83_FR_21861 83 FR 21770 - Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene: Davis and Weber Counties Canal Company

83 FR 21770 - Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene: Davis and Weber Counties Canal Company

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 91 (May 10, 2018)

Page Range21770-21771
FR Document2018-09964

Federal Register, Volume 83 Issue 91 (Thursday, May 10, 2018)
[Federal Register Volume 83, Number 91 (Thursday, May 10, 2018)]
[Notices]
[Pages 21770-21771]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-09964]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD18-8-000]


Notice of Preliminary Determination of a Qualifying Conduit 
Hydropower Facility and Soliciting Comments and Motions To Intervene: 
Davis and Weber Counties Canal Company

    On April 27, 2018, Davis and Weber Counties Canal Company filed a 
notice of intent to construct a qualifying conduit hydropower facility, 
pursuant to section 30 of the Federal Power Act (FPA), as amended by 
section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). 
The proposed West Point Pump Station Micro-hydropower Project would 
have an installed capacity of 8 kilowatts (kW), and would be located 
along Davis and Weber Counties Canal Company's secondary irrigation 
system. The project would be located near the Town of West Point in 
Davis County, Utah.
    Applicant Contact: Richard Smith, General Manager, Davis and Weber 
Counties Canal Company, 138 West 1300 North, Sunset, UT 84015; Phone 
No. (801) 774-6373.
    FERC Contact: Robert Bell, Phone No. (202) 502-6062; Email: 
robert.bell@ferc.gov.
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) Two new generating units that have a 
total generating capacity of 8 kW, housed in a pump return pipeline to 
a storage reservoir; and (2) appurtenant facilities. The proposed 
project would have an estimated annual generation of 6 megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
                                                            Satisfies (Y/
       Statutory provision               Description             N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by    The conduit the facility            Y
 HREA.                             uses is a tunnel,
                                   canal, pipeline,
                                   aqueduct, flume, ditch,
                                   or similar manmade
                                   water conveyance that
                                   is operated for the
                                   distribution of water
                                   for agricultural,
                                   municipal, or
                                   industrial consumption
                                   and not primarily for
                                   the generation of
                                   electricity.
FPA 30(a)(3)(C)(i), as amended    The facility is                     Y
 by HREA.                          constructed, operated,
                                   or maintained for the
                                   generation of electric
                                   power and uses for such
                                   generation only the
                                   hydroelectric potential
                                   of a non-federally
                                   owned conduit.
FPA 30(a)(3)(C)(ii), as amended   The facility has an                 Y
 by HREA.                          installed capacity that
                                   does not exceed 5
                                   megawatts.
FPA 30(a)(3)(C)(iii), as amended  On or before August 9,              Y
 by HREA.                          2013, the facility is
                                   not licensed, or
                                   exempted from the
                                   licensing requirements
                                   of Part I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: The proposed hydroelectric project will 
utilize an existing irrigation pipeline, the primary purpose of which 
is to deliver lawn and garden pressure irrigation water to these same 
counties to Davis and Weber Counties. The addition of the West Point 
Pump Station Micro-hydropower Project will not alter the conduit's 
primary purpose. Therefore, based upon the above criteria, Commission 
staff preliminarily determines that the proposal satisfies the 
requirements for a qualifying conduit hydropower facility, which is not 
required to be licensed or exempted from licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the

[[Page 21771]]

facility meets the qualifying criteria must set forth their evidentiary 
basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2017).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE, Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE, Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (i.e., CD18-8) in the 
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, call 
(202) 502-8659.

    Dated: May 4, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-09964 Filed 5-9-18; 8:45 am]
BILLING CODE 6717-01-P



                                               21770                          Federal Register / Vol. 83, No. 91 / Thursday, May 10, 2018 / Notices

                                               following meetings related to the                          The discussions at the meetings                    (FPA), as amended by section 4 of the
                                               transmission planning activities of                     described above may address matters at                Hydropower Regulatory Efficiency Act
                                               Tucson Electric Power Company, UNS                      issue in the following proceeding:                    of 2013 (HREA). The proposed West
                                               Electric, Inc., Public Service Company                  ER13–75, Public Service Company of                    Point Pump Station Micro-hydropower
                                               of New Mexico, Arizona Public Service                   Colorado, et al.                                      Project would have an installed capacity
                                               Company, El Paso Electric Company,                         For more information contact Nicole                of 8 kilowatts (kW), and would be
                                               Black Hills Power, Inc., Black Hills                    Cramer, Office of Energy Market                       located along Davis and Weber Counties
                                               Colorado Electric Utility Company, LP,                  Regulation, Federal Energy Regulatory                 Canal Company’s secondary irrigation
                                               Cheyenne Light, Fuel, & Power                           Commission at (202) 502–6775 or                       system. The project would be located
                                               Company, NV Energy, Inc.; and Xcel                      nicole.cramer@ferc.gov.                               near the Town of West Point in Davis
                                               Energy Services, Inc. on behalf of Public                 Dated: May 4, 2018.                                 County, Utah.
                                               Service Company of Colorado:                            Kimberly D. Bose,                                       Applicant Contact: Richard Smith,
                                               Planning Management Committee                           Secretary.                                            General Manager, Davis and Weber
                                                    Meeting                                            [FR Doc. 2018–09965 Filed 5–9–18; 8:45 am]            Counties Canal Company, 138 West
                                                  May 9, 2018, 9 a.m.–3 p.m. (MDT)                     BILLING CODE 6717–01–P                                1300 North, Sunset, UT 84015; Phone
                                               Planning Management Committee                                                                                 No. (801) 774–6373.
                                                    Meeting                                                                                                    FERC Contact: Robert Bell, Phone No.
                                                  June 13, 2018, 9 a.m.–3 p.m. (MDT)                   DEPARTMENT OF ENERGY                                  (202) 502–6062; Email: robert.bell@
                                                  The May 9, 2018 Planning                                                                                   ferc.gov.
                                                                                                       Federal Energy Regulatory
                                               Management Committee Meeting will be                                                                            Qualifying Conduit Hydropower
                                                                                                       Commission
                                               held at: Energy Strategies, 215 State St.                                                                     Facility Description: The proposed
                                               #200, Salt Lake City, UT 84111.                         [Docket No. CD18–8–000]                               project would consist of: (1) Two new
                                                  The June 13, 2018 Planning                                                                                 generating units that have a total
                                               Management Committee Meeting will be                    Notice of Preliminary Determination of                generating capacity of 8 kW, housed in
                                               held at: Xcel Energy, 1800 Larimer St.,                 a Qualifying Conduit Hydropower                       a pump return pipeline to a storage
                                               Denver, CO 80202.                                       Facility and Soliciting Comments and                  reservoir; and (2) appurtenant facilities.
                                                  The above-referenced meetings will                   Motions To Intervene: Davis and                       The proposed project would have an
                                               be available via web conference and                     Weber Counties Canal Company                          estimated annual generation of 6
                                               teleconference.                                           On April 27, 2018, Davis and Weber                  megawatt-hours.
                                                  The above-referenced meetings are                    Counties Canal Company filed a notice                   A qualifying conduit hydropower
                                               open to stakeholders.                                   of intent to construct a qualifying                   facility is one that is determined or
                                                  Further information may be found at                  conduit hydropower facility, pursuant                 deemed to meet all of the criteria shown
                                               http://www.westconnect.com/.                            to section 30 of the Federal Power Act                in the table below.

                                                                                 TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                  Satisfies
                                                            Statutory provision                                                             Description                                            (Y/N)

                                               FPA 30(a)(3)(A), as amended by HREA ...            The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or             Y
                                                                                                    similar manmade water conveyance that is operated for the distribution of water for
                                                                                                    agricultural, municipal, or industrial consumption and not primarily for the genera-
                                                                                                    tion of electricity.
                                               FPA 30(a)(3)(C)(i), as amended by HREA             The facility is constructed, operated, or maintained for the generation of electric                Y
                                                                                                    power and uses for such generation only the hydroelectric potential of a non-feder-
                                                                                                    ally owned conduit.
                                               FPA 30(a)(3)(C)(ii), as amended by HREA            The facility has an installed capacity that does not exceed 5 megawatts .....................      Y
                                               FPA 30(a)(3)(C)(iii), as amended by                On or before August 9, 2013, the facility is not licensed, or exempted from the licens-            Y
                                                 HREA.                                              ing requirements of Part I of the FPA.



                                                  Preliminary Determination: The                         Comments and Motions to Intervene:                  all capital letters the ‘‘COMMENTS
                                               proposed hydroelectric project will                     Deadline for filing comments contesting               CONTESTING QUALIFICATION FOR A
                                               utilize an existing irrigation pipeline,                whether the facility meets the qualifying             CONDUIT HYDROPOWER FACILITY’’
                                               the primary purpose of which is to                      criteria is 45 days from the issuance                 or ‘‘MOTION TO INTERVENE,’’ as
                                               deliver lawn and garden pressure                        date of this notice.                                  applicable; (2) state in the heading the
                                               irrigation water to these same counties                   Deadline for filing motions to                      name of the applicant and the project
                                               to Davis and Weber Counties. The                        intervene is 30 days from the issuance                number of the application to which the
                                               addition of the West Point Pump Station                 date of this notice.                                  filing responds; (3) state the name,
                                               Micro-hydropower Project will not alter                   Anyone may submit comments or a                     address, and telephone number of the
                                               the conduit’s primary purpose.                          motion to intervene in accordance with
                                                                                                                                                             person filing; and (4) otherwise comply
                                                                                                       the requirements of Rules of Practice
daltland on DSKBBV9HB2PROD with NOTICES




                                               Therefore, based upon the above                                                                               with the requirements of sections
                                                                                                       and Procedure, 18 CFR 385.210 and
                                               criteria, Commission staff preliminarily                                                                      385.2001 through 385.2005 of the
                                                                                                       385.214. Any motions to intervene must
                                               determines that the proposal satisfies                  be received on or before the specified                Commission’s regulations.1 All
                                               the requirements for a qualifying                       deadline date for the particular                      comments contesting Commission staff’s
                                               conduit hydropower facility, which is                   proceeding.                                           preliminary determination that the
                                               not required to be licensed or exempted                   Filing and Service of Responsive
                                               from licensing.                                         Documents: All filings must (1) bear in                 1 18   CFR 385.2001–2005 (2017).



                                          VerDate Sep<11>2014   16:29 May 09, 2018   Jkt 244001   PO 00000   Frm 00009   Fmt 4703   Sfmt 4703   E:\FR\FM\10MYN1.SGM     10MYN1


                                                                              Federal Register / Vol. 83, No. 91 / Thursday, May 10, 2018 / Notices                                                 21771

                                               facility meets the qualifying criteria                  also be viewed on the web at http://                  of 2013 (HREA). The proposed Canal
                                               must set forth their evidentiary basis.                 www.ferc.gov/docs-filing/elibrary.asp                 Station 603+00 Micro-hydropower
                                                  The Commission strongly encourages                   using the ‘‘eLibrary’’ link. Enter the                Project would have an installed capacity
                                               electronic filing. Please file motions to               docket number (i.e., CD18–8) in the                   up to 8 kilowatts (kW), and would be
                                               intervene and comments using the                        docket number field to access the                     located along the four-foot wide by six-
                                               Commission’s eFiling system at http://                  document. For assistance, call toll-free              foot long section of the open irrigation
                                               www.ferc.gov/docs-filing/efiling.asp.                   1–866–208–3676 or email                               canal. The project would be located near
                                               Commenters can submit brief comments                    FERCOnlineSupport@ferc.gov. For TTY,                  the Town of Sunset in Davis County,
                                               up to 6,000 characters, without prior                   call (202) 502–8659.                                  Utah.
                                               registration, using the eComment system                   Dated: May 4, 2018.                                   Applicant Contact: Richard Smith,
                                               at http://www.ferc.gov/docs-filing/                     Kimberly D. Bose,                                     General Manager, Davis and Weber
                                               ecomment.asp. You must include your                                                                           Counties Canal Company, 138 West
                                                                                                       Secretary.
                                               name and contact information at the end                                                                       1300 North, Sunset, UT 84015; Phone
                                                                                                       [FR Doc. 2018–09964 Filed 5–9–18; 8:45 am]
                                               of your comments. For assistance,                                                                             No. (801) 774–6373.
                                                                                                       BILLING CODE 6717–01–P
                                               please contact FERC Online Support at
                                                                                                                                                               FERC Contact: Robert Bell, Phone No.
                                               FERCOnlineSupport@ferc.gov, (866)
                                                                                                                                                             (202) 502–6062; Email: robert.bell@
                                               208–3676 (toll free), or (202) 502–8659
                                                                                                       DEPARTMENT OF ENERGY                                  ferc.gov.
                                               (TTY). In lieu of electronic filing, please
                                               send a paper copy to: Secretary, Federal                                                                        Qualifying Conduit Hydropower
                                                                                                       Federal Energy Regulatory
                                               Energy Regulatory Commission, 888                                                                             Facility Description: The proposed
                                                                                                       Commission
                                               First Street NE, Washington, DC 20426.                                                                        project would consist of: (1) Two new
                                               A copy of all other filings in reference                [Docket No. CD18–7–000]                               generating units plus two future units,
                                               to this application must be accompanied                                                                       approximately four-foot wide by six-foot
                                                                                                       Davis and Weber Counties Canal                        long, placed in an open channel of the
                                               by proof of service on all persons listed               Company; Notice of Preliminary
                                               in the service list prepared by the                                                                           Davis & Weber Canal with a total
                                                                                                       Determination of a Qualifying Conduit                 generating capacity of up to 8 kW; and
                                               Commission in this proceeding, in                       Hydropower Facility and Soliciting
                                               accordance with 18 CFR 4.34(b) and                                                                            (2) appurtenant facilities. The proposed
                                                                                                       Comments and Motions To Intervene                     project would have an estimated annual
                                               385.2010.
                                                  Locations of Notice of Intent: Copies                  On April 27, 2018, Davis and Weber                  generation of 17.5 megawatt-hours, and
                                               of the notice of intent can be obtained                 Counties Canal Company filed a notice                 may include two additional units in the
                                               directly from the applicant or such                     of intent to construct a qualifying                   future.
                                               copies can be viewed and reproduced at                  conduit hydropower facility, pursuant                   A qualifying conduit hydropower
                                               the Commission in its Public Reference                  to section 30 of the Federal Power Act                facility is one that is determined or
                                               Room, Room 2A, 888 First Street NE,                     (FPA), as amended by section 4 of the                 deemed to meet all of the criteria shown
                                               Washington, DC 20426. The filing may                    Hydropower Regulatory Efficiency Act                  in the table below.

                                                                                 TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                  Satisfies
                                                            Statutory provision                                                             Description                                            (Y/N)

                                               FPA 30(a)(3)(A), as amended by HREA ...            The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or             Y
                                                                                                    similar manmade water conveyance that is operated for the distribution of water for
                                                                                                    agricultural, municipal, or industrial consumption and not primarily for the genera-
                                                                                                    tion of electricity.
                                               FPA 30(a)(3)(C)(i), as amended by HREA             The facility is constructed, operated, or maintained for the generation of electric                Y
                                                                                                    power and uses for such generation only the hydroelectric potential of a non-feder-
                                                                                                    ally owned conduit.
                                               FPA 30(a)(3)(C)(ii), as amended by HREA            The facility has an installed capacity that does not exceed 5 megawatts .....................      Y
                                               FPA 30(a)(3)(C)(iii), as amended by                On or before August 9, 2013, the facility is not licensed, or exempted from the licens-            Y
                                                 HREA.                                              ing requirements of Part I of the FPA.



                                                  Preliminary Determination: The                         Comments and Motions to Intervene:                     Filing and Service of Responsive
                                               proposed hydroelectric project will                     Deadline for filing comments contesting               Documents: All filings must (1) bear in
                                               utilize the Davis and Weber Canal, the                  whether the facility meets the qualifying             all capital letters the ‘‘COMMENTS
                                               primary purpose of which is to deliver                  criteria is 45 days from the issuance                 CONTESTING QUALIFICATION FOR A
                                               agricultural and irrigation water to                    date of this notice.                                  CONDUIT HYDROPOWER FACILITY’’
                                               Davis and Weber counties. The addition                    Deadline for filing motions to                      or ‘‘MOTION TO INTERVENE,’’ as
                                               of the Canal Station 603+00 Micro-                      intervene is 30 days from the issuance                applicable; (2) state in the heading the
                                               hydropower Project will not alter the                   date of this notice.                                  name of the applicant and the project
                                               conduit’s primary purpose. Therefore,                     Anyone may submit comments or a                     number of the application to which the
daltland on DSKBBV9HB2PROD with NOTICES




                                               based upon the above criteria,                          motion to intervene in accordance with                filing responds; (3) state the name,
                                               Commission staff preliminarily                          the requirements of Rules of Practice                 address, and telephone number of the
                                               determines that the proposal satisfies                  and Procedure, 18 CFR 385.210 and                     person filing; and (4) otherwise comply
                                               the requirements for a qualifying                       385.214. Any motions to intervene must                with the requirements of sections
                                               conduit hydropower facility, which is                   be received on or before the specified                385.2001 through 385.2005 of the
                                               not required to be licensed or exempted                 deadline date for the particular
                                               from licensing.                                         proceeding.


                                          VerDate Sep<11>2014   16:29 May 09, 2018   Jkt 244001   PO 00000   Frm 00010   Fmt 4703   Sfmt 4703   E:\FR\FM\10MYN1.SGM   10MYN1



Document Created: 2018-11-02 09:47:47
Document Modified: 2018-11-02 09:47:47
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 21770 