ENVIRONMENTAL PROTECTION AGENCY

Federal Register Volume 83, Issue 102 (May 25, 2018)

Page Range24226-24227
FR Document2018-11217

Pursuant to the Federal Clean Air Act (CAA or the Act), the Environmental Protection Agency (EPA) is approving a Louisiana State Implementation Plan (SIP) revision revising the 2008 8-hour ozone National Ambient Air Quality Standard (NAAQS) maintenance plan for the five-parish Baton Rouge area. The revised maintenance plan allows for relaxation of the Federal Reid Vapor Pressure (RVP) requirements in the Baton Rouge area. EPA has determined that relaxation of the RVP requirement would not interfere with attainment or maintenance of the NAAQS or with any other CAA requirement.

Federal Register, Volume 83 Issue 102 (Friday, May 25, 2018)
[Federal Register Volume 83, Number 102 (Friday, May 25, 2018)]
[Rules and Regulations]
[Pages 24226-24227]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-11217]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[EPA-R06-OAR-2018-0111; FRL-9978-44--Region 6]


Approval and Promulgation of Implementation Plans; Louisiana; 
2008 8-Hour Ozone Maintenance Plan Revision for Baton Rouge

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: Pursuant to the Federal Clean Air Act (CAA or the Act), the 
Environmental Protection Agency (EPA) is approving a Louisiana State 
Implementation Plan (SIP) revision revising the 2008 8-hour ozone 
National Ambient Air Quality Standard (NAAQS) maintenance plan for the 
five-parish Baton Rouge area. The revised maintenance plan allows for 
relaxation of the Federal Reid Vapor Pressure (RVP) requirements in the 
Baton Rouge area. EPA has determined that relaxation of the RVP 
requirement would not interfere with attainment or maintenance of the 
NAAQS or with any other CAA requirement.

DATES: This rule is effective on June 25, 2018.

ADDRESSES: The EPA has established a docket for this action under 
Docket ID No. EPA-R06-OAR-2018-0111. All documents in the docket are 
listed on the http://www.regulations.gov website. Although listed in 
the index, some information is not publicly available, e.g., 
Confidential Business Information or other information whose disclosure 
is restricted by statute. Certain other material, such as copyrighted 
material, is not placed on the internet and will be publicly available 
only in hard copy form. Publicly available docket materials are 
available either electronically through http://www.regulations.gov or 
in hard copy at the EPA Region 6, 1445 Ross Avenue, Suite 700, Dallas, 
Texas 75202-2733.

FOR FURTHER INFORMATION CONTACT: Wendy Jacques, 214-665-7395, 
[email protected].

SUPPLEMENTARY INFORMATION: Throughout this document ``we,'' ``us,'' and 
``our'' means the EPA.

I. Background

    The background for this action is discussed in detail in our April 
13, 2018 proposal (83 FR 16017). In that document we proposed to (1) 
approve a revision to the 2008 8-hour ozone NAAQS maintenance plan for 
the Baton Rouge area (Ascension, East Baton Rouge, Iberville, 
Livingston, and West Baton Rouge Parishes) and (2) determine that 
relaxation of the RVP requirement in the maintenance plan would not 
interfere with the attainment or maintenance of the NAAQS or with any 
other CAA requirement. While we did not receive any relevant adverse 
comments regarding our proposal, we did receive a letter of support 
from the Louisiana Mid-Continent Oil and Gas Association, and a comment 
letter from U.S. Senators John Kennedy and Bill Cassidy and U.S. 
Representative Garrett Graves requesting that we act expeditiously to 
finalize our proposed approval of the SIP revision. As stated in our 
proposed rule, we found the State's submission meets all applicable CAA 
requirements, thus we are finalizing the approval of this SIP revision 
as proposed.

II. Final Action

    We are approving the January 31, 2018 revision to the 2008 8-hour 
ozone NAAQS maintenance plan for the five-parish Baton Rouge area. We 
have determined that relaxation of the RVP requirement in the 
maintenance plan will not interfere with the attainment or maintenance 
of the NAAQS or with any other CAA requirement. This action is being 
taken under section 110 of the Act.

III. Statutory and Executive Order Reviews

    Under the CAA, the Administrator is required to approve a SIP 
submission that complies with the provisions of the Act and applicable 
Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in 
reviewing SIP submissions, the EPA's role is to approve state choices, 
provided that they meet the criteria of the CAA. Accordingly, this 
action merely approves state law as meeting Federal requirements and 
does not impose additional requirements beyond those imposed by state 
law. For that reason, this action:
     Is not a ``significant regulatory action'' subject to 
review by the Office of Management and Budget under Executive Orders 
12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 
2011);
     Is not an Executive Order 13771 (82 FR 9339, February 2, 
2017) regulatory action because SIP approvals are exempted under 
Executive Order 12866;
     Does not impose an information collection burden under the 
provisions

[[Page 24227]]

of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
     Is certified as not having a significant economic impact 
on a substantial number of small entities under the Regulatory 
Flexibility Act (5 U.S.C. 601 et seq.);
     Does not contain any unfunded mandate or significantly or 
uniquely affect small governments, as described in the Unfunded 
Mandates Reform Act of 1995 (Pub. L. 104-4);
     Does not have Federalism implications as specified in 
Executive Order 13132 (64 FR 43255, August 10, 1999);
     Is not an economically significant regulatory action based 
on health or safety risks subject to Executive Order 13045 (62 FR 
19885, April 23, 1997);
     Is not a significant regulatory action subject to 
Executive Order 13211 (66 FR 28355, May 22, 2001);
     Is not subject to requirements of section 12(d) of the 
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 
note) because application of those requirements would be inconsistent 
with the CAA; and
     Does not provide EPA with the discretionary authority to 
address, as appropriate, disproportionate human health or environmental 
effects, using practicable and legally permissible methods, under 
Executive Order 12898 (59 FR 7629, February 16, 1994).
    In addition, the SIP is not approved to apply on any Indian 
reservation land or in any other area where EPA or an Indian tribe has 
demonstrated that a tribe has jurisdiction. In those areas of Indian 
country, the rule does not have tribal implications and will not impose 
substantial direct costs on tribal governments or preempt tribal law as 
specified by Executive Order 13175 (65 FR 67249, November 9, 2000).
    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the 
Small Business Regulatory Enforcement Fairness Act of 1996, generally 
provides that before a rule may take effect, the agency promulgating 
the rule must submit a rule report, which includes a copy of the rule, 
to each House of the Congress and to the Comptroller General of the 
United States. EPA will submit a report containing this action and 
other required information to the U.S. Senate, the U.S. House of 
Representatives, and the Comptroller General of the United States prior 
to publication of the rule in the Federal Register. A major rule cannot 
take effect until 60 days after it is published in the Federal 
Register. This action is not a ``major rule'' as defined by 5 U.S.C. 
804(2).
    Under section 307(b)(1) of the Clean Air Act, petitions for 
judicial review of this action must be filed in the United States Court 
of Appeals for the appropriate circuit by July 24, 2018. Filing a 
petition for reconsideration by the Administrator of this final rule 
does not affect the finality of this action for the purposes of 
judicial review nor does it extend the time within which a petition for 
judicial review may be filed, and shall not postpone the effectiveness 
of such rule or action. This action may not be challenged later in 
proceedings to enforce its requirements. (See section 307(b)(2).)

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Incorporation by 
reference, Intergovernmental relations, Nitrogen dioxide, Ozone, 
Reporting and recordkeeping requirements, Volatile organic compounds.

    Dated: May 21, 2018.
Anne Idsal,
Regional Administrator, Region 6.

    Title 40 CFR part 52 is amended as follows:

PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

0
1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401 et seq.

Subpart T--Louisiana

0
2. In Sec.  52.970(e), the second table titled ``EPA Approved Louisiana 
Nonregulatory Provisions and Quasi-Regulatory Measures'' is amended by 
adding an entry at the end for ``2008 8-hour Ozone NAAQS Revised 
Maintenance Plan'' to read as follows:


Sec.  52.970  Identification of plan.

* * * * *
    (e) * * *

                  EPA Approved Louisiana Nonregulatory Provisions and Quasi-Regulatory Measures
----------------------------------------------------------------------------------------------------------------
                                                            State
                                        Applicable        submittal/
      Name of SIP provision            geographic or      effective     EPA approval date        Explanation
                                    nonattainment area       date
----------------------------------------------------------------------------------------------------------------
 
                                                  * * * * * * *
2008 8-hour Ozone NAAQS Revised    Baton Rouge Area....    1/31/2018  5/25/2018, [Insert    ....................
 Maintenance Plan.                                                     Federal Register
                                                                       citation].
----------------------------------------------------------------------------------------------------------------

[FR Doc. 2018-11217 Filed 5-24-18; 8:45 am]
BILLING CODE 6560-50-P



                                           24226                  Federal Register / Vol. 83, No. 102 / Friday, May 25, 2018 / Rules and Regulations

                                                                                         EPA-APPROVED RHODE ISLAND REGULATIONS—Continued
                                                                                                                                                                          EPA approval
                                                   State citation                     Title/subject                             State effective date                                            Explanations
                                                                                                                                                                             date

                                                      *                         *                          *                        *                       *                       *                  *



                                           *      *       *       *      *                                  (e) * * *

                                                                                                               RHODE ISLAND NON REGULATORY
                                           Name of non regulatory SIP               Applicable geographic or                State submittal date/          EPA approved date                  Explanations
                                                   provision                          nonattainment area                       effective date


                                                    *                           *                         *                        *                       *                    *                        *
                                           I/M SIP Narrative ................   Statewide ...........................   Submitted 2/17/2017 ........    5/25/2018, [insert Federal      Narrative describing how
                                                                                                                                                          Register citation].             the Rhode Island I/M
                                                                                                                                                                                          program meets the re-
                                                                                                                                                                                          quirements in the fed-
                                                                                                                                                                                          eral I/M rule.



                                           [FR Doc. 2018–11201 Filed 5–24–18; 8:45 am]                   e.g., Confidential Business Information                 State’s submission meets all applicable
                                           BILLING CODE 6560–50–P                                        or other information whose disclosure is                CAA requirements, thus we are
                                                                                                         restricted by statute. Certain other                    finalizing the approval of this SIP
                                                                                                         material, such as copyrighted material,                 revision as proposed.
                                           ENVIRONMENTAL PROTECTION                                      is not placed on the internet and will be
                                           AGENCY                                                                                                                II. Final Action
                                                                                                         publicly available only in hard copy
                                                                                                         form. Publicly available docket                            We are approving the January 31,
                                           40 CFR Part 52                                                materials are available either                          2018 revision to the 2008 8-hour ozone
                                           [EPA–R06–OAR–2018–0111; FRL–9978–                             electronically through http://                          NAAQS maintenance plan for the five-
                                           44—Region 6]                                                  www.regulations.gov or in hard copy at                  parish Baton Rouge area. We have
                                                                                                         the EPA Region 6, 1445 Ross Avenue,                     determined that relaxation of the RVP
                                           Approval and Promulgation of                                  Suite 700, Dallas, Texas 75202–2733.                    requirement in the maintenance plan
                                           Implementation Plans; Louisiana; 2008                         FOR FURTHER INFORMATION CONTACT:
                                                                                                                                                                 will not interfere with the attainment or
                                           8-Hour Ozone Maintenance Plan                                 Wendy Jacques, 214–665–7395,                            maintenance of the NAAQS or with any
                                           Revision for Baton Rouge                                      jacques.wendy@epa.gov.                                  other CAA requirement. This action is
                                                                                                                                                                 being taken under section 110 of the
                                           AGENCY:  Environmental Protection                             SUPPLEMENTARY INFORMATION:                              Act.
                                           Agency (EPA).                                                 Throughout this document ‘‘we,’’ ‘‘us,’’
                                           ACTION: Final rule.                                           and ‘‘our’’ means the EPA.                              III. Statutory and Executive Order
                                                                                                                                                                 Reviews
                                           SUMMARY: Pursuant to the Federal Clean                        I. Background
                                                                                                                                                                    Under the CAA, the Administrator is
                                           Air Act (CAA or the Act), the                                   The background for this action is                     required to approve a SIP submission
                                           Environmental Protection Agency (EPA)                         discussed in detail in our April 13, 2018               that complies with the provisions of the
                                           is approving a Louisiana State                                proposal (83 FR 16017). In that                         Act and applicable Federal regulations.
                                           Implementation Plan (SIP) revision                            document we proposed to (1) approve a                   42 U.S.C. 7410(k); 40 CFR 52.02(a).
                                           revising the 2008 8-hour ozone National                       revision to the 2008 8-hour ozone                       Thus, in reviewing SIP submissions, the
                                           Ambient Air Quality Standard (NAAQS)                          NAAQS maintenance plan for the Baton                    EPA’s role is to approve state choices,
                                           maintenance plan for the five-parish                          Rouge area (Ascension, East Baton                       provided that they meet the criteria of
                                           Baton Rouge area. The revised                                 Rouge, Iberville, Livingston, and West                  the CAA. Accordingly, this action
                                           maintenance plan allows for relaxation                        Baton Rouge Parishes) and (2) determine                 merely approves state law as meeting
                                           of the Federal Reid Vapor Pressure                            that relaxation of the RVP requirement                  Federal requirements and does not
                                           (RVP) requirements in the Baton Rouge                         in the maintenance plan would not                       impose additional requirements beyond
                                           area. EPA has determined that                                 interfere with the attainment or                        those imposed by state law. For that
                                           relaxation of the RVP requirement                             maintenance of the NAAQS or with any                    reason, this action:
                                           would not interfere with attainment or                        other CAA requirement. While we did                        • Is not a ‘‘significant regulatory
                                           maintenance of the NAAQS or with any                          not receive any relevant adverse                        action’’ subject to review by the Office
                                           other CAA requirement.                                        comments regarding our proposal, we                     of Management and Budget under
                                           DATES: This rule is effective on June 25,                     did receive a letter of support from the                Executive Orders 12866 (58 FR 51735,
                                           2018.                                                         Louisiana Mid-Continent Oil and Gas                     October 4, 1993) and 13563 (76 FR 3821,
                                           ADDRESSES: The EPA has established a                          Association, and a comment letter from                  January 21, 2011);
amozie on DSK3GDR082PROD with RULES




                                           docket for this action under Docket ID                        U.S. Senators John Kennedy and Bill                        • Is not an Executive Order 13771 (82
                                           No. EPA–R06–OAR–2018–0111. All                                Cassidy and U.S. Representative Garrett                 FR 9339, February 2, 2017) regulatory
                                           documents in the docket are listed on                         Graves requesting that we act                           action because SIP approvals are
                                           the http://www.regulations.gov website.                       expeditiously to finalize our proposed                  exempted under Executive Order 12866;
                                           Although listed in the index, some                            approval of the SIP revision. As stated                    • Does not impose an information
                                           information is not publicly available,                        in our proposed rule, we found the                      collection burden under the provisions


                                      VerDate Sep<11>2014     16:28 May 24, 2018     Jkt 244001   PO 00000      Frm 00008    Fmt 4700   Sfmt 4700   E:\FR\FM\25MYR1.SGM    25MYR1


                                                                Federal Register / Vol. 83, No. 102 / Friday, May 25, 2018 / Rules and Regulations                                                    24227

                                           of the Paperwork Reduction Act (44                      tribe has jurisdiction. In those areas of              not be challenged later in proceedings to
                                           U.S.C. 3501 et seq.);                                   Indian country, the rule does not have                 enforce its requirements. (See section
                                              • Is certified as not having a                       tribal implications and will not impose                307(b)(2).)
                                           significant economic impact on a                        substantial direct costs on tribal
                                                                                                                                                          List of Subjects in 40 CFR Part 52
                                           substantial number of small entities                    governments or preempt tribal law as
                                           under the Regulatory Flexibility Act (5                 specified by Executive Order 13175 (65                   Environmental protection, Air
                                           U.S.C. 601 et seq.);                                    FR 67249, November 9, 2000).                           pollution control, Incorporation by
                                              • Does not contain any unfunded                         The Congressional Review Act, 5                     reference, Intergovernmental relations,
                                           mandate or significantly or uniquely                    U.S.C. 801 et seq., as added by the Small              Nitrogen dioxide, Ozone, Reporting and
                                           affect small governments, as described                  Business Regulatory Enforcement                        recordkeeping requirements, Volatile
                                           in the Unfunded Mandates Reform Act                     Fairness Act of 1996, generally provides               organic compounds.
                                           of 1995 (Pub. L. 104–4);                                that before a rule may take effect, the
                                              • Does not have Federalism                           agency promulgating the rule must                        Dated: May 21, 2018.
                                           implications as specified in Executive                  submit a rule report, which includes a                 Anne Idsal,
                                           Order 13132 (64 FR 43255, August 10,                    copy of the rule, to each House of the                 Regional Administrator, Region 6.
                                           1999);                                                  Congress and to the Comptroller General
                                              • Is not an economically significant                 of the United States. EPA will submit a                  Title 40 CFR part 52 is amended as
                                           regulatory action based on health or                    report containing this action and other                follows:
                                           safety risks subject to Executive Order                 required information to the U.S. Senate,
                                                                                                                                                          PART 52—APPROVAL AND
                                           13045 (62 FR 19885, April 23, 1997);                    the U.S. House of Representatives, and
                                                                                                                                                          PROMULGATION OF
                                              • Is not a significant regulatory action             the Comptroller General of the United
                                                                                                                                                          IMPLEMENTATION PLANS
                                           subject to Executive Order 13211 (66 FR                 States prior to publication of the rule in
                                           28355, May 22, 2001);                                   the Federal Register. A major rule
                                              • Is not subject to requirements of                  cannot take effect until 60 days after it              ■ 1. The authority citation for part 52
                                           section 12(d) of the National                           is published in the Federal Register.                  continues to read as follows:
                                           Technology Transfer and Advancement                     This action is not a ‘‘major rule’’ as                     Authority: 42 U.S.C. 7401 et seq.
                                           Act of 1995 (15 U.S.C. 272 note) because                defined by 5 U.S.C. 804(2).
                                           application of those requirements would                    Under section 307(b)(1) of the Clean                Subpart T—Louisiana
                                           be inconsistent with the CAA; and                       Air Act, petitions for judicial review of
                                              • Does not provide EPA with the                      this action must be filed in the United                ■  2. In § 52.970(e), the second table
                                           discretionary authority to address, as                  States Court of Appeals for the                        titled ‘‘EPA Approved Louisiana
                                           appropriate, disproportionate human                     appropriate circuit by July 24, 2018.                  Nonregulatory Provisions and Quasi-
                                           health or environmental effects, using                  Filing a petition for reconsideration by               Regulatory Measures’’ is amended by
                                           practicable and legally permissible                     the Administrator of this final rule does              adding an entry at the end for ‘‘2008 8-
                                           methods, under Executive Order 12898                    not affect the finality of this action for             hour Ozone NAAQS Revised
                                           (59 FR 7629, February 16, 1994).                        the purposes of judicial review nor does               Maintenance Plan’’ to read as follows:
                                              In addition, the SIP is not approved                 it extend the time within which a
                                                                                                                                                          § 52.970    Identification of plan.
                                           to apply on any Indian reservation land                 petition for judicial review may be filed,
                                           or in any other area where EPA or an                    and shall not postpone the effectiveness               *       *    *      *      *
                                           Indian tribe has demonstrated that a                    of such rule or action. This action may                    (e) * * *
                                                            EPA APPROVED LOUISIANA NONREGULATORY PROVISIONS AND QUASI-REGULATORY MEASURES
                                                                                                                                  State
                                                                                               Applicable geographic or         submittal/
                                                     Name of SIP provision                                                                          EPA approval date                    Explanation
                                                                                                 nonattainment area              effective
                                                                                                                                   date


                                                   *             *                                   *                      *                        *                   *                        *
                                           2008 8-hour Ozone NAAQS Revised                    Baton Rouge Area ............      1/31/2018      5/25/2018, [Insert Federal
                                             Maintenance Plan.                                                                                    Register citation].



                                           [FR Doc. 2018–11217 Filed 5–24–18; 8:45 am]
                                           BILLING CODE 6560–50–P
amozie on DSK3GDR082PROD with RULES




                                      VerDate Sep<11>2014   16:28 May 24, 2018   Jkt 244001   PO 00000   Frm 00009   Fmt 4700   Sfmt 4700    E:\FR\FM\25MYR1.SGM   25MYR1



Document Created: 2018-05-25 02:13:00
Document Modified: 2018-05-25 02:13:00
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionFinal rule.
DatesThis rule is effective on June 25, 2018.
ContactWendy Jacques, 214-665-7395, [email protected]
FR Citation83 FR 24226 
CFR AssociatedEnvironmental Protection; Air Pollution Control; Incorporation by Reference; Intergovernmental Relations; Nitrogen Dioxide; Ozone; Reporting and Recordkeeping Requirements and Volatile Organic Compounds

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR