83_FR_2647 83 FR 2635 - Lock 13 Hydro Partners, LLC; Notice Soliciting Scoping Comments

83 FR 2635 - Lock 13 Hydro Partners, LLC; Notice Soliciting Scoping Comments

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 12 (January 18, 2018)

Page Range2635-2636
FR Document2018-00754

Federal Register, Volume 83 Issue 12 (Thursday, January 18, 2018)
[Federal Register Volume 83, Number 12 (Thursday, January 18, 2018)]
[Notices]
[Pages 2635-2636]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-00754]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14799-001]


Lock 13 Hydro Partners, LLC; Notice Soliciting Scoping Comments

    a. Type Filing: Notice of Intent to File License Application and 
Pre-Application Document for an Original Major License.
    b. Project No.: P-14799-001.
    c. Date Filed: September 7, 2017.
    d. Applicant: Lock 13 Hydro Partners, LLC.
    e. Name of Project: Evelyn Hydroelectric Project.
    f. Location: On the Kentucky River, in Lee and Estill Counties, 
Kentucky. The project would be located at the Commonwealth of 
Kentucky's existing Lock and Dam No. 13. No federal land would be 
occupied by the project works or located within the project boundary.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: David Brown Kinloch, Lock 13 Hydro Partners, 
LLC, 414 S. Wenzel Street, Louisville, KY

[[Page 2636]]

40204; (502) 589-0975; [email protected]
    i. FERC Contact: Sarah Salazar, (202) 502-6863 or 
[email protected].
    j. Cooperating Agencies: Federal, state, local, and tribal agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues that wish to cooperate in the preparation of the 
environmental document should follow the instructions for filing such 
requests described in item l below. Cooperating agencies should note 
the Commission's policy that agencies that cooperate in the preparation 
of the environmental document cannot also intervene. See 94 FERC 61,076 
(2001).
    k. Deadline for Filing Scoping Comments: February 8, 2018.
    l. With this notice, we are soliciting comments on Commission 
staff's Scoping Document 1 (SD1). All comments on the SD1 should be 
sent to the address above in paragraph h. In addition, all comments on 
SD1, requests for cooperating agency status, and all communications to 
and from Commission staff related to the merits of the potential 
application must be filed with the Commission. Documents may be filed 
electronically via the internet. See 18 CFR 385.2001(a)(1)(iii) and the 
instructions on the Commission's website http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support. In lieu of electronic 
filing, please send a paper copy to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426.
    All filings with the Commission must include on the first page, the 
project name (Evelyn Hydroelectric Project and number (P-14799-001), 
and bear the appropriate heading: Comments on Scoping Document 1, 
Request for Cooperating Agency Status, or Communications to and from 
Commission Staff. Any individual or entity interested in commenting on 
the SD1 must do so by February 8, 2018.
    m. A copy of the Pre-Application Document is available for review 
at the Commission in the Public Reference Room, or may be viewed on the 
Commission's website (http://www.ferc.gov) using the eLibrary link. 
Enter the docket number, excluding the last three digits in the docket 
number field, to access the document. For assistance, contact FERC 
Online Support at [email protected], or toll free at 1-866-
208-3676, or for TTY, (202) 502-8659. A copy is also available for 
inspection and reproduction at the address in paragraph h.
    Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Scoping Process: The Commission staff intends to prepare a 
single Environmental Assessment (EA) for the Evelyn Hydroelectric 
Project in accordance with the National Environmental Policy Act. The 
EA will consider both site-specific and cumulative environmental 
impacts and reasonable alternatives to the proposed action.
    Commission staff does not propose to conduct any on-site scoping 
meetings at this time. Instead, we are soliciting comments, 
recommendations, and information, on the SD1 issued on January 9, 2018.
    Copies of the SD1 outlining the subject areas to be addressed in 
the EA were distributed to the parties on the Commission's mailing list 
and the applicant's distribution list. Copies of the SD1 may be viewed 
on the web at http://www.ferc.gov using the eLibrary link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. For assistance, call 1-866-208-3676 or 
for TTY, (202) 502-8659.

    Dated: January 9, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-00754 Filed 1-17-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                             Federal Register / Vol. 83, No. 12 / Thursday, January 18, 2018 / Notices                                                  2635

                                                385.214) on or before 5:00 p.m. Eastern                 required, pursuant to 18 CFR 16.21(b),                    Docket Numbers: RP18–338–000.
                                                time on the specified comment date.                     to continue project operations until the                  Applicants: Guardian Pipeline, L.L.C.
                                                Protests may be considered, but                         Commission issues someone else a                          Description: § 4(d) Rate Filing:
                                                intervention is necessary to become a                   license for the project or otherwise                   Negotiated Rate PAL Agreement—
                                                party to the proceeding.                                orders disposition of the project.                     MIECO INC to be effective 1/10/2018.
                                                   eFiling is encouraged. More detailed                    If the project is subject to section 15                Filed Date: 1/9/18.
                                                information relating to filing                          of the FPA, notice is hereby given that                   Accession Number: 20180109–5146.
                                                requirements, interventions, protests,                  an annual license for Project No. 2531                    Comments Due: 5 p.m. ET 1/22/18.
                                                service, and qualifying facilities filings              is issued to the licensee for a period                    The filings are accessible in the
                                                can be found at: http://www.ferc.gov/                   effective January 1, 2018 through                      Commission’s eLibrary system by
                                                docs-filing/efiling/filing-req.pdf. For                 December 31, 2018 or until the issuance                clicking on the links or querying the
                                                other information, call (866) 208–3676                  of a new license for the project or other              docket number.
                                                (toll free). For TTY, call (202) 502–8659.              disposition under the FPA, whichever                      Any person desiring to intervene or
                                                  Dated: January 9, 2018.                               comes first. If issuance of a new license              protest in any of the above proceedings
                                                                                                        (or other disposition) does not take                   must file in accordance with Rules 211
                                                Kimberly D. Bose,
                                                                                                        place on or before December 31, 2018,                  and 214 of the Commission’s
                                                Secretary.
                                                                                                        notice is hereby given that, pursuant to               Regulations (18 CFR 385.211 and
                                                [FR Doc. 2018–00749 Filed 1–17–18; 8:45 am]             18 CFR 16.18(c), an annual license                     385.214) on or before 5:00 p.m. Eastern
                                                BILLING CODE 6717–01–P                                  under section 15(a)(1) of the FPA is                   time on the specified comment date.
                                                                                                        renewed automatically without further                  Protests may be considered, but
                                                                                                        order or notice by the Commission,                     intervention is necessary to become a
                                                DEPARTMENT OF ENERGY                                    unless the Commission orders                           party to the proceeding.
                                                Federal Energy Regulatory                               otherwise.                                                eFiling is encouraged. More detailed
                                                                                                           If the project is not subject to section            information relating to filing
                                                Commission
                                                                                                        15 of the FPA, notice is hereby given                  requirements, interventions, protests,
                                                [Project No. 2531–000]                                  that the licensee, Brookfield White Pine,              service, and qualifying facilities filings
                                                                                                        LLC is authorized to continue operation                can be found at: http://www.ferc.gov/
                                                Brookfield White Pine, LLC; Notice of                   of the West Buxton Hydroelectric                       docs-filing/efiling/filing-req.pdf. For
                                                Authorization for Continued Project                     Project, until such time as the                        other information, call (866) 208–3676
                                                Operation                                               Commission acts on its application for                 (toll free). For TTY, call (202) 502–8659.
                                                   On August 10, 2012, Brookfield White                 a subsequent license.
                                                                                                                                                                 Dated: January 10, 2018.
                                                Pine LLC, licensee for the West Buxton                    Dated: January 11, 2018.                             Kimberly D. Bose,
                                                Hydroelectric Project, filed an                         Kimberly D. Bose,                                      Secretary.
                                                Application for a New License pursuant                  Secretary.                                             [FR Doc. 2018–00743 Filed 1–17–18; 8:45 am]
                                                to the Federal Power Act (FPA) and the                  [FR Doc. 2018–00750 Filed 1–17–18; 8:45 am]            BILLING CODE 6717–01–P
                                                Commission’s regulations thereunder.                    BILLING CODE 6717–01–P
                                                The West Buxton Hydroelectric Project
                                                facility is located on the Saco River in                                                                       DEPARTMENT OF ENERGY
                                                the towns of Buxton, Hollis, and                        DEPARTMENT OF ENERGY
                                                Standish, within York and Cumberland                                                                           Federal Energy Regulatory
                                                Counties, Maine.                                        Federal Energy Regulatory                              Commission
                                                   The license for Project No. 2531 was                 Commission
                                                issued for a period ending December 31,                                                                        [Project No. 14799–001]
                                                2017. Section 15(a) (1) of the FPA, 16                  Combined Notice of Filings
                                                                                                                                                               Lock 13 Hydro Partners, LLC; Notice
                                                U.S.C. 808(a)(1), requires the                            Take notice that the Commission has                  Soliciting Scoping Comments
                                                Commission, at the expiration of a                      received the following Natural Gas
                                                license term, to issue from year-to-year                Pipeline Rate and Refund Report filings:                 a. Type Filing: Notice of Intent to File
                                                an annual license to the then licensee                                                                         License Application and Pre-
                                                under the terms and conditions of the                   Filings Instituting Proceedings                        Application Document for an Original
                                                prior license until a new license is                       Docket Numbers: RP18–272–001.                       Major License.
                                                issued, or the project is otherwise                        Applicants: Ryckman Creek                             b. Project No.: P–14799–001.
                                                disposed of as provided in section 15 or                Resources, LLC.                                          c. Date Filed: September 7, 2017.
                                                any other applicable section of the FPA.                   Description: Tariff Amendment:                        d. Applicant: Lock 13 Hydro Partners,
                                                If the project’s prior license waived the               Amended Non Conforming Service                         LLC.
                                                applicability of section 15 of the FPA,                 Agreement Filing to be effective 12/28/                  e. Name of Project: Evelyn
                                                then, based on section 9(b) of the                      2017.                                                  Hydroelectric Project.
                                                Administrative Procedure Act, 5 U.S.C.                     Filed Date: 1/9/18.                                   f. Location: On the Kentucky River, in
                                                558(c), and as set forth at 18 CFR                         Accession Number: 20180109–5145.                    Lee and Estill Counties, Kentucky. The
                                                16.21(a), if the licensee of such project                  Comments Due: 5 p.m. ET 1/22/18.                    project would be located at the
                                                has filed an application for a subsequent                  Docket Numbers: RP18–337–000.                       Commonwealth of Kentucky’s existing
                                                license, the licensee may continue to                                                                          Lock and Dam No. 13. No federal land
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                           Applicants: Gulf Crossing Pipeline
                                                operate the project in accordance with                  Company LLC.                                           would be occupied by the project works
                                                the terms and conditions of the license                    Description: § 4(d) Rate Filing: Neg                or located within the project boundary.
                                                after the minor or minor part license                   Rate Agmt Filing (BP 1936) to be                         g. Filed Pursuant to: Federal Power
                                                expires, until the Commission acts on                   effective 1/9/2018.                                    Act 16 U.S.C. 791(a)–825(r).
                                                its application. If the licensee of such a                 Filed Date: 1/9/18.                                   h. Applicant Contact: David Brown
                                                project has not filed an application for                   Accession Number: 20180109–5022.                    Kinloch, Lock 13 Hydro Partners, LLC,
                                                a subsequent license, then it may be                       Comments Due: 5 p.m. ET 1/22/18.                    414 S. Wenzel Street, Louisville, KY


                                           VerDate Sep<11>2014   18:27 Jan 17, 2018   Jkt 244001   PO 00000   Frm 00021   Fmt 4703   Sfmt 4703   E:\FR\FM\18JAN1.SGM   18JAN1


                                                2636                         Federal Register / Vol. 83, No. 12 / Thursday, January 18, 2018 / Notices

                                                40204; (502) 589–0975; email—                           assistance, contact FERC Online                        Commission) invites the general public
                                                kyhydropower@gmail.com.                                 Support at FERCONlineSupport@                          and other Federal agencies to take this
                                                   i. FERC Contact: Sarah Salazar, (202)                ferc.gov, or toll free at 1–866–208–3676,              opportunity to comment on the
                                                502–6863 or sarah.salazar@ferc.gov.                     or for TTY, (202) 502–8659. A copy is                  following information collections.
                                                   j. Cooperating Agencies: Federal,                    also available for inspection and                      Comments are requested concerning:
                                                state, local, and tribal agencies with                  reproduction at the address in                         Whether the proposed collection of
                                                jurisdiction and/or special expertise                   paragraph h.                                           information is necessary for the proper
                                                with respect to environmental issues                       Register online at http://                          performance of the functions of the
                                                that wish to cooperate in the                           www.ferc.gov/docs-filing/                              Commission, including whether the
                                                preparation of the environmental                        esubscription.asp to be notified via                   information shall have practical utility;
                                                document should follow the                              email of new filings and issuances                     the accuracy of the Commission’s
                                                instructions for filing such requests                   related to this or other pending projects.             burden estimate; ways to enhance the
                                                described in item l below. Cooperating                  For assistance, contact FERC Online                    quality, utility, and clarity of the
                                                agencies should note the Commission’s                   Support.                                               information collected; ways to minimize
                                                policy that agencies that cooperate in                     n. Scoping Process: The Commission                  the burden of the collection of
                                                the preparation of the environmental                    staff intends to prepare a single                      information on the respondents,
                                                document cannot also intervene. See 94                  Environmental Assessment (EA) for the                  including the use of automated
                                                FERC 61,076 (2001).                                     Evelyn Hydroelectric Project in                        collection techniques or other forms of
                                                   k. Deadline for Filing Scoping                       accordance with the National                           information technology; and ways to
                                                Comments: February 8, 2018.                             Environmental Policy Act. The EA will                  further reduce the information
                                                   l. With this notice, we are soliciting               consider both site-specific and                        collection burden on small business
                                                comments on Commission staff’s                          cumulative environmental impacts and                   concerns with fewer than 25 employees.
                                                Scoping Document 1 (SD1). All                           reasonable alternatives to the proposed                  The FCC may not conduct or sponsor
                                                comments on the SD1 should be sent to                   action.                                                a collection of information unless it
                                                the address above in paragraph h. In                       Commission staff does not propose to                displays a currently valid Office of
                                                addition, all comments on SD1, requests                 conduct any on-site scoping meetings at                Management and Budget (OMB) control
                                                for cooperating agency status, and all                  this time. Instead, we are soliciting                  number. No person shall be subject to
                                                communications to and from                              comments, recommendations, and                         any penalty for failing to comply with
                                                Commission staff related to the merits of               information, on the SD1 issued on                      a collection of information subject to the
                                                the potential application must be filed                 January 9, 2018.                                       PRA that does not display a valid OMB
                                                with the Commission. Documents may                         Copies of the SD1 outlining the                     control number.
                                                be filed electronically via the internet.               subject areas to be addressed in the EA
                                                See 18 CFR 385.2001(a)(1)(iii) and the                                                                         DATES: Written PRA comments should
                                                                                                        were distributed to the parties on the                 be submitted on or before March 19,
                                                instructions on the Commission’s                        Commission’s mailing list and the
                                                website http://www.ferc.gov/docs-filing/                                                                       2018. If you anticipate that you will be
                                                                                                        applicant’s distribution list. Copies of               submitting comments, but find it
                                                efiling.asp. Commenters can submit                      the SD1 may be viewed on the web at
                                                brief comments up to 6,000 characters,                                                                         difficult to do so within the period of
                                                                                                        http://www.ferc.gov using the eLibrary                 time allowed by this notice, you should
                                                without prior registration, using the                   link. Enter the docket number excluding
                                                eComment system at http://                                                                                     advise the contact listed below as soon
                                                                                                        the last three digits in the docket                    as possible.
                                                www.ferc.gov/docs-filing/                               number field to access the document.
                                                ecomment.asp. You must include your                                                                            ADDRESSES: Direct all PRA comments to
                                                                                                        For assistance, call 1–866–208–3676 or
                                                name and contact information at the end                                                                        Cathy Williams, FCC, via email PRA@
                                                                                                        for TTY, (202) 502–8659.
                                                of your comments. For assistance,                                                                              fcc.gov and to Cathy.Williams@fcc.gov.
                                                please contact FERC Online Support. In                    Dated: January 9, 2018.                              FOR FURTHER INFORMATION CONTACT: For
                                                lieu of electronic filing, please send a                Kimberly D. Bose,                                      additional information about the
                                                paper copy to: Kimberly D. Bose,                        Secretary.                                             information collection, contact Cathy
                                                Secretary, Federal Energy Regulatory                    [FR Doc. 2018–00754 Filed 1–17–18; 8:45 am]            Williams at (202) 418–2918.
                                                Commission, 888 First Street NE,                        BILLING CODE 6717–01–P                                 SUPPLEMENTARY INFORMATION:
                                                Washington, DC 20426.                                                                                            OMB Control Number: 3060–0441.
                                                   All filings with the Commission must                                                                          Title: Section 90.621, Selection and
                                                include on the first page, the project                  FEDERAL COMMUNICATIONS                                 Assignment of Frequencies and Section
                                                name (Evelyn Hydroelectric Project and                  COMMISSION                                             90.693, Grandfathering Provisions for
                                                number (P–14799–001), and bear the                                                                             Incumbent Licensees.
                                                appropriate heading: Comments on                        [OMB 3060–0441]
                                                                                                                                                                 Form Number: N/A.
                                                Scoping Document 1, Request for                                                                                  Type of Review: Extension of a
                                                                                                        Information Collection Being Reviewed
                                                Cooperating Agency Status, or                                                                                  currently approved collection.
                                                                                                        by the Federal Communications
                                                Communications to and from                                                                                       Respondents: Business or other for-
                                                                                                        Commission Under Delegated
                                                Commission Staff. Any individual or                                                                            profit entities; Not-for-profit
                                                                                                        Authority
                                                entity interested in commenting on the                                                                         institutions; and State, Local, or Tribal
                                                SD1 must do so by February 8, 2018.                     AGENCY: Federal Communications                         Government.
                                                   m. A copy of the Pre-Application                     Commission.                                              Number of Respondents: 50
                                                Document is available for review at the
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        ACTION: Notice and request for                         respondents; 50 responses.
                                                Commission in the Public Reference                      comments.                                                Estimated Time per Response: 1.5
                                                Room, or may be viewed on the                                                                                  hours.
                                                Commission’s website (http://                           SUMMARY:  As part of its continuing effort               Frequency of Response: On occasion
                                                www.ferc.gov) using the eLibrary link.                  to reduce paperwork burdens, and as                    reporting requirement.
                                                Enter the docket number, excluding the                  required by the Paperwork Reduction                      Obligation to Respond: Required to
                                                last three digits in the docket number                  Act of 1995 (PRA), the Federal                         obtain or retain benefits. Statutory
                                                field, to access the document. For                      Communications Commission (FCC or                      authority for this information collection


                                           VerDate Sep<11>2014   18:27 Jan 17, 2018   Jkt 244001   PO 00000   Frm 00022   Fmt 4703   Sfmt 4703   E:\FR\FM\18JAN1.SGM   18JAN1



Document Created: 2018-01-18 00:42:38
Document Modified: 2018-01-18 00:42:38
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 2635 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR