83_FR_27629 83 FR 27515 - The Uniendo a Puerto Rico Fund and the Connect USVI Fund, Connect America Fund, ETC Annual Reports and Certifications

83 FR 27515 - The Uniendo a Puerto Rico Fund and the Connect USVI Fund, Connect America Fund, ETC Annual Reports and Certifications

FEDERAL COMMUNICATIONS COMMISSION

Federal Register Volume 83, Issue 114 (June 13, 2018)

Page Range27515-27518
FR Document2018-12488

In this document, the Federal Communications Commission (Commission) establishes the Uniendo a Puerto Rico Fund and the Connect USVI Fund to rebuild, improve and expand voice and broadband networks in Puerto Rico and the U.S. Virgin Islands. Through the Uniendo a Puerto Rico Fund, the Commission will make available up to $750 million of funding to carriers in Puerto Rico, including an immediate infusion of $51.2 million for restoration efforts in 2018. Through the Connect USVI Fund, the Commission will make available up to $204 million of funding to carriers in the U.S. Virgin Islands, including an immediate infusion of $13 million for restoration efforts in 2018. As a result of these Funds, as well as the Commission's decision not to offset more than $65 million in advance payments it made to carriers last year, it will make available up to $256 million in additional high-cost support for rebuilding, improving, and expanding broadband-capable networks in Puerto Rico and the Virgin Islands.

Federal Register, Volume 83 Issue 114 (Wednesday, June 13, 2018)
[Federal Register Volume 83, Number 114 (Wednesday, June 13, 2018)]
[Rules and Regulations]
[Pages 27515-27518]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-12488]


=======================================================================
-----------------------------------------------------------------------

FEDERAL COMMUNICATIONS COMMISSION

47 CFR Part 54

[WC Docket Nos. 18-143, 10-90, 14-58; FCC 18-57]


The Uniendo a Puerto Rico Fund and the Connect USVI Fund, Connect 
America Fund, ETC Annual Reports and Certifications

AGENCY: Federal Communications Commission.

ACTION: Final action.

-----------------------------------------------------------------------

SUMMARY: In this document, the Federal Communications Commission 
(Commission) establishes the Uniendo a Puerto Rico Fund and the Connect 
USVI Fund to rebuild, improve and expand voice and broadband networks 
in Puerto Rico and the U.S. Virgin Islands. Through the Uniendo a 
Puerto Rico Fund, the Commission will make available up to $750 million 
of funding to carriers in Puerto Rico, including an immediate infusion 
of $51.2 million for restoration efforts in 2018. Through the Connect 
USVI Fund, the Commission will make available up to $204 million of 
funding to carriers in the U.S. Virgin Islands, including an immediate 
infusion of $13 million for restoration efforts in 2018. As a result of 
these Funds, as well as the Commission's decision not to offset more 
than $65 million in advance payments it made to carriers last year, it 
will make available up to $256 million in additional high-cost support 
for rebuilding, improving, and expanding broadband-capable networks in 
Puerto Rico and the Virgin Islands.

DATES: This action is effective June 13, 2018.

FOR FURTHER INFORMATION CONTACT: Alexander Minard, Wireline Competition 
Bureau, (202) 418-7400 or TTY: (202) 418-0484.

SUPPLEMENTARY INFORMATION: This is a summary of the Commission's Order 
in WC Docket Nos. 18-143, 10-90, 14-58; FCC 18-57, adopted on May 8, 
2018 and released on May 29, 2018. The full text of this document is 
available for public inspection during regular business hours in the 
FCC Reference Center, Room CY-A257, 445 12th Street SW, Washington, DC 
20554 or at the following internet address: https://docs.fcc.gov/public/attachments/FCC-18-57A1.pdf.

I. Introduction

    1. The 2017 hurricane season caused widespread devastation to 
Puerto Rico and the U.S. Virgin Islands, destroying thousands of homes 
and causing near total destruction of critical infrastructure. 
Hurricane Maria, the strongest storm to hit Puerto Rico in almost a 
century, ripped through the island as a Category 4 storm with 155-mph 
winds. Following on the heels of Hurricane Irma, Maria's damage to the 
communications network proved particularly devastating. The government 
of Puerto Rico estimates that the two hurricanes caused approximately 
$1.5 billion of damage to the communications network. Similarly, Maria 
``decimat[ed] the communications and power grid'' across St. Croix, the 
largest of the U.S. Virgin Islands. And the ``[t]wo other main islands, 
St. John and St. Thomas, [had been] pummeled by Hurricane Irma just 14 
days earlier.'' Recovery of the communications networks in Puerto Rico 
and the U.S. Virgin Islands has proven especially challenging, 
particularly compared to other locations in the United States impacted 
by this season's hurricanes,

[[Page 27516]]

due to their isolation from the mainland, which has caused logistical 
difficulties and contributed to ongoing electrical power outages.
    2. Restoring communications networks is a critical element of 
recovery. The Commission establishes the Uniendo a Puerto Rico Fund and 
the Connect USVI Fund to rebuild, improve and expand voice and 
broadband networks in Puerto Rico and the U.S. Virgin Islands.
    3. Through the Uniendo a Puerto Rico Fund, the Commission will make 
available up to $750 million of funding to carriers in Puerto Rico, 
including an immediate infusion of $51.2 million for restoration 
efforts in 2018. Of the remainder, the Commission anticipates that 
about $444.5 million would be made available over a 10-year term for 
fixed voice and broadband (an $84 million increase over current funding 
levels) and that about $254 million would be made available over a 3-
year term for 4G Long-Term Evolution (LTE) mobile voice and broadband 
(a $16.8 million increase).
    4. Through the Connect USVI Fund, the Commission will make 
available up to $204 million of funding to carriers in the U.S. Virgin 
Islands, including an immediate infusion of $13 million for restoration 
efforts in 2018. Of the remainder, the Commission anticipates that 
about $186.5 million would be made available over a 10-year term for 
fixed broadband (a $21 million increase) and that about $4.4 million 
would be made available over a 3-year term for 4G LTE mobile voice and 
broadband (a $4.2 million increase).
    5. As a result of these Funds, as well as the Commission's decision 
not to offset more than $65 million in advance payments it made to 
carriers last year, the Commission will make available up to $256 
million in additional high-cost support for rebuilding, improving, and 
expanding broadband-capable networks in Puerto Rico and the Virgin 
Islands. The Commission intends to target high-cost support over the 
next several years in a tailored and cost-effective manner, using 
competitive processes where appropriate.

II. Order: No Offset of Advance Payments

    6. At the outset, the Commission now declines to offset the 
approximately $65.8 million in emergency high-cost support provided 
immediately following the hurricanes against future payments. Although 
the Commission had previously anticipated offsetting the advance 
payments against future support, it no longer believes that to be a 
prudent course. The continuing difficulties in bringing service and 
power back to Puerto Rico and the U.S. Virgin Islands have impeded and 
delayed restoration efforts so that conditions on the islands have not 
improved sufficiently to justify reducing future support payments. 
Restoration efforts are still ongoing rather than largely complete and 
persistent power outages and other logistical challenges have made the 
continued operation of restored networks more expensive than some 
expected. As such, requiring the offset of advance payments would 
substantially delay, if not prevent, further restoration efforts--and 
the Commission finds that the public interest is best served by 
allowing carriers to continue their critical work to restore their 
communications networks. The Commission therefore declines to offset 
future payments against the emergency relief granted by the 2017 
Hurricane Funding Order.
    7. As a result, the Commission will continue in 2018 to provide, at 
a minimum, current levels of high-cost support to carriers in Puerto 
Rico and the U.S. Virgin Islands. This means that in Puerto Rico, the 
fixed carrier (PRTC) will continue to receive approximately $3 million 
each month (or $36 million annualized) and mobile carriers (Centennial 
Puerto Rico Operations Corp., Suncom Wireless Puerto Rico Operating 
Co., Cingular Wireless, Puerto Rico Telephone Company, PR Wireless 
Inc., and Worldnet Telecommunications, Inc.) will continue to receive 
approximately $6.6 million each month (or $79.2 million annualized) in 
frozen support in the near term. In the U.S. Virgin Islands, the fixed 
carrier (Viya) will continue to receive approximately $1.4 million each 
month (or $16.5 million annualized) and the mobile carrier (Choice 
Communications, LLC) will continue to receive approximately $5,600 each 
month (or $67,000 annualized) in frozen support in the near term.
    8. Also as a result of this decision, the advance payments should 
be considered a new, one-time source of high-cost support provided in 
the immediate aftermath of the hurricanes. The same rules and 
accountability measures as currently govern the frozen high-cost 
support these carriers receive will continue to apply. The Commission 
will also apply its accounting and audit rules to prevent waste, fraud, 
and abuse. For the reasons given in section III, paras. 22-23 in the 
following, the Commission finds good cause to forego the usual notice-
and-comment procedure for this Order.

III. The Uniendo A Puerto Rico Fund and the Connect USVI Fund

    9. The Commission will establish the Uniendo a Puerto Rico Fund and 
the Connect USVI Fund in two stages. In stage one, the Commission makes 
$51.2 million in new funding available to Puerto Rico and $13 million 
to the U.S. Virgin Islands to help restore voice and broadband service. 
The Commission provides this immediate relief to allow impacted 
carriers to rebuild more quickly in 2018 and set the stage for the 
longer-term plan. In stage two, the Commission intends to make about 
$699 million available in the Uniendo a Puerto Rico Fund and about $191 
million available in the Connect USVI Fund to rebuild, improve, and 
expand voice and broadband networks on the islands in the longer term.
    10. The Commission finds that it is in the public interest to 
provide new funding in the short term to restore service in Puerto Rico 
and the U.S. Virgin Islands. Given the devastation wrought by these two 
back-to-back hurricanes, which collectively were unprecedented in their 
severity and in the protracted duration of damage they caused, the 
Commission decides to make available up to $64.2 million of new 
funding--roughly equal to the amount it has decided not to offset 
against existing support payments--to bolster the ability of existing 
carriers to restore their facilities across the islands. This 
additional support should help restore and maintain service as quickly 
as possible for as many people as possible during that interim period.
    11. Specifically, the Commission directs a one-time infusion of 
$51.2 million through the Uniendo a Puerto Rico Fund and $13 million 
through the Connect USVI Fund to support any facilities-based providers 
of voice and broadband services even if they have not previously 
received universal service support. The Commission finds this 
allocation of support (in addition to existing support streams) to be 
likely sufficient to cover the short-term costs of restoration while 
the Commission considers further reforms and funding over the longer 
term. In so finding, the Commission takes into account, among other 
factors, differences in landmass, geography, topography, and population 
between Puerto Rico and the U.S. Virgin Islands, the significant 
financial and operational challenges faced by carriers in both areas, 
and the past and current availability of high-cost support to carriers.
    12. The Commission distributes the Stage 1 funding for each 
territory through a three-step process. First, any

[[Page 27517]]

facilities-based provider of voice and broadband internet access 
service may elect to participate in this opportunity for new 
restoration funding. To participate, a facilities-based provider must 
submit a certification regarding the number of subscribers (voice or 
broadband internet access service) it served in the territory as of 
June 30, 2017 (before the hurricanes), along with accompanying 
evidence, to the Commission within 14 days of the publication of this 
Order. A voice-only subscriber, a broadband-only subscriber, and a 
voice-and-broadband subscriber each count as one subscriber. For mobile 
network operators, each line in a multi-line plan counts as one 
subscriber. For fixed network operators, each enterprise location 
served counts as one subscriber; such treatment reflects the high fixed 
costs of deploying service to any one location as well as the higher 
revenue potential of enterprise customers. The Commission uses the same 
definition of voice and broadband subscribers as applies to FCC Form 
477 reporting. Providers also must file a copy of the certification and 
accompanying evidence through the Commission's Electronic Comment 
Filing System (ECFS) as well as email a copy to [email protected]. 
The Commission will then verify eligibility using various data sources, 
including FCC Form 477 data.
    13. Second, the Commission allocates 60 percent of the funding 
available to the territory to fixed network operators and 40 percent to 
mobile network operators. The Commission does so for two reasons. For 
one, allocating more to fixed service providers is appropriate in light 
of the relatively higher costs of restoring fixed services. For 
another, the Commission expects that restoring and improving the fixed 
network will facilitate more reliable and faster backhaul for the 
mobile services. In other words, new funding for fixed networks may in 
fact decrease at least some of the need for funding of mobile networks.
    14. Third, the Commission directs the Wireline Competition Bureau 
(WCB) and the Wireless Telecommunications Bureau (WTB) to allocate 
these amounts among qualifying providers of each territory and type 
according to the number of subscribers (voice or broadband internet 
access service) each served as of June 30, 2017. The Bureaus shall make 
public these allocations via a Public Notice as soon as practicable.
    15. The Commission notes that to be eligible for funding, the 
provider must be willing at the time of certification to be designated 
an eligible telecommunications carrier (ETC) by the relevant 
commission, must in fact become an ETC and submit that designation to 
the Universal Service Administrative Company (USAC) before receiving 
any funding, and must remain an ETC for at least one year after first 
receiving funding. Given the importance of conducting restoration 
operations as quickly as possible, the Commission expects local 
regulators and providers to work together to designate ETCs as quickly 
as possible. If a provider has not been designated an ETC within 60 
days of the Bureaus' announcement of support allocations, the 
Commission reserves the right to redirect that provider's allocation 
toward other universal service purposes, such as increasing the funding 
available for long-term rebuilding of voice and broadband-capable 
networks in Puerto Rico and the U.S. Virgin Islands.
    16. The Commission reminds providers that section 254(e) of the Act 
and Sec.  54.7 of the Commission's rules provide that carriers 
receiving federal universal service support ``shall use that support 
only for the provision, maintenance, and upgrading of facilities and 
services for which the support is intended.'' Carriers must therefore 
use this additional funding to help restore and improve coverage and 
service quality to pre-hurricane levels and to help safeguard their 
equipment against future natural disasters. Appropriate uses include 
repairing, removing, reinforcing or relocating network elements damaged 
during the hurricanes; repairing or restoring customer premise 
equipment; replacing, rebuilding, and reinforcing the physical outside 
plant (poles, fiber, nodes, coaxial cables, and the like); hardening 
networks against future disasters; and increasing network resiliency to 
power outages or other potential service interruptions due to natural 
disasters. To help ensure that support is targeted towards short-term 
restoration and rebuilding expenses, the Commission limits eligible 
expenditures to those incurred through June 30, 2019, beginning from 
the date that the affected areas were declared a disaster by the 
Federal Emergency Management Agency following Hurricanes Irma and 
Maria. Carriers will be required to certify both at the time of 
acceptance of support and after support is spent that all support was 
used for the intended purpose. The Commission also notes that, during 
the short term when networks are still being restored, backhaul from 
fixed-service providers is essential to the provision of mobile 
services and it requires providers seeking restoration funding to offer 
backhaul to all interested parties on nondiscriminatory terms for a 
period of one year after first receiving funds. Failure to abide by 
these conditions may result in the loss of some or all restoration 
funding. The Commission reminds Puerto Rico and the U.S. Virgin Islands 
that the Act prohibits the territories from adopting regulations 
related to funding that are ``inconsistent with the Commission's rules 
to preserve and advance universal service.''
    17. To protect against duplicative recovery and guard against 
waste, fraud, and abuse, carriers may not use this support for costs 
that are (or will be) reimbursed by other sources of funding inclusive 
of federal or local government aid or insurance reimbursements. 
Moreover, carriers are prohibited from using Stage 1 support for other 
purposes, such as the retirement of company debt unrelated to eligible 
expenditures, or other expenses not directly related to hurricane 
restoration and improvement. The Commission reminds carriers that high-
cost support recipients ``are subject to random compliance audits and 
other investigations to ensure compliance with program rules and 
orders.'' Carriers must retain for at least ten years the records 
required to demonstrate that their use of this support complied with 
this Order and other Commission rules. The Commission directs USAC to 
initiate audits of Stage 1 disbursements in conjunction with its 2018 
audits.
    18. The Commission acknowledges that they are not allocating the 
new funding in proportion to frozen high-cost support. That is in large 
part because those frozen allocations were by and large established at 
least seven years ago and do not necessarily reflect the costs of 
providing or restoring service or the extent of today's networks. 
Indeed, if the Commission were to follow such allocation, wireless 
carriers in Puerto Rico would receive approximately 1,177 times the 
support of such carriers in the U.S. Virgin Islands--a strange result 
given that Puerto Rico is only 33 times larger than the U.S. Virgin 
Islands. And networks owned by those not historically universal-service 
recipients would be entirely excluded--despite the damage they incurred 
from the hurricanes. Instead, the Commission believes the relative size 
of each network, coupled with a recognition that fixed service networks 
generally require greater funding for restoration efforts and the need 
to provide non-contiguous service in the U.S. Virgin Islands, better 
reflect the likely costs of restoration.
    19. The Commission finds that using notice and comment procedures 
for this interim and one-time relief, and thereby

[[Page 27518]]

delaying its effectiveness by at least several months, would be 
impracticable and contrary to the public interest. The good cause 
exception to the notice and comment procedures of the Administrative 
Procedures Act ``excuses notice and comment in emergency situations, or 
where delay could result in serious harm.''
    20. Given the emergency situation and the devastation to 
communications networks caused by the hurricanes, the sooner providers 
receive additional funds, the sooner service can be restored to the 
people of Puerto Rico and the U.S. Virgin Islands. As noted above, 
Hurricane Maria was a once-in-a-century storm that caused devastating 
damage. Even after months of recovery efforts, ``the majority of 
citizens in Puerto Rico lack access to continuous and reliable 
telecommunications services.'' Similarly, ``only a small percentage of 
Viya's wireline customers have had their voice, broadband, and cable 
service restored, and there are still significant gaps in Viya's USVI 
wireless coverage.'' Voice and broadband-capable networks, of course, 
serve important public safety goals (including allowing the public to 
quickly notify first responders of emergencies). And the next hurricane 
season commences on June 1, 2018. Delaying these funds could result in 
serious harm if carriers are not able to restore and fortify their 
service before the start of the next hurricane season. Such efforts 
will take significant time, and the Commission wishes to help the 
carriers proceed as rapidly as possible.
    21. The Commission is also concerned that some carriers might 
choose cheaper restoration plans that leave equipment vulnerable to 
another hurricane over more costly restoration plans that better 
protect against future natural disasters. Further, unlike other 
affected areas, Puerto Rico and the U.S. Virgin Islands have struggled 
to restore electrical power. One provider explains that ``[t]he 
principal cause of communications outages and network unreliability in 
Puerto Rico undoubtedly has been the continued lack of commercial power 
and long-term reliance on backup generators.'' Based on these unique 
circumstances, the Commission finds that the need for rapid action 
provides good cause for forgoing the usual administrative procedures in 
this unique situation.
    22. The Commission further finds good cause to make this relief 
effective immediately upon publication in the Federal Register. ``In 
determining whether good cause exists, an agency should `balance the 
necessity for immediate implementation against principles of 
fundamental fairness which require that all affected persons be 
afforded a reasonable amount of time to prepare for the effective date 
of its ruling.' '' This interim relief imposes no regulatory burden on 
any carrier but merely offers funds to help their restoration efforts. 
The Commission therefore does not believe it would violate fundamental 
fairness to make the action effective immediately, particularly given 
the substantial need for immediate implementation of the relief, which 
only exists during calendar year 2018. Indeed, waiting 30 days to make 
this relief available ``would undermine the public interest by 
delaying'' restoration of service in hurricane-ravaged areas.
    23. Finally, given the urgent need to bring service back to pre-
hurricane levels as soon as possible, the Commission finds good cause 
to extend its previous waiver of Sec.  54.313(c)(4) of the Commission's 
rules, which requires carriers receiving frozen support to certify that 
all support is used ``to build and operate broadband-capable networks 
used to offer the provider's own retail broadband service in areas 
substantially unserved by an unsubsidized competitor.''

IV. Procedural Matters

A. Paperwork Reduction Act

    24. This document does not contain new information collection 
requirements subject to the Paperwork Reduction Act of 1995 (PRA), 
Public Law 104-13. In addition, therefore, it does not contain any new 
or information collection burden for small business concerns with fewer 
than 25 employees, pursuant to the Small Business Paperwork Relief Act 
of 2002, Public Law 107-198, see 44 U.S.C. 3506(c)(4).

B. Congressional Review Act

    25. The Commission will send a copy of this Order to Congress and 
the Government Accountability Office pursuant to the Congressional 
Review Act, see 5 U.S.C. 801(a)(1)(A).
    26. Final Regulatory Flexibility Certification. Because the Order 
relies upon the good cause exception to notice and comment procedures, 
no final regulatory flexibility analysis is required under 5 U.S.C. 
604.

V. Ordering Clauses

    27. Accordingly, it is ordered, pursuant to the authority contained 
in sections 4(i), 214, 254, 303(r), and 403 of the Communications Act 
of 1934, as amended, 47 U.S.C. 154(i), 214, 254, 303(r), and 403, and 
Sec. Sec.  1.1, 1.3, and 1.412 of the Commission's rules, 47 CFR 1.1, 
1.3, and 1.412, that this Order is adopted. The Order is effective upon 
publication in the Federal Register.
    28. It is further ordered that, pursuant to Sec.  1.3 of the 
Commission's rules, 47 CFR 1.3, that Sec.  54.313(c)(4) of the 
Commission's rules, 47 CFR 54.313(c)(4), is waived to the extent 
described in this document.


Federal Communications Commission.
Marlene Dortch,
Secretary.
[FR Doc. 2018-12488 Filed 6-12-18; 8:45 am]
 BILLING CODE 6712-01-P



                                                            Federal Register / Vol. 83, No. 114 / Wednesday, June 13, 2018 / Rules and Regulations                                          27515

                                           or on the distribution of power and                     PART 165—REGULATED NAVIGATION                          to carriers in Puerto Rico, including an
                                           responsibilities between the Federal                    AREAS AND LIMITED ACCESS AREAS                         immediate infusion of $51.2 million for
                                           Government and Indian tribes. If you                                                                           restoration efforts in 2018. Through the
                                           believe this rule has implications for                  ■ 1. The authority citation for part 165               Connect USVI Fund, the Commission
                                           federalism or Indian tribes, please                     continues to read as follows:                          will make available up to $204 million
                                           contact the person listed in the FOR                      Authority: 33 U.S.C. 1231; 50 U.S.C. 191;            of funding to carriers in the U.S. Virgin
                                           FURTHER INFORMATION CONTACT section                     33 CFR 1.05–1, 6.04–1, and 160.5;                      Islands, including an immediate
                                           above.                                                  Department of Homeland Security Delegation             infusion of $13 million for restoration
                                                                                                   No. 0170.1.                                            efforts in 2018. As a result of these
                                           E. Unfunded Mandates Reform Act
                                                                                                   ■ 2. Add § 165.T13–0536 to read as                     Funds, as well as the Commission’s
                                             The Unfunded Mandates Reform Act                      follows:                                               decision not to offset more than $65
                                           of 1995 (2 U.S.C. 1531–1538) requires                                                                          million in advance payments it made to
                                           Federal agencies to assess the effects of               § 165.T13–0536 Safety Zone; Columbia                   carriers last year, it will make available
                                           their discretionary regulatory actions. In              River, The Dalles, OR.                                 up to $256 million in additional high-
                                           particular, the Act addresses actions                     (a) Safety zone. The following area is               cost support for rebuilding, improving,
                                           that may result in the expenditure by a                 designated a safety zone: Waters of the                and expanding broadband-capable
                                           State, local, or tribal government, in the              Columbia River, within a 450-yard                      networks in Puerto Rico and the Virgin
                                           aggregate, or by the private sector of                  radius of the fireworks barge located at               Islands.
                                           $100,000,000 (adjusted for inflation) or                45°36′18″ N, 121°10′23″ W in vicinity of               DATES: This action is effective June 13,
                                           more in any one year. Though this rule                  The Dalles, OR.                                        2018.
                                           will not result in such an expenditure,                   (b) Regulations. In accordance with                  FOR FURTHER INFORMATION CONTACT:
                                           we do discuss the effects of this rule                  § 165.23, no person may enter or remain                Alexander Minard, Wireline
                                           elsewhere in this preamble.                             in this safety zone unless authorized by               Competition Bureau, (202) 418–7400 or
                                                                                                   the Captain of the Port Columbia River                 TTY: (202) 418–0484.
                                           F. Environment                                          or his designated representative. Also in
                                                                                                                                                          SUPPLEMENTARY INFORMATION: This is a
                                              We have analyzed this rule under                     accordance with § 165.23, no person
                                                                                                   may bring into, or allow to remain in                  summary of the Commission’s Order in
                                           Department of Homeland Security                                                                                WC Docket Nos. 18–143, 10–90, 14–58;
                                           Directive 023–01 and Commandant                         this safety zone any vehicle, vessel, or
                                                                                                   object unless authorized by the Captain                FCC 18–57, adopted on May 8, 2018 and
                                           Instruction M16475.1D, which guide the                                                                         released on May 29, 2018. The full text
                                           Coast Guard in complying with the                       of the Port Columbia River or his
                                                                                                   designated representative.                             of this document is available for public
                                           National Environmental Policy Act of                                                                           inspection during regular business
                                           1969 (42 U.S.C. 4321–4370f), and have                     (c) Enforcement period. This section
                                                                                                   will be enforced from 9 p.m. to 11:30                  hours in the FCC Reference Center,
                                           determined that this action is one of a                                                                        Room CY–A257, 445 12th Street SW,
                                           category of actions that do not                         p.m. on June 30, 2018.
                                                                                                                                                          Washington, DC 20554 or at the
                                           individually or cumulatively have a                        Dated: June 6, 2018.                                following internet address: https://
                                           significant effect on the human                         D.F. Berliner,                                         docs.fcc.gov/public/attachments/FCC-
                                           environment. This rule involves a safety                Captain, U.S. Coast Guard, Acting Captain              18-57A1.pdf.
                                           zone lasting approximately two and a                    of the Port, Sector Columbia River.
                                           half hours that will prohibit entry                     [FR Doc. 2018–12658 Filed 6–12–18; 8:45 am]
                                                                                                                                                          I. Introduction
                                           within 450 yards of a fireworks barge. It               BILLING CODE 9110–04–P                                    1. The 2017 hurricane season caused
                                           is categorically excluded from further                                                                         widespread devastation to Puerto Rico
                                           review under paragraph L60(a) of                                                                               and the U.S. Virgin Islands, destroying
                                           Appendix A, Table 1 of DHS Instruction                                                                         thousands of homes and causing near
                                           Manual 023–01–001–01, Rev. 01. A                        FEDERAL COMMUNICATIONS
                                                                                                   COMMISSION                                             total destruction of critical
                                           Record of Environmental Consideration                                                                          infrastructure. Hurricane Maria, the
                                           supporting this determination is                                                                               strongest storm to hit Puerto Rico in
                                                                                                   47 CFR Part 54
                                           available in the docket where indicated                                                                        almost a century, ripped through the
                                           under ADDRESSES.                                        [WC Docket Nos. 18–143, 10–90, 14–58; FCC              island as a Category 4 storm with 155-
                                                                                                   18–57]                                                 mph winds. Following on the heels of
                                           G. Protest Activities
                                                                                                                                                          Hurricane Irma, Maria’s damage to the
                                             The Coast Guard respects the First                    The Uniendo a Puerto Rico Fund and
                                                                                                                                                          communications network proved
                                           Amendment rights of protesters.                         the Connect USVI Fund, Connect
                                                                                                                                                          particularly devastating. The
                                           Protesters are asked to contact the                     America Fund, ETC Annual Reports
                                                                                                                                                          government of Puerto Rico estimates
                                           person listed in the FOR FURTHER                        and Certifications
                                                                                                                                                          that the two hurricanes caused
                                           INFORMATION CONTACT section to                          AGENCY:  Federal Communications                        approximately $1.5 billion of damage to
                                           coordinate protest activities so that your              Commission.                                            the communications network. Similarly,
                                           message can be received without                                                                                Maria ‘‘decimat[ed] the communications
                                                                                                   ACTION: Final action.
                                           jeopardizing the safety or security of                                                                         and power grid’’ across St. Croix, the
                                           people, places or vessels.                              SUMMARY:   In this document, the Federal               largest of the U.S. Virgin Islands. And
                                           List of Subjects in 33 CFR Part 165                     Communications Commission                              the ‘‘[t]wo other main islands, St. John
                                                                                                   (Commission) establishes the Uniendo a                 and St. Thomas, [had been] pummeled
                                             Harbors, Marine safety, Navigation                    Puerto Rico Fund and the Connect USVI                  by Hurricane Irma just 14 days earlier.’’
amozie on DSK3GDR082PROD with RULES




                                           (water), Reporting and recordkeeping                    Fund to rebuild, improve and expand                    Recovery of the communications
                                           requirements, Security measures,                        voice and broadband networks in Puerto                 networks in Puerto Rico and the U.S.
                                           Waterways.                                              Rico and the U.S. Virgin Islands.                      Virgin Islands has proven especially
                                             For the reasons discussed in the                      Through the Uniendo a Puerto Rico                      challenging, particularly compared to
                                           preamble, the Coast Guard amends 33                     Fund, the Commission will make                         other locations in the United States
                                           CFR part 165 as follows:                                available up to $750 million of funding                impacted by this season’s hurricanes,


                                      VerDate Sep<11>2014   15:53 Jun 12, 2018   Jkt 244001   PO 00000   Frm 00011   Fmt 4700   Sfmt 4700   E:\FR\FM\13JNR1.SGM   13JNR1


                                           27516            Federal Register / Vol. 83, No. 114 / Wednesday, June 13, 2018 / Rules and Regulations

                                           due to their isolation from the                         difficulties in bringing service and                   III. The Uniendo A Puerto Rico Fund
                                           mainland, which has caused logistical                   power back to Puerto Rico and the U.S.                 and the Connect USVI Fund
                                           difficulties and contributed to ongoing                 Virgin Islands have impeded and                           9. The Commission will establish the
                                           electrical power outages.                               delayed restoration efforts so that                    Uniendo a Puerto Rico Fund and the
                                              2. Restoring communications                          conditions on the islands have not                     Connect USVI Fund in two stages. In
                                           networks is a critical element of                       improved sufficiently to justify reducing              stage one, the Commission makes $51.2
                                           recovery. The Commission establishes                    future support payments. Restoration                   million in new funding available to
                                           the Uniendo a Puerto Rico Fund and the                  efforts are still ongoing rather than                  Puerto Rico and $13 million to the U.S.
                                           Connect USVI Fund to rebuild, improve                   largely complete and persistent power                  Virgin Islands to help restore voice and
                                           and expand voice and broadband                          outages and other logistical challenges                broadband service. The Commission
                                           networks in Puerto Rico and the U.S.                    have made the continued operation of                   provides this immediate relief to allow
                                           Virgin Islands.                                         restored networks more expensive than
                                              3. Through the Uniendo a Puerto Rico                                                                        impacted carriers to rebuild more
                                                                                                   some expected. As such, requiring the                  quickly in 2018 and set the stage for the
                                           Fund, the Commission will make                          offset of advance payments would
                                           available up to $750 million of funding                                                                        longer-term plan. In stage two, the
                                                                                                   substantially delay, if not prevent,                   Commission intends to make about $699
                                           to carriers in Puerto Rico, including an                further restoration efforts—and the
                                           immediate infusion of $51.2 million for                                                                        million available in the Uniendo a
                                                                                                   Commission finds that the public                       Puerto Rico Fund and about $191
                                           restoration efforts in 2018. Of the
                                                                                                   interest is best served by allowing                    million available in the Connect USVI
                                           remainder, the Commission anticipates
                                                                                                   carriers to continue their critical work to            Fund to rebuild, improve, and expand
                                           that about $444.5 million would be
                                                                                                   restore their communications networks.                 voice and broadband networks on the
                                           made available over a 10-year term for
                                                                                                   The Commission therefore declines to                   islands in the longer term.
                                           fixed voice and broadband (an $84
                                           million increase over current funding                   offset future payments against the                        10. The Commission finds that it is in
                                           levels) and that about $254 million                     emergency relief granted by the 2017                   the public interest to provide new
                                           would be made available over a 3-year                   Hurricane Funding Order.                               funding in the short term to restore
                                           term for 4G Long-Term Evolution (LTE)                      7. As a result, the Commission will                 service in Puerto Rico and the U.S.
                                           mobile voice and broadband (a $16.8                     continue in 2018 to provide, at a                      Virgin Islands. Given the devastation
                                           million increase).                                      minimum, current levels of high-cost                   wrought by these two back-to-back
                                              4. Through the Connect USVI Fund,                    support to carriers in Puerto Rico and                 hurricanes, which collectively were
                                           the Commission will make available up                   the U.S. Virgin Islands. This means that               unprecedented in their severity and in
                                           to $204 million of funding to carriers in               in Puerto Rico, the fixed carrier (PRTC)               the protracted duration of damage they
                                           the U.S. Virgin Islands, including an                   will continue to receive approximately                 caused, the Commission decides to
                                           immediate infusion of $13 million for                   $3 million each month (or $36 million                  make available up to $64.2 million of
                                           restoration efforts in 2018. Of the                     annualized) and mobile carriers                        new funding—roughly equal to the
                                           remainder, the Commission anticipates                   (Centennial Puerto Rico Operations                     amount it has decided not to offset
                                           that about $186.5 million would be                      Corp., Suncom Wireless Puerto Rico                     against existing support payments—to
                                           made available over a 10-year term for                  Operating Co., Cingular Wireless, Puerto               bolster the ability of existing carriers to
                                           fixed broadband (a $21 million increase)                Rico Telephone Company, PR Wireless                    restore their facilities across the islands.
                                           and that about $4.4 million would be                    Inc., and Worldnet                                     This additional support should help
                                           made available over a 3-year term for 4G                Telecommunications, Inc.) will                         restore and maintain service as quickly
                                           LTE mobile voice and broadband (a $4.2                  continue to receive approximately $6.6                 as possible for as many people as
                                           million increase).                                      million each month (or $79.2 million                   possible during that interim period.
                                              5. As a result of these Funds, as well                                                                         11. Specifically, the Commission
                                                                                                   annualized) in frozen support in the
                                           as the Commission’s decision not to                                                                            directs a one-time infusion of $51.2
                                                                                                   near term. In the U.S. Virgin Islands, the
                                           offset more than $65 million in advance                                                                        million through the Uniendo a Puerto
                                                                                                   fixed carrier (Viya) will continue to
                                           payments it made to carriers last year,                                                                        Rico Fund and $13 million through the
                                                                                                   receive approximately $1.4 million each
                                           the Commission will make available up                                                                          Connect USVI Fund to support any
                                                                                                   month (or $16.5 million annualized)
                                           to $256 million in additional high-cost                                                                        facilities-based providers of voice and
                                                                                                   and the mobile carrier (Choice
                                           support for rebuilding, improving, and                                                                         broadband services even if they have
                                                                                                   Communications, LLC) will continue to
                                           expanding broadband-capable networks                                                                           not previously received universal
                                                                                                   receive approximately $5,600 each
                                           in Puerto Rico and the Virgin Islands.                                                                         service support. The Commission finds
                                                                                                   month (or $67,000 annualized) in frozen                this allocation of support (in addition to
                                           The Commission intends to target high-                  support in the near term.
                                           cost support over the next several years                                                                       existing support streams) to be likely
                                           in a tailored and cost-effective manner,                   8. Also as a result of this decision, the           sufficient to cover the short-term costs
                                           using competitive processes where                       advance payments should be considered                  of restoration while the Commission
                                           appropriate.                                            a new, one-time source of high-cost                    considers further reforms and funding
                                                                                                   support provided in the immediate                      over the longer term. In so finding, the
                                           II. Order: No Offset of Advance                         aftermath of the hurricanes. The same                  Commission takes into account, among
                                           Payments                                                rules and accountability measures as                   other factors, differences in landmass,
                                              6. At the outset, the Commission now                 currently govern the frozen high-cost                  geography, topography, and population
                                           declines to offset the approximately                    support these carriers receive will                    between Puerto Rico and the U.S. Virgin
                                           $65.8 million in emergency high-cost                    continue to apply. The Commission will                 Islands, the significant financial and
                                           support provided immediately                            also apply its accounting and audit rules              operational challenges faced by carriers
amozie on DSK3GDR082PROD with RULES




                                           following the hurricanes against future                 to prevent waste, fraud, and abuse. For                in both areas, and the past and current
                                           payments. Although the Commission                       the reasons given in section III, paras.               availability of high-cost support to
                                           had previously anticipated offsetting the               22–23 in the following, the Commission                 carriers.
                                           advance payments against future                         finds good cause to forego the usual                      12. The Commission distributes the
                                           support, it no longer believes that to be               notice-and-comment procedure for this                  Stage 1 funding for each territory
                                           a prudent course. The continuing                        Order.                                                 through a three-step process. First, any


                                      VerDate Sep<11>2014   15:53 Jun 12, 2018   Jkt 244001   PO 00000   Frm 00012   Fmt 4700   Sfmt 4700   E:\FR\FM\13JNR1.SGM   13JNR1


                                                            Federal Register / Vol. 83, No. 114 / Wednesday, June 13, 2018 / Rules and Regulations                                          27517

                                           facilities-based provider of voice and                  relevant commission, must in fact                      on nondiscriminatory terms for a period
                                           broadband internet access service may                   become an ETC and submit that                          of one year after first receiving funds.
                                           elect to participate in this opportunity                designation to the Universal Service                   Failure to abide by these conditions may
                                           for new restoration funding. To                         Administrative Company (USAC) before                   result in the loss of some or all
                                           participate, a facilities-based provider                receiving any funding, and must remain                 restoration funding. The Commission
                                           must submit a certification regarding the               an ETC for at least one year after first               reminds Puerto Rico and the U.S. Virgin
                                           number of subscribers (voice or                         receiving funding. Given the importance                Islands that the Act prohibits the
                                           broadband internet access service) it                   of conducting restoration operations as                territories from adopting regulations
                                           served in the territory as of June 30,                  quickly as possible, the Commission                    related to funding that are ‘‘inconsistent
                                           2017 (before the hurricanes), along with                expects local regulators and providers to              with the Commission’s rules to preserve
                                           accompanying evidence, to the                           work together to designate ETCs as                     and advance universal service.’’
                                           Commission within 14 days of the                        quickly as possible. If a provider has not                17. To protect against duplicative
                                           publication of this Order. A voice-only                 been designated an ETC within 60 days                  recovery and guard against waste, fraud,
                                           subscriber, a broadband-only subscriber,                of the Bureaus’ announcement of                        and abuse, carriers may not use this
                                           and a voice-and-broadband subscriber                    support allocations, the Commission                    support for costs that are (or will be)
                                           each count as one subscriber. For                       reserves the right to redirect that                    reimbursed by other sources of funding
                                           mobile network operators, each line in                  provider’s allocation toward other                     inclusive of federal or local government
                                           a multi-line plan counts as one                         universal service purposes, such as                    aid or insurance reimbursements.
                                           subscriber. For fixed network operators,                increasing the funding available for                   Moreover, carriers are prohibited from
                                           each enterprise location served counts                  long-term rebuilding of voice and                      using Stage 1 support for other
                                           as one subscriber; such treatment                       broadband-capable networks in Puerto                   purposes, such as the retirement of
                                           reflects the high fixed costs of deploying              Rico and the U.S. Virgin Islands.                      company debt unrelated to eligible
                                           service to any one location as well as                                                                         expenditures, or other expenses not
                                                                                                      16. The Commission reminds
                                           the higher revenue potential of                                                                                directly related to hurricane restoration
                                                                                                   providers that section 254(e) of the Act
                                           enterprise customers. The Commission                                                                           and improvement. The Commission
                                                                                                   and § 54.7 of the Commission’s rules
                                           uses the same definition of voice and                                                                          reminds carriers that high-cost support
                                                                                                   provide that carriers receiving federal
                                           broadband subscribers as applies to FCC                                                                        recipients ‘‘are subject to random
                                                                                                   universal service support ‘‘shall use that
                                           Form 477 reporting. Providers also must                                                                        compliance audits and other
                                                                                                   support only for the provision,                        investigations to ensure compliance
                                           file a copy of the certification and
                                                                                                   maintenance, and upgrading of facilities               with program rules and orders.’’ Carriers
                                           accompanying evidence through the
                                                                                                   and services for which the support is                  must retain for at least ten years the
                                           Commission’s Electronic Comment
                                                                                                   intended.’’ Carriers must therefore use                records required to demonstrate that
                                           Filing System (ECFS) as well as email a
                                                                                                   this additional funding to help restore                their use of this support complied with
                                           copy to ConnectAmerica@fcc.gov. The
                                                                                                   and improve coverage and service                       this Order and other Commission rules.
                                           Commission will then verify eligibility
                                                                                                   quality to pre-hurricane levels and to                 The Commission directs USAC to
                                           using various data sources, including
                                                                                                   help safeguard their equipment against                 initiate audits of Stage 1 disbursements
                                           FCC Form 477 data.
                                              13. Second, the Commission allocates                 future natural disasters. Appropriate                  in conjunction with its 2018 audits.
                                           60 percent of the funding available to                  uses include repairing, removing,                         18. The Commission acknowledges
                                           the territory to fixed network operators                reinforcing or relocating network                      that they are not allocating the new
                                           and 40 percent to mobile network                        elements damaged during the                            funding in proportion to frozen high-
                                           operators. The Commission does so for                   hurricanes; repairing or restoring                     cost support. That is in large part
                                           two reasons. For one, allocating more to                customer premise equipment; replacing,                 because those frozen allocations were by
                                           fixed service providers is appropriate in               rebuilding, and reinforcing the physical               and large established at least seven
                                           light of the relatively higher costs of                 outside plant (poles, fiber, nodes,                    years ago and do not necessarily reflect
                                           restoring fixed services. For another, the              coaxial cables, and the like); hardening               the costs of providing or restoring
                                           Commission expects that restoring and                   networks against future disasters; and                 service or the extent of today’s
                                           improving the fixed network will                        increasing network resiliency to power                 networks. Indeed, if the Commission
                                           facilitate more reliable and faster                     outages or other potential service                     were to follow such allocation, wireless
                                           backhaul for the mobile services. In                    interruptions due to natural disasters.                carriers in Puerto Rico would receive
                                           other words, new funding for fixed                      To help ensure that support is targeted                approximately 1,177 times the support
                                           networks may in fact decrease at least                  towards short-term restoration and                     of such carriers in the U.S. Virgin
                                           some of the need for funding of mobile                  rebuilding expenses, the Commission                    Islands—a strange result given that
                                           networks.                                               limits eligible expenditures to those                  Puerto Rico is only 33 times larger than
                                              14. Third, the Commission directs the                incurred through June 30, 2019,                        the U.S. Virgin Islands. And networks
                                           Wireline Competition Bureau (WCB)                       beginning from the date that the affected              owned by those not historically
                                           and the Wireless Telecommunications                     areas were declared a disaster by the                  universal-service recipients would be
                                           Bureau (WTB) to allocate these amounts                  Federal Emergency Management Agency                    entirely excluded—despite the damage
                                           among qualifying providers of each                      following Hurricanes Irma and Maria.                   they incurred from the hurricanes.
                                           territory and type according to the                     Carriers will be required to certify both              Instead, the Commission believes the
                                           number of subscribers (voice or                         at the time of acceptance of support and               relative size of each network, coupled
                                           broadband internet access service) each                 after support is spent that all support                with a recognition that fixed service
                                           served as of June 30, 2017. The Bureaus                 was used for the intended purpose. The                 networks generally require greater
                                           shall make public these allocations via                 Commission also notes that, during the                 funding for restoration efforts and the
amozie on DSK3GDR082PROD with RULES




                                           a Public Notice as soon as practicable.                 short term when networks are still being               need to provide non-contiguous service
                                              15. The Commission notes that to be                  restored, backhaul from fixed-service                  in the U.S. Virgin Islands, better reflect
                                           eligible for funding, the provider must                 providers is essential to the provision of             the likely costs of restoration.
                                           be willing at the time of certification to              mobile services and it requires                           19. The Commission finds that using
                                           be designated an eligible                               providers seeking restoration funding to               notice and comment procedures for this
                                           telecommunications carrier (ETC) by the                 offer backhaul to all interested parties               interim and one-time relief, and thereby


                                      VerDate Sep<11>2014   15:53 Jun 12, 2018   Jkt 244001   PO 00000   Frm 00013   Fmt 4700   Sfmt 4700   E:\FR\FM\13JNR1.SGM   13JNR1


                                           27518            Federal Register / Vol. 83, No. 114 / Wednesday, June 13, 2018 / Rules and Regulations

                                           delaying its effectiveness by at least                  principles of fundamental fairness                     1.412 of the Commission’s rules, 47 CFR
                                           several months, would be impracticable                  which require that all affected persons                1.1, 1.3, and 1.412, that this Order is
                                           and contrary to the public interest. The                be afforded a reasonable amount of time                adopted. The Order is effective upon
                                           good cause exception to the notice and                  to prepare for the effective date of its               publication in the Federal Register.
                                           comment procedures of the                               ruling.’ ’’ This interim relief imposes no               28. It is further ordered that, pursuant
                                           Administrative Procedures Act ‘‘excuses                 regulatory burden on any carrier but                   to § 1.3 of the Commission’s rules, 47
                                           notice and comment in emergency                         merely offers funds to help their                      CFR 1.3, that § 54.313(c)(4) of the
                                           situations, or where delay could result                 restoration efforts. The Commission                    Commission’s rules, 47 CFR
                                           in serious harm.’’                                      therefore does not believe it would                    54.313(c)(4), is waived to the extent
                                              20. Given the emergency situation and                violate fundamental fairness to make the               described in this document.
                                           the devastation to communications                       action effective immediately,
                                           networks caused by the hurricanes, the                                                                         Federal Communications Commission.
                                                                                                   particularly given the substantial need
                                           sooner providers receive additional                     for immediate implementation of the                    Marlene Dortch,
                                           funds, the sooner service can be restored               relief, which only exists during calendar              Secretary.
                                           to the people of Puerto Rico and the                    year 2018. Indeed, waiting 30 days to                  [FR Doc. 2018–12488 Filed 6–12–18; 8:45 am]
                                           U.S. Virgin Islands. As noted above,                    make this relief available ‘‘would                     BILLING CODE 6712–01–P
                                           Hurricane Maria was a once-in-a-                        undermine the public interest by
                                           century storm that caused devastating                   delaying’’ restoration of service in
                                           damage. Even after months of recovery                   hurricane-ravaged areas.                               DEPARTMENT OF COMMERCE
                                           efforts, ‘‘the majority of citizens in                     23. Finally, given the urgent need to
                                           Puerto Rico lack access to continuous                   bring service back to pre-hurricane                    National Oceanic and Atmospheric
                                           and reliable telecommunications                         levels as soon as possible, the                        Administration
                                           services.’’ Similarly, ‘‘only a small                   Commission finds good cause to extend
                                           percentage of Viya’s wireline customers                 its previous waiver of § 54.313(c)(4) of               50 CFR Part 679
                                           have had their voice, broadband, and                    the Commission’s rules, which requires
                                           cable service restored, and there are still             carriers receiving frozen support to                   [Docket No. 170816769–8162–02]
                                           significant gaps in Viya’s USVI wireless                certify that all support is used ‘‘to build
                                           coverage.’’ Voice and broadband-                                                                               RIN 0648–XG285
                                                                                                   and operate broadband-capable
                                           capable networks, of course, serve                      networks used to offer the provider’s                  Fisheries of the Exclusive Economic
                                           important public safety goals (including                own retail broadband service in areas                  Zone Off Alaska; Pacific Cod by
                                           allowing the public to quickly notify                   substantially unserved by an                           Vessels Using Jig Gear in the Central
                                           first responders of emergencies). And                   unsubsidized competitor.’’                             Regulatory Area of the Gulf of Alaska
                                           the next hurricane season commences
                                           on June 1, 2018. Delaying these funds                   IV. Procedural Matters                                 AGENCY:  National Marine Fisheries
                                           could result in serious harm if carriers                A. Paperwork Reduction Act                             Service (NMFS), National Oceanic and
                                           are not able to restore and fortify their                                                                      Atmospheric Administration (NOAA),
                                           service before the start of the next                      24. This document does not contain                   Commerce.
                                           hurricane season. Such efforts will take                new information collection
                                                                                                                                                          ACTION: Temporary rule; closure.
                                           significant time, and the Commission                    requirements subject to the Paperwork
                                           wishes to help the carriers proceed as                  Reduction Act of 1995 (PRA), Public                    SUMMARY:    NMFS is prohibiting directed
                                           rapidly as possible.                                    Law 104–13. In addition, therefore, it                 fishing for Pacific cod by vessels using
                                              21. The Commission is also concerned                 does not contain any new or                            jig gear in the Central Regulatory Area
                                           that some carriers might choose cheaper                 information collection burden for small                of the Gulf of Alaska (GOA). This action
                                           restoration plans that leave equipment                  business concerns with fewer than 25                   is necessary to prevent exceeding the
                                           vulnerable to another hurricane over                    employees, pursuant to the Small                       2018 Pacific cod total allowable catch
                                           more costly restoration plans that better               Business Paperwork Relief Act of 2002,                 apportioned to vessels using jig gear in
                                           protect against future natural disasters.               Public Law 107–198, see 44 U.S.C.                      the Central Regulatory Area of the GOA.
                                           Further, unlike other affected areas,                   3506(c)(4).                                            DATES: Effective 1200 hours, Alaska
                                           Puerto Rico and the U.S. Virgin Islands                                                                        local time (A.l.t.), June 10, 2018,
                                                                                                   B. Congressional Review Act
                                           have struggled to restore electrical                                                                           through 2400 hours, A.l.t., December 31,
                                           power. One provider explains that                         25. The Commission will send a copy
                                                                                                                                                          2018.
                                           ‘‘[t]he principal cause of                              of this Order to Congress and the
                                           communications outages and network                      Government Accountability Office                       FOR FURTHER INFORMATION CONTACT:
                                           unreliability in Puerto Rico                            pursuant to the Congressional Review                   Obren Davis, 907–586–7228.
                                           undoubtedly has been the continued                      Act, see 5 U.S.C. 801(a)(1)(A).                        SUPPLEMENTARY INFORMATION: NMFS
                                           lack of commercial power and long-term                    26. Final Regulatory Flexibility                     manages the groundfish fishery in the
                                           reliance on backup generators.’’ Based                  Certification. Because the Order relies                GOA exclusive economic zone
                                           on these unique circumstances, the                      upon the good cause exception to notice                according to the Fishery Management
                                           Commission finds that the need for                      and comment procedures, no final                       Plan for Groundfish of the Gulf of
                                           rapid action provides good cause for                    regulatory flexibility analysis is required            Alaska (FMP) prepared by the North
                                           forgoing the usual administrative                       under 5 U.S.C. 604.                                    Pacific Fishery Management Council
                                           procedures in this unique situation.                                                                           under authority of the Magnuson-
                                              22. The Commission further finds                     V. Ordering Clauses                                    Stevens Fishery Conservation and
amozie on DSK3GDR082PROD with RULES




                                           good cause to make this relief effective                  27. Accordingly, it is ordered,                      Management Act. Regulations governing
                                           immediately upon publication in the                     pursuant to the authority contained in                 fishing by U.S. vessels in accordance
                                           Federal Register. ‘‘In determining                      sections 4(i), 214, 254, 303(r), and 403               with the FMP appear at subpart H of 50
                                           whether good cause exists, an agency                    of the Communications Act of 1934, as                  CFR part 600 and 50 CFR part 679.
                                           should ‘balance the necessity for                       amended, 47 U.S.C. 154(i), 214, 254,                   Regulations governing sideboard
                                           immediate implementation against                        303(r), and 403, and §§ 1.1, 1.3, and                  protections for GOA groundfish


                                      VerDate Sep<11>2014   15:53 Jun 12, 2018   Jkt 244001   PO 00000   Frm 00014   Fmt 4700   Sfmt 4700   E:\FR\FM\13JNR1.SGM   13JNR1



Document Created: 2018-06-12 23:59:32
Document Modified: 2018-06-12 23:59:32
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionFinal action.
DatesThis action is effective June 13, 2018.
ContactAlexander Minard, Wireline Competition Bureau, (202) 418-7400 or TTY: (202) 418-0484.
FR Citation83 FR 27515 

2025 Federal Register | Disclaimer | Privacy Policy