83_FR_28337 83 FR 28220 - Notice of Application for Temporary Amendment and Soliciting Comments, Motions To Intervene, and Protests; North Eastern Wisconsin Hydro, LLC.

83 FR 28220 - Notice of Application for Temporary Amendment and Soliciting Comments, Motions To Intervene, and Protests; North Eastern Wisconsin Hydro, LLC.

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 117 (June 18, 2018)

Page Range28220-28221
FR Document2018-12949

Federal Register, Volume 83 Issue 117 (Monday, June 18, 2018)
[Federal Register Volume 83, Number 117 (Monday, June 18, 2018)]
[Notices]
[Pages 28220-28221]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-12949]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 8015-005]


Notice of Application for Temporary Amendment and Soliciting 
Comments, Motions To Intervene, and Protests; North Eastern Wisconsin 
Hydro, LLC.

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Temporary Amendment.
    b. Project No.: 8015-005.
    c. Date Filed: June 11, 2018.
    d. Applicant: North Eastern Wisconsin Hydro, LLC.
    e. Name of Project: Shawano Paper Mills Dam Project.
    f. Location: The project is located on the Wolf River in Shawano 
County, Wisconsin.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Ms. Melissa Rondou, Eagle Creek Renewable 
Energy, 116 N State St., P.O. Box 167, Neshkoro, WI 54960; telephone: 
(920) 293-4628 ext. 347.
    i. FERC Contact: Christopher Chaney, telephone: (202) 502-6778, and 
email address: [email protected].
    j. Deadline for filing comments, motions to intervene, and protests 
is 15 days from the issuance date of this notice by the Commission.
    All documents may be filed electronically via the internet. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
website at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected] or toll free at 1-866-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail a copy to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Washington, DC 20426. Please include 
the project number (P-8015-005) on any comments or motions filed.
    k. Description of Request: The exemptee is seeking a temporary 
amendment to operate the project at a target elevation of 802.9 feet 
mean sea level (msl), or 0.4 foot above the authorized target elevation 
of 802.5 feet msl. The exemptee would continue to operate within the 
authorized elevation range of 801.83 feet msl and 803.17 feet msl. The 
exemptee states the amendment is necessary to address recreation and 
possible public safety concerns when operating the project at the 
authorized target elevation. The proposed temporary amendment would end 
no later than November 15, 2018.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 
20426, or by calling (202) 502-8371. This filing may also be viewed on 
the Commission's website at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits 
in the docket number field to access the document. A copy is also 
available for inspection and reproduction at the address in item (h) 
above.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO 
INTERVENE as applicable; (2) set forth in the heading the name of the 
applicant and

[[Page 28221]]

the project number of the application to which the filing responds; (3) 
furnish the name, address, and telephone number of the person 
protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions 
to intervene, or protests must set forth their evidentiary basis and 
otherwise comply with the requirements of 18 CFR 4.34(b). All comments, 
motions to intervene, or protests should relate to project works which 
are the subject of the amendment application. Agencies may obtain 
copies of the application directly from the applicant. A copy of any 
protest or motion to intervene must be served upon each representative 
of the applicant specified in the particular application. If an 
intervener files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency. A copy of all other filings in reference to 
this application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

    Dated: June 12, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-12949 Filed 6-15-18; 8:45 am]
 BILLING CODE 6717-01-P



                                              28220                          Federal Register / Vol. 83, No. 117 / Monday, June 18, 2018 / Notices

                                                 Description: § 205(d) Rate Filing: ISO                 Dated: June 12, 2018.                                First Street NE, Washington, DC 20426.
                                              New England Inc. and NEPOOL;                            Kimberly D. Bose,                                      Please include the project number (P–
                                              Revisions to the Determination of                       Secretary.                                             8015–005) on any comments or motions
                                              Economic Life to be effective 8/10/2018.                [FR Doc. 2018–12943 Filed 6–15–18; 8:45 am]            filed.
                                                 Filed Date: 6/11/18.                                 BILLING CODE 6717–01–P
                                                                                                                                                                k. Description of Request: The
                                                 Accession Number: 20180611–5141.                                                                            exemptee is seeking a temporary
                                                 Comments Due: 5 p.m. ET 7/2/18.                                                                             amendment to operate the project at a
                                                                                                      DEPARTMENT OF ENERGY                                   target elevation of 802.9 feet mean sea
                                                 Docket Numbers: ER18–1771–000.
                                                                                                                                                             level (msl), or 0.4 foot above the
                                                 Applicants: Langdon Renewables,                                                                             authorized target elevation of 802.5 feet
                                                                                                      Federal Energy Regulatory
                                              LLC.                                                                                                           msl. The exemptee would continue to
                                                                                                      Commission
                                                 Description: Baseline eTariff Filing:                                                                       operate within the authorized elevation
                                              Langdon Renewables, LLC Application                     [Project No. 8015–005]
                                                                                                                                                             range of 801.83 feet msl and 803.17 feet
                                              for Market-Based Rates to be effective                                                                         msl. The exemptee states the
                                              7/25/2018.                                              Notice of Application for Temporary
                                                                                                      Amendment and Soliciting Comments,                     amendment is necessary to address
                                                 Filed Date: 6/11/18.                                                                                        recreation and possible public safety
                                                 Accession Number: 20180611–5148.                     Motions To Intervene, and Protests;
                                                                                                      North Eastern Wisconsin Hydro, LLC.                    concerns when operating the project at
                                                 Comments Due: 5 p.m. ET 7/2/18.                                                                             the authorized target elevation. The
                                                 Docket Numbers: ER18–1772–000.                          Take notice that the following                      proposed temporary amendment would
                                                 Applicants: Cheekerton, LLC.                         hydroelectric application has been filed               end no later than November 15, 2018.
                                                 Description: Baseline eTariff Filing:                with the Commission and is available                      l. Locations of the Application: A
                                              Cheekerton, LLC MBR Application to be                   for public inspection:                                 copy of the application is available for
                                              effective 7/3/2018.                                        a. Application Type: Temporary                      inspection and reproduction at the
                                                 Filed Date: 6/12/18.                                 Amendment.                                             Commission’s Public Reference Room,
                                                 Accession Number: 20180612–5045.                        b. Project No.: 8015–005.                           located at 888 First Street NE, Room 2A,
                                                 Comments Due: 5 p.m. ET 7/3/18.                         c. Date Filed: June 11, 2018.                       Washington, DC 20426, or by calling
                                                                                                         d. Applicant: North Eastern                         (202) 502–8371. This filing may also be
                                                 Docket Numbers: ER18–1773–000.                       Wisconsin Hydro, LLC.                                  viewed on the Commission’s website at
                                                 Applicants: NorthWestern                                e. Name of Project: Shawano Paper                   http://www.ferc.gov/docs-filing/
                                              Corporation.                                            Mills Dam Project.                                     elibrary.asp. Enter the docket number
                                                 Description: § 205(d) Rate Filing: SA                   f. Location: The project is located on              excluding the last three digits in the
                                              683 1st Rev—Control Center Services                     the Wolf River in Shawano County,                      docket number field to access the
                                              Agreement with MATL to be effective                     Wisconsin.                                             document. A copy is also available for
                                              8/1/2018.                                                  g. Filed Pursuant to: Federal Power                 inspection and reproduction at the
                                                 Filed Date: 6/12/18.                                 Act, 16 U.S.C. 791(a)–825(r).                          address in item (h) above.
                                                 Accession Number: 20180612–5058.                        h. Applicant Contact: Ms. Melissa                      You may also register online at http://
                                                 Comments Due: 5 p.m. ET 7/3/18.                      Rondou, Eagle Creek Renewable Energy,                  www.ferc.gov/docs-filing/
                                                 Docket Numbers: ER18–1774–000.                       116 N State St., P.O. Box 167, Neshkoro,               esubscription.asp to be notified via
                                                 Applicants: Southwestern Electric                    WI 54960; telephone: (920) 293–4628                    email of new filings and issuances
                                              Power Company.                                          ext. 347.                                              related to this or other pending projects.
                                                                                                         i. FERC Contact: Christopher Chaney,                For assistance, contact FERC Online
                                                 Description: § 205(d) Rate Filing:
                                                                                                      telephone: (202) 502–6778, and email                   Support.
                                              Revised and Restated Minden PSA to be
                                                                                                      address: christopher.chaney@ferc.gov.                     m. Individuals desiring to be included
                                              effective 9/1/2018.
                                                                                                         j. Deadline for filing comments,                    on the Commission’s mailing list should
                                                 Filed Date: 6/12/18.                                 motions to intervene, and protests is 15               so indicate by writing to the Secretary
                                                 Accession Number: 20180612–5059.                     days from the issuance date of this                    of the Commission.
                                                 Comments Due: 5 p.m. ET 7/3/18.                      notice by the Commission.                                 n. Comments, Protests, or Motions to
                                                 The filings are accessible in the                       All documents may be filed                          Intervene: Anyone may submit
                                              Commission’s eLibrary system by                         electronically via the internet. See 18                comments, a protest, or a motion to
                                              clicking on the links or querying the                   CFR 385.2001(a)(1)(iii) and the                        intervene in accordance with the
                                              docket number.                                          instructions on the Commission’s                       requirements of Rules of Practice and
                                                 Any person desiring to intervene or                  website at http://www.ferc.gov/docs-                   Procedure, 18 CFR 385.210, .211, .214.
                                              protest in any of the above proceedings                 filing/efiling.asp. Commenters can                     In determining the appropriate action to
                                              must file in accordance with Rules 211                  submit brief comments up to 6,000                      take, the Commission will consider all
                                              and 214 of the Commission’s                             characters, without prior registration,                protests or other comments filed, but
                                              Regulations (18 CFR 385.211 and                         using the eComment system at http://                   only those who file a motion to
                                              385.214) on or before 5:00 p.m. Eastern                 www.ferc.gov/docs-filing/                              intervene in accordance with the
                                              time on the specified comment date.                     ecomment.asp. You must include your                    Commission’s Rules may become a
                                              Protests may be considered, but                         name and contact information at the end                party to the proceeding. Any comments,
                                              intervention is necessary to become a                   of your comments. For assistance,                      protests, or motions to intervene must
                                              party to the proceeding.                                please contact FERC Online Support at                  be received on or before the specified
                                                 eFiling is encouraged. More detailed                 FERCOnlineSupport@ferc.gov or toll                     comment date for the particular
amozie on DSK3GDR082PROD with NOTICES1




                                              information relating to filing                          free at 1–866–208–3676, or for TTY,                    application.
                                              requirements, interventions, protests,                  (202) 502–8659. Although the                              o. Filing and Service of Responsive
                                              service, and qualifying facilities filings              Commission strongly encourages                         Documents: All filings must (1) bear in
                                              can be found at: http://www.ferc.gov/                   electronic filing, documents may also be               all capital letters the title COMMENTS,
                                              docs-filing/efiling/filing-req.pdf. For                 paper-filed. To paper-file, mail a copy                PROTEST, or MOTION TO INTERVENE
                                              other information, call (866) 208–3676                  to: Kimberly D. Bose, Secretary, Federal               as applicable; (2) set forth in the
                                              (toll free). For TTY, call (202) 502–8659.              Energy Regulatory Commission, 888                      heading the name of the applicant and


                                         VerDate Sep<11>2014   18:00 Jun 15, 2018   Jkt 244001   PO 00000   Frm 00039   Fmt 4703   Sfmt 4703   E:\FR\FM\18JNN1.SGM   18JNN1


                                                                             Federal Register / Vol. 83, No. 117 / Monday, June 18, 2018 / Notices                                                      28221

                                              the project number of the application to                Hancock, Putnam, Green, and Morgan                     downstream Sinclair Project (FERC No.
                                              which the filing responds; (3) furnish                  Counties, Georgia. The project occupies                1951), remains in Lake Sinclair for a few
                                              the name, address, and telephone                        about 493.7 acres of federal land                      hours before being pumped back into
                                              number of the person protesting or                      administered by the U.S. Forest Service.               Lake Oconee. Pumpback operation
                                              intervening; and (4) otherwise comply                      g. Filed Pursuant to: Federal Power                 occurs at night, when electrical system
                                              with the requirements of 18 CFR                         Act, 16 U.S.C. 791(a)–825(r).                          demand is low (off-peak hours). For
                                              385.2001 through 385.2005. All                             h. Applicant Contact: Courtenay R.                  normal day-to-day operation, Lake
                                              comments, motions to intervene, or                      O’Mara, P.E., Wallace Dam Hydro                        Oconee fluctuates between elevations
                                              protests must set forth their evidentiary               Relicensing Manager, Southern                          435.0 and 433.5 feet Plant Datum,
                                              basis and otherwise comply with the                     Company Generation, BIN 10193, 241                     resulting in an average daily fluctuation
                                              requirements of 18 CFR 4.34(b). All                     Ralph McGill Blvd. NE, Atlanta, GA                     of 1.5 feet. The Wallace Dam Project
                                              comments, motions to intervene, or                      30308–3374; (404) 506–7219; cromara@                   discharges directly into Lake Sinclair,
                                              protests should relate to project works                 southernco.com.                                        with no intervening riverine or
                                              which are the subject of the amendment                     i. FERC Contact: Allan Creamer at                   bypassed reach. Generation typically is
                                              application. Agencies may obtain copies                 (202) 502–8365, or at allan.creamer@                   the highest during the summer months,
                                              of the application directly from the                    ferc.gov.                                              where Wallace Dam generates for about
                                              applicant. A copy of any protest or                        j. This application is not ready for                7 to 8 hours during the afternoon peak
                                              motion to intervene must be served                      environmental analysis (EA) at this                    demand period. During the fall and
                                              upon each representative of the                         time.
                                                                                                                                                             winter months, generation typically last
                                              applicant specified in the particular                      k. Project Description: The Wallace
                                                                                                                                                             5 to 6 hours.
                                              application. If an intervener files                     Dam Project consists of: (1) A 2,395-
                                                                                                                                                                During drought periods, the Wallace
                                              comments or documents with the                          foot-long, 120-foot-high dam, consisting
                                                                                                      of (i) a 347-foot-long west earth                      Dam Project supports the minimum
                                              Commission relating to the merits of an                                                                        flow requirements of the downstream
                                              issue that may affect the responsibilities              embankment, (ii) a 300-foot-long west
                                                                                                      concrete non-overflow section, (iii) a                 Sinclair Project. When the Sinclair
                                              of a particular resource agency, they                                                                          Project’s calculated inflow drops below
                                              must also serve a copy of the document                  266-foot-long concrete spillway with
                                                                                                      five Tainter gates, each 48 feet high by               its minimum flow requirement of 250
                                              on that resource agency. A copy of all                                                                         cfs, water is released from Lake Oconee
                                              other filings in reference to this                      42 feet wide with a discharge capacity
                                                                                                      of 35,000 cubic feet per second (cfs), (iv)            to maintain Lake Sinclair at the
                                              application must be accompanied by                                                                             minimum level necessary for safe
                                              proof of service on all persons listed in               a 531.4-foot-long powerhouse intake
                                                                                                      section, protected by trashracks having                pumpback operation at Wallace Dam,
                                              the service list prepared by the                                                                               which is 338.2 feet Plant Datum.
                                              Commission in this proceeding, in                       a clear bar spacing of 9.5 to 10.5 inches
                                                                                                      and leading to six penstocks with a                       l. A copy of the application is
                                              accordance with 18 CFR 4.34(b) and                                                                             available for review at the Commission
                                              385.2010.                                               maximum diameter of 25.5 feet, (v) a
                                                                                                      226-foot-long east concrete non-                       in the Public Reference Room or may be
                                                Dated: June 12, 2018.                                 overflow section, (vi) a 725-foot-long                 viewed on the Commission’s website at
                                              Kimberly D. Bose,                                       east earth embankment, and (vii) two                   http://www.ferc.gov, using the eLibrary
                                              Secretary.                                              saddle dikes, located east of the dam,                 link. Enter the docket number,
                                              [FR Doc. 2018–12949 Filed 6–15–18; 8:45 am]             totaling about 900 feet in length; (2) an              excluding the last three digits in the
                                              BILLING CODE 6717–01–P                                  18,188-acre reservoir (Lake Oconee) at                 docket number field, to access the
                                                                                                      an elevation of 435.0 feet Plant Datum                 document. For assistance, contact FERC
                                                                                                      (where Plant Datum equals mean sea                     Online Support at
                                              DEPARTMENT OF ENERGY                                    level (NAVD88) minus 0.20 feet); (3) a                 FERCOnlineSupport@ferc.gov, or toll
                                                                                                      powerhouse integral with the dam that                  free at (866) 208–3676, or for TTY at
                                              Federal Energy Regulatory                               contains six turbine/generator units                   (202) 502–8659. A copy is also available
                                              Commission                                              (two conventional generating units and                 for inspection and reproduction at
                                              [Project No. 2413–124]                                  four reversible pump units, with a total               https://www.georgiapower.com/
                                                                                                      installed capacity of 321.3 megawatts;                 company/energy-industry/generating-
                                              Notice of Application Tendered for                      (4) a 20,000-foot-long tailrace that flows             plants/wallace-dam-project.html, or the
                                              Filing With the Commission and                          into Lake Sinclair, which serves as the                address in paragraph h.
                                              Establishing Procedural Schedule for                    lower reservoir for the Wallace Dam                       You may also register online at http://
                                              Licensing and Deadline for                              Project; (5) transmission facilities that              www.ferc.gov/docs-filing/
                                              Submission of Final Amendments;                         consist of (i) 13.8-kilovolt (kV) generator            esubscription.asp to be notified via
                                              Georgia Power Company                                   leads, (ii) two 13.8/230-kV step-up                    email of new filings and issuances
                                                                                                      transformers, (iii) a 230-kV substation,               related to this or other pending projects.
                                                Take notice that the following                                                                               For assistance, contact FERC Online
                                              hydroelectric application has been filed                and (iv) a 15.67-mile-long transmission
                                                                                                      line that extends from Wallace Dam                     Support.
                                              with the Commission and is available                                                                              m. Procedural Schedule: The
                                              for public inspection.                                  west to a switching station near
                                                                                                      Eatonton, Georgia; and (6) appurtenant                 application will be processed according
                                                a. Type of Application: New Major                                                                            to the following preliminary Hydro
                                              License.                                                facilities.
                                                                                                         The Wallace Dam Project is a pumped                 Licensing Schedule. Revisions to the
                                                b. Project No.: 2413–124.                                                                                    schedule will be made as appropriate.
                                                c. Date Filed: May 31, 2018.                          storage project, generating 390,083
amozie on DSK3GDR082PROD with NOTICES1




                                                d. Applicant: Georgia Power Company                   megawatt-hours of electricity annually.                            Milestone                  Target date
                                              (Georgia Power).                                        Water for generation at Wallace Dam
                                                e. Name of Project: Wallace Dam                       comes from inflow, plus storage in Lake                Notice of Acceptance/Notice of        August 2018.
                                              Pumped Storage Project (Wallace Dam                     Oconee. The project generates during                      Ready for Environmental Anal-
                                                                                                                                                                ysis.
                                              Project).                                               peak power demand hours to meet the                    Filing of recommendations, prelimi-   October 2018.
                                                f. Location: The existing project is                  electrical system demand. Water that is                   nary terms and conditions, and
                                              located on the Oconee River, in                         not used for generation at the                            fishway prescriptions.



                                         VerDate Sep<11>2014   18:00 Jun 15, 2018   Jkt 244001   PO 00000   Frm 00040   Fmt 4703   Sfmt 4703   E:\FR\FM\18JNN1.SGM   18JNN1



Document Created: 2018-06-18 15:49:59
Document Modified: 2018-06-18 15:49:59
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 28220 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR