments and has expert staff
                                                described at http://www.ferc.gov/                       whether the project is in the public                  available to assist you at (202) 502–8258
                                                resources/guides/how-to/intervene.asp.                  convenience and necessity.                            or FercOnlineSupport@ferc.gov. Please


                                           VerDate Sep<11>2014   18:41 May 07, 2018   Jkt 244001   PO 00000   Frm 00018   Fmt 4703   Sfmt 4703   E:\FR\FM\08MYN1.SGM   08MYN1


                                                                                Federal Register / Vol. 83, No. 89 / Tuesday, May 8, 2018 / Notices                                                         20805

                                                carefully follow these instructions so                  25 feet wide and 100 feet long (covering               preparation of the EA.3 Agencies that
                                                that your comments are properly                         approximately 0.1 acre of land), would                 would like to request cooperating
                                                recorded.                                               be constructed and maintained. The                     agency status should follow the
                                                   (1) You can file your comments                       proposed Project site and all workspaces               instructions for filing comments
                                                electronically using the eComment                       would be within the existing                           provided under the Public Participation
                                                feature on the Commission’s website                     Burgettstown Lateral right-of-way.                     section of this notice.
                                                (www.ferc.gov) under the link to
                                                Documents and Filings. This is an easy                  The EA Process                                         Consultations Under Section 106 of the
                                                method for submitting brief, text-only                                                                         National Historic Preservation Act
                                                                                                           The National Environmental Policy
                                                comments on a project;                                  Act (NEPA) requires the Commission to                    In accordance with the Advisory
                                                   (2) You can file your comments                       take into account the environmental                    Council on Historic Preservation’s
                                                electronically by using the eFiling                     impacts that could result from an action               implementing regulations for section
                                                feature on the Commission’s website                     whenever it considers the issuance of a                106 of the National Historic
                                                (www.ferc.gov) under the link to                        Certificate of Public Convenience and                  Preservation Act, we are using this
                                                Documents and Filings. With eFiling,                    Necessity. NEPA also requires us 2 to                  notice to initiate consultation with the
                                                you can provide comments in a variety                   discover and address concerns the                      applicable State Historic Preservation
                                                of formats by attaching them as a file                  public may have about proposals. This                  Office (SHPO), and to solicit their views
                                                with your submission. New eFiling                       process is referred to as ‘‘scoping.’’ The             and those of other government agencies,
                                                users must first create an account by                   main goal of the scoping process is to                 interested Indian tribes, and the public
                                                clicking on eRegister. If you are filing a              focus the analysis in the EA on the                    on the project’s potential effects on
                                                comment on a particular project, please                 important environmental issues. By this                historic properties.4 We will define the
                                                select ‘‘Comment on a Filing’’ as the                   notice, the Commission requests public                 project-specific Area of Potential Effects
                                                filing type; or                                         comments on the scope of the issues to                 (APE) in consultation with the SHPO as
                                                   (3) You can file a paper copy of your                address in the EA. We will consider all                the project develops. On natural gas
                                                comments by mailing them to the                         filed comments during the preparation                  facility projects, the APE at a minimum
                                                following address. Be sure to reference                 of the EA.                                             encompasses all areas subject to ground
                                                the project docket number (CP18–118–                       In the EA we will discuss impacts that              disturbance (examples include
                                                000) with your submission: Kimberly D.                  could occur as a result of the                         construction right-of-way, contractor/
                                                Bose, Secretary, Federal Energy                         construction and operation of the                      pipe storage yards, compressor stations,
                                                Regulatory Commission, 888 First Street                 proposed project under these general                   and access roads). Our EA for this
                                                NE, Room 1A, Washington, DC 20426.                      headings:                                              project will document our findings on
                                                Summary of the Proposed Project                            • Geology and soils;                                the impacts on historic properties and
                                                                                                                                                               summarize the status of consultations
                                                  Rover proposes to construct, own, and                    • vegetation and wildlife;
                                                                                                                                                               under section 106.
                                                operate a new meter station on its                         • endangered and threatened species;
                                                Burgettstown Lateral in Jefferson                          • cultural resources;                               Environmental Mailing List
                                                County, Ohio. The UGS-Crawford Meter                       • land use;                                           The environmental mailing list
                                                Station Project would receive up to 350                    • air quality and noise;                            includes federal, state, and local
                                                million cubic feet per day of natural gas.                 • public safety; and                                government representatives and
                                                According to Rover, its project would                      • cumulative impacts                                agencies; elected officials; Native
                                                respond to proven market demand for                        We will also evaluate reasonable                    American Tribes; and local libraries.
                                                additional receipt point facilities from                alternatives to the proposed project or                This list also includes all affected
                                                the Marcellus and Utica Shale supply                    portions of the project, and make                      landowners (as defined in the
                                                areas.                                                  recommendations on how to lessen or                    Commission’s regulations) who are
                                                  The UGS-Crawford Meter Station                        avoid impacts on the various resource                  potential right-of-way grantors, whose
                                                Project would consist of an ultrasonic                  areas.                                                 property may be used temporarily for
                                                meter skid and ancillary facilities, as                    The EA will present our independent                 project purposes, or who own homes
                                                well as a new permanent access road.                    analysis of the issues. The EA will be                 within certain distances of aboveground
                                                  The general location of the project                   available in the public record through                 facilities, and anyone who submits
                                                facility is shown in appendix 1.1                       eLibrary. Depending on the comments                    comments on the project. We will
                                                Land Requirements for Construction                      received during the scoping process, we                update the environmental mailing list as
                                                                                                        may publish and distribute the EA to                   the analysis proceeds to ensure that we
                                                  Construction of the proposed facilities               the public for an allotted comment                     send the information related to this
                                                would disturb about 3.6 acres of land for               period. We will consider all comments                  environmental review to all individuals,
                                                the aboveground facility. Following                     on the EA before making our                            organizations, and government entities
                                                construction, Rover would maintain                      recommendations to the Commission.                     interested in and/or potentially affected
                                                about 0.9 acre for permanent operation                  To ensure we have the opportunity to                   by the proposed project.
                                                of the project’s facilities; the remaining              consider and address your comments,                      If we publish and distribute the EA,
                                                acreage would be restored and revert to                 please carefully follow the instructions               copies of the EA will be sent to the
                                                former uses. In addition, a new                         in the Public Participation section,
                                                permanent access road, approximately                    beginning on page 2.                                     3 The Council on Environmental Quality

                                                                                                                                                               regulations addressing cooperating agency
sradovich on DSK3GMQ082PROD with NOTICES




                                                  1 The appendices referenced in this notice will
                                                                                                           With this notice, we are asking                     responsibilities are at Title 40, Code of Federal
                                                not appear in the Federal Register. Copies of           agencies with jurisdiction by law and/                 Regulations, Part 1501.6.
                                                appendices were sent to all those receiving this        or special expertise with respect to the                 4 The Advisory Council on Historic Preservation’s

                                                notice in the mail and are available at www.ferc.gov    environmental issues of this project to                regulations are at Title 36, Code of Federal
                                                using the link called eLibrary or from the              formally cooperate with us in the                      Regulations, Part 800. Those regulations define
                                                Commission’s Public Reference Room, 888 First                                                                  historic properties as any prehistoric or historic
                                                Street NE, Washington, DC 20426, or call (202) 502–                                                            district, site, building, structure, or object included
                                                8371. For instructions on connecting to eLibrary,         2 We, us, and our refer to the environmental staff   in or eligible for inclusion in the National Register
                                                refer to the last page of this notice.                  of the Commission’s Office of Energy Projects.         of Historic Places.



                                           VerDate Sep<11>2014   18:41 May 07, 2018   Jkt 244001   PO 00000   Frm 00019   Fmt 4703   Sfmt 4703   E:\FR\FM\08MYN1.SGM    08MYN1


                                                20806                           Federal Register / Vol. 83, No. 89 / Tuesday, May 8, 2018 / Notices

                                                environmental mailing list for public                     Dated: May 1, 2018.                                   Dated: May 2, 2018.
                                                review and comment. If you would                        Kimberly D. Bose,                                     Kimberly D. Bose,
                                                prefer to receive a paper copy of the                   Secretary.                                            Secretary.
                                                document instead of the CD Version, or                  [FR Doc. 2018–09720 Filed 5–7–18; 8:45 am]            [FR Doc. 2018–09717 Filed 5–7–18; 8:45 am]
                                                would like to remove your name from                     BILLING CODE 6717–01–P                                BILLING CODE 6717–01–P
                                                the mailing list, please return the
                                                attached Information Request (appendix
                                                2).                                                     DEPARTMENT OF ENERGY                                  DEPARTMENT OF ENERGY
                                                Becoming an Intervenor                                                                                        Federal Energy Regulatory
                                                                                                        Federal Energy Regulatory
                                                                                                        Commission                                            Commission
                                                   In addition to involvement in the EA
                                                scoping process, you may want to                                                                              [Docket Nos. CP18–37–000 and CP18–38–
                                                become an intervenor which is an                        [Docket No. NJ18–14–000]                              000]
                                                official party to the Commission’s                                                                            Sierrita Gas Pipeline LLC; Notice of
                                                proceeding. Intervenors play a more                     Oncor Electric Delivery Company LLC;
                                                                                                                                                              Schedule for Environmental Review of
                                                formal role in the process and are able                 Notice of Filing
                                                                                                                                                              the Sierrita Compressor Expansion
                                                to file briefs, appear at hearings, and be                                                                    Project
                                                heard by the courts if they choose to                      Take notice that on April 25, 2018,
                                                appeal the Commission’s final ruling.                   Oncor Electric Delivery Company LLC                      On December 21, 2017, Sierrita Gas
                                                An intervenor formally participates in                  submitted its tariff filing: Oncor TFO                Pipeline LLC (Sierrita) filed an
                                                the proceeding by filing a request to                   Tariff Rate Changes to be effective 3/27/             application in Docket No. CP18–37–000
                                                intervene. Instructions for becoming an                 2018.                                                 requesting a Certificate of Public
                                                                                                           Any person desiring to intervene or to             Convenience and Necessity pursuant to
                                                intervenor are in the Document-less
                                                                                                        protest this filing must file in                      Section 7(c) of the Natural Gas Act to
                                                Intervention Guide under the e-filing
                                                                                                        accordance with Rules 211 and 214 of                  construct and operate certain natural gas
                                                link on the Commission’s website.
                                                                                                                                                              pipeline facilities. Additionally, in
                                                Motions to intervene are more fully                     the Commission’s Rules of Practice and
                                                                                                                                                              Docket No. CP18–38–000, Sierrita is
                                                described at http://www.ferc.gov/                       Procedure (18 CFR 385.211, 385.214).
                                                                                                                                                              requesting an amendment to its Section
                                                resources/guides/how-to/intervene.asp.                  Protests will be considered by the
                                                                                                                                                              3 authorization and its Presidential
                                                                                                        Commission in determining the                         Permit. The proposed project is known
                                                Additional Information                                  appropriate action to be taken, but will              as the Sierrita Compressor Expansion
                                                   Additional information about the                     not serve to make protestants parties to              Project (Project), in which Sierrita
                                                project is available from the                           the proceeding. Any person wishing to                 would increase the design capacity of
                                                Commission’s Office of External Affairs,                become a party must file a notice of                  existing Line No. 2177 to 627,000,000
                                                at (866) 208–FERC, or on the FERC                       intervention or motion to intervene, as               cubic feet per day at its border crossing
                                                website at www.ferc.gov using the                       appropriate. Such notices, motions, or                into Mexico in Pima County, Arizona.
                                                eLibrary link. Click on the eLibrary link,              protests must be filed on or before the                  On January 5, 2018, the Federal
                                                click on General Search and enter the                   comment date. On or before the                        Energy Regulatory Commission
                                                docket number, excluding the last three                 comment date, it is not necessary to                  (Commission or FERC) issued its Notice
                                                digits in the Docket Number field (i.e.,                serve motions to intervene or protests                of Applications for the Project. Among
                                                CP18–118). Be sure you have selected                    on persons other than the Applicant.                  other things, that notice alerted agencies
                                                an appropriate date range. For                             The Commission encourages                          issuing federal authorizations of the
                                                assistance, please contact FERC Online                  electronic submission of protests and                 requirement to complete all necessary
                                                Support at FercOnlineSupport@ferc.gov                                                                         reviews and to reach a final decision on
                                                                                                        interventions in lieu of paper using the
                                                                                                                                                              a request for a federal authorization
                                                or toll free at (866) 208–3676, or for                  eFiling link at http://www.ferc.gov.
                                                                                                                                                              within 90 days of the date of issuance
                                                TTY, contact (202) 502–8659. The                        Persons unable to file electronically
                                                                                                                                                              of the Commission staff’s Environmental
                                                eLibrary link also provides access to the               should submit an original and 5 copies
                                                                                                                                                              Assessment (EA) for the Project. This
                                                texts of formal documents issued by the                 of the protest or intervention to the                 instant notice identifies the FERC staff’s
                                                Commission, such as orders, notices,                    Federal Energy Regulatory Commission,                 planned schedule for the completion of
                                                and rulemakings.                                        888 First Street NE, Washington, DC                   the EA for the Project.
                                                   In addition, the Commission offers a                 20426.
                                                                                                                                                              Schedule for Environmental Review
                                                free service called eSubscription which                    This filing is accessible on-line at
                                                allows you to keep track of all formal                  http://www.ferc.gov, using the eLibrary               Issuance of EA—June 13, 2018
                                                issuances and submittals in specific                    link and is available for review in the               90-Day Federal Authorization Decision
                                                dockets. This can reduce the amount of                  Commission’s Public Reference Room in                    Deadline—September 11, 2018
                                                time you spend researching proceedings                  Washington, DC. There is an                              If a schedule change becomes
                                                by automatically providing you with                     eSubscription link on the website that                necessary, additional notice will be
                                                notification of these filings, document                 enables subscribers to receive email                  provided so that the relevant agencies
                                                summaries, and direct links to the                      notification when a document is added                 are kept informed of the Project’s
sradovich on DSK3GMQ082PROD with NOTICES




                                                documents. Go to www.ferc.gov/docs-                     to a subscribed docket(s). For assistance             progress.
                                                filing/esubscription.asp.                               with any FERC Online service, please                  Project Description
                                                   Finally, public sessions or site visits              email FERCOnlineSupport@ferc.gov, or                    Sierrita proposes to construct in Pima
                                                will be posted on the Commission’s                      call (866) 208–3676 (toll free). For TTY,             County, Arizona one 15,900 horsepower
                                                calendar located at www.ferc.gov/                       call (202) 502–8659.                                  compressor station, suction and
                                                EventCalendar/EventsList.aspx along                        Comment Date: 5:00 p.m. Eastern                    discharge piping, and ancillary facilities
                                                with other related information.                         Time on May 16, 2018.                                 on its existing Line No. 2177; one 10-


                                           VerDate Sep<11>2014   18:41 May 07, 2018   Jkt 244001   PO 00000   Frm 00020   Fmt 4703   Sfmt 4703   E:\FR\FM\08MYN1.SGM   08MYN1



Document Created: 2018-05-08 01:32:36
Document Modified: 2018-05-08 01:32:36
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106: