83_FR_28615 83 FR 28497 - Federal Policy for the Protection of Human Subjects: Six Month Delay of the General Compliance Date of Revisions While Allowing the Use of Three Burden-Reducing Provisions During the Delay Period

83 FR 28497 - Federal Policy for the Protection of Human Subjects: Six Month Delay of the General Compliance Date of Revisions While Allowing the Use of Three Burden-Reducing Provisions During the Delay Period

DEPARTMENT OF HOMELAND SECURITY
DEPARTMENT OF LABOR
DEPARTMENT OF DEFENSE
DEPARTMENT OF EDUCATION
DEPARTMENT OF VETERANS AFFAIRS
ENVIRONMENTAL PROTECTION AGENCY
DEPARTMENT OF HEALTH AND HUMAN SERVICES
NATIONAL SCIENCE FOUNDATION
DEPARTMENT OF TRANSPORTATION
DEPARTMENT OF AGRICULTURE
DEPARTMENT OF ENERGY
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
DEPARTMENT OF COMMERCE
CONSUMER PRODUCT SAFETY COMMISSION
SOCIAL SECURITY ADMINISTRATION
AGENCY FOR INTERNATIONAL DEVELOPMENT
DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

Federal Register Volume 83, Issue 118 (June 19, 2018)

Page Range28497-28520
FR Document2018-13187

In a final rule published on January 19, 2017, a number of federal departments and agencies revised to the Federal Policy for the Protection of Human Subjects (often referred to as the ``Common Rule''), which each department and agency adopted into regulations in its part of the Code of Federal Regulations (CFR). The Consumer Product Safety Commission (CPSC) adopted the same changes in a final rule published on September 18, 2017. The revised Common Rule was scheduled to become effective on January 19, 2018, with a general compliance date of the same date. By an interim final rule issued on January 17, 2018 and published in the Federal Register on January 22, 2018, federal departments and agencies delayed the effective date and the general compliance date for the revised Common Rule for a 6-month period, until July 19, 2018. The Department of Housing and Urban Development (HUD) published an interim final rule adopting the same regulatory changes on January 26, 2018. The revised Common Rule, including technical amendments made by the January 22, 2018 interim final rule, is referred to here as the ``2018 Requirements.'' On April 20, 2018, the federal departments and agencies listed here published a notice of proposed rulemaking (NPRM) proposing and seeking comments as to whether the general compliance date for the 2018 Requirements should be delayed for an additional 6-month period. The NPRM also proposed and sought comments on whether to allow regulated entities to implement certain burden-reducing provisions of the 2018 Requirements in specified circumstances during such continued delay period. Through this final rule, we are adopting the proposals described in the April 20, 2018 NPRM. This rule delays the general compliance date for the 2018 Requirements for an additional 6-month period, until January 21, 2019. As a result of this delay, regulated entities will be required, with an exception, to continue to comply with the requirements of the pre-2018 version of the Federal Policy for the Protection of Human Subjects (the ``pre-2018 Requirements'') until January 21, 2019. The one exception to this general rule is that institutions will be permitted (but not required) to implement, for certain research, three burden-reducing provisions of the 2018 Requirements during the delay period (July 19, 2018, through January 20, 2019). Those three provisions are: The revised definition of ``research,'' which deems certain activities not to be research covered by the Common Rule; the elimination of the requirement for annual continuing review with respect to certain categories of research; and the elimination of the requirement that institutional review boards (IRBs) review grant applications or other funding proposals related to the research. Institutions taking advantage of the three-burden reducing provisions must comply with all other pre-2018 Requirements during the delay period. The three burden-reducing provisions of the 2018 Requirements can only be implemented during the delay period with respect to studies initiated prior to January 21, 2019 that will transition to compliance with the revised Common Rule. Any study that implements these three burden-reducing provisions during the delay period must, beginning on January 21, 2019, comply with all of the 2018 Requirements for the balance of the study's duration.

Federal Register, Volume 83 Issue 118 (Tuesday, June 19, 2018)
[Federal Register Volume 83, Number 118 (Tuesday, June 19, 2018)]
[Rules and Regulations]
[Pages 28497-28520]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-13187]



[[Page 28495]]

Vol. 83

Tuesday,

No. 118

June 19, 2018

Part II





Department of Homeland Security





-----------------------------------------------------------------------





6 CFR Part 46





Department of Agriculture





-----------------------------------------------------------------------

7 CFR Part 1c





Department of Energy





-----------------------------------------------------------------------

10 CFR Part 745





National Aeronautics and Space Administration





-----------------------------------------------------------------------

14 CFR Part 1230





Department of Commerce





-----------------------------------------------------------------------

15 CFR Part 27





Consumer Product Safety Commission





-----------------------------------------------------------------------

16 CFR Part 1028





Social Security Administration





-----------------------------------------------------------------------

20 CFR Part 431

[[Page 28496]]

Agency for International Development





-----------------------------------------------------------------------

22 CFR Part 225





Department of Housing and Urban Development





-----------------------------------------------------------------------

24 CFR Part 60





Department of Labor





-----------------------------------------------------------------------

29 CFR Part 21





Department of Defense





-----------------------------------------------------------------------

32 CFR Part 219





Department of Education





-----------------------------------------------------------------------

34 CFR Part 97





Department of Veterans Affairs





-----------------------------------------------------------------------

38 CFR Part 16





Environmental Protection Agency





-----------------------------------------------------------------------

40 CFR Part 26





Department of Health and Human Services





-----------------------------------------------------------------------

45 CFR Part 46





National Science Foundation





-----------------------------------------------------------------------

45 CFR Part 690





Department of Transportation





-----------------------------------------------------------------------

49 CFR Part 11





-----------------------------------------------------------------------





Federal Policy for the Protection of Human Subjects: Six Month Delay of 
the General Compliance Date of Revisions While Allowing the Use of 
Three Burden-Reducing Provisions during the Delay Period; Final Rule

Federal Register / Vol. 83 , No. 118 / Tuesday, June 19, 2018 / Rules 
and Regulations

[[Page 28497]]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

6 CFR Part 46

DEPARTMENT OF AGRICULTURE

7 CFR Part 1c

DEPARTMENT OF ENERGY

10 CFR Part 745

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

14 CFR Part 1230

DEPARTMENT OF COMMERCE

15 CFR Part 27

CONSUMER PRODUCT SAFETY COMMISSION

16 CFR Part 1028

SOCIAL SECURITY ADMINISTRATION

20 CFR Part 431

AGENCY FOR INTERNATIONAL DEVELOPMENT

22 CFR Part 225

DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

24 CFR Part 60

DEPARTMENT OF LABOR

29 CFR Part 21

DEPARTMENT OF DEFENSE

32 CFR Part 219

DEPARTMENT OF EDUCATION

34 CFR Part 97

DEPARTMENT OF VETERANS AFFAIRS

38 CFR Part 16

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 26

DEPARTMENT OF HEALTH AND HUMAN SERVICES

45 CFR Part 46

RIN 0937-AA05

NATIONAL SCIENCE FOUNDATION

45 CFR Part 690

DEPARTMENT OF TRANSPORTATION

49 CFR Part 11


Federal Policy for the Protection of Human Subjects: Six Month 
Delay of the General Compliance Date of Revisions While Allowing the 
Use of Three Burden-Reducing Provisions During the Delay Period

AGENCY: Department of Homeland Security; Department of Agriculture; 
Department of Energy; National Aeronautics and Space Administration; 
Department of Commerce; Consumer Product Safety Commission; Social 
Security Administration; Agency for International Development; 
Department of Housing and Urban Development; Department of Labor; 
Department of Defense; Department of Education; Department of Veterans 
Affairs; Environmental Protection Agency; Department of Health and 
Human Services; National Science Foundation; and Department of 
Transportation.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: In a final rule published on January 19, 2017, a number of 
federal departments and agencies revised to the Federal Policy for the 
Protection of Human Subjects (often referred to as the ``Common 
Rule''), which each department and agency adopted into regulations in 
its part of the Code of Federal Regulations (CFR). The Consumer Product 
Safety Commission (CPSC) adopted the same changes in a final rule 
published on September 18, 2017. The revised Common Rule was scheduled 
to become effective on January 19, 2018, with a general compliance date 
of the same date. By an interim final rule issued on January 17, 2018 
and published in the Federal Register on January 22, 2018, federal 
departments and agencies delayed the effective date and the general 
compliance date for the revised Common Rule for a 6-month period, until 
July 19, 2018. The Department of Housing and Urban Development (HUD) 
published an interim final rule adopting the same regulatory changes on 
January 26, 2018. The revised Common Rule, including technical 
amendments made by the January 22, 2018 interim final rule, is referred 
to here as the ``2018 Requirements.''
    On April 20, 2018, the federal departments and agencies listed here 
published a notice of proposed rulemaking (NPRM) proposing and seeking 
comments as to whether the general compliance date for the 2018 
Requirements should be delayed for an additional 6-month period. The 
NPRM also proposed and sought comments on whether to allow regulated 
entities to implement certain burden-reducing provisions of the 2018 
Requirements in specified circumstances during such continued delay 
period.
    Through this final rule, we are adopting the proposals described in 
the April 20, 2018 NPRM. This rule delays the general compliance date 
for the 2018 Requirements for an additional 6-month period, until 
January 21, 2019. As a result of this delay, regulated entities will be 
required, with an exception, to continue to comply with the 
requirements of the pre-2018 version of the Federal Policy for the 
Protection of Human Subjects (the ``pre-2018 Requirements'') until 
January 21, 2019. The one exception to this general rule is that 
institutions will be permitted (but not required) to implement, for 
certain research, three burden-reducing provisions of the 2018 
Requirements during the delay period (July 19, 2018, through January 
20, 2019). Those three provisions are: The revised definition of 
``research,'' which deems certain activities not to be research covered 
by the Common Rule; the elimination of the requirement for annual 
continuing review with respect to certain categories of research; and 
the elimination of the requirement that institutional review boards 
(IRBs) review grant applications or other funding proposals related to 
the research. Institutions taking advantage of the three-burden 
reducing provisions must comply with all other pre-2018 Requirements 
during the delay period. The three burden-reducing provisions of the 
2018 Requirements can only be implemented during the delay period with 
respect to studies initiated prior to January 21, 2019 that will 
transition to compliance with the revised Common Rule. Any study that 
implements these three burden-reducing provisions during the delay 
period must, beginning on January 21, 2019, comply with all of the 2018 
Requirements for the balance of the study's duration.

DATES: Effective date: This rule is effective on July 19, 2018. 
Compliance dates: The general compliance date for the 2018 Requirements 
in the final rule published in the Federal Register (82 FR 7149, Jan. 
19, 2017) and of the final rule published by the Consumer Product 
Safety Commission in the Federal Register (82 FR 43459, Sept. 18, 
2017), which were delayed in the interim final rule published in the 
Federal Register (83 FR 2885, Jan. 22, 2018), and adopted by HUD 
through an interim final rule published in the Federal Register (83 FR 
3589, Jan. 26, 2018), with the exception of Sec.  ___.114(b), is 
further delayed until January 21, 2019. The

[[Page 28498]]

compliance date for Sec.  ___.114(b) (cooperative research) remains 
January 20, 2020.

ADDRESSES: Jerry Menikoff, M.D., J.D., Office for Human Research 
Protections, 1101 Wootton Parkway, Suite 200, Rockville, MD 20852.

FOR FURTHER INFORMATION CONTACT: Jerry Menikoff, M.D., J.D., Office for 
Human Research Protections (OHRP), Department of Health and Human 
Services, 1101 Wootton Parkway, Suite 200, Rockville, MD 20852; 
telephone: 240-453-6900 or 1-866-447-4777; facsimile: 301-402-2071; 
email [email protected].

SUPPLEMENTARY INFORMATION: 

I. Background

    On January 19, 2017, the Department of Health and Human Services 
(HHS) and other federal departments and agencies published a final rule 
revising the Federal Policy for the Protection of Human Subjects 
(generally referred to as ``the Common Rule''). 82 FR 7149. The CPSC 
adopted the same regulatory changes in a separate final rule published 
on September 18, 2017. 82 FR 43459. The revised Common Rule was 
originally scheduled to become effective on January 19, 2018, with a 
general compliance date of January 19, 2018 (with the exception of the 
revisions to the cooperative research provision at Sec.  ___.114(b), 
which has a compliance date of January 20, 2020).
    Some representatives of the regulated community expressed concern 
regarding their ability to implement all of the 2018 Requirements by 
the scheduled general compliance date.\1\
---------------------------------------------------------------------------

    \1\ See, e.g., the June 21, 2017 letter to Jerry Menikoff from 
the Association of American Medical Colleges, Association of 
American Universities, Association of Public & Land-grant 
Universities, and Council on Governmental Relations, available at 
https://www.aamc.org/download/480840/data/aamcissuesjointletteroncommonrule.pdf.
    See the June 9, 2017 letter to Secretary Thomas Price from the 
American Medical Informatics Association at https://www.amia.org/sites/default/files/AMIA%20Letter%20Regarding%20the%20Common%20Rule.pdf.
    See also August 2, 2017 SACHRP Letter to HHS Secretary, 
Attachment A- Recommendations on Compliance Dates and Transition 
Provisions, https://www.hhs.gov/ohrp/sachrp-committee/recommendations/attachment/a/august/2/2017/index.html.
---------------------------------------------------------------------------

    On January 17, 2018, HHS and other federal departments and agencies 
placed on display at the Office of the Federal Register an interim 
final rule delaying the effective date and general compliance date of 
the 2018 Requirements to July 19, 2018. 83 FR 2885 (published January 
22, 2018). This rule did not impact the compliance date for the 
cooperative research provision at Sec.  ___.114(b), which remained 
January 20, 2020. On January 26, 2018, HUD published an interim final 
rule adopting the interagency interim final rule. 83 FR 3589.
    On April 20, 2018, federal departments and agencies published a 
notice of proposed rulemaking (NPRM) soliciting comments on two 
proposals. 83 FR 17595. The first proposed an additional 6-month delay 
for the general compliance date for the 2018 Requirements (from July 
19, 2018 to January 21, 2019). The second proposed a flexibility that 
would allow regulated entities to take advantage of three burden-
reducing provisions of the 2018 Requirements during the delay period. 
Both proposals are described more fully below, together with a 
discussion of the public comments submitted, and our response to public 
comments. For the reasons provided below, this final rule adopts the 
proposals set forth in the NPRM.

II. Public Comments and Response to Comments

A. 2018 Interim Final Rule and 2018 NPRM Public Comment Summary

    Public comment was solicited on the interim final rule between 
January 22, 2018 and March 19, 2018. Public comment was solicited on 
the NPRM to delay the implementation of the 2018 Requirements while 
permitting the use of three burden-reducing provisions of the 2018 
Requirements between April 20, 2018 and May 21, 2018.
    We received 62 public comments on the interim final rule. Of these, 
36 comments were related to the Common Rule. The remaining 26 comments 
were not related to the Common Rule in any way. We received 73 comments 
on the NPRM. Five of these comments were not related to the Common 
Rule.
    Several common themes emerged from the public comments on the 
interim final rule and the NPRM. These included:

--The need for the regulated community to have as much advance notice 
as possible about any delay in implementing the 2018 Requirements.
--The need for guidance to be issued promptly.
--General support for a delay of the general compliance date, with more 
limited support for a delay beyond January, 2019. This support, 
however, was generally tied to concern with whether Common Rule 
departments and agencies will be able to issue guidance in a timely 
fashion prior to the new general compliance date of January 21, 2019.

    Both sets of comments tended to endorse some type of delay beyond 
July 19, 2018 in the general compliance date for the 2018 Requirements. 
Comments on the interim final rule tended to suggest that institutions 
be permitted to voluntarily implement the 2018 Requirements in their 
entirety at any time after July 19, 2018, while comments on the NPRM 
indicated broad support for the narrower approach of permitting the 
voluntary use of three burden-reducing provisions during the delay 
period.

B. Public Comments on the January 22, 2018 Interim Final Rule and 
Response to Comments

    As well as soliciting comments on the delay of the implementation 
of the 2018 Requirements, the interim final rule solicited comments on 
the following:

--Whether or not the interim final rule should be considered regulatory 
or de-regulatory.
--Whether or not our assumption that 50 percent of regulated entities 
would have gone forward using the new or expanded exemption categories, 
had the implementation date of the 2018 Requirements remained January 
19, 2018, was correct.

    We received no comments on our assumption that 50 percent of 
regulated entities would have gone forward using the new or expanded 
exemption categories had the implementation date of the 2018 
Requirements remained January 19, 2018. We received one comment 
addressing whether or not the interim final rule should be considered 
regulatory or de-regulatory. This comment indicated that the 2018 
Requirements should be considered de-regulatory, without commenting on 
the regulatory or de-regulatory status of the interim final rule.
    Of the 36 comments received on the interim final rule related to 
the Common Rule (and more specifically on delaying the effective and 
general compliance dates of the 2018 Requirements to July 19, 2018), 
several themes were present. Many of these comments discussed issues 
with the timing and issuance of the interim final rule, claiming that 
the fact that it was put on public display in the Federal Register 48 
hours before the original implementation date caused chaos and 
confusion in the regulated community. Several commenters described what 
they categorized as chaos that ensued when the interim final rule was 
put on public display 48 hours before the original effective date and 
general compliance date for the 2018 Requirements. This rollout created 
administrative burdens for institutions,

[[Page 28499]]

as many had changed IT systems, training programs, and other 
operational tasks and then had to hastily undo these changes. Another 
commenter described the issuance of the interim final rule and the 
relative silence from Common Rule departments and agencies in the 
period since publication of the 2018 Requirements (in the January 19, 
2017 final rule) as a betrayal of IRBs.
    Additionally, commenters expressed concern that given the short 
timeline between the closing of the comment period and the new general 
implementation date of July 19, 2018, any further delay of the 2018 
Requirements would similarly create chaos and confusion in the 
regulated community. Commenters also generally expressed that the 6-
month delay granted by the interim final rule created a situation in 
which regulated entities that were ready to implement the 2018 
Requirements in January 2018 had to spend the personnel hours to 
``undo'' these changes, which seemed contradictory to the overall goal 
of the revisions to the Common Rule of reducing administrative burden. 
A few commenters focused entirely on how the relative silence by Common 
Rule departments and agencies since publication of the 2018 
Requirements has created a confusing environment for this regulated 
community and requested more transparency from the regulating 
departments and agencies in the future.
    [Response: We acknowledge that the timing of the interim final rule 
was not ideal and led to frustration within the regulated community. We 
believe that the 2018 NPRM and this final rule to delay the general 
compliance date for the 2018 Requirements while permitting the use of 
three burden-reducing provisions of the 2018 Requirements provides the 
regulated community with sufficient notice about when the 2018 
Requirements will go into effect, and when regulated entities will be 
required to comply with the 2018 Requirements.]
    Almost half of the comments related to the Common Rule advocated 
for the Common Rule departments and agencies to retain the July 19, 
2018 effective date for the 2018 Requirements, and to delay the general 
compliance date. These commenters argued that during the period between 
the effective date and delayed general compliance date, institutions 
should be permitted to voluntarily comply (on a study-by-study basis) 
with the 2018 Requirements. A couple of these comments advocated for 
institutions to be able to implement select 2018 Requirements during 
this voluntary compliance period, as opposed to choosing to comply with 
the entirety of the 2018 Requirements, in order to provide institutions 
with the most flexibility. A majority of the comments described in this 
paragraph advocated for delaying the general compliance date to January 
21, 2019, as these commenters did not believe that full compliance with 
the 2018 Requirements would be possible by July 19, 2018. A few 
commenters advocated delaying the general compliance date beyond 
January 21, 2019 to permit institutions as much time as possible to 
comply with the 2018 Requirements
    One commenter suggested that both the effective and general 
compliance dates be delayed by 6 months to one year after Common Rule 
departments and agencies issue critical guidance documents. Other 
commenters suggested that Common Rule departments and agencies should 
be given a date by which they must publish key guidance documents. 
Several comments included a description of guidance documents that they 
would like for Common Rule departments and agencies to focus on 
initially. Suggestions included: OHRP's decision charts, key 
information in informed consent, broad consent, and continuing review 
(Sec.  ___.109(f)).
    Some of the comments relevant to the Common Rule advocated for no 
additional delay in the implementation of the 2018 Requirements beyond 
July 19, 2018. These comments argued that institutions and Common Rule 
departments and agencies have had sufficient time to prepare for the 
implementation of the Rule. One comment suggested that while guidance 
would certainly be helpful, it is possible to implement the Rule 
without such guidance, as evidenced by the fact that many institutions 
were ready to implement the 2018 Requirements before the publication of 
the interim final rule.
    Several commenters also addressed whether certain aspects of the 
2018 Requirements would be difficult to implement in the absence of 
agency guidance. These commenters acknowledged the importance of 
guidance to implement many areas of the 2018 Requirements but noted 
that the confusion and chaos created by late-breaking announcements of 
delays in the implementation of the 2018 Requirements ultimately caused 
more administrative burden within institutions. One large public 
university system in the United States indicated that if guidance is 
issued after institutions have revised their policies, procedures, and 
IT systems, it likely will create a burdensome situation where 
policies, procedures, and IT systems will need to be revised again to 
comport with department and agency guidance.
    [Response: We agree with interim final rule comments suggesting 
that we keep the effective date of the 2018 Requirements as July 19, 
2018, while delaying the general compliance date. While we considered 
the alternative of amending the transition provision to permit 
institutions to voluntarily comply with the revised rule beginning on 
July 19, 2018, and not requiring compliance with the new rule until 
January 21, 2019 or later, we believe this approach could result in 
confusion regarding implementation of the revised Common Rule that 
could be minimized with the issuance of guidance from the Common Rule 
departments and agencies. By adopting the changes proposed in the NPRM, 
we believe the Common Rule departments and agencies will be able to 
issue relevant guidance documents that will better enable the regulated 
community to comply with the 2018 Requirements. As described in the 
NPRM, we also considered a delay to the effective and general 
compliance dates without proposing this additional option in the 
interim period. Such an approach would be simple to implement. We 
decided against finalizing this alternative to be responsive to public 
comments received and in an effort to minimize burdens with respect to 
new provisions that will not be difficult to implement prior to the 
general compliance date of the 2018 Requirements.
    We recognize the difficulty in implementing the 2018 Requirements 
in the absence of guidance and will strive to issue guidance on key 
aspects of the 2018 Requirements as quickly as possible, while also 
engaging stakeholders.]
    A small subset of comments suggested additional revisions to the 
Common Rule. For example, one commenter discussed the inclusion of a 
provision that would permit parents to decline certain procedures on 
behalf of their children.
    [Response: This comment listed several clinical procedures done in 
the routine course of medical care. Such activities are outside of the 
scope of the Common Rule, and thus are outside of the scope of this 
rulemaking.]
    Others discussed concerns with the waiver provision at Sec.  
___.101(i) and suggested that this provision be strengthened such that 
departments and agencies are only permitted to waive the Common Rule 
with regard to certain research activities when such a waiver

[[Page 28500]]

is consistent with the Belmont Report.\2\ One commenter also suggested 
that the Clinton Memorandum\3\ concerning requirements pertaining to 
classified research be fully implemented. These comments also 
referenced concerns with the carve-out form the definition of research 
pertaining to authorized operational activities in support of national 
security missions.
---------------------------------------------------------------------------

    \2\ National Commission for the Protection of Human Subjects of 
Biomedical and Behavioral Research. Ethical Principles and 
Guidelines for the Protection of Human Subjects of Research. April 
18, 1979. https://www.hhs.gov/ohrp/regulations-and-policy/belmont-report/.
    \3\ Clinton, WJ. Strengthened Protections for Human Subjects of 
Classified Research. 62 FR 26367-26372. May 13, 1997. https://www.thefederalregister.org/fdsys/pkg/FR-1997-05-13/pdf/97-12699.pdf.
---------------------------------------------------------------------------

    [Response: The January 19, 2017 final rule preamble stated 
``[t]hese authorized operational activities, as determined by each 
agency, do not include research activities as defined by the Common 
Rule, nor have they ever in the past been considered regulated by the 
Common Rule. This category of activity is removed from the definition 
of research to make explicit that the requirements of the final rule do 
not apply to authorized operational activities in support of national 
security missions. This clarification is not intended to narrow the 
scope of the Common Rule. We do not believe that this category 
contradicts President Clinton's Memorandum of 1997 regarding classified 
research, because this category is merely clarifying what activities 
are not considered to meet the definition of research. The Clinton 
Memorandum calls for a number of requirements to be added to 
protections for classified research activities, but it does not address 
activities that are not considered research.'']
    Some commenters expressed concerns with how the transition 
provision essentially creates a dual regulatory system for human 
subjects protections. One commenter explicitly advocated for the Common 
Rule to require all research subject to the Common Rule to comply with 
the 2018 Requirements by a certain date given the additional 
protections to subjects that the revised Common Rule affords research 
participants.
    [Response: We agree that the transition provision at Sec.  
___.101(l) creates a system in which many institutions will need to be 
familiar with both versions of the Common Rule (if they elect to keep 
at least some previously initiated studies subject to the pre-2018 
Requirements while their newly initiated studies are subject to the 
2018 Requirements). However, we believe that the flexibility afforded 
by the transition provision is important for institutions to manage 
their operations while implementing the 2018 Requirements. We do not 
believe that this compromises the protection of human subjects.]
    A few comments suggested that the general compliance date of the 
2018 Requirements should coincide with FDA's revision of its human 
subjects protection regulations in order for there not to be a time 
period where FDA regulations are not harmonized with the other Common 
Rule departments and agencies.
    [Response: With respect to the comments suggesting that the general 
compliance date of the 2018 Requirements should be tied to the FDA 
harmonization efforts with the Common Rule, we do not believe that this 
is necessary. FDA is currently working to harmonize its human subjects 
regulations with the 2018 Requirements, to the extent permitted by 
FDA's statutory authority and mandate. We do not believe it is 
necessary to further delay the 2018 Requirements' general compliance 
date as a result of a separate rulemaking effort.]
    One commenter argued that the 2018 Requirements should not be 
implemented at all, as in their view, the pre-2018 Requirements 
adequately protect human subjects.
    [Response: We disagree. We believe that the 2018 Requirements will 
provide a meaningful improvement in human subjects protection, while 
reducing administrative burden on institutions.]
    A couple of commenters argued that the general compliance date for 
the cooperative research provision (Sec.  ___.114) should be delayed to 
2022.
    [Response: We disagree with the comments suggesting that the 
compliance date for the cooperative research provision (Sec.  
___.114(b)) needs to be delayed beyond January 2020. Public comments 
requesting this change have not provided specific evidence for why such 
a delay is necessary, nor for the assertion that implementing the 
single IRB of record in cooperative research requirement will not 
result in a reduction in burden.]

C. Public Comments on the April 20, 2018 NPRM and Response to Comments

    The April 20, 2018 NPRM sought comment on two primary proposals: 
(1) The proposal to delay the general compliance date for the 2018 
Requirements to January 21, 2019; and (2) whether institutions should 
be allowed to implement three burden-reducing provisions in the 2018 
Requirements during the delay period from July 19, 2018 to January 21, 
2019. The NPRM also solicited comment on the advisability of two 
alternative approaches to delaying the 2018 Requirements: (1) The 
alternative of delaying the effective date and general compliance date 
until January 21, 2019, but without the option to implement certain 
2018 Requirements during that delay period; and (2) the alternative of 
delaying the effective date and general compliance date beyond January 
21, 2019. The NPRM also solicited comment on whether the general 
compliance date for the 2018 Requirements should remain July 19, 2018.
    The NPRM proposed to modify the transition provision at Sec.  
___.101(l) to permit an institution or IRB (and not just an IRB) to 
document the institution's decision to transition a study to comply 
with the 2018 Requirements. (We received no public comments on this 
proposal.)
    A majority of comments that discussed the NPRM proposals supported 
some kind of delay to the implementation of the 2018 Requirements. A 
majority supported the NPRM proposals as drafted but indicated that 
their support was contingent upon the Common Rule departments and 
agencies issuing the relevant guidance prior to July 19, 2018 for the 
three burden-reducing provisions, and all other key guidance documents 
before the January 2019 general compliance date. In particular, 
commenters noted that critical guidance documents would need to be 
available to the regulated community at least four months prior to the 
proposed general compliance date of January 21, 2019. These commenters 
specifically stated that if critical guidance documents were not 
available by September 19, 2019, they would support an additional delay 
of the general compliance date.
    Comments in response to the NPRM generally supported the position 
that many institutions need additional time to prepare to implement the 
2018 Requirements, and that the Common Rule departments and agencies 
need more time to develop and issue guidance. Several commenters 
specifically noted that the Department of Veterans Affairs is not yet 
ready to implement the 2018 Requirements and needs more time.
    Commenters suggested guidance documents that should be provided as 
quickly as possible to the regulated community. These suggestions 
included revising existing guidance, or issuing new guidance, as 
follows:

--Revised OHRP decision charts

[[Page 28501]]

--Information on the Sec.  ___.116 clinical trial consent form posting 
location
--Limited IRB review
--Broad consent
--The new requirement that the informed consent give the prospective 
subject the information that a reasonable person would want to know in 
order to make an informed decision about research participation
--The new requirement that the informed consent begin with a concise 
and focused presentation of the key information that is most likely to 
assist a prospective subject or legally authorized representative in 
understanding the reasons why one might or might not want to 
participate in the research.
--Identifiability
--Privacy and confidentiality
--Benign behavioral interventions
--Continuing review

    [Response: This final rule adopts the April 20, 2018 NPRM 
proposals, with minor changes made to the regulatory text for 
clarification and accuracy. As stated above, we agree with the comments 
that the issuance of guidance will be useful for institutions to be 
able to implement the 2018 Requirements, and are working to issue such 
guidance promptly. We appreciate the commenter input on topics for 
guidance to be issued by the departments and agencies.]
    One commenter noted that if Common Rule departments and agencies 
envisioned a specific way that institutions or IRBs should document the 
use of the three burden-reducing provisions in the 2018 Requirements or 
document the fact that an ongoing study has transitioned to comply with 
the 2018 Requirements, that information must be communicated to the 
regulated community as soon as possible.
    [Response: We do not believe that there is a need to prescribe how 
institutions document the decision to use the three burden-reducing 
provisions of the 2018 Requirements or the decision to transition a 
study to comply with the 2018 Requirements (on or after January 21, 
2019), beyond the requirement that the institution or an IRB must 
document and date such determination. For example, this institutional 
determination could be documented in IRB meeting minutes, or in an IRB 
reviewer checklist (if an institution uses a checklist system). This 
institutional determination could also be documented in an 
institution's existing electronic system, if one exists, or in a 
spreadsheet created and maintained by the institution to keep track of 
which studies have been transitioned to the 2018 Requirements.]
    Several alternatives were suggested for how a delay might be 
structured. These included:

--Permitting voluntary compliance with the entirety of the 2018 
Requirements between July 19, 2018 and January 21, 2019
--Keeping the NPRM proposals related to decoupling the effective and 
general compliance dates and the early implementation of the three 
burden-reducing provisions of the 2018 Requirements, but delaying the 
effective date of the 2018 Requirements until at least one year after 
Common Rule departments and agencies have issued key guidance documents
--Delaying both the effective and general compliance dates until 
January 21, 2019
--Delaying both the effective and general compliance dates beyond 
January 21, 2019
--Permitting the use of the three burden-reducing provisions of the 
2018 Requirements, but not requiring that studies taking advantage of 
this flexibility comply with the entirety of the 2018 Requirements on 
and after January 21, 2019.

    A minority of comments indicated concern that the NPRM proposals 
would be confusing for the regulated community to implement accurately. 
However, several of these comments indicated that if the Common Rule 
departments and agencies determined that moving forward with a delay 
was still appropriate, the structure proposed in the NPRM would be 
acceptable.
    Regardless of the delay structure endorsed, commenters noted that 
no matter the delay option chosen by Common Rule departments and 
agencies, guidance needed to be issued in order for the regulated 
community to make use of the delay period and prepare their 
institutions.
    [Response: We acknowledge that there were multiple ways that an 
implementation delay of the 2018 Requirements could be structured. We 
believe that the approach proposed in the NPRM and adopted in this 
final rule is the best balance of permitting institutions to implement 
several of the more straightforward provisions of the 2018 Requirements 
before the general compliance date, while granting Common Rule 
departments and agencies additional time to develop and issue key 
guidance documents, and granting institutions additional time to ensure 
that their operations are ready to implement the 2018 Requirements.
    We do not believe a delay of the general compliance date beyond 
January 21, 2019 is necessary. As discussed in the NPRM, we continue to 
believe that the regulated community will not need additional time 
beyond January 2019 to comply with the 2018 Requirements. Most NPRM 
comments supported the idea that January 2019 would be sufficient to 
allow for implementation of the 2018 Requirements, provided that the 
Common Rule departments and agencies issued key guidance.
    We recognize that the implementation structure in this final rule 
might be confusing to some in the regulated community. We intend to 
engage in educational outreach to help the regulated community better 
understand what is permitted and what is not under the revised 
transition provision at Sec.  __.101(l).]
    Several commenters indicated that understanding OHRP's plan for 
modifying the Federalwide Assurance (``FWA'') process to comport with 
the 2018 Requirements would also be helpful. Specific concerns were 
raised about the deletion of the option to ``check the box'' on the FWA 
and how the removal of this option will, in certain states with 
separate human subjects requirements, present administrative challenges 
for institutions. Another commenter expressed concern about whether, 
after January 21, 2019, FWAs would still be valid given that they would 
include statements and elections no longer required under the 2018 
Requirements.
    [Response: We intend to provide the regulated community with 
information about how the FWA process will change well in advance of 
any modifications that are implemented. The 2018 Requirements at Sec.  
___.103(b) state that the ``[assurance] shall be filed in such form and 
manner as the department or agency head prescribes.'' To that end, 
Common Rule departments and agencies have significant flexibility in 
what information is requested in the assurance process. Questions about 
non-OHRP assurances will be addressed by the relevant Common Rule 
departments and agencies. With respect to OHRP issued FWAs, OHRP wishes 
to make clear that assurances on file with the office will still be 
valid on and after January 21, 2019 for their effective period. 
Additionally, any changes made to the assurance process will take 
account of the fact that some institutions might oversee protocols that 
comply with the pre-2018 and 2018 Requirements.]
    One commenter expressed concern with how auditors would handle IRBs 
reviewing protocols governed by both

[[Page 28502]]

the pre-2018 Requirements and the 2018 Requirements, given that the 
2018 Requirements do not require that every nondiscriminatory effort 
will be made to ensure that no IRB consists entirely of men or entirely 
of women (pre-2018 Requirements at Sec.  ___.107(b)).
    [Response: We believe that the Sec.  __.107(a) requirements for 
diversity on IRBs serves the same purpose, and thus do not see a 
conflict between the diversity requirements for IRBs under the pre-2018 
Requirements and the 2018 Requirements.]
    While the NPRM did not solicit comments on the requirement for 
cooperative research to be reviewed by a single IRB (see Sec.  
___.114), we received several comments discussing this provision. 
Several asked for an additional 2-year delay before the changes at 
Sec.  ___.114(b) become effective. Others said that this provision 
should be amended such that use of a single IRB is voluntary in 
cooperative research. These comments argued that the 2018 Requirements' 
preamble (published in the January 19, 2017 final rule) underestimated 
the costs of the single IRB mandate and the confusion that implementing 
this policy would create for investigators. Several of these comments 
acknowledged that over time, as institutions become accustomed to 
developing reliance agreements and managing the single IRB process, the 
costs currently being experienced would decrease.
    [Response: We appreciate the comments received on the single IRB of 
record requirement in cooperative research (Sec.  ___.114(b)). We 
continue to believe that a compliance date of January 20, 2020 for this 
provision gives institutions sufficient time to prepare and implement 
this requirement. While these commenters anecdotally indicated that 
implementing this requirement has been more costly to institutions than 
the January 19, 2017 final rule preamble estimated, no comment provided 
data about the actual costs to implement this provision. In the absence 
of specific data, we retain our cost and benefit assumptions related to 
this provision.]
    One comment suggested adding the exemption category for secondary 
use where consent is not required (Sec.  ___.104(d)(4)) to the burden-
reducing provisions. This commenter noted that because the inability to 
implement the revised exemptions during the delay period (i.e., July 
19, 2018 through January 20, 2018) accounted for the majority of the 
costs estimated in the NPRM for this delay, it would be preferable for 
the final rule to permit the early implementation of this exemption 
category.
    [Response: As explained in the April 20, 2018 NPRM, we did not 
propose adding the revised exemption categories to Sec.  
___.101(l)(4)(i)(A) because implementation of these categories would 
involve significantly greater complications. For example, we noted in 
the NPRM that these categories use terms that are newly defined, or for 
which revised definitions have been included in the 2018 Requirements, 
and permitting compliance with these categories without also 
selectively adopting revised definitions could be problematic. 
Specifically in regard to Sec.  ___.104(d)(4), this exemption involves 
several regulations and statutes outside of the scope of the Common 
Rule. As a result, it is a much more complicated provision to 
implement, and thus was not included as one of the burden-reducing 
provisions of the 2018 Requirements that institutions could voluntarily 
implement during the delay period. After consideration of the public 
comments received, we continue to believe that the approach proposed in 
the NPRM makes the most sense.]
    One commenter argued that the 2018 Requirements should be 
withdrawn, and that Common Rule departments and agencies should issue 
several smaller NPRMs to revise specific aspects of the Common Rule.
    [Response: We disagree with this comment. We believe that the 2018 
Requirements will provide a meaningful improvement in human subjects 
protection, while reducing administrative burden on institutions.]
    One commenter proposed that institutions or other Common Rule 
departments and agencies be required to file interim reports with HHS 
about their status with regard to full implementation and compliance 
with the 2018 Requirements. This commenter suggested that HHS could 
issue waivers for full implementation of the rule based on these 
interim reports. Additionally, such a reporting requirement would give 
HHS and other Common Rule departments and agencies the data necessary 
to determine if another adjustment to the 2018 Requirements might be 
needed.
    [Response: We believe that this approach is impractical and 
unnecessary. We believe that this final rule will give institutions 
sufficient time to implement the 2018 Requirements, which also 
precludes the need for such a phased approach.]
    One commenter indicated a desire to see a final rule containing the 
flexibility included in the original publication of the 2018 
Requirements, on January 19, 2017, that institutions be permitted to 
implement provisions of the 2018 Requirements at any time before the 
effective date.
    [Response: This commenter misunderstood the transition provision as 
written in the first publication of the 2018 Requirements; the 
transition provision published in the January 19, 2017 final rule 
revising the Common Rule did not include the ability for institutions 
to implement all provisions of the 2018 Requirements before the 
effective date and general compliance date.]
    As with the comments on the interim final rule, a few comments 
expressed concern with the waiver provision at Sec.  ___.101(i) 
allowing federal departments and agencies to waive some or all 
provisions of the Common Rule (which could allow research to be 
conducted on people without their informed consent). These comments 
additionally expressed concern with institutions being permitted to 
implement the exclusion of certain operational activities conducted by 
intelligence agencies during the delay period and suggested that this 
carve-out from the definition of research be removed from the 2018 
Requirements.
    [Response: We are not contemplating modifying the carve-outs from 
the definition of research. Regarding the carve-out from the definition 
of research pertaining to authorized operational activities in support 
of national security missions, the January 19, 2017 final rule preamble 
noted that ``[t]hese authorized operational activities, as determined 
by each agency, do not include research activities as defined by the 
Common Rule, nor have they ever in the past been considered regulated 
by the Common Rule. This category of activity is removed from the 
definition of research to make explicit that the requirements of the 
final rule do not apply to authorized operational activities in support 
of national security missions. This clarification is not intended to 
narrow the scope of the Common Rule.'']

III. Delay of the General Compliance Date Until January 21, 2019

    Through this final rule, the general compliance date for the 2018 
Requirements is delayed for a 6-month period until January 21, 2019. 
Section __.101(l)(2) is revised to make this delay explicit. The dates 
included in the transition provision, set forth at Sec.  ___.101(l)(3), 
(4), and (5), are also modified to reflect this revised general 
compliance date.
    As a result of this rule, regulated entities will be required to 
comply with the pre-2018 Requirements prior to January 21, 2019 
(putting aside the

[[Page 28503]]

burden-reducing provisions discussed in section III below). Regulated 
entities may not, prior to January 21, 2019, comply with all provisions 
of the 2018 Requirements, with the exception of the three burden-
reducing provisions, in lieu of all provisions of the pre-2018 
Requirements. Of course, regulated entities are permitted to adopt 
provisions that do not conflict with the pre-2018 Requirements, prior 
to January 21, 2019. For example, institutions may choose to 
incorporate additional elements of informed consent that happen to be 
found in the 2018 Requirements, or elsewhere, so long as such 
implementation does not conflict with the pre-2018 Requirements. In 
other words, institutions have the same flexibility they have always 
had (i.e., to exceed the minimum requirements set by the regulations).
    The compliance date for the cooperative research provision of the 
2018 Requirements (Sec.  ___.114(b)) remains January 20, 2020.

IV. Optional Flexibility: Implementation of Certain Burden-Reducing 
Provisions During the Delay Period

    As detailed in revised Sec.  ___.101(l)(4) and as set forth below 
in more detail, during the additional 6-month period that the general 
compliance date for the 2018 Requirements is delayed (July 19, 2018 
through January 20, 2019), institutions may transition a research study 
to the 2018 Requirements in order to take advantage of three burden-
reducing provisions of the 2018 Requirements. This final rule also 
restructures Sec.  ___.101(l)(3) and (4) (now numbered (5)) to aid 
readability. A new section (now Sec.  ___.101(1)(4)) describes how the 
requirements apply to research transitioning to take advantage of the 
burden-reducing provisions during different time periods. Below, we 
provide an overview of the revised transition provision to clarify its 
application to different types of studies, including studies taking 
early advantage of the three burden-reducing provisions of the 2018 
Requirements.

A. Research Subject to the pre-2018 Requirements (Sec.  ___.101(l)(3))

    As a default, studies initiated (i.e., initially approved by an 
IRB, or for which IRB review was waived by the government pursuant to 
Sec.  ___.101(i) or determined to be exempt) before January 21, 2019 
(the new general compliance date for the 2018 Requirements) will 
continue to be subject to the pre-2018 Requirements. This approach will 
maintain the ability of institutions to hold such studies to the same 
set of standards throughout their duration and will avoid a 
circumstance in which such research is subject to two sets of rules. 
However, as described below, institutions may elect to transition such 
studies to comply with the 2018 Requirements.

B. Research Subject to the 2018 Requirements (Sec.  ___.101(l)(5))

    Research initiated (i.e., initially approved by an IRB, or for 
which IRB review was waived by the government pursuant to Sec.  
___.101(i), or determined to be exempt) on or after January 21, 2019 
(the new general compliance date for the 2018 Requirements) must be 
conducted in compliance with the 2018 Requirements.

C. Research That Transitions To Comply With the 2018 Requirements on or 
After January 21, 2019 (Sec.  ___.101(l)(4)(ii))

    Section __.101(l)(4)(ii) applies to studies following the pre-2018 
Requirements that transition to comply with the 2018 Requirements on or 
after January 21, 2019. In such circumstances, the study must be 
conducted in compliance with the 2018 Requirements beginning on the 
transition date (i.e., the date the transition determination is 
documented, on or after January 21, 2019) for its duration.

D. Research That Transitions To Comply With the 2018 Requirements 
During the 6-Month Delay Period (Sec.  __.101(l)(4)(i))

    As described in Sec.  ___.101(l)(4)(i)(A), the option of applying 
the three burden-reducing provisions of the 2018 Requirements during 
the 6-month delay period is only available with respect to studies that 
transition to comply with the 2018 Requirements between July 19, 2018 
through January 20, 2019.
    Beginning on the date that the transition determination is 
documented, through January 20, 2019, such studies must comply with the 
pre-2018 Requirements, except that the studies will comply with the 
three burden-reducing provisions instead of or in addition to the 
comparable pre-2018 Requirements (specified in Sec.  
___.101(l)(4)(i)(A)(1)-(3)).
     Pursuant to Sec.  ___.101(l)(4)(i)(A)(1), Sec.  ___.102(l) 
of the 2018 Requirements (definition of research) will apply instead of 
Sec.  ___.102(d) of the pre-2018 Requirements).
     Pursuant to Sec.  ___.101(l)(4)(i)(A)(2), Sec.  ___.103(d) 
of the 2018 Requirements (revised certification requirement that 
eliminates IRB review of application or proposal) will apply instead of 
Sec.  ___.103(f) of the pre-2018 Requirements.
     Pursuant to Sec.  __.101(l)(4)(i)(A)(3), Sec.  
___.109(f)(1)(i) and (iii) of the 2018 Requirements (exceptions to 
mandated continuing review) will apply instead of Sec.  ___.103(b) of 
the pre-2018 Requirements (as related to the requirement for continuing 
review) and in addition to Sec.  ___.109 of the pre-2018 Requirements.
    This approach is designed to afford institutions additional time 
before they are required to comply with all provisions of the 2018 
Requirements, while enabling them to take advantage of the three 
burden-reducing provisions during the delay period.
    In addition, beginning on January 21, 2019, such studies must, for 
the balance of their duration, comply with the 2018 Requirements in 
their entirety.
    We believe this rule strikes an appropriate balance of permitting 
voluntary early adoption of provisions that reduce burdens without 
creating significant complexities. An institution's decision about 
whether to transition a study to the 2018 Requirements to take 
advantage of the three burden-reducing provisions might vary depending 
on the nature and progress of the study, including any elements of the 
study to be conducted on or after January 21, 2019. For example, 
studies planning to recruit some subjects on or after January 21, 2019 
would have to meet the new requirements for obtaining the informed 
consent of those subjects. In contrast, for studies in which the 
remaining activities consist only of completing data analyses, the new 
requirements for informed consent generally would not be applicable.
    While the three burden-reducing provisions are a regulatory 
package, an institution that takes advantage of this flexibility may, 
as a matter of institutional policy, adopt a more stringent standard 
(such as that of the pre-2018 Requirements) for any or all of the 
circumstances addressed by these three provisions. For example, if an 
institution chooses to adopt a policy that studies that qualify for 
expedited review under a certain category should continue to be subject 
to annual continuing review, this rule does not prevent the institution 
from adopting and implementing that policy.
    Given that studies taking advantage of this flexibility will be 
complying with provisions from both the pre-2018 Requirements and the 
2018 Requirements during the delay period, we explain how some 
provisions interact and clarify our intended

[[Page 28504]]

interpretations of particular regulatory provisions that will apply 
during the 6-month delay period. For studies electing to transition to 
comply with the 2018 Requirements during the 6-month delay period (July 
19, 2018 through January 20, 2019), once the decision to transition the 
study is documented:
    1. In applying the definition of research under the 2018 
Requirements (Sec.  ___.102(l)(3)), the reference to a ``public health 
authority'' will be given the meaning provided in the definition of 
``public health authority'' in the 2018 Requirements (Sec.  
___.102(k)). This interpretation arises because ``public health 
authority'' is defined in the 2018 Requirements, but not in the pre-
2018 Requirements.
    2. In applying Sec.  ___.103(d) of the 2018 Requirements, the 
reference to research ``exempted under Sec.  __.104'' will be 
interpreted to refer to research exempted under Sec.  ___.101(b) of the 
pre-2018 Requirements. This interpretation arises given that only the 
exemptions set forth in the pre-2018 Requirements will be in effect 
during the 6-month delay period.
    3. The reference to ``[r]esearch eligible for expedited review in 
accordance with Sec.  ___.110'' in Sec.  ___.109(f)(1)(i) of the 2018 
Requirements will be interpreted to refer to Sec.  ___.110 of the pre-
2018 Requirements.
    4. The documentation requirements described in Sec.  ___.115(a)(3) 
of the 2018 Requirements (documenting an IRB's rationale for conducting 
continuing review not otherwise required) are not applicable during 
this period.
    5. Section__.103(d) of the 2018 Requirements will be substituted 
for Sec.  ___.103(f) of the pre-2018 Requirements. Both sections 
address the requirement for certification of research supported by a 
federal department or agency. In addition to removing the requirement 
that IRBs review grant applications or proposals, Sec.  ___.103(d) of 
the 2018 Requirements reflects other minor wording changes necessary to 
accommodate the removal of the grant application or proposal review 
requirement or to provide additional clarifications.

E. General Transition Issues

    The regulatory provisions are not prescriptive regarding how an 
institution chooses to make its transition decisions. An institution 
may elect to transition research protocols to the 2018 Requirements on 
a protocol-by-protocol basis, or for a class of protocols (e.g., all 
minimal risk research), or for the institution's entire research 
portfolio.
    Section __.101(l)(4)(ii) applies to studies following the pre-2018 
Requirements that, at some point on or after January 21, 2019, 
transition to comply with the 2018 Requirements. If the determination 
to transition a study to the 2018 Requirements is documented on or 
after January 21, 2019, as of the date of documentation the study must 
be conducted in compliance with the 2018 Requirements for its duration.
    We clarify that the transition provision at Sec.  ___.101(l)(4) of 
the 2018 Requirements extends to research newly initiated during the 
delay period. Research newly initiated between July 19, 2018 and 
January 20, 2019 may be either conducted under the pre-2018 
Requirements, in accordance with Sec.  __.101(l)(3); or, an institution 
may transition research newly initiated during the delay period to the 
2018 Requirements, in accordance with Sec.  __.101(l)(4), in which 
event the research would be conducted under the pre-2018 Requirements, 
with substitution of the three burden-reducing provisions of the 2018 
Requirements for the comparable provisions of the pre-2018 
Requirements. In addition, on or after January 21, 2019, an institution 
may choose to transition research initiated during the delay period 
that was initially conducted under the pre-2018 Requirements, to 
compliance with the 2018 Requirements. In the NPRM, proposed Sec.  
___.101(l)(4) referenced application by an institution ``engaged in 
research'' to ``ongoing'' research. In order to clarify the Common Rule 
departments' and agencies' intention that research newly initiated 
during the delay period may transition to the 2018 Requirements, this 
final rule no longer includes the qualifier of ``ongoing'' to describe 
research that transitions to the 2018 Requirements in accordance with 
Sec.  ___.101(l)(4). The final rule at Sec.  ___.101(l)(4) also 
includes the additional wording ``planning or'' before ``engaged in 
research'' to clarify that institutions are allowed to take advantage 
of the 2018 Requirements' carve-outs from the definition of research 
for studies newly initiated during the delay period (which would allow 
a study that qualifies for one of the carve-outs to be conducted 
without prior IRB review and approval or application of the other 
regulatory requirements).
    This final rule revises the requirement, now set forth at Sec.  
___.101(l)(4), regarding which entity may document an institution's 
decision to transition research. This change will offer institutions 
greater flexibility regarding who documents the transition 
determination. Under the January 19, 2017 final rule, an institutional 
determination that research would transition to comply with the 2018 
Requirements had to be documented by an IRB. Under this rule, such a 
determination may be documented either by an IRB or an institution 
(through officials who have the authority to make such determinations 
on behalf of the institution). Such documentation must include the date 
of the transition determination, and records documenting the transition 
decision must be retained in accordance with Sec.  ___.115(b).
    As a general matter, once an institution decides to transition a 
study to the 2018 Requirements and that determination is documented, 
the date of documentation will serve as the de facto compliance date 
for either the three-burden reducing provisions for transition 
determinations documented between July 19, 2018 and January 20, 2019, 
or the 2018 Requirements as applied to the study for transition 
determinations documented on or after January 21, 2019.
    This final rule has an effective date of July 19, 2018, to enable 
regulated entities to take advantage of the three burden-reducing 
provisions during the delay period. However, as explained in this rule, 
the requirements a study must comply with beginning on July 19, 2018 
are detailed in the transition provision codified at Sec.  
___.101(l)(1)-(5). Finally, for consistency, headings were added to 
Sec.  ___.101(l)(1) and (2).

V. Legal Authorities

    The legal authorities for the departments and agencies that are 
signatories to this action are as follows:
    Department of Homeland Security, 5 U.S.C. 301; Public Law 107-296, 
sec. 102, 306(c); Public Law 108-458, sec. 8306. Department of 
Agriculture, 5 U.S.C. 301; 42 U.S.C. 300v-1(b). Department of Energy, 5 
U.S.C. 301; 42 U.S.C. 7254; 42 U.S.C. 300v-1(b). National Aeronautics 
and Space Administration, 5 U.S.C. 301; 42 U.S.C. 300v-1(b). Department 
of Commerce, 5 U.S.C. 301; 42 U.S.C. 300v-1(b). Consumer Product Safety 
Commission, 5 U.S.C. 301; 42 U.S.C. 300v-1(b). Social Security 
Administration, 5 U.S.C. 301; 42 U.S.C. 289(a). Agency for 
International Development, 5 U.S.C. 301; 42 U.S.C. 300v-1(b), unless 
otherwise noted. Department of Housing and Urban Development, 5 U.S.C. 
301; 42 U.S.C. 300v-1(b); 3535(d). Department of Labor, 5 U.S.C. 301; 
29 U.S.C. 551. Department of Defense, 5 U.S.C. 301. Department of 
Education, 5 U.S.C. 301; 20 U.S.C. 1221e-3, 3474.

[[Page 28505]]

Department of Veterans Affairs, 5 U.S.C. 301; 38 U.S.C. 501, 7331, 
7334; 42 U.S.C. 300v-1(b). Environmental Protection Agency, 5 U.S.C. 
301; 7 U.S.C. 136a(a) and 136w(a)(1); 21 U.S.C. 346a(e)(1)(C); sec. 
201, Public Law 109-54, 119 Stat. 531; and 42 U.S.C. 300v-1(b). 
Department of Health and Human Services, 5 U.S.C. 301; 42 U.S.C. 
289(a); 42 U.S.C. 300v-1(b). National Science Foundation, 5 U.S.C. 301; 
42 U.S.C. 300v-1(b). Department of Transportation, 5 U.S.C. 301; 42 
U.S.C. 300v-1(b).

VI. Regulatory Impact Analyses

    We have examined the effects of this final rule under Executive 
Order 12866 on Regulatory Planning and Review (September 30, 1993), 
Executive Order 13563 on Improving Regulation and Regulatory Review 
(January 18, 2011), Executive Order 13771 on Reducing Regulation and 
Controlling Regulatory Costs (January 30, 2017), the Paperwork 
Reduction Act of 1995 (Pub. L. 104-13), the Regulatory Flexibility Act 
(Pub. L. 96-354, September 19, 1980), the Unfunded Mandates Reform Act 
of 1995 (Pub. L. 104-4), and Executive Order 13132 on Federalism 
(August 4, 1999).

A. Executive Orders 12866, 13563, and 13771

    Executive Orders 12866 and 13563 direct agencies to assess all 
costs and benefits of available regulatory alternatives and, if 
regulation is necessary, to select regulatory approaches that maximize 
net benefits (including potential economic, environmental, public 
health and safety effects; distributive impacts; and equity). Executive 
Order 13563 is supplemental to and reaffirms the principles, 
structures, and definitions governing regulatory review as established 
in Executive Order 12866, emphasizing the importance of quantifying 
both costs and benefits, of reducing costs, of harmonizing rules, and 
of promoting flexibility. In accordance with the provisions of 
Executive Order 12866, this rule was submitted to the Office of 
Management and Budget (OMB) for review and has been determined to be a 
``significant'' regulatory action. This regulation has been designated 
as ``regulatory'' under Executive Order 13771 (Reducing Regulation and 
Controlling Regulatory Costs, issued on January 30, 2017). We estimate 
that this rule generates $2.02 million in annualized costs at a 7% 
discount rate, discounted relative to year 2016, over a perpetual time 
horizon. Details on the estimated costs of this final rule can be found 
in the economic analysis below.
1. Need for This Final Rule and Summary
    On January 19, 2017, HHS and 15 other federal departments and 
agencies published the 2018 Requirements designed to more thoroughly 
address the broader types of research conducted or otherwise supported 
by all of the Common Rule departments and agencies. In addition, the 
CPSC adopted the same regulatory changes on September 18, 2017. This 
rule was amended in a final rule published in the Federal Register on 
January 22, 2018 and adopted by HUD through a final rule published on 
January 26, 2018.
    This final rule allows regulated entities to continue to comply 
with the pre-2018 requirements until January 21, 2019. As discussed 
above, this final rule also permits institutions, during the period 
between July 19, 2018 and January 21, 2019, to take advantage of three 
provisions in the 2018 Requirements intended to minimize burdens on 
regulated entities. Those three burden-reducing 2018 Requirements are 
(1) the 2018 Requirements' definition of ``research,'' which deems 
certain activities not to be research, (2) the elimination of the 
requirement for annual continuing review of certain categories of 
research, and (3) the elimination of the requirement that IRBs review 
grant applications or proposals related to the research. As described 
in section III above, this flexibility is permitted for studies for 
which an institution makes a choice to have those studies be subject to 
the 2018 Requirements.
2. Public Comments on the April 20, 2018 NPRM RIA and Response to 
Comments
    The April 20, 2018 NPRM RIA solicited comment on the following 
assumptions:

--That in almost all categories described in the RIA for the 2018 
Requirements, the foregone benefits (costs) of delaying the 2018 
Requirements by six months are what would have been the benefits of 
implementing the 2018 Requirements during the period of July 2018 
through January of 2019. Similarly, the assumption that, in almost all 
categories described in the RIA for the 2018 Requirements, the benefits 
(cost-savings) associated with delaying the 2018 Requirements by six 
months are what would have been the costs of implementing the 2018 
Requirements during the period of July 2018 through January of 2019.
--That some entities will experience cost savings as a result of this 
rule, and some entities would experience costs as a result of this 
rule.
--That 50 percent of regulated entities will take advantage of the 
option to implement three burden-reducing provisions of the 2018 
Requirements early. Additionally, the NPRM sought comment that would 
provide insight into entities' views regarding the interconnectedness 
of the 2018 Requirements' provisions and thus allow for refinement of 
the 50 percent estimate.
    --That this rulemaking will not have a significant economic impact 
on a substantial number of small entities.
    We received several comments on the costs and benefits associated 
with the April 20, 2018 NPRM to delay the 2018 Requirements. None of 
these comments provided specific feedback on the cost and benefit 
assumptions included in the NPRM.
    These comments indicated that the timing and implementation of the 
interim final rule created additional administrative burden on 
institutions that were prepared to implement the 2018 Requirements on 
January 19, 2018.
    As discussed above, one comment noted that if we permitted the 
exemption at Sec.  ___.104(d)(4) for secondary research where consent 
is not required to be implemented prior to the general compliance date, 
this delay would essentially be cost neutral. While we appreciate that 
there might be economic benefits to permitting the early implementation 
of one or more of the new or revised exemption categories, we did not 
include the exemptions as one of the provisions of the 2018 
Requirements institutions can utilize during the delay period finalized 
in this rule because of the added complexity of implementing the 
exemptions in the absence of guidance.
    Finally, we received several comments indicating that the January 
19, 2017 final rule preamble underestimated the costs of implementing 
the cooperative research provision at Sec.  ___.114. These comments 
argued that, at best, this provision would represent a shifting of 
administrative costs and burdens, but would not represent an overall 
cost savings. We continue to believe that the original compliance date 
of this provision in January 2020 gives institutions sufficient time to 
prepare and implement this requirement. While these commenters 
anecdotally indicated that implementing this requirement has been more 
costly to institutions than the January 19, 2017 final rule preamble 
estimated, no commenter provided data about the actual costs to 
implement this provision. In the absence of specific

[[Page 28506]]

data, we continue with our cost and benefit assumptions related to this 
provision.
3. Analysis of Benefits (Cost-Savings) and Costs (Foregone Benefits) 
\4\
---------------------------------------------------------------------------

    \4\ Note, that the terms ``benefits'' and ``cost-savings'' are 
used interchangeably in this RIA. Similarly, the terms ``costs'' and 
``foregone benefits'' are also used interchangeably.
---------------------------------------------------------------------------

    The RIA for the 2018 Requirements described the benefits and costs 
of 16 broad categories of changes finalized. The RIA for this final 
rule uses the information and calculations described in the preamble to 
the 2018 Requirements as a base for estimating benefits and costs of 
delaying the general implementation of the 2018 Requirements by six 
months. The time period for the analysis in this RIA is the 6-month 
period from July 2018 to January 2019.
    Table 1 summarizes the quantified benefits and costs of delaying 
the general implementation of 2018 Requirements. Over the period of 
July 2018 to January 2019, annualized benefits of $6.4 million are 
estimated using a 3 percent discount rate; annualized benefits of $5.9 
million are estimated using a 7 percent discount rate. Annualized costs 
of $37.2 million are estimated using a 3 percent discount rate; 
annualized costs of $34.4 million are estimated using a 7 percent 
discount rate. Note that all values are represented in millions of 2016 
dollars, and 2016 is used as the frame of reference for discounting.

 Table 1--All Benefits and Costs of Delaying the General Compliance Date
                  for the 2018 Requirements by 6 Months
                [From July 19, 2018 to January 21, 2019]
------------------------------------------------------------------------
                                           Annualized value by discount
                                              rate (millions of 2016
                                                     dollars)
                                         -------------------------------
                                             3 Percent       7 Percent
------------------------------------------------------------------------
Benefits (Cost-Savings):
    Quantified Benefits.................             6.4             5.9
Costs (Foregone Benefits):
    Quantified Costs....................            37.4            34.7
------------------------------------------------------------------------

    The estimated benefits and costs of delaying the general 
implementation date of the 2018 Requirements by 6 months are shown in 
Table 2 below. Note that the categorization shown below includes the 
same 16 categories used in the RIA of the 2018 Requirements.

    Table 2--Accounting Table of Quantified Benefits (Cost-savings) and Costs (Foregone Benefits) of Delaying
                              Compliance With the 2018 Requirements by 6 Months \5\
----------------------------------------------------------------------------------------------------------------
                                                    Annualized value over 1 year by discount rate (millions of
                                                                           2016 dollars)
                                                 ---------------------------------------------------------------
          2018 Requirement RIA Category               Benefits (cost-savings)        Costs (foregone benefits)
                                                 ---------------------------------------------------------------
                                                        3%              7%              3%              7%
----------------------------------------------------------------------------------------------------------------
Regulated Community Learning New Requirements     ..............  ..............  ..............  ..............
 and Developing Training Materials; OHRP
 Developing Training and Guidance Materials, and
 Implementing the 2018 Requirements.............
Extending Oversight to IRBs Unaffiliated with an            4.47            4.14  ..............  ..............
 Institution Holding an FWA (impact to IRBs not
 operated by an FWA-holding institution)........
Excluding Activities from the Requirements of     ..............  ..............            0.95            0.88
 the Common Rule Because They Are Not Research..
Clarifying and Harmonizing Regulatory             ..............  ..............  ..............  ..............
 Requirements and Agency Guidance...............
Modifying the Assurance Requirements............  ..............  ..............            0.31            0.29
Requirement for Written Procedures and            ..............  ..............  ..............  ..............
 Agreements for Reliance on IRBs Not Operated by
 the Engaged Institution (impact to FWA-holding
 institutions)..................................
Eliminating the Requirement that the Grant        ..............  ..............             8.5             7.9
 Application or Proposal Undergo IRB Review and
 Approval.......................................
Expansion of Research Activities Exempt from                0.01            0.01            20.8            19.3
 Full IRB Review................................
Elimination of Continuing Review of Research                1.04            0.96            4.10            3.80
 Under Specific Conditions......................
Amending the Expedited Review Procedures........  ..............  ..............            2.66            2.47
Cooperative Research (single IRB mandate in       ..............  ..............  ..............  ..............
 multi-institutional research) \6\..............
Changes in the Basic Elements of Consent,         ..............  ..............  ..............  ..............
 Including Documentation........................
Obtaining Consent to Secondary Use of             ..............  ..............  ..............  ..............
 Identifiable Biospecimens and Identifiable
 Private Information............................
Elimination of Pre-2018 Rule Requirement to       ..............  ..............            0.07            0.06
 Waive Consent in Certain Subject Recruitment
 Activities.....................................
Requirement for Posting of Consent Forms for                0.85            0.79  ..............  ..............
 Clinical Trials Conducted or supported by
 Common Rule Departments or Agencies............
Alteration in Waiver for Documentation of         ..............  ..............  ..............  ..............
 Informed Consent in Certain Circumstances......
-------------------------------------------------

[[Page 28507]]

 
Cost Savings, as indicated by public comments                                     ..............  ..............
 (unable to attribute to particular provisions).           Unquantified
----------------------------------------------------------------------------------------------------------------

    We assume that in almost all categories described in the RIA for 
the 2018 Requirements the foregone benefits (costs) of delaying the 
2018 Requirements by 6 months are what would have been the benefits of 
implementing the 2018 Requirements during the period of July 2018 
through January 2019. Similarly, we assume that, in almost all 
categories described in the RIA for the 2018 Requirements, the benefits 
(cost-savings) associated with delaying the 2018 Requirements by 6 
months are what would have been the costs of implementing the 2018 
Requirements during the period of July 2018 through January 2019. We 
assume this because regulated entities likely would not have difficulty 
implementing these provisions in the absence of guidance from Common 
Rule departments or agencies, and thus could have been implemented as 
assumed in the economic analysis contained in the RIA for the 2018 
Requirements.\5\ \6\
---------------------------------------------------------------------------

    \5\ Zeroes in Table 2 (represented by --) signify that the 
category has been unaffected by the 6-month delay of the 2018 
Requirements. The category could be unaffected for one of two 
reasons: (1) No costs or benefits were associated with the category 
in the RIA for the 2018 Requirements; or (2) the costs and benefits 
of the provision during the 6-month delay are the same as those 
estimated in the RIA for the 2018 Requirements.
    \6\ Because compliance with this provision is not required until 
2020, benefits and costs here are not included.
---------------------------------------------------------------------------

    Categories with different assumptions are described below.
    a. Regulated Community Learning New Requirements and Developing 
Training Materials; OHRP Developing Training and Guidance Materials, 
and Implementing the 2018 Requirements
    We assume that even with the proposed 6-month delay, regulated 
entities and OHRP will still assume costs related to learning the new 
requirements and developing training materials. Thus, there are no 
effects estimated here.
    We expect that some entities would experience cost savings as a 
result of this final rule, and some entities will experience costs as a 
result of this rule, but we lack data to quantify these effects.
b. Early Implementation of the Three Burden-Reducing Provisions of the 
2018 Requirements (Explicit Carve-Outs of Activities From the 
Definition of Research [Sec.  ___.102(l)]; Eliminating the Requirement 
That the Grant Application or Other Funding Proposal Undergo IRB Review 
and Approval [Pre-2018 Rule at Sec.  ___.103(f)]; Elimination of 
Continuing Review of Research Under Specific Conditions [Sec. Sec.  
___.109(f) and ___.115(a)(3)]
    We assume that 50 percent of regulated entities will take advantage 
of the option included in this final rule to implement three burden-
reducing provisions of the 2018 Requirements prior to the general 
compliance date. We assume this because an institution's decision about 
whether to transition a study to the 2018 Requirements to take 
advantage of the three burden-reducing provisions might vary depending 
on the nature and progress of the study, including any elements of the 
study to be conducted on or after January 21, 2019. For example, 
studies planning to recruit some subjects on or after January 21, 2019 
would have to meet the new requirements for obtaining the informed 
consent of those subjects. In contrast, for studies whose remaining 
activities consist only of completing data analyses, the new 
requirements for informed consent would generally not be applicable. 
Therefore, we assume that there are situations in which an institution 
would want to take advantage of the three burden-reducing provisions, 
and situations in which an institution would not want to take advantage 
of this flexibility. We note that we intend to publish guidance on the 
carve-outs from the definition of research prior to July 19, 2018, 
which may also impact an institution's decision to elect to implement 
the three burden-reducing provisions or not.
    Thus, these entities will still obtain the benefits and costs 
described in the RIA for the 2018 Requirements, implying no effects of 
this rule for 50 percent of regulated entities. For the regulated 
entities that do not take advantage of these flexibilities, we assume 
that the foregone benefits (costs) of delaying implementation of these 
provisions are what would have been the benefits of implementing these 
provisions in January 2018. Similarly, we assume that the benefits 
(cost-savings) associated with delaying the implementation of these 
provisions are what would have been the costs of implementing these 
provisions in July 2018. We assume that these regulated entities 
account for 50 percent of the costs and benefits that would have been 
experienced in 2018 absent this delay.
    We also assume that institutional or IRB staff at the IRB 
Administrative staff level \7\ will spend 5 minutes per protocol 
documenting the voluntary election to use the three burden-reducing 
2018 provisions during the time period of July 19, 2018 to January 21, 
2019.
---------------------------------------------------------------------------

    \7\ See the RIA to the 2018 Requirements (82 FR 7149) for more 
information about the labor categories used in this analysis.
---------------------------------------------------------------------------

    Some members of the regulated community have indicated that even 
though the 2018 Requirements yield cost savings, these institutions are 
still hesitant to transition ongoing research to the 2018 Requirements, 
largely because of the burden of making studies already in compliance 
with the pre-2018 requirements comply with the 2018 requirements. Also, 
some institutions seem inclined to make all of the transitions at once. 
This interconnectedness is key to some of the assumptions noted 
elsewhere in this analysis. For example, if the three burden-reducing 
provisions are considered on their own, a reasonable assumption would 
be that 100 percent of affected entities would realize the associated 
cost savings as soon as possible. The use, instead, of a 50 percent 
estimate reflects entities' possible inclinations to make all 
transitions at once.
c. Expansion of Research Activities Exempt From Full IRB Review (Sec.  
___.104(d))
    The 2018 Requirements include five new exemption categories and 
modify

[[Page 28508]]

all but one exemption that exist in the pre-2018 Requirements. We have 
received feedback from SACHRP that guidance will be useful for 
regulated entities to implement many of the exemption categories.\8\ 
Areas where significant guidance will be helpful include: Applying the 
categories of the new exemptions themselves, conducting limited IRB 
review (as required in four exemptions), developing and using broad 
consent (as required in two exemptions), utilizing the exemption for 
certain HIPAA covered activities, and understanding which federally 
supported or conducted nonresearch information collections qualify for 
exemption.
---------------------------------------------------------------------------

    \8\ See for example, SACHRP Recommendations of August 2, 2017: 
https://www.hhs.gov/ohrp/sachrp-committee/recommendations/sachrp-recommendations/index.html.
---------------------------------------------------------------------------

    Because the guidance documents that would be helpful to assist 
regulated entities in implementing these provisions of the 2018 
Requirements have not yet been issued, we assume that 50 percent of the 
regulated entities would not have taken advantage of the expansion in 
exemptions during this six month-delay. For these entities, we assume 
that there are no benefits and costs of the proposed delay, because 
they would not have changed their operations. We assume that 50 percent 
of the regulated entities would have gone forward with using the new or 
expanded exemption categories under the 2018 Requirements; for these 
entities, there are costs of delaying the implementation of this 
provision during the six-month delay proposed in this NPRM.
    We do not have data to support our assumption of what percent of 
regulated entities would have gone forward with the implementation of 
these provisions in the absence of additional guidance, and what 
percent would not have gone forward.
4. Analysis of Final Rule Alternative
    An alternative to the proposal finalized in this rule was to delay 
the effective date and general compliance date to January 21, 2019.
    Table 3 summarizes the quantified benefits and costs of the 
alternative proposal of delaying the general implementation of 2018 
Requirements without the option to implement certain provisions of the 
2018 Requirements. Over the period of July 2018 to January 2019, 
annualized benefits of $7.4 million are estimated using a 3 percent 
discount rate; annualized benefits of $6.9 million are estimated using 
a 7 percent discount rate. Annualized costs of $50.8 million are 
estimated using a 3 percent discount rate; annualized costs of $47.0 
million are estimated using a 7 percent discount rate. Note that all 
values are represented in millions of 2016 dollars, and 2016 is used as 
the frame of reference for discounting.

  Table 3--All Benefits and Costs of Delaying Compliance With the 2018
               Requirements Under the Alternative Proposal
------------------------------------------------------------------------
                                           Annualized value by discount
                                              rate (millions of 2016
                                                     dollars)
                                         -------------------------------
                                             3 Percent       7 Percent
------------------------------------------------------------------------
Benefits (Cost-Savings):
    Quantified Benefits:................             7.4             6.9
Costs (Foregone Benefits):
    Quantified Costs....................            50.8            47.0
------------------------------------------------------------------------

B. Paperwork Reduction Act (PRA)

    This final rule contains collections of information that are 
subject to review and approval by the Office of Management and Budget 
(OMB) under the Paperwork Reduction Act (PRA), as amended (44 U.S.C. 
3501-3520). A description of these provisions is given in this document 
with an estimate of the annual reporting and recordkeeping burden.
    Title: Federal Policy for the Protection of Human Subjects.
    Description: In this document is a discussion of the regulatory 
provisions we believe are subject to the PRA and the probable 
information collection burden associated with these provisions. In 
general, the following actions trigger the PRA: (i) Reporting; (ii) 
Recordkeeping.
    Description of Respondents: The reporting and recordkeeping 
requirements in this document are imposed on institutions, 
institutional review boards, and investigators involved in human 
subjects research conducted or supported or otherwise subject to 
regulation by any federal department or agency that takes 
administrative action that makes the policy applicable to such 
research.
Sec.  ___.101(l)(4) Compliance Date and Transition Provision (OMB 
Control No 0990-0260)
    Section 101(l)(4)(i) permits studies to transition to the 2018 
Requirements between July 19, 2018 and January 21, 2019 (which would be 
the new general compliance date for the 2018 Requirements). Between 
July 19, 2018 and January 21, 2019, institutions that elect to 
transition studies to the 2018 Requirements would, after the decision 
to transition has been documented, be able to take advantage of the 
three burden-reducing 2018 Requirements.
    This option is described in a revision to Sec.  ___.101(l)(4)(i). 
As described, studies taking advantage of this option would be subject 
to the three burden-reducing 2018 Requirements instead of, or in 
addition to, the comparable provisions of the pre-2018 Requirements. As 
discussed above, the three burden-reducing 2018 Requirements are (1) 
the 2018 Requirements' definition of ``research'' at Sec.  ___.102(l) 
(instead of Sec.  ___.102(d) of the pre-2018 Requirements), which deems 
certain activities not to be research, (2) the elimination of the 
requirement that an IRB review the grant application or proposal 
related to the research at Sec.  ___.103(d) of the 2018 Requirements 
(instead of Sec.  ___.103(f) of the pre-2018 Requirements), and (3) the 
elimination of the requirement for annual continuing review of certain 
categories of research at Sec.  ___.109(f)(1)(i) and (iii) of the 2018 
Requirements (instead of Sec.  ___.103(b), as related to the 
requirement for continuing review, and in addition to Sec.  ___.109 of 
the pre-2018 Requirements).

[[Page 28509]]

    We estimate that approximately 92,084 protocols would take 
advantage of the voluntary election described in Sec.  
___.101(l)(4)(i). We estimate that institutional staff would spend 5 
minutes per protocol documenting that the study will be subject to the 
three burden-reducing provisions of the 2018 Requirements during the 
time period of July 19, 2018 through January 21, 2019. We estimate that 
this provision includes 7,674 burden hours.

C. Regulatory Flexibility Act (RFA)

    The Regulatory Flexibility Act (5 U.S.C. 601 et seq.) (RFA) and the 
Small Business Regulatory Enforcement and Fairness Act of 1996, which 
amended the RFA, require agencies that issue a regulation to analyze 
options for regulatory relief for small businesses. If a rule has a 
significant economic impact on a substantial number of small entities, 
agencies must specifically consider the economic effect of the rule on 
small entities and analyze regulatory options that could lessen the 
impact of the rule. The RFA generally defines a ``small entity'' as (1) 
a proprietary firm meeting the size standards of the Small Business 
Administration (SBA); (2) a nonprofit organization that is not dominant 
in its field; or (3) a small government jurisdiction with a population 
of less than 50,000 (states and individuals are not included in the 
definition of ``small entity''). HHS considers a rule to have a 
significant economic impact on a substantial number of small entities 
if at least 5 percent of small entities experience an impact of more 
than 3 percent of revenue.
    We have determined that this final rule will not have a significant 
economic impact on a substantial number of small entities under the 
RFA. In making this determination, the impact of concern is any 
significant adverse economic impact on small entities. An agency may 
certify that a rule will not have a significant economic impact on a 
substantial number of small entities if the rule relieves regulatory 
burden, has no net burden or otherwise has a positive economic effect 
on the small entities subject to the rule. This final rule would not 
impose a regulatory burden for regulated small entities because it 
would delay the general compliance date for the 2018 Requirements, 
allowing the status quo to be retained for the period of delay. 
Additionally, regulated small entities are permitted to comply 
voluntarily with those aspects of the 2018 Requirements that do not 
conflict with the pre-2018 Requirements, prior to January 21, 2019. We 
have therefore concluded that this action will have no net regulatory 
burden for all directly regulated small entities.

D. Unfunded Mandates Reform Act (UMRA)

    Federal mandate that may result in the expenditure by State, local, 
and tribal governments, in the aggregate, or by the private sector, of 
$100,000,000 or more (adjusted annually for inflation) in any one 
year.'' In 2018, that threshold is approximately $150 million. We do 
not expect this rule to result in expenditures that will exceed this 
amount. This action does not contain any unfunded mandate as described 
in UMRA, 2 U.S.C. 1531-1538, and does not significantly or uniquely 
affect small governments.2 U.S.C. 1531-1538, and does not significantly 
or uniquely affect small governments.

E. Executive Order 13132: Federalism

    Executive Order 13132 establishes certain requirements that an 
agency must meet when it promulgates a rule that imposes substantial 
direct requirement costs on state and local governments or has 
federalism implications. We have determined that this rule would not 
contain policies that would have substantial direct effects on the 
States, on the relationship between the Federal Government and the 
States, or on the distribution of power and responsibilities among the 
various levels of government. The changes in this rule represent the 
Federal Government regulating its own program. Accordingly, we conclude 
that the rule does not propose policies that have federalism 
implications as defined in Executive Order 13132 and, consequently, a 
federalism summary impact statement is not required.
    For the reasons set forth in the preamble, the Federal Policy for 
the Protection of Human Subjects, as published in the Federal Register 
on January 19, 2017 (82 FR 7149) and as adopted in a final rule 
published by the CPSC on September 18, 2017 (82 FR 43459), and as 
amended in a final rule published in the Federal Register on January 
22, 2018 (83 FR 2885) and adopted by HUD through a final rule published 
on January 26, 2018 (83 FR 3589), is further amended as follows:

Text of the Amended Common Rule

PART__--PROTECTION OF HUMAN SUBJECTS

    1. Amend Sec.  ___.101 by adding a heading for paragraph (l)(1), 
revising paragraphs (l)(2), (3), and (4), and adding paragraph (l)(5) 
to read as follows:

Sec.  ___.101 To what does this policy apply?

* * * * *
    (l) * * *
    (1) Pre-2018 Requirements. * * *
    (2) 2018 Requirements. For purposes of this section, the 2018 
Requirements means the Federal Policy for the Protection of Human 
Subjects requirements contained in this [part/subpart]. The general 
compliance date for the 2018 Requirements is January 21, 2019. The 
compliance date for Sec.  ___.114(b) (cooperative research) of the 2018 
Requirements is January 20, 2020.
    (3) Research subject to pre-2018 requirements. The pre-2018 
Requirements shall apply to the following research, unless the research 
is transitioning to comply with the 2018 Requirements in accordance 
with paragraph (l)(4) of this section:
    (i) Research initially approved by an IRB under the pre-2018 
Requirements before January 21, 2019;
    (ii) Research for which IRB review was waived pursuant to Sec.  
___.101(i) of the pre-2018 Requirements before January 21, 2019; and
    (iii) Research for which a determination was made that the research 
was exempt under Sec.  .101(b) of the pre-2018 Requirements before 
January 21, 2019.
    (4) Transitioning research. If, on or after July 19, 2018, an 
institution planning or engaged in research otherwise covered by 
paragraph (l)(3) of this section determines that such research instead 
will transition to comply with the 2018 Requirements, the institution 
or an IRB must document and date such determination.
    (i) If the determination to transition is documented between July 
19, 2018, and January 20, 2019, the research shall:
    (A) Beginning on the date of such documentation through January 20, 
2019, comply with the pre-2018 Requirements, except that the research 
shall comply with the following:
    (1) Section ___.102(l) of the 2018 Requirements (definition of 
research) (instead of Sec.  ___.102(d) of the pre-2018 Requirements);
    (2) Section ___.103(d) of the 2018 Requirements (revised 
certification requirement that eliminates IRB review of application or 
proposal) (instead of Sec.  ___.103(f) of the pre-2018 Requirements); 
and
    (3) Section ___.109(f)(1)(i) and (iii) of the 2018 Requirements 
(exceptions to mandated continuing review) (instead of Sec.  
___.103(b), as related to the requirement for continuing review, and

[[Page 28510]]

in addition to Sec.  ___.109, of the pre-2018 Requirements); and
    (B) Beginning on January 21, 2019, comply with the 2018 
Requirements.
    (ii) If the determination to transition is documented on or after 
January 21, 2019, the research shall, beginning on the date of such 
documentation, comply with the 2018 Requirements.
    (5) Research subject to 2018 Requirements. The 2018 Requirements 
shall apply to the following research:
    (i) Research initially approved by an IRB on or after January 21, 
2019;
    (ii) Research for which IRB review is waived pursuant to paragraph 
(i) of this section on or after January 21, 2019; and
    (iii) Research for which a determination is made that the research 
is exempt on or after January 21, 2019.
* * * * *

DEPARTMENT OF HOMELAND SECURITY

List of Subjects in 6 CFR Part 46

    Human research subjects, Reporting and recordkeeping requirements, 
Research.

    For the reasons stated in the preamble, Department of Homeland 
Security further amends 6 CFR part 46 as published in the Federal 
Register on January 19, 2017 (82 FR 7149), and as amended in an interim 
final rule published in the Federal Register on January 22, 2018 (83 FR 
2885), as follows:

PART 46--PROTECTION OF HUMAN SUBJECTS

0
1. The authority citation for part 46 continues to read as follows:

    Authority:  5 U.S.C. 301; Pub. L. 107-296, sec. 102, 306(c); 
Pub. L. 108-458, sec. 8306.


0
2. Amend Sec.  46.101 by adding a heading for paragraph (l)(1), 
revising paragraphs (l)(2), (3), and (4), and adding paragraph (l)(5) 
to read as follows:


Sec.  46.101  To what does this policy apply?

* * * * *
    (l) * * *
    (1) Pre-2018 Requirements. * * *
    (2) 2018 Requirements. For purposes of this section, the 2018 
Requirements means the Federal Policy for the Protection of Human 
Subjects requirements contained in this part. The general compliance 
date for the 2018 Requirements is January 21, 2019. The compliance date 
for Sec.  46.114(b) (cooperative research) of the 2018 Requirements is 
January 20, 2020.
    (3) Research subject to pre-2018 requirements. The pre-2018 
Requirements shall apply to the following research, unless the research 
is transitioning to comply with the 2018 Requirements in accordance 
with paragraph (l)(4) of this section:
    (i) Research initially approved by an IRB under the pre-2018 
Requirements before January 21, 2019;
    (ii) Research for which IRB review was waived pursuant to Sec.  
46.101(i) of the pre-2018 Requirements) before January 21, 2019; and
    (iii) Research for which a determination was made that the research 
was exempt under Sec.  46.101(b) of the pre-2018 Requirements before 
January 21, 2019.
    (4) Transitioning research. If, on or after July 19, 2018, an 
institution planning or engaged in research otherwise covered by 
paragraph (l)(3) of this section determines that such research instead 
will transition to comply with the 2018 Requirements, the institution 
or an IRB must document and date such determination.
    (i) If the determination to transition is documented between July 
19, 2018, and January 20, 2019, the research shall:
    (A) Beginning on the date of such documentation through January 20, 
2019, comply with the pre-2018 Requirements, except that the research 
shall comply with the following:
    (1) Section 46.102(l) of the 2018 Requirements (definition of 
research) (instead of Sec.  46.102(d) of the pre-2018 Requirements);
    (2) Section 46.103(d) of the 2018 Requirements (revised 
certification requirement that eliminates IRB review of application or 
proposal) (instead of Sec.  46.103(f) of the pre-2018 Requirements); 
and
    (3) Section 46.109(f)(1)(i) and (iii) of the 2018 Requirements 
(exceptions to mandated continuing review) (instead of Sec.  46.103(b), 
as related to the requirement for continuing review, and in addition to 
Sec.  46.109, of the pre-2018 Requirements); and
    (B) Beginning on January 21, 2019, comply with the 2018 
Requirements.
    (ii) If the determination to transition is documented on or after 
January 21, 2019, the research shall, beginning on the date of such 
documentation, comply with the 2018 Requirements.
    (5) Research subject to 2018 Requirements. The 2018 Requirements 
shall apply to the following research:
    (i) Research initially approved by an IRB on or after January 21, 
2019;
    (ii) Research for which IRB review is waived pursuant to paragraph 
(i) of this section on or after January 21, 2019; and
    (iii) Research for which a determination is made that the research 
is exempt on or after January 21, 2019.
* * * * *

Claire M. Grady,
Deputy Secretary (Acting), Department of Homeland Security.

DEPARTMENT OF AGRICULTURE

List of Subjects in 7 CFR Part 1c

    Human research subjects, Reporting and recordkeeping requirements, 
Research.

    For the reasons stated in the preamble, Department of Agriculture 
further amends 7 CFR part 1c as published in the Federal Register on 
January 19, 2017 (82 FR 7149), and as amended in an interim final rule 
published in the Federal Register on January 22, 2018 (83 FR 2885), as 
follows:

PART 1c--PROTECTION OF HUMAN SUBJECTS

0
1. The authority citation for part 1c continues to read as follows:

    Authority:  5 U.S.C. 301; 42 U.S.C. 300v-1(b).


0
2. Amend Sec.  1c.101 by adding a heading for paragraph (l)(1), 
revising paragraphs (l)(2), (3), and (4), and adding paragraph (l)(5) 
to read as follows:


Sec.  1c.101  To what does this policy apply?

* * * * *
    (l) * * *
    (1) Pre-2018 Requirements. * * *
    (2) 2018 Requirements. For purposes of this section, the 2018 
Requirements means the Federal Policy for the Protection of Human 
Subjects requirements contained in this part. The general compliance 
date for the 2018 Requirements is January 21, 2019. The compliance date 
for Sec.  1c.114(b) (cooperative research) of the 2018 Requirements is 
January 20, 2020.
    (3) Research subject to pre-2018 requirements. The pre-2018 
Requirements shall apply to the following research, unless the research 
is transitioning to comply with the 2018 Requirements in accordance 
with paragraph (l)(4) of this section:
    (i) Research initially approved by an IRB under the pre-2018 
Requirements before January 21, 2019;
    (ii) Research for which IRB review was waived pursuant to Sec.  
1c.101(i) of the pre-2018 Requirements before January 21, 2019; and
    (iii) Research for which a determination was made that the research 
was exempt under Sec.  1c.101(b)

[[Page 28511]]

of the pre-2018 Requirements before January 21, 2019.
    (4) Transitioning research. If, on or after July 19, 2018, an 
institution planning or engaged in research otherwise covered by 
paragraph (l)(3) of this section determines that such research instead 
will transition to comply with the 2018 Requirements, the institution 
or an IRB must document and date such determination.
    (i) If the determination to transition is documented between July 
19, 2018, and January 20, 2019, the research shall:
    (A) Beginning on the date of such documentation through January 20, 
2019, comply with the pre-2018 Requirements, except that the research 
shall comply with the following:
    (1) Section 1c.102(l) of the 2018 Requirements (definition of 
research) (instead of Sec.  1c.102(d) of the pre-2018 Requirements);
    (2) Section 1c.103(d) of the 2018 Requirements (revised 
certification requirement that eliminates IRB review of application or 
proposal) (instead of Sec.  1c.103(f) of the pre-2018 Requirements); 
and
    (3) Section 1c.109(f)(1)(i) and (iii) of the 2018 Requirements 
(exceptions to mandated continuing review) (instead of Sec.  1c.103(b), 
as related to the requirement for continuing review, and in addition to 
Sec.  1c.109, of the pre-2018 Requirements); and
    (B) Beginning on January 21, 2019, comply with the 2018 
Requirements.
    (ii) If the determination to transition is documented on or after 
January 21, 2019, the research shall, beginning on the date of such 
documentation, comply with the 2018 Requirements.
    (5) Research subject to 2018 Requirements. The 2018 Requirements 
shall apply to the following research:
    (i) Research initially approved by an IRB on or after January 21, 
2019;
    (ii) Research for which IRB review is waived pursuant to paragraph 
(i) of this section on or after January 21, 2019; and
    (iii) Research for which a determination is made that the research 
is exempt on or after January 21, 2019.
* * * * *

Chavonda Jacobs-Young,
Acting Deputy Under Secretary for Research, Education, and Economics, 
USDA.

DEPARTMENT OF ENERGY

List of Subjects in 10 CFR Part 745

    Human research subjects, Reporting and recordkeeping requirements, 
Research.

    For the reasons stated in the preamble, Department of Energy 
further amends 10 CFR part 745 as published in the Federal Register on 
January 19, 2017 (82 FR 7149), and as amended in an interim final rule 
published in the Federal Register on January 22, 2018 (83 FR 2885), as 
follows:

PART 745--PROTECTION OF HUMAN SUBJECTS

0
1. The authority citation for part 745 continues to read as follows:

    Authority:  5 U.S.C. 301; 42 U.S.C. 7254; 42 U.S.C. 300v-1(b).


0
2. Amend Sec.  745.101 by adding a heading for paragraph (l)(1), 
revising paragraphs (l)(2), (3), and (4), and adding paragraph (l)(5) 
to read as follows:


Sec.  745.101  To what does this policy apply?

* * * * *
    (l) * * *
    (1) Pre-2018 Requirements. * * *
    (2) 2018 Requirements. For purposes of this section, the 2018 
Requirements means the Federal Policy for the Protection of Human 
Subjects requirements contained in this part. The general compliance 
date for the 2018 Requirements is January 21, 2019. The compliance date 
for Sec.  745.114(b) (cooperative research) of the 2018 Requirements is 
January 20, 2020.
    (3) Research subject to pre-2018 requirements. The pre-2018 
Requirements shall apply to the following research, unless the research 
is transitioning to comply with the 2018 Requirements in accordance 
with paragraph (l)(4) of this section:
    (i) Research initially approved by an IRB under the pre-2018 
Requirements before January 21, 2019;
    (ii) Research for which IRB review was waived pursuant to Sec.  
745.101(i) of the pre-2018 Requirements before January 21, 2019; and
    (iii) Research for which a determination was made that the research 
was exempt under Sec.  745.101(b) of the pre-2018 Requirements before 
January 21, 2019.
    (4) Transitioning research. If, on or after July 19, 2018, an 
institution planning or engaged in research otherwise covered by 
paragraph (l)(3) of this section determines that such research instead 
will transition to comply with the 2018 Requirements, the institution 
or an IRB must document and date such determination.
    (i) If the determination to transition is documented between July 
19, 2018, and January 20, 2019, the research shall:
    (A) Beginning on the date of such documentation through January 20, 
2019, comply with the pre-2018 Requirements, except that the research 
shall comply with the following:
    (1) Section 745.102(l) of the 2018 Requirements (definition of 
research) (instead of Sec.  745.102(d) of the pre-2018 Requirements);
    (2) Section 745.103(d) of the 2018 Requirements (revised 
certification requirement that eliminates IRB review of application or 
proposal) (instead of Sec.  745.103(f) of the pre-2018 Requirements); 
and
    (3) Section 745.109(f)(1)(i) and (iii) of the 2018 Requirements 
(exceptions to mandated continuing review) (instead of Sec.  
745.103(b), as related to the requirement for continuing review, and in 
addition to Sec.  745.109, of the pre-2018 Requirements); and
    (B) Beginning on January 21, 2019, comply with the 2018 
Requirements.
    (ii) If the determination to transition is documented on or after 
January 21, 2019, the research shall, beginning on the date of such 
documentation, comply with the 2018 Requirements.
    (5) Research subject to 2018 Requirements. The 2018 Requirements 
shall apply to the following research:
    (i) Research initially approved by an IRB on or after January 21, 
2019;
    (ii) Research for which IRB review is waived pursuant to paragraph 
(i) of this section on or after January 21, 2019; and
    (iii) Research for which a determination is made that the research 
is exempt on or after January 21, 2019.
* * * * *

Dan Brouillette,
Deputy Secretary of Energy.

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

List of Subjects in 14 CFR Part 1230

    Human research subjects, Reporting and recordkeeping requirements, 
Research.

    For the reasons stated in the preamble, National Aeronautics and 
Space Administration further amends 14 CFR part 1230 as published in 
the Federal Register on January 19, 2017 (82 FR 7149), and as amended 
in an interim final rule published in the Federal Register on January 
22, 2018 (83 FR 2885), as follows:

PART 1230--PROTECTION OF HUMAN SUBJECTS

0
1. The authority citation for part 1230 continues to read as follows:

    Authority:  5 U.S.C. 301; 42 U.S.C. 300v-1(b).


0
2. Amend Sec.  1230.101 by adding a heading for paragraph (l)(1), 
revising paragraphs (l)(2), (3), and (4), and adding paragraph (l)(5) 
to read as follows:

[[Page 28512]]

Sec.  1230.101   To what does this policy apply?

* * * * *
    (l) * * *
    (1) Pre-2018 Requirements. * * *
    (2) 2018 Requirements. For purposes of this section, the 2018 
Requirements means the Federal Policy for the Protection of Human 
Subjects requirements contained in this part. The general compliance 
date for the 2018 Requirements is January 21, 2019. The compliance date 
for Sec.  1230.114(b) (cooperative research) of the 2018 Requirements 
is January 20, 2020.
    (3) Research subject to pre-2018 requirements. The pre-2018 
Requirements shall apply to the following research, unless the research 
is transitioning to comply with the 2018 Requirements in accordance 
with paragraph (l)(4) of this section:
    (i) Research initially approved by an IRB under the pre-2018 
Requirements before January 21, 2019;
    (ii) Research for which IRB review was waived pursuant to Sec.  
1230.101(i) of the pre-2018 Requirements before January 21, 2019; and
    (iii) Research for which a determination was made that the research 
was exempt under Sec.  1230.101(b) of the pre-2018 Requirements before 
January 21, 2019.
    (4) Transitioning research. If, on or after July 19, 2018, an 
institution planning or engaged in research otherwise covered by 
paragraph (l)(3) of this section determines that such research instead 
will transition to comply with the 2018 Requirements, the institution 
or an IRB must document and date such determination.
    (i) If the determination to transition is documented between July 
19, 2018, and January 20, 2019, the research shall:
    (A) Beginning on the date of such documentation through January 20, 
2019, comply with the pre-2018 Requirements, except that the research 
shall comply with the following:
    (1) Section 1230.102(l) of the 2018 Requirements (definition of 
research) (instead of Sec.  1230.102(d) of the pre-2018 Requirements);
    (2) Section 1230.103(d) of the 2018 Requirements (revised 
certification requirement that eliminates IRB review of application or 
proposal) (instead of Sec.  1230.103(f) of the pre-2018 Requirements); 
and
    (3) Section 1230.109(f)(1)(i) and (iii) of the 2018 Requirements 
(exceptions to mandated continuing review) (instead of Sec.  
1230.103(b), as related to the requirement for continuing review, and 
in addition to Sec.  1230.109, of the pre-2018 Requirements); and
    (B) Beginning on January 21, 2019, comply with the 2018 
Requirements.
    (ii) If the determination to transition is documented on or after 
January 21, 2019, the research shall, beginning on the date of such 
documentation, comply with the 2018 Requirements.
    (5) Research subject to 2018 Requirements. The 2018 Requirements 
shall apply to the following research:
    (i) Research initially approved by an IRB on or after January 21, 
2019;
    (ii) Research for which IRB review is waived pursuant to paragraph 
(i) of this section on or after January 21, 2019; and
    (iii) Research for which a determination is made that the research 
is exempt on or after January 21, 2019.
* * * * *

James D. Polk,
Chief Health & Medical Officer, National Aeronautics and Space 
Administration.

DEPARTMENT OF COMMERCE

List of Subjects in 15 CFR Part 27

    Human research subjects, Reporting and recordkeeping requirements, 
Research.

    For the reasons stated in the preamble, Department of Commerce 
further amends 15 CFR part 27 as published in the Federal Register on 
January 19, 2017 (82 FR 7149), and as amended in an interim final rule 
published in the Federal Register on January 22, 2018 (83 FR 2885), as 
follows:

PART 27--PROTECTION OF HUMAN SUBJECTS

0
1. The authority citation for part 27 continues to read as follows:

    Authority: 5 U.S.C. 301; 42 U.S.C. 300v-1(b).


0
2. Amend Sec.  27.101 by adding a heading for paragraph (l)(1), 
revising paragraphs (l)(2), (3), and (4), and adding paragraph (l)(5) 
to read as follows:


Sec.  27.101   To what does this policy apply?

* * * * *
    (l) * * *
    (1) Pre-2018 Requirements. * * *
    (2) 2018 Requirements. For purposes of this section, the 2018 
Requirements means the Federal Policy for the Protection of Human 
Subjects requirements contained in this part. The general compliance 
date for the 2018 Requirements is January 21, 2019. The compliance date 
for Sec.  27.114(b) (cooperative research) of the 2018 Requirements is 
January 20, 2020.
    (3) Research subject to pre-2018 requirements. The pre-2018 
Requirements shall apply to the following research, unless the research 
is transitioning to comply with the 2018 Requirements in accordance 
with paragraph (l)(4) of this section:
    (i) Research initially approved by an IRB under the pre-2018 
Requirements before January 21, 2019;
    (ii) Research for which IRB review was waived pursuant to Sec.  
27.101(i) of the pre-2018 Requirements before January 21, 2019; and
    (iii) Research for which a determination was made that the research 
was exempt under Sec.  27.101(b) of the pre-2018 Requirements before 
January 21, 2019.
    (4) Transitioning research. If, on or after July 19, 2018, an 
institution planning or engaged in research otherwise covered by 
paragraph (l)(3) of this section determines that such research instead 
will transition to comply with the 2018 Requirements, the institution 
or an IRB must document and date such determination.
    (i) If the determination to transition is documented between July 
19, 2018, and January 20, 2019, the research shall:
    (A) Beginning on the date of such documentation through January 20, 
2019, comply with the pre-2018 Requirements, except that the research 
shall comply with the following:
    (1) Section 27.102(l) of the 2018 Requirements (definition of 
research) (instead of Sec.  27.102(d) of the pre-2018 Requirements);
    (2) Section 27.103(d) of the 2018 Requirements (revised 
certification requirement that eliminates IRB review of application or 
proposal) (instead of Sec.  27.103(f) of the pre-2018 Requirements); 
and
    (3) Section 27.109(f)(1)(i) and (iii) of the 2018 Requirements 
(exceptions to mandated continuing review) (instead of Sec.  27.103(b), 
as related to the requirement for continuing review, and in addition to 
Sec.  27.109, of the pre-2018 Requirements); and
    (B) Beginning on January 21, 2019, comply with the 2018 
Requirements.
    (ii) If the determination to transition is documented on or after 
January 21, 2019, the research shall, beginning on the date of such 
documentation, comply with the 2018 Requirements.
    (5) Research subject to 2018 Requirements. The 2018 Requirements 
shall apply to the following research:
    (i) Research initially approved by an IRB on or after January 21, 
2019;
    (ii) Research for which IRB review is waived pursuant to paragraph 
(i) of this section on or after January 21, 2019; and

[[Page 28513]]

    (iii) Research for which a determination is made that the research 
is exempt on or after January 21, 2019.
* * * * *

Wilbur L. Ross,
Secretary of Commerce.

CONSUMER PRODUCT SAFETY COMMISSION

List of Subjects in 16 CFR Part 1028

    Human research subjects, Reporting and recordkeeping requirements, 
Research.

    For the reasons stated in the preamble, Consumer Product Safety 
Commission further amends 16 CFR part 1028 as published in the Federal 
Register on January 19, 2017 (82 FR 7149) and as adopted in a final 
rule published by the CPSC on September 18, 2017 (82 FR 43459), and as 
amended in an interim final rule published in the Federal Register on 
January 22, 2018 (83 FR 2885), as follows:

PART 1028--PROTECTION OF HUMAN SUBJECTS

0
1. The authority citation for part 1028 continues to read as follows:

    Authority: 5 U.S.C. 301; 42 U.S.C. 300v-1(b).


0
2. Amend Sec.  1028.101 by adding a heading for paragraph (l)(1), 
revising paragraphs (l)(2), (3), and (4), and adding paragraph (l)(5) 
to read as follows:


Sec.  1028.101   To what does this policy apply?

* * * * *
    (l) * * *
    (1) Pre-2018 Requirements. * * *
    (2) 2018 Requirements. For purposes of this section, the 2018 
Requirements means the Federal Policy for the Protection of Human 
Subjects requirements contained in this part. The general compliance 
date for the 2018 Requirements is January 21, 2019. The compliance date 
for Sec.  1028.114(b) (cooperative research) of the 2018 Requirements 
is January 20, 2020.
    (3) Research subject to pre-2018 requirements. The pre-2018 
Requirements shall apply to the following research, unless the research 
is transitioning to comply with the 2018 Requirements in accordance 
with paragraph (l)(4) of this section:
    (i) Research initially approved by an IRB under the pre-2018 
Requirements before January 21, 2019;
    (ii) Research for which IRB review was waived pursuant to Sec.  
1028.101(i) of the pre-2018 Requirements before January 21, 2019; and
    (iii) Research for which a determination was made that the research 
was exempt under Sec.  1028.101(b) of the pre-2018 Requirements before 
January 21, 2019.
    (4) Transitioning research. If, on or after July 19, 2018, an 
institution planning or engaged in research otherwise covered by 
paragraph (l)(3) of this section determines that such research instead 
will transition to comply with the 2018 Requirements, the institution 
or an IRB must document and date such determination.
    (i) If the determination to transition is documented between July 
19, 2018, and January 20, 2019, the research shall:
    (A) Beginning on the date of such documentation through January 20, 
2019, comply with the pre-2018 Requirements, except that the research 
shall comply with the following:
    (1) Section 1028.102(l) of the 2018 Requirements (definition of 
research) (instead of Sec.  1028.102(d) of the pre-2018 Requirements);
    (2) Section 1028.103(d) of the 2018 Requirements (revised 
certification requirement that eliminates IRB review of application or 
proposal) (instead of Sec.  1028.103(f) of the pre-2018 Requirements); 
and
    (3) Section 1028.109(f)(1)(i) and (iii) of the 2018 Requirements 
(exceptions to mandated continuing review) (instead of Sec.  
1028.103(b), as related to the requirement for continuing review, and 
in addition to Sec.  1028.109, of the pre-2018 Requirements); and
    (B) Beginning on January 21, 2019, comply with the 2018 
Requirements.
    (ii) If the determination to transition is documented on or after 
January 21, 2019, the research shall, beginning on the date of such 
documentation, comply with the 2018 Requirements.
    (5) Research subject to 2018 Requirements. The 2018 Requirements 
shall apply to the following research:
    (i) Research initially approved by an IRB on or after January 21, 
2019;
    (ii) Research for which IRB review is waived pursuant to paragraph 
(i) of this section on or after January 21, 2019; and
    (iii) Research for which a determination is made that the research 
is exempt on or after January 21, 2019.
* * * * *

Alberta E. Mills,
Secretary, Consumer Product Safety Commission.

SOCIAL SECURITY ADMINISTRATION

List of Subjects in 20 CFR Part 431

    Human research subjects, Reporting and recordkeeping requirements, 
Research.

    For the reasons stated in the preamble, Social Security 
Administration further amends 20 CFR part 431 as published in the 
Federal Register on January 19, 2017 (82 FR 7149), and as amended in an 
interim final rule published in the Federal Register on January 22, 
2018 (83 FR 2885), as follows:

PART 431--PROTECTION OF HUMAN SUBJECTS

0
1. The authority citation for part 431 continues to read as follows:

    Authority:  5 U.S.C. 301; 42 U.S.C. 289(a).


0
2. Amend Sec.  431.101 by adding a heading for paragraph (l)(1), 
revising paragraphs (l)(2), (3), and (4), and adding paragraph (l)(5) 
to read as follows:


Sec.  431.101   To what does this policy apply?

* * * * *
    (l) * * *
    (1) Pre-2018 Requirements. * * *
    (2) 2018 Requirements. For purposes of this section, the 2018 
Requirements means the Federal Policy for the Protection of Human 
Subjects requirements contained in this part. The general compliance 
date for the 2018 Requirements is January 21, 2019. The compliance date 
for Sec.  431.114(b) (cooperative research) of the 2018 Requirements is 
January 20, 2020.
    (3) Research subject to pre-2018 requirements. The pre-2018 
Requirements shall apply to the following research, unless the research 
is transitioning to comply with the 2018 Requirements in accordance 
with paragraph (l)(4) of this section:
    (i) Research initially approved by an IRB under the pre-2018 
Requirements before January 21, 2019;
    (ii) Research for which IRB review was waived pursuant to Sec.  
431.101(i) of the pre-2018 Requirements before January 21, 2019; and
    (iii) Research for which a determination was made that the research 
was exempt under Sec.  431.101(b) of the pre-2018 Requirements before 
January 21, 2019.
    (4) Transitioning research. If, on or after July 19, 2018, an 
institution planning or engaged in research otherwise covered by 
paragraph (l)(3) of this section determines that such research instead 
will transition to comply with the 2018 Requirements, the institution 
or an IRB must document and date such determination.
    (i) If the determination to transition is documented between July 
19, 2018, and January 20, 2019, the research shall:
    (A) Beginning on the date of such documentation through January 20, 
2019, comply with the pre-2018

[[Page 28514]]

Requirements, except that the research shall comply with the following:
    (1) Section 431.102(l) of the 2018 Requirements (definition of 
research) (instead of Sec.  431.102(d) of the pre-2018 Requirements);
    (2) Section 431.103(d) of the 2018 Requirements (revised 
certification requirement that eliminates IRB review of application or 
proposal) (instead of Sec.  431.103(f) of the pre-2018 Requirements); 
and
    (3) Section 431.109(f)(1)(i) and (iii) of the 2018 Requirements 
(exceptions to mandated continuing review) (instead of Sec.  
431.103(b), as related to the requirement for continuing review, and in 
addition to Sec.  431.109, of the pre-2018 Requirements); and
    (B) Beginning on January 21, 2019, comply with the 2018 
Requirements.
    (ii) If the determination to transition is documented on or after 
January 21, 2019, the research shall, beginning on the date of such 
documentation, comply with the 2018 Requirements.
    (5) Research subject to 2018 Requirements. The 2018 Requirements 
shall apply to the following research:
    (i) Research initially approved by an IRB on or after January 21, 
2019;
    (ii) Research for which IRB review is waived pursuant to paragraph 
(i) of this section on or after January 21, 2019; and
    (iii) Research for which a determination is made that the research 
is exempt on or after January 21, 2019.
* * * * *

Nancy Berryhill,
Acting Commissioner of Social Security.

AGENCY FOR INTERNATIONAL DEVELOPMENT

List of Subjects in 22 CFR Part 225

    Human research subjects, Reporting and recordkeeping requirements, 
Research.

    For the reasons stated in the preamble, Agency for International 
Development further amends 22 CFR part 225 as published in the Federal 
Register on January 19, 2017 (82 FR 7149), and as amended in an interim 
final rule published in the Federal Register on January 22, 2018 (83 FR 
2885), as follows:

PART 225--PROTECTION OF HUMAN SUBJECTS

0
1. The authority citation for part 225 continues to read as follows:

    Authority: 5 U.S.C. 301; 42 U.S.C. 300v-1(b), unless otherwise 
noted.


0
2. Amend Sec.  225.101 by adding a heading for paragraph (l)(1), 
revising paragraphs (l)(2), (3), and (4), and adding paragraph (l)(5) 
to read as follows:


Sec.  225.101   To what does this policy apply?

* * * * *
    (l) * * *
    (1) Pre-2018 Requirements. * * *
    (2) 2018 Requirements. For purposes of this section, the 2018 
Requirements means the Federal Policy for the Protection of Human 
Subjects requirements contained in this part. The general compliance 
date for the 2018 Requirements is January 21, 2019. The compliance date 
for Sec.  225.114(b) (cooperative research) of the 2018 Requirements is 
January 20, 2020.
    (3) Research subject to pre-2018 requirements. The pre-2018 
Requirements shall apply to the following research, unless the research 
is transitioning to comply with the 2018 Requirements in accordance 
with paragraph (l)(4) of this section:
    (i) Research initially approved by an IRB under the pre-2018 
Requirements before January 21, 2019;
    (ii) Research for which IRB review was waived pursuant to Sec.  
225.101(i) of the pre-2018 Requirements before January 21, 2019; and
    (iii) Research for which a determination was made that the research 
was exempt under Sec.  225.101(b) of the pre-2018 Requirements before 
January 21, 2019.
    (4) Transitioning research. If, on or after July 19, 2018, an 
institution planning or engaged in research otherwise covered by 
paragraph (l)(3) of this section determines that such research instead 
will transition to comply with the 2018 Requirements, the institution 
or an IRB must document and date such determination.
    (i) If the determination to transition is documented between July 
19, 2018, and January 20, 2019, the research shall:
    (A) Beginning on the date of such documentation through January 20, 
2019, comply with the pre-2018 Requirements, except that the research 
shall comply with the following:
    (1) Section 225.102(l) of the 2018 Requirements (definition of 
research) (instead of Sec.  225.102(d) of the pre-2018 Requirements);
    (2) Section 225.103(d) of the 2018 Requirements (revised 
certification requirement that eliminates IRB review of application or 
proposal) (instead of Sec.  225.103(f) of the pre-2018 Requirements); 
and
    (3) Section 225.109(f)(1)(i) and (iii) of the 2018 Requirements 
(exceptions to mandated continuing review) (instead of Sec.  
225.103(b), as related to the requirement for continuing review, and in 
addition to Sec.  225.109, of the pre-2018 Requirements); and
    (B) Beginning on January 21, 2019, comply with the 2018 
Requirements.
    (ii) If the determination to transition is documented on or after 
January 21, 2019, the research shall, beginning on the date of such 
documentation, comply with the 2018 Requirements.
    (5) Research subject to 2018 Requirements. The 2018 Requirements 
shall apply to the following research:
    (i) Research initially approved by an IRB on or after January 21, 
2019;
    (ii) Research for which IRB review is waived pursuant to paragraph 
(i) of this section on or after January 21, 2019; and
    (iii) Research for which a determination is made that the research 
is exempt on or after January 21, 2019.
* * * * *

Irene Koek,
Senior Deputy Assistant Administrator for Global Health, U.S. Agency 
for International Development.

DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

List of Subjects in 24 CFR Part 60

    Human research subjects, Reporting and recordkeeping requirements, 
Research.

    For the reasons stated in the preamble, Department of Housing and 
Urban Development further amends 24 CFR part 60 as published in the 
Federal Register on January 19, 2017 (82 FR 7149), and as amended in an 
interim final rule published in the Federal Register on January 22, 
2018 (83 FR 2885), and adopted by HUD through an interim final rule 
published on January 26, 2018 (83 FR 3589), as follows:

PART 60--PROTECTION OF HUMAN SUBJECTS

0
1. The authority citation for part 60 continues to read as follows:

    Authority: 5 U.S.C. 301; 42 U.S.C. 300v-1(b) and 3535(d).


0
2. Amend Sec.  60.101 by adding a heading for paragraph (l)(1), 
revising paragraphs (l)(2), (3), and (4), and adding paragraph (l)(5) 
to read as follows:


Sec.  60.101  To what does this policy apply?

* * * * *
    (l) * * *
    (1) Pre-2018 Requirements. * * *
    (2) 2018 Requirements. For purposes of this section, the 2018 
Requirements means the Federal Policy for the Protection of Human 
Subjects requirements contained in this part. The general compliance 
date for the 2018 Requirements is January 21, 2019. The compliance date 
for Sec.  60.114(b)

[[Page 28515]]

(cooperative research) of the 2018 Requirements is January 20, 2020.
    (3) Research subject to pre-2018 requirements. The pre-2018 
Requirements shall apply to the following research, unless the research 
is transitioning to comply with the 2018 Requirements in accordance 
with paragraph (l)(4) of this section:
    (i) Research initially approved by an IRB under the pre-2018 
Requirements before January 21, 2019;
    (ii) Research for which IRB review was waived pursuant to Sec.  
60.101(i) of the pre-2018 Requirements before January 21, 2019; and
    (iii) Research for which a determination was made that the research 
was exempt under Sec.  60.101(b) of the pre-2018 Requirements before 
January 21, 2019.
    (4) Transitioning research. If, on or after July 19, 2018, an 
institution planning or engaged in research otherwise covered by 
paragraph (l)(3) of this section determines that such research instead 
will transition to comply with the 2018 Requirements, the institution 
or an IRB must document and date such determination.
    (i) If the determination to transition is documented between July 
19, 2018, and January 20, 2019, the research shall:
    (A) Beginning on the date of such documentation through January 20, 
2019, comply with the pre-2018 Requirements, except that the research 
shall comply with the following:
    (1) Section 60.102(l) of the 2018 Requirements (definition of 
research) (instead of Sec.  60.102(d) of the pre-2018 Requirements);
    (2) Section 60.103(d) of the 2018 Requirements (revised 
certification requirement that eliminates IRB review of application or 
proposal) (instead of Sec.  60.103(f) of the pre-2018 Requirements); 
and
    (3) Section 60.109(f)(1)(i) and (iii) of the 2018 Requirements 
(exceptions to mandated continuing review) (instead of Sec.  60.103(b), 
as related to the requirement for continuing review, and in addition to 
Sec.  60.109, of the pre-2018 Requirements); and
    (B) Beginning on January 21, 2019, comply with the 2018 
Requirements.
    (ii) If the determination to transition is documented on or after 
January 21, 2019, the research shall, beginning on the date of such 
documentation, comply with the 2018 Requirements.
    (5) Research subject to 2018 Requirements. The 2018 Requirements 
shall apply to the following research:
    (i) Research initially approved by an IRB on or after January 21, 
2019;
    (ii) Research for which IRB review is waived pursuant to paragraph 
(i) of this section on or after January 21, 2019; and
    (iii) Research for which a determination is made that the research 
is exempt on or after January 21, 2019.
* * * * *

Todd M. Richardson,
Acting General Deputy Assistant Secretary for Policy Development and 
Research, U.S. Department of Housing and Urban Development.

DEPARTMENT OF LABOR

List of Subjects in 29 CFR Part 21

    Human research subjects, Reporting and recordkeeping requirements, 
Research.

    For the reasons stated in the preamble, Department of Labor further 
amends 29 CFR part 21 as published in the Federal Register on January 
19, 2017 (82 FR 7149), and as amended in an interim final rule 
published in the Federal Register on January 22, 2018 (83 FR 2885), as 
follows:

PART 21--PROTECTION OF HUMAN SUBJECTS

0
1. The authority citation for part 21 continues to read as follows:

    Authority: 5 U.S.C. 301; 29 U.S.C. 551.


0
2. Amend Sec.  21.101 by adding a heading for paragraph (l)(1), 
revising paragraphs (l)(2), (3), and (4), and adding paragraph (l)(5) 
to read as follows:


Sec.  21.101  To what does this policy apply?

* * * * *
    (l) * * *
    (1) Pre-2018 Requirements. * * *
    (2) 2018 Requirements. For purposes of this section, the 2018 
Requirements means the Federal Policy for the Protection of Human 
Subjects requirements contained in this part. The general compliance 
date for the 2018 Requirements is January 21, 2019. The compliance date 
for Sec.  21.114(b) (cooperative research) of the 2018 Requirements is 
January 20, 2020.
    (3) Research subject to pre-2018 requirements. The pre-2018 
Requirements shall apply to the following research, unless the research 
is transitioning to comply with the 2018 Requirements in accordance 
with paragraph (l)(4) of this section:
    (i) Research initially approved by an IRB under the pre-2018 
Requirements before January 21, 2019;
    (ii) Research for which IRB review was waived pursuant to Sec.  
21.101(i) of the pre-2018 Requirements before January 21, 2019; and
    (iii) Research for which a determination was made that the research 
was exempt under Sec.  21.101(b) of the pre-2018 Requirements before 
January 21, 2019.
    (4) Transitioning research. If, on or after July 19, 2018, an 
institution planning or engaged in research otherwise covered by 
paragraph (l)(3) of this section determines that such research instead 
will transition to comply with the 2018 Requirements, the institution 
or an IRB must document and date such determination.
    (i) If the determination to transition is documented between July 
19, 2018, and January 20, 2019, the research shall:
    (A) Beginning on the date of such documentation through January 20, 
2019, comply with the pre-2018 Requirements, except that the research 
shall comply with the following:
    (1) Section 21.102(l) of the 2018 Requirements (definition of 
research) (instead of Sec.  21.102(d) of the pre-2018 Requirements);
    (2) Section 21.103(d) of the 2018 Requirements (revised 
certification requirement that eliminates IRB review of application or 
proposal) (instead of Sec.  21.103(f) of the pre-2018 Requirements); 
and
    (3) Section 21.109(f)(1)(i) and (iii) of the 2018 Requirements 
(exceptions to mandated continuing review) (instead of Sec.  21.103(b), 
as related to the requirement for continuing review, and in addition to 
Sec.  21.109, of the pre-2018 Requirements); and
    (B) Beginning on January 21, 2019, comply with the 2018 
Requirements.
    (ii) If the determination to transition is documented on or after 
January 21, 2019, the research shall, beginning on the date of such 
documentation, comply with the 2018 Requirements.
    (5) Research subject to 2018 Requirements. The 2018 Requirements 
shall apply to the following research:
    (i) Research initially approved by an IRB on or after January 21, 
2019;
    (ii) Research for which IRB review is waived pursuant to paragraph 
(i) of this section on or after January 21, 2019; and
    (iii) Research for which a determination is made that the research 
is exempt on or after January 21, 2019.
* * * * *

R. Alexander Acosta,
Secretary of Labor.

DEPARTMENT OF DEFENSE

List of Subjects in 32 CFR Part 219

    Human research subjects, Reporting and recordkeeping requirements, 
Research.

    For the reasons stated in the preamble, Department of Defense

[[Page 28516]]

further amends 32 CFR part 219 as published in the Federal Register on 
January 19, 2017 (82 FR 7149), and as amended in an interim final rule 
published in the Federal Register on January 22, 2018 (83 FR 2885), as 
follows:

PART 219--PROTECTION OF HUMAN SUBJECTS

0
1. The authority citation for part 219 continues to read as follows:

    Authority:  5 U.S.C. 301; 42 U.S.C. 300v-1(b).


0
2. Amend Sec.  219.101 by adding a heading for paragraph (l)(1), 
revising paragraphs (l)(2), (3), and (4), and adding paragraph (l)(5) 
to read as follows:


Sec.  219.101   To what does this policy apply?

* * * * *
    (l) * * *
    (1) Pre-2018 Requirements. * * *
    (2) 2018 Requirements. For purposes of this section, the 2018 
Requirements means the Federal Policy for the Protection of Human 
Subjects requirements contained in this part. The general compliance 
date for the 2018 Requirements is January 21, 2019. The compliance date 
for Sec.  219.114(b) (cooperative research) of the 2018 Requirements is 
January 20, 2020.
    (3) Research subject to pre-2018 requirements. The pre-2018 
Requirements shall apply to the following research, unless the research 
is transitioning to comply with the 2018 Requirements in accordance 
with paragraph (l)(4) of this section:
    (i) Research initially approved by an IRB under the pre-2018 
Requirements before January 21, 2019;
    (ii) Research for which IRB review was waived pursuant to Sec.  
219.101(i) of the pre-2018 Requirements before January 21, 2019; and
    (iii) Research for which a determination was made that the research 
was exempt under Sec.  219.101(b) of the pre-2018 Requirements before 
January 21, 2019.
    (4) Transitioning research. If, on or after July 19, 2018, an 
institution planning or engaged in research otherwise covered by 
paragraph (l)(3) of this section determines that such research instead 
will transition to comply with the 2018 Requirements, the institution 
or an IRB must document and date such determination.
    (i) If the determination to transition is documented between July 
19, 2018, and January 20, 2019, the research shall:
    (A) Beginning on the date of such documentation through January 20, 
2019, comply with the pre-2018 Requirements, except that the research 
shall comply with the following:
    (1) Section 219.102(l) of the 2018 Requirements (definition of 
research) (instead of Sec.  219.102(d) of the pre-2018 Requirements);
    (2) Section 219.103(d) of the 2018 Requirements (revised 
certification requirement that eliminates IRB review of application or 
proposal) (instead of Sec.  219.103(f) of the pre-2018 Requirements); 
and
    (3) Section 219.109(f)(1)(i) and (iii) of the 2018 Requirements 
(exceptions to mandated continuing review) (instead of Sec.  
219.103(b), as related to the requirement for continuing review, and in 
addition to Sec.  219.109, of the pre-2018 Requirements); and
    (B) Beginning on January 21, 2019, comply with the 2018 
Requirements.
    (ii) If the determination to transition is documented on or after 
January 21, 2019, the research shall, beginning on the date of such 
documentation, comply with the 2018 Requirements.
    (5) Research subject to 2018 Requirements. The 2018 Requirements 
shall apply to the following research:
    (i) Research initially approved by an IRB on or after January 21, 
2019;
    (ii) Research for which IRB review is waived pursuant to paragraph 
(i) of this section on or after January 21, 2019; and
    (iii) Research for which a determination is made that the research 
is exempt on or after January 21, 2019.
* * * * *

Mary J. Miller,
Principal Deputy, Assistant Secretary of Defense for Research and 
Engineering, U.S. Department of Defense.

DEPARTMENT OF EDUCATION

List of Subjects in 34 CFR Part 97

    Human research subjects, Reporting and recordkeeping requirements, 
Research.

    For the reasons stated in the preamble, Department of Education 
further amends 34 CFR part 97 as published in the Federal Register on 
January 19, 2017 (82 FR 7149), and as amended in an interim final rule 
published in the Federal Register on January 22, 2018 (83 FR 2885), as 
follows:

PART 97--PROTECTION OF HUMAN SUBJECTS

0
1. The authority citation for part 97 continues to read as follows:

    Authority: 5 U.S.C. 301; 20 U.S.C. 1221e-3, 3474; 42 U.S.C. 
300v-1(b).


0
2. Amend Sec.  97.101 by adding a heading for paragraph (l)(1), 
revising paragraphs (l)(2), (3), and (4), and adding paragraph (l)(5) 
to read as follows:


Sec.  97.101  To what does this policy apply?

* * * * *
    (l) * * *
    (1) Pre-2018 Requirements. * * *
    (2) 2018 Requirements. For purposes of this section, the 2018 
Requirements means the Federal Policy for the Protection of Human 
Subjects requirements contained in this subpart. The general compliance 
date for the 2018 Requirements is January 21, 2019. The compliance date 
for Sec.  97.114(b) (cooperative research) of the 2018 Requirements is 
January 20, 2020.
    (3) Research subject to pre-2018 requirements. The pre-2018 
Requirements shall apply to the following research, unless the research 
is transitioning to comply with the 2018 Requirements in accordance 
with paragraph (l)(4) of this section:
    (i) Research initially approved by an IRB under the pre-2018 
Requirements before January 21, 2019;
    (ii) Research for which IRB review was waived pursuant to Sec.  
97.101(i) of the pre-2018 Requirements before January 21, 2019; and
    (iii) Research for which a determination was made that the research 
was exempt under Sec.  97.101(b) of the pre-2018 Requirements before 
January 21, 2019.
    (4) Transitioning research. If, on or after July 19, 2018, an 
institution planning or engaged in research otherwise covered by 
paragraph (l)(3) of this section determines that such research instead 
will transition to comply with the 2018 Requirements, the institution 
or an IRB must document and date such determination.
    (i) If the determination to transition is documented between July 
19, 2018, and January 20, 2019, the research shall:
    (A) Beginning on the date of such documentation through January 20, 
2019, comply with the pre-2018 Requirements, except that the research 
shall comply with the following:
    (1) Section 97.102(l) of the 2018 Requirements (definition of 
research) (instead of Sec.  97.102(d) of the pre-2018 Requirements);
    (2) Section 97.103(d) of the 2018 Requirements (revised 
certification requirement that eliminates IRB review of application or 
proposal) (instead of Sec.  97.103(f) of the pre-2018 Requirements); 
and
    (3) Section 97.109(f)(1)(i) and (iii) of the 2018 Requirements 
(exceptions to mandated continuing review) (instead of Sec.  97.103(b), 
as related to the requirement for continuing review, and

[[Page 28517]]

in addition to Sec.  97.109, of the pre-2018 Requirements); and
    (B) Beginning on January 21, 2019, comply with the 2018 
Requirements.
    (ii) If the determination to transition is documented on or after 
January 21, 2019, the research shall, beginning on the date of such 
documentation, comply with the 2018 Requirements.
    (5) Research subject to 2018 Requirements. The 2018 Requirements 
shall apply to the following research:
    (i) Research initially approved by an IRB on or after January 21, 
2019;
    (ii) Research for which IRB review is waived pursuant to paragraph 
(i) of this section on or after January 21, 2019; and
    (iii) Research for which a determination is made that the research 
is exempt on or after January 21, 2019.
* * * * *

Betsy DeVos,
Secretary of Education.

DEPARTMENT OF VETERANS AFFAIRS

List of Subjects in 38 CFR Part 16

    Human research subjects, Reporting and recordkeeping requirements, 
Research.

    For the reasons stated in the preamble, Department of Veterans 
Affairs further amends 38 CFR part 16 as published in the Federal 
Register on January 19, 2017 (82 FR 7149), and as amended in an interim 
final rule published in the Federal Register on January 22, 2018 (83 FR 
2885), as follows:

PART 16--PROTECTION OF HUMAN SUBJECTS

0
1. The authority citation for part 16 continues to read as follows:

    Authority:  5 U.S.C. 301; 38 U.S.C. 501, 7331, 7334; 42 U.S.C. 
300v-1(b).


0
2. Amend Sec.  16.101 by adding a heading for paragraph (l)(1), 
revising paragraphs (l)(2), (3), and (4), and adding paragraph (l)(5) 
to read as follows:


Sec.  16.101  To what does this policy apply?

* * * * *
    (l) * * *
    (1) Pre-2018 Requirements. * * *
    (2) 2018 Requirements. For purposes of this section, the 2018 
Requirements means the Federal Policy for the Protection of Human 
Subjects requirements contained in this part. The general compliance 
date for the 2018 Requirements is January 21, 2019. The compliance date 
for Sec.  16.114(b) (cooperative research) of the 2018 Requirements is 
January 20, 2020.
    (3) Research subject to pre-2018 requirements. The pre-2018 
Requirements shall apply to the following research, unless the research 
is transitioning to comply with the 2018 Requirements in accordance 
with paragraph (l)(4) of this section:
    (i) Research initially approved by an IRB under the pre-2018 
Requirements before January 21, 2019;
    (ii) Research for which IRB review was waived pursuant to Sec.  
16.101(i) of the pre-2018 Requirements before January 21, 2019; and
    (iii) Research for which a determination was made that the research 
was exempt under Sec.  16.101(b) of the pre-2018 Requirements before 
January 21, 2019.
    (4) Transitioning research. If, on or after July 19, 2018, an 
institution planning or engaged in research otherwise covered by 
paragraph (l)(3) of this section determines that such research instead 
will transition to comply with the 2018 Requirements, the institution 
or an IRB must document and date such determination.
    (i) If the determination to transition is documented between July 
19, 2018, and January 20, 2019, the research shall:
    (A) Beginning on the date of such documentation through January 20, 
2019, comply with the pre-2018 Requirements, except that the research 
shall comply with the following:
    (1) Section 16.102(l) of the 2018 Requirements (definition of 
research) (instead of Sec.  16.102(d) of the pre-2018 Requirements);
    (2) Section 16.103(d) of the 2018 Requirements (revised 
certification requirement that eliminates IRB review of application or 
proposal) (instead of Sec.  16.103(f) of the pre-2018 Requirements); 
and
    (3) Section 16.109(f)(1)(i) and (iii) of the 2018 Requirements 
(exceptions to mandated continuing review) (instead of Sec.  16.103(b), 
as related to the requirement for continuing review, and in addition to 
Sec.  16.109, of the pre-2018 Requirements); and
    (B) Beginning on January 21, 2019, comply with the 2018 
Requirements.
    (ii) If the determination to transition is documented on or after 
January 21, 2019, the research shall, beginning on the date of such 
documentation, comply with the 2018 Requirements.
    (5) Research subject to 2018 Requirements. The 2018 Requirements 
shall apply to the following research:
    (i) Research initially approved by an IRB on or after January 21, 
2019;
    (ii) Research for which IRB review is waived pursuant to paragraph 
(i) of this section on or after January 21, 2019; and
    (iii) Research for which a determination is made that the research 
is exempt on or after January 21, 2019.
* * * * *

Jacquelyn Hayes-Byrd,
Acting Chief of Staff, Department of Veterans Affairs.

ENVIRONMENTAL PROTECTION AGENCY

List of Subjects in 40 CFR Part 26

    Human research subjects, Reporting and recordkeeping requirements, 
Research.

    For the reasons stated in the preamble, Environmental Protection 
Agency further amends 40 CFR part 26 as published in the Federal 
Register on January 19, 2017 (82 FR 7149), and as amended in an interim 
final rule published in the Federal Register on January 22, 2018 (83 FR 
2885), as follows:

PART 26--PROTECTION OF HUMAN SUBJECTS

0
1. The authority citation for part 26 continues to read as follows:

    Authority: 5 U.S.C. 301; 7 U.S.C. 136a(a) and 136w(a)(1); 21 
U.S.C. 346a(e)(1)(C); sec. 201, Pub. L. 109-54, 119 Stat. 531; and 
42 U.S.C. 300v-1(b).


0
2. Amend Sec.  26.101 by adding a heading for paragraph (l)(1), 
revising paragraphs (l)(2), (3), and (4), and adding paragraph (l)(5) 
to read as follows:


Sec.  26.101  To what does this policy apply?

* * * * *
    (l) * * *
    (1) Pre-2018 Requirements. * * *
    (2) 2018 Requirements. For purposes of this section, the 2018 
Requirements means the Federal Policy for the Protection of Human 
Subjects requirements contained in this subpart. The general compliance 
date for the 2018 Requirements is January 21, 2019. The compliance date 
for Sec.  26.114(b) (cooperative research) of the 2018 Requirements is 
January 20, 2020.
    (3) Research subject to pre-2018 requirements. The pre-2018 
Requirements shall apply to the following research, unless the research 
is transitioning to comply with the 2018 Requirements in accordance 
with paragraph (l)(4) of this section:
    (i) Research initially approved by an IRB under the pre-2018 
Requirements before January 21, 2019;
    (ii) Research for which IRB review was waived pursuant to Sec.  
26.101(i) of the pre-2018 Requirements before January 21, 2019; and

[[Page 28518]]

    (iii) Research for which a determination was made that the research 
was exempt under Sec.  26.101(b) of the pre-2018 Requirements before 
January 21, 2019.
    (4) Transitioning research. If, on or after July 19, 2018, an 
institution planning or engaged in research otherwise covered by 
paragraph (l)(3) of this section determines that such research instead 
will transition to comply with the 2018 Requirements, the institution 
or an IRB must document and date such determination.
    (i) If the determination to transition is documented between July 
19, 2018, and January 20, 2019, the research shall:
    (A) Beginning on the date of such documentation through January 20, 
2019, comply with the pre-2018 Requirements, except that the research 
shall comply with the following:
    (1) Section 26.102(l) of the 2018 Requirements (definition of 
research) (instead of Sec.  26.102(d) of the pre-2018 Requirements);
    (2) Section 26.103(d) of the 2018 Requirements (revised 
certification requirement that eliminates IRB review of application or 
proposal) (instead of Sec.  26.103(f) of the pre-2018 Requirements); 
and
    (3) Section 26.109(f)(1)(i) and (iii) of the 2018 Requirements 
(exceptions to mandated continuing review) (instead of Sec.  26.103(b), 
as related to the requirement for continuing review, and in addition to 
Sec.  26.109, of the pre-2018 Requirements); and
    (B) Beginning on January 21, 2019, comply with the 2018 
Requirements.
    (ii) If the determination to transition is documented on or after 
January 21, 2019, the research shall, beginning on the date of such 
documentation, comply with the 2018 Requirements.
    (5) Research subject to 2018 Requirements. The 2018 Requirements 
shall apply to the following research:
    (i) Research initially approved by an IRB on or after January 21, 
2019;
    (ii) Research for which IRB review is waived pursuant to paragraph 
(i) of this section on or after January 21, 2019; and
    (iii) Research for which a determination is made that the research 
is exempt on or after January 21, 2019.
* * * * *

E. Scott Pruitt,
Administrator, Environmental Protection Agency.

DEPARTMENT OF HEALTH AND HUMAN SERVICES

List of Subjects in 45 CFR Part 46

    Human research subjects, Reporting and recordkeeping requirements, 
Research.

    For the reasons stated in the preamble, Department of Health and 
Human Services further amends 45 CFR part 46 as published in the 
Federal Register on January 19, 2017 (82 FR 7149), and as amended in an 
interim final rule published in the Federal Register on January 22, 
2018 (83 FR 2885), as follows:

PART 46--PROTECTION OF HUMAN SUBJECTS

0
1. The authority citation for part 46 continues to read as follows:

    Authority:  5 U.S.C. 301; 42 U.S.C. 289(a); 42 U.S.C. 300v-1(b).


0
2. Amend Sec.  46.101 by adding a heading for paragraph (l)(1), 
revising paragraphs (l)(2), (3), and (4), and adding paragraph (l)(5) 
to read as follows:


Sec.  46.101   To what does this policy apply?

* * * * *
    (l) * * *
    (1) Pre-2018 Requirements. * * *
    (2) 2018 Requirements. For purposes of this section, the 2018 
Requirements means the Federal Policy for the Protection of Human 
Subjects requirements contained in this subpart. The general compliance 
date for the 2018 Requirements is January 21, 2019. The compliance date 
for Sec.  46.114(b) (cooperative research) of the 2018 Requirements is 
January 20, 2020.
    (3) Research subject to pre-2018 requirements. The pre-2018 
Requirements shall apply to the following research, unless the research 
is transitioning to comply with the 2018 Requirements in accordance 
with paragraph (l)(4) of this section:
    (i) Research initially approved by an IRB under the pre-2018 
Requirements before January 21, 2019;
    (ii) Research for which IRB review was waived pursuant to Sec.  
46.101(i) of the pre-2018 Requirements before January 21, 2019; and
    (iii) Research for which a determination was made that the research 
was exempt under Sec.  46.101(b) of the pre-2018 Requirements before 
January 21, 2019.
    (4) Transitioning research. If, on or after July 19, 2018, an 
institution planning or engaged in research otherwise covered by 
paragraph (l)(3) of this section determines that such research instead 
will transition to comply with the 2018 Requirements, the institution 
or an IRB must document and date such determination.
    (i) If the determination to transition is documented between July 
19, 2018, and January 20, 2019, the research shall:
    (A) Beginning on the date of such documentation through January 20, 
2019, comply with the pre-2018 Requirements, except that the research 
shall comply with the following:
    (1) Section 46.102(l) of the 2018 Requirements (definition of 
research) (instead of Sec.  46.102(d) of the pre-2018 Requirements);
    (2) Section 46.103(d) of the 2018 Requirements (revised 
certification requirement that eliminates IRB review of application or 
proposal) (instead of Sec.  46.103(f) of the pre-2018 Requirements); 
and
    (3) Section 46.109(f)(1)(i) and (iii) of the 2018 Requirements 
(exceptions to mandated continuing review) (instead of Sec.  46.103(b), 
as related to the requirement for continuing review, and in addition to 
Sec.  46.109, of the pre-2018 Requirements); and
    (B) Beginning on January 21, 2019, comply with the 2018 
Requirements.
    (ii) If the determination to transition is documented on or after 
January 21, 2019, the research shall, beginning on the date of such 
documentation, comply with the 2018 Requirements.
    (5) Research subject to 2018 Requirements. The 2018 Requirements 
shall apply to the following research:
    (i) Research initially approved by an IRB on or after January 21, 
2019;
    (ii) Research for which IRB review is waived pursuant to paragraph 
(i) of this section on or after January 21, 2019; and
    (iii) Research for which a determination is made that the research 
is exempt on or after January 21, 2019.
* * * * *

Alex M. Azar II,
Secretary, U.S. Department of Health and Human Services.

NATIONAL SCIENCE FOUNDATION

List of Subjects in 45 CFR Part 690

    Human research subjects, Reporting and recordkeeping requirements, 
Research.

    For the reasons stated in the preamble, National Science Foundation 
further amends 45 CFR part 690 as published in the Federal Register on 
January 19, 2017 (82 FR 7149), and as amended in an interim final rule 
published in the Federal Register on January 22, 2018 (83 FR 2885), as 
follows:

PART 690--PROTECTION OF HUMAN SUBJECTS

0
1. The authority citation for part 690 continues to read as follows:

    Authority:  5 U.S.C. 301; 42 U.S.C. 300v-1(b).


[[Page 28519]]



0
2. Amend Sec.  690.101 by adding a heading for paragraph (l)(1), 
revising paragraphs (l)(2), (3), and (4), and adding paragraph (l)(5) 
to read as follows:


Sec.  690.101  To what does this policy apply?

* * * * *
    (l) * * *
    (1) Pre-2018 Requirements. * * *
    (2) 2018 Requirements. For purposes of this section, the 2018 
Requirements means the Federal Policy for the Protection of Human 
Subjects requirements contained in this part. The general compliance 
date for the 2018 Requirements is January 21, 2019. The compliance date 
for Sec.  690.114(b) (cooperative research) of the 2018 Requirements is 
January 20, 2020.
    (3) Research subject to pre-2018 requirements. The pre-2018 
Requirements shall apply to the following research, unless the research 
is transitioning to comply with the 2018 Requirements in accordance 
with paragraph (l)(4) of this section:
    (i) Research initially approved by an IRB under the pre-2018 
Requirements before January 21, 2019;
    (ii) Research for which IRB review was waived pursuant to Sec.  
690.101(i) of the pre-2018 Requirements before January 21, 2019; and
    (iii) Research for which a determination was made that the research 
was exempt under Sec.  690.101(b) of the pre-2018 Requirements before 
January 21, 2019.
    (4) Transitioning research. If, on or after July 19, 2018, an 
institution planning or engaged in research otherwise covered by 
paragraph (l)(3) of this section determines that such research instead 
will transition to comply with the 2018 Requirements, the institution 
or an IRB must document and date such determination.
    (i) If the determination to transition is documented between July 
19, 2018, and January 20, 2019, the research shall:
    (A) Beginning on the date of such documentation through January 20, 
2019, comply with the pre-2018 Requirements, except that the research 
shall comply with the following:
    (1) Section 690.102(l) of the 2018 Requirements (definition of 
research) (instead of Sec.  690.102(d) of the pre-2018 Requirements);
    (2) Section 690.103(d) of the 2018 Requirements (revised 
certification requirement that eliminates IRB review of application or 
proposal) (instead of Sec.  690.103(f) of the pre-2018 Requirements); 
and
    (3) Section 690.109(f)(1)(i) and (iii) of the 2018 Requirements 
(exceptions to mandated continuing review) (instead of Sec.  
690.103(b), as related to the requirement for continuing review, and in 
addition to Sec.  690.109, of the pre-2018 Requirements); and
    (B) Beginning on January 21, 2019, comply with the 2018 
Requirements.
    (ii) If the determination to transition is documented on or after 
January 21, 2019, the research shall, beginning on the date of such 
documentation, comply with the 2018 Requirements.
    (5) Research subject to 2018 Requirements. The 2018 Requirements 
shall apply to the following research:
    (i) Research initially approved by an IRB on or after January 21, 
2019;
    (ii) Research for which IRB review is waived pursuant to paragraph 
(i) of this section on or after January 21, 2019; and
    (iii) Research for which a determination is made that the research 
is exempt on or after January 21, 2019.
* * * * *

Lawrence Rudolph,
General Counsel, National Science Foundation.

DEPARTMENT OF TRANSPORTATION

List of Subjects in 49 CFR Part 11

    Human research subjects, Reporting and recordkeeping requirements, 
Research.

    For the reasons stated in the preamble, Department of 
Transportation further amends 49 CFR part 11 as published in the 
Federal Register on January 19, 2017 (82 FR 7149), and as amended in an 
interim final rule published in the Federal Register on January 22, 
2018 (83 FR 2885), as follows:

PART 11--PROTECTION OF HUMAN SUBJECTS

0
1. The authority citation for part 11 continues to read as follows:

    Authority: 5 U.S.C. 301; 42 U.S.C. 300v-1(b).


0
2. Amend Sec.  11.101 by adding a heading for paragraph (l)(1), 
revising paragraphs (l)(2), (3), and (4), and adding paragraph (l)(5) 
to read as follows:


Sec.  11.101   To what does this policy apply?

* * * * *
    (l) * * *
    (1) Pre-2018 Requirements. * * *
    (2) 2018 Requirements. For purposes of this section, the 2018 
Requirements means the Federal Policy for the Protection of Human 
Subjects requirements contained in this part. The general compliance 
date for the 2018 Requirements is January 21, 2019. The compliance date 
for Sec.  11.114(b) (cooperative research) of the 2018 Requirements is 
January 20, 2020.
    (3) Research subject to pre-2018 requirements. The pre-2018 
Requirements shall apply to the following research, unless the research 
is transitioning to comply with the 2018 Requirements in accordance 
with paragraph (l)(4) of this section:
    (i) Research initially approved by an IRB under the pre-2018 
Requirements before January 21, 2019;
    (ii) Research for which IRB review was waived pursuant to Sec.  
11.101(i) of the pre-2018 Requirements before January 21, 2019; and
    (iii) Research for which a determination was made that the research 
was exempt under Sec.  11.101(b) of the pre-2018 Requirements before 
January 21, 2019.
    (4) Transitioning research. If, on or after July 19, 2018, an 
institution planning or engaged in research otherwise covered by 
paragraph (l)(3) of this section determines that such research instead 
will transition to comply with the 2018 Requirements, the institution 
or an IRB must document and date such determination.
    (i) If the determination to transition is documented between July 
19, 2018, and January 20, 2019, the research shall:
    (A) Beginning on the date of such documentation through January 20, 
2019, comply with the pre-2018 Requirements, except that the research 
shall comply with the following:
    (1) Section 11.102(l) of the 2018 Requirements (definition of 
research) (instead of Sec.  11.102(d) of the pre-2018 Requirements);
    (2) Section 11.103(d) of the 2018 Requirements (revised 
certification requirement that eliminates IRB review of application or 
proposal) (instead of Sec.  11.103(f) of the pre-2018 Requirements); 
and
    (3) Section 11.109(f)(1)(i) and (iii) of the 2018 Requirements 
(exceptions to mandated continuing review) (instead of Sec.  11.103(b), 
as related to the requirement for continuing review, and in addition to 
Sec.  11.109, of the pre-2018 Requirements); and
    (B) Beginning on January 21, 2019, comply with the 2018 
Requirements.
    (ii) If the determination to transition is documented on or after 
January 21, 2019, the research shall, beginning on the date of such 
documentation, comply with the 2018 Requirements.
    (5) Research subject to 2018 Requirements. The 2018 Requirements 
shall apply to the following research:
    (i) Research initially approved by an IRB on or after January 21, 
2019;

[[Page 28520]]

    (ii) Research for which IRB review is waived pursuant to paragraph 
(i) of this section on or after January 21, 2019; and
    (iii) Research for which a determination is made that the research 
is exempt on or after January 21, 2019.
* * * * *

Elaine L. Chao,
Secretary of Transportation.
[FR Doc. 2018-13187 Filed 6-18-18; 8:45 am]
 BILLING CODE 4150-36-P



                                                                 Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations                                          28497

                                              DEPARTMENT OF HOMELAND                                  DEPARTMENT OF TRANSPORTATION                           whether to allow regulated entities to
                                              SECURITY                                                                                                       implement certain burden-reducing
                                                                                                      49 CFR Part 11                                         provisions of the 2018 Requirements in
                                              6 CFR Part 46                                                                                                  specified circumstances during such
                                                                                                      Federal Policy for the Protection of
                                                                                                                                                             continued delay period.
                                              DEPARTMENT OF AGRICULTURE                               Human Subjects: Six Month Delay of
                                                                                                      the General Compliance Date of                            Through this final rule, we are
                                                                                                      Revisions While Allowing the Use of                    adopting the proposals described in the
                                              7 CFR Part 1c
                                                                                                      Three Burden-Reducing Provisions                       April 20, 2018 NPRM. This rule delays
                                              DEPARTMENT OF ENERGY                                    During the Delay Period                                the general compliance date for the 2018
                                                                                                                                                             Requirements for an additional 6-month
                                              10 CFR Part 745                                         AGENCY:  Department of Homeland                        period, until January 21, 2019. As a
                                                                                                      Security; Department of Agriculture;                   result of this delay, regulated entities
                                              NATIONAL AERONAUTICS AND                                Department of Energy; National                         will be required, with an exception, to
                                              SPACE ADMINISTRATION                                    Aeronautics and Space Administration;                  continue to comply with the
                                                                                                      Department of Commerce; Consumer                       requirements of the pre-2018 version of
                                              14 CFR Part 1230                                        Product Safety Commission; Social                      the Federal Policy for the Protection of
                                                                                                      Security Administration; Agency for                    Human Subjects (the ‘‘pre-2018
                                              DEPARTMENT OF COMMERCE                                  International Development; Department                  Requirements’’) until January 21, 2019.
                                                                                                      of Housing and Urban Development;                      The one exception to this general rule
                                              15 CFR Part 27                                          Department of Labor; Department of                     is that institutions will be permitted
                                                                                                      Defense; Department of Education;                      (but not required) to implement, for
                                              CONSUMER PRODUCT SAFETY                                 Department of Veterans Affairs;                        certain research, three burden-reducing
                                              COMMISSION                                              Environmental Protection Agency;                       provisions of the 2018 Requirements
                                                                                                      Department of Health and Human                         during the delay period (July 19, 2018,
                                              16 CFR Part 1028                                        Services; National Science Foundation;                 through January 20, 2019). Those three
                                              SOCIAL SECURITY ADMINISTRATION                          and Department of Transportation.                      provisions are: The revised definition of
                                                                                                      ACTION: Final rule.                                    ‘‘research,’’ which deems certain
                                              20 CFR Part 431                                                                                                activities not to be research covered by
                                                                                                      SUMMARY:    In a final rule published on
                                                                                                                                                             the Common Rule; the elimination of
                                              AGENCY FOR INTERNATIONAL                                January 19, 2017, a number of federal
                                                                                                                                                             the requirement for annual continuing
                                              DEVELOPMENT                                             departments and agencies revised to the
                                                                                                                                                             review with respect to certain categories
                                                                                                      Federal Policy for the Protection of
                                                                                                                                                             of research; and the elimination of the
                                              22 CFR Part 225                                         Human Subjects (often referred to as the
                                                                                                                                                             requirement that institutional review
                                                                                                      ‘‘Common Rule’’), which each
                                                                                                                                                             boards (IRBs) review grant applications
                                              DEPARTMENT OF HOUSING AND                               department and agency adopted into
                                                                                                                                                             or other funding proposals related to the
                                              URBAN DEVELOPMENT                                       regulations in its part of the Code of
                                                                                                                                                             research. Institutions taking advantage
                                                                                                      Federal Regulations (CFR). The
                                                                                                      Consumer Product Safety Commission                     of the three-burden reducing provisions
                                              24 CFR Part 60
                                                                                                      (CPSC) adopted the same changes in a                   must comply with all other pre-2018
                                              DEPARTMENT OF LABOR                                     final rule published on September 18,                  Requirements during the delay period.
                                                                                                      2017. The revised Common Rule was                      The three burden-reducing provisions of
                                              29 CFR Part 21                                          scheduled to become effective on                       the 2018 Requirements can only be
                                                                                                      January 19, 2018, with a general                       implemented during the delay period
                                              DEPARTMENT OF DEFENSE                                   compliance date of the same date. By an                with respect to studies initiated prior to
                                                                                                      interim final rule issued on January 17,               January 21, 2019 that will transition to
                                              32 CFR Part 219                                                                                                compliance with the revised Common
                                                                                                      2018 and published in the Federal
                                                                                                      Register on January 22, 2018, federal                  Rule. Any study that implements these
                                              DEPARTMENT OF EDUCATION                                                                                        three burden-reducing provisions
                                                                                                      departments and agencies delayed the
                                                                                                      effective date and the general                         during the delay period must, beginning
                                              34 CFR Part 97                                                                                                 on January 21, 2019, comply with all of
                                                                                                      compliance date for the revised
                                              DEPARTMENT OF VETERANS                                  Common Rule for a 6-month period,                      the 2018 Requirements for the balance
                                              AFFAIRS                                                 until July 19, 2018. The Department of                 of the study’s duration.
                                                                                                      Housing and Urban Development (HUD)                    DATES: Effective date: This rule is
                                              38 CFR Part 16                                          published an interim final rule adopting               effective on July 19, 2018. Compliance
                                                                                                      the same regulatory changes on January                 dates: The general compliance date for
                                              ENVIRONMENTAL PROTECTION                                26, 2018. The revised Common Rule,                     the 2018 Requirements in the final rule
                                              AGENCY                                                  including technical amendments made                    published in the Federal Register (82
                                                                                                      by the January 22, 2018 interim final                  FR 7149, Jan. 19, 2017) and of the final
                                              40 CFR Part 26                                          rule, is referred to here as the ‘‘2018                rule published by the Consumer Product
                                                                                                      Requirements.’’                                        Safety Commission in the Federal
                                              DEPARTMENT OF HEALTH AND                                   On April 20, 2018, the federal                      Register (82 FR 43459, Sept. 18, 2017),
                                              HUMAN SERVICES                                          departments and agencies listed here                   which were delayed in the interim final
daltland on DSKBBV9HB2PROD with RULES2




                                                                                                      published a notice of proposed                         rule published in the Federal Register
                                              45 CFR Part 46
                                                                                                      rulemaking (NPRM) proposing and                        (83 FR 2885, Jan. 22, 2018), and adopted
                                                                                                      seeking comments as to whether the                     by HUD through an interim final rule
                                              RIN 0937–AA05
                                                                                                      general compliance date for the 2018                   published in the Federal Register (83
                                              NATIONAL SCIENCE FOUNDATION                             Requirements should be delayed for an                  FR 3589, Jan. 26, 2018), with the
                                                                                                      additional 6-month period. The NPRM                    exception of § lll.114(b), is further
                                              45 CFR Part 690                                         also proposed and sought comments on                   delayed until January 21, 2019. The


                                         VerDate Sep<11>2014   18:16 Jun 18, 2018   Jkt 244001   PO 00000   Frm 00003   Fmt 4701   Sfmt 4700   E:\FR\FM\19JNR2.SGM   19JNR2


                                              28498              Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations

                                              compliance date for § lll.114(b)                        § lll.114(b), which remained                             Both sets of comments tended to
                                              (cooperative research) remains January                  January 20, 2020. On January 26, 2018,                 endorse some type of delay beyond July
                                              20, 2020.                                               HUD published an interim final rule                    19, 2018 in the general compliance date
                                              ADDRESSES: Jerry Menikoff, M.D., J.D.,                  adopting the interagency interim final                 for the 2018 Requirements. Comments
                                              Office for Human Research Protections,                  rule. 83 FR 3589.                                      on the interim final rule tended to
                                              1101 Wootton Parkway, Suite 200,                           On April 20, 2018, federal                          suggest that institutions be permitted to
                                              Rockville, MD 20852.                                    departments and agencies published a                   voluntarily implement the 2018
                                              FOR FURTHER INFORMATION CONTACT: Jerry                  notice of proposed rulemaking (NPRM)                   Requirements in their entirety at any
                                              Menikoff, M.D., J.D., Office for Human                  soliciting comments on two proposals.                  time after July 19, 2018, while
                                              Research Protections (OHRP),                            83 FR 17595. The first proposed an                     comments on the NPRM indicated broad
                                              Department of Health and Human                          additional 6-month delay for the general               support for the narrower approach of
                                              Services, 1101 Wootton Parkway, Suite                   compliance date for the 2018                           permitting the voluntary use of three
                                              200, Rockville, MD 20852; telephone:                    Requirements (from July 19, 2018 to                    burden-reducing provisions during the
                                              240–453–6900 or 1–866–447–4777;                         January 21, 2019). The second proposed                 delay period.
                                              facsimile: 301–402–2071; email                          a flexibility that would allow regulated               B. Public Comments on the January 22,
                                              Jerry.Menikoff@hhs.gov.                                 entities to take advantage of three                    2018 Interim Final Rule and Response
                                                                                                      burden-reducing provisions of the 2018                 to Comments
                                              SUPPLEMENTARY INFORMATION:
                                                                                                      Requirements during the delay period.
                                              I. Background                                           Both proposals are described more fully                   As well as soliciting comments on the
                                                                                                      below, together with a discussion of the               delay of the implementation of the 2018
                                                 On January 19, 2017, the Department                                                                         Requirements, the interim final rule
                                              of Health and Human Services (HHS)                      public comments submitted, and our
                                                                                                      response to public comments. For the                   solicited comments on the following:
                                              and other federal departments and
                                              agencies published a final rule revising                reasons provided below, this final rule                —Whether or not the interim final rule
                                              the Federal Policy for the Protection of                adopts the proposals set forth in the                     should be considered regulatory or
                                              Human Subjects (generally referred to as                NPRM.                                                     de-regulatory.
                                                                                                                                                             —Whether or not our assumption that
                                              ‘‘the Common Rule’’). 82 FR 7149. The                   II. Public Comments and Response to                       50 percent of regulated entities would
                                              CPSC adopted the same regulatory                        Comments                                                  have gone forward using the new or
                                              changes in a separate final rule
                                                                                                      A. 2018 Interim Final Rule and 2018                       expanded exemption categories, had
                                              published on September 18, 2017. 82 FR
                                                                                                      NPRM Public Comment Summary                               the implementation date of the 2018
                                              43459. The revised Common Rule was
                                                                                                                                                                Requirements remained January 19,
                                              originally scheduled to become effective                  Public comment was solicited on the
                                                                                                                                                                2018, was correct.
                                              on January 19, 2018, with a general                     interim final rule between January 22,
                                              compliance date of January 19, 2018                     2018 and March 19, 2018. Public                           We received no comments on our
                                              (with the exception of the revisions to                 comment was solicited on the NPRM to                   assumption that 50 percent of regulated
                                              the cooperative research provision at                   delay the implementation of the 2018                   entities would have gone forward using
                                              § lll.114(b), which has a compliance                    Requirements while permitting the use                  the new or expanded exemption
                                              date of January 20, 2020).                              of three burden-reducing provisions of                 categories had the implementation date
                                                 Some representatives of the regulated                the 2018 Requirements between April                    of the 2018 Requirements remained
                                              community expressed concern regarding                   20, 2018 and May 21, 2018.                             January 19, 2018. We received one
                                              their ability to implement all of the 2018                                                                     comment addressing whether or not the
                                                                                                        We received 62 public comments on
                                              Requirements by the scheduled general                                                                          interim final rule should be considered
                                                                                                      the interim final rule. Of these, 36
                                              compliance date.1                                                                                              regulatory or de-regulatory. This
                                                                                                      comments were related to the Common
                                                 On January 17, 2018, HHS and other                                                                          comment indicated that the 2018
                                                                                                      Rule. The remaining 26 comments were
                                              federal departments and agencies placed                                                                        Requirements should be considered de-
                                                                                                      not related to the Common Rule in any
                                              on display at the Office of the Federal                                                                        regulatory, without commenting on the
                                                                                                      way. We received 73 comments on the
                                              Register an interim final rule delaying                                                                        regulatory or de-regulatory status of the
                                                                                                      NPRM. Five of these comments were not
                                              the effective date and general                                                                                 interim final rule.
                                                                                                      related to the Common Rule.
                                              compliance date of the 2018                                                                                       Of the 36 comments received on the
                                                                                                        Several common themes emerged                        interim final rule related to the Common
                                              Requirements to July 19, 2018. 83 FR                    from the public comments on the
                                              2885 (published January 22, 2018). This                                                                        Rule (and more specifically on delaying
                                                                                                      interim final rule and the NPRM. These                 the effective and general compliance
                                              rule did not impact the compliance date                 included:
                                              for the cooperative research provision at                                                                      dates of the 2018 Requirements to July
                                                                                                      —The need for the regulated community                  19, 2018), several themes were present.
                                                 1 See, e.g., the June 21, 2017 letter to Jerry         to have as much advance notice as                    Many of these comments discussed
                                              Menikoff from the Association of American Medical         possible about any delay in                          issues with the timing and issuance of
                                              Colleges, Association of American Universities,           implementing the 2018 Requirements.                  the interim final rule, claiming that the
                                              Association of Public & Land-grant Universities,        —The need for guidance to be issued
                                              and Council on Governmental Relations, available
                                                                                                                                                             fact that it was put on public display in
                                              at https://www.aamc.org/download/480840/data/             promptly.                                            the Federal Register 48 hours before the
                                              aamcissuesjointletteroncommonrule.pdf.                  —General support for a delay of the                    original implementation date caused
                                                 See the June 9, 2017 letter to Secretary Thomas        general compliance date, with more                   chaos and confusion in the regulated
                                              Price from the American Medical Informatics               limited support for a delay beyond                   community. Several commenters
                                              Association at https://www.amia.org/sites/default/
daltland on DSKBBV9HB2PROD with RULES2




                                              files/AMIA%20Letter%20Regarding%20the                     January, 2019. This support, however,                described what they categorized as
                                              %20Common%20Rule.pdf.                                     was generally tied to concern with                   chaos that ensued when the interim
                                                 See also August 2, 2017 SACHRP Letter to HHS           whether Common Rule departments                      final rule was put on public display 48
                                              Secretary, Attachment A- Recommendations on               and agencies will be able to issue                   hours before the original effective date
                                              Compliance Dates and Transition Provisions,
                                              https://www.hhs.gov/ohrp/sachrp-committee/
                                                                                                        guidance in a timely fashion prior to                and general compliance date for the
                                              recommendations/attachment/a/august/2/2017/               the new general compliance date of                   2018 Requirements. This rollout created
                                              index.html.                                               January 21, 2019.                                    administrative burdens for institutions,


                                         VerDate Sep<11>2014   18:16 Jun 18, 2018   Jkt 244001   PO 00000   Frm 00004   Fmt 4701   Sfmt 4700   E:\FR\FM\19JNR2.SGM   19JNR2


                                                                 Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations                                          28499

                                              as many had changed IT systems,                         the 2018 Requirements, in order to                     systems will need to be revised again to
                                              training programs, and other operational                provide institutions with the most                     comport with department and agency
                                              tasks and then had to hastily undo these                flexibility. A majority of the comments                guidance.
                                              changes. Another commenter described                    described in this paragraph advocated                     [Response: We agree with interim
                                              the issuance of the interim final rule                  for delaying the general compliance date               final rule comments suggesting that we
                                              and the relative silence from Common                    to January 21, 2019, as these                          keep the effective date of the 2018
                                              Rule departments and agencies in the                    commenters did not believe that full                   Requirements as July 19, 2018, while
                                              period since publication of the 2018                    compliance with the 2018 Requirements                  delaying the general compliance date.
                                              Requirements (in the January 19, 2017                   would be possible by July 19, 2018. A                  While we considered the alternative of
                                              final rule) as a betrayal of IRBs.                      few commenters advocated delaying the                  amending the transition provision to
                                                 Additionally, commenters expressed                   general compliance date beyond January                 permit institutions to voluntarily
                                              concern that given the short timeline                   21, 2019 to permit institutions as much                comply with the revised rule beginning
                                              between the closing of the comment                      time as possible to comply with the                    on July 19, 2018, and not requiring
                                              period and the new general                              2018 Requirements                                      compliance with the new rule until
                                              implementation date of July 19, 2018,                      One commenter suggested that both                   January 21, 2019 or later, we believe this
                                              any further delay of the 2018                           the effective and general compliance                   approach could result in confusion
                                              Requirements would similarly create                     dates be delayed by 6 months to one                    regarding implementation of the revised
                                              chaos and confusion in the regulated                    year after Common Rule departments                     Common Rule that could be minimized
                                              community. Commenters also generally                    and agencies issue critical guidance                   with the issuance of guidance from the
                                              expressed that the 6-month delay                        documents. Other commenters                            Common Rule departments and
                                              granted by the interim final rule created               suggested that Common Rule                             agencies. By adopting the changes
                                              a situation in which regulated entities                 departments and agencies should be                     proposed in the NPRM, we believe the
                                              that were ready to implement the 2018                   given a date by which they must publish                Common Rule departments and
                                              Requirements in January 2018 had to                     key guidance documents. Several                        agencies will be able to issue relevant
                                              spend the personnel hours to ‘‘undo’’                   comments included a description of                     guidance documents that will better
                                              these changes, which seemed                             guidance documents that they would                     enable the regulated community to
                                              contradictory to the overall goal of the                like for Common Rule departments and                   comply with the 2018 Requirements. As
                                              revisions to the Common Rule of                         agencies to focus on initially.                        described in the NPRM, we also
                                              reducing administrative burden. A few                   Suggestions included: OHRP’s decision                  considered a delay to the effective and
                                              commenters focused entirely on how                      charts, key information in informed                    general compliance dates without
                                              the relative silence by Common Rule                     consent, broad consent, and continuing                 proposing this additional option in the
                                              departments and agencies since                          review (§ lll.109(f)).                                 interim period. Such an approach
                                              publication of the 2018 Requirements                       Some of the comments relevant to the
                                                                                                                                                             would be simple to implement. We
                                              has created a confusing environment for                 Common Rule advocated for no
                                                                                                                                                             decided against finalizing this
                                              this regulated community and requested                  additional delay in the implementation
                                                                                                                                                             alternative to be responsive to public
                                              more transparency from the regulating                   of the 2018 Requirements beyond July
                                                                                                                                                             comments received and in an effort to
                                              departments and agencies in the future.                 19, 2018. These comments argued that
                                                                                                                                                             minimize burdens with respect to new
                                                 [Response: We acknowledge that the                   institutions and Common Rule
                                                                                                                                                             provisions that will not be difficult to
                                              timing of the interim final rule was not                departments and agencies have had
                                                                                                                                                             implement prior to the general
                                              ideal and led to frustration within the                 sufficient time to prepare for the
                                                                                                                                                             compliance date of the 2018
                                              regulated community. We believe that                    implementation of the Rule. One
                                                                                                                                                             Requirements.
                                              the 2018 NPRM and this final rule to                    comment suggested that while guidance
                                              delay the general compliance date for                   would certainly be helpful, it is possible                We recognize the difficulty in
                                              the 2018 Requirements while permitting                  to implement the Rule without such                     implementing the 2018 Requirements in
                                              the use of three burden-reducing                        guidance, as evidenced by the fact that                the absence of guidance and will strive
                                              provisions of the 2018 Requirements                     many institutions were ready to                        to issue guidance on key aspects of the
                                              provides the regulated community with                   implement the 2018 Requirements                        2018 Requirements as quickly as
                                              sufficient notice about when the 2018                   before the publication of the interim                  possible, while also engaging
                                              Requirements will go into effect, and                   final rule.                                            stakeholders.]
                                              when regulated entities will be required                   Several commenters also addressed                      A small subset of comments suggested
                                              to comply with the 2018 Requirements.]                  whether certain aspects of the 2018                    additional revisions to the Common
                                                 Almost half of the comments related                  Requirements would be difficult to                     Rule. For example, one commenter
                                              to the Common Rule advocated for the                    implement in the absence of agency                     discussed the inclusion of a provision
                                              Common Rule departments and                             guidance. These commenters                             that would permit parents to decline
                                              agencies to retain the July 19, 2018                    acknowledged the importance of                         certain procedures on behalf of their
                                              effective date for the 2018                             guidance to implement many areas of                    children.
                                              Requirements, and to delay the general                  the 2018 Requirements but noted that                      [Response: This comment listed
                                              compliance date. These commenters                       the confusion and chaos created by late-               several clinical procedures done in the
                                              argued that during the period between                   breaking announcements of delays in                    routine course of medical care. Such
                                              the effective date and delayed general                  the implementation of the 2018                         activities are outside of the scope of the
                                              compliance date, institutions should be                 Requirements ultimately caused more                    Common Rule, and thus are outside of
                                              permitted to voluntarily comply (on a                   administrative burden within                           the scope of this rulemaking.]
daltland on DSKBBV9HB2PROD with RULES2




                                              study-by-study basis) with the 2018                     institutions. One large public university                 Others discussed concerns with the
                                              Requirements. A couple of these                         system in the United States indicated                  waiver provision at § lll.101(i) and
                                              comments advocated for institutions to                  that if guidance is issued after                       suggested that this provision be
                                              be able to implement select 2018                        institutions have revised their policies,              strengthened such that departments and
                                              Requirements during this voluntary                      procedures, and IT systems, it likely                  agencies are only permitted to waive the
                                              compliance period, as opposed to                        will create a burdensome situation                     Common Rule with regard to certain
                                              choosing to comply with the entirety of                 where policies, procedures, and IT                     research activities when such a waiver


                                         VerDate Sep<11>2014   18:16 Jun 18, 2018   Jkt 244001   PO 00000   Frm 00005   Fmt 4701   Sfmt 4700   E:\FR\FM\19JNR2.SGM   19JNR2


                                              28500              Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations

                                              is consistent with the Belmont Report.2                 the transition provision is important for              The NPRM also solicited comment on
                                              One commenter also suggested that the                   institutions to manage their operations                the advisability of two alternative
                                              Clinton Memorandum3 concerning                          while implementing the 2018                            approaches to delaying the 2018
                                              requirements pertaining to classified                   Requirements. We do not believe that                   Requirements: (1) The alternative of
                                              research be fully implemented. These                    this compromises the protection of                     delaying the effective date and general
                                              comments also referenced concerns                       human subjects.]                                       compliance date until January 21, 2019,
                                              with the carve-out form the definition of                 A few comments suggested that the                    but without the option to implement
                                              research pertaining to authorized                       general compliance date of the 2018                    certain 2018 Requirements during that
                                              operational activities in support of                    Requirements should coincide with                      delay period; and (2) the alternative of
                                              national security missions.                             FDA’s revision of its human subjects                   delaying the effective date and general
                                                 [Response: The January 19, 2017 final                protection regulations in order for there              compliance date beyond January 21,
                                              rule preamble stated ‘‘[t]hese authorized               not to be a time period where FDA                      2019. The NPRM also solicited
                                              operational activities, as determined by                regulations are not harmonized with the                comment on whether the general
                                              each agency, do not include research                    other Common Rule departments and                      compliance date for the 2018
                                              activities as defined by the Common                     agencies.                                              Requirements should remain July 19,
                                              Rule, nor have they ever in the past                      [Response: With respect to the                       2018.
                                              been considered regulated by the                        comments suggesting that the general
                                                                                                                                                                The NPRM proposed to modify the
                                              Common Rule. This category of activity                  compliance date of the 2018
                                                                                                                                                             transition provision at § lll.101(l) to
                                              is removed from the definition of                       Requirements should be tied to the FDA
                                                                                                                                                             permit an institution or IRB (and not
                                              research to make explicit that the                      harmonization efforts with the Common
                                                                                                                                                             just an IRB) to document the
                                              requirements of the final rule do not                   Rule, we do not believe that this is
                                                                                                                                                             institution’s decision to transition a
                                              apply to authorized operational                         necessary. FDA is currently working to
                                                                                                                                                             study to comply with the 2018
                                              activities in support of national security              harmonize its human subjects
                                                                                                                                                             Requirements. (We received no public
                                              missions. This clarification is not                     regulations with the 2018 Requirements,
                                                                                                                                                             comments on this proposal.)
                                              intended to narrow the scope of the                     to the extent permitted by FDA’s
                                                                                                      statutory authority and mandate. We do                    A majority of comments that
                                              Common Rule. We do not believe that                                                                            discussed the NPRM proposals
                                              this category contradicts President                     not believe it is necessary to further
                                                                                                      delay the 2018 Requirements’ general                   supported some kind of delay to the
                                              Clinton’s Memorandum of 1997                                                                                   implementation of the 2018
                                              regarding classified research, because                  compliance date as a result of a separate
                                                                                                      rulemaking effort.]                                    Requirements. A majority supported the
                                              this category is merely clarifying what                                                                        NPRM proposals as drafted but
                                              activities are not considered to meet the                 One commenter argued that the 2018
                                                                                                      Requirements should not be                             indicated that their support was
                                              definition of research. The Clinton                                                                            contingent upon the Common Rule
                                              Memorandum calls for a number of                        implemented at all, as in their view, the
                                                                                                      pre-2018 Requirements adequately                       departments and agencies issuing the
                                              requirements to be added to protections                                                                        relevant guidance prior to July 19, 2018
                                              for classified research activities, but it              protect human subjects.
                                                                                                        [Response: We disagree. We believe                   for the three burden-reducing
                                              does not address activities that are not                                                                       provisions, and all other key guidance
                                              considered research.’’]                                 that the 2018 Requirements will provide
                                                                                                      a meaningful improvement in human                      documents before the January 2019
                                                 Some commenters expressed concerns                                                                          general compliance date. In particular,
                                              with how the transition provision                       subjects protection, while reducing
                                                                                                      administrative burden on institutions.]                commenters noted that critical guidance
                                              essentially creates a dual regulatory                                                                          documents would need to be available
                                                                                                        A couple of commenters argued that
                                              system for human subjects protections.                                                                         to the regulated community at least four
                                                                                                      the general compliance date for the
                                              One commenter explicitly advocated for
                                                                                                      cooperative research provision (§ lll                  months prior to the proposed general
                                              the Common Rule to require all research                                                                        compliance date of January 21, 2019.
                                                                                                      .114) should be delayed to 2022.
                                              subject to the Common Rule to comply                      [Response: We disagree with the                      These commenters specifically stated
                                              with the 2018 Requirements by a certain                 comments suggesting that the                           that if critical guidance documents were
                                              date given the additional protections to                compliance date for the cooperative                    not available by September 19, 2019,
                                              subjects that the revised Common Rule                   research provision (§ lll.114(b))                      they would support an additional delay
                                              affords research participants.                          needs to be delayed beyond January                     of the general compliance date.
                                                 [Response: We agree that the                         2020. Public comments requesting this
                                              transition provision at § lll.101(l)                                                                              Comments in response to the NPRM
                                                                                                      change have not provided specific                      generally supported the position that
                                              creates a system in which many                          evidence for why such a delay is
                                              institutions will need to be familiar with                                                                     many institutions need additional time
                                                                                                      necessary, nor for the assertion that                  to prepare to implement the 2018
                                              both versions of the Common Rule (if                    implementing the single IRB of record
                                              they elect to keep at least some                                                                               Requirements, and that the Common
                                                                                                      in cooperative research requirement will               Rule departments and agencies need
                                              previously initiated studies subject to                 not result in a reduction in burden.]
                                              the pre-2018 Requirements while their                                                                          more time to develop and issue
                                              newly initiated studies are subject to the              C. Public Comments on the April 20,                    guidance. Several commenters
                                              2018 Requirements). However, we                         2018 NPRM and Response to Comments                     specifically noted that the Department
                                              believe that the flexibility afforded by                                                                       of Veterans Affairs is not yet ready to
                                                                                                         The April 20, 2018 NPRM sought                      implement the 2018 Requirements and
                                                                                                      comment on two primary proposals: (1)                  needs more time.
                                                2 National Commission for the Protection of
                                                                                                      The proposal to delay the general
                                              Human Subjects of Biomedical and Behavioral                                                                       Commenters suggested guidance
daltland on DSKBBV9HB2PROD with RULES2




                                              Research. Ethical Principles and Guidelines for the     compliance date for the 2018
                                                                                                      Requirements to January 21, 2019; and                  documents that should be provided as
                                              Protection of Human Subjects of Research. April 18,
                                              1979. https://www.hhs.gov/ohrp/regulations-and-         (2) whether institutions should be                     quickly as possible to the regulated
                                              policy/belmont-report/.                                 allowed to implement three burden-                     community. These suggestions included
                                                3 Clinton, WJ. Strengthened Protections for
                                                                                                      reducing provisions in the 2018                        revising existing guidance, or issuing
                                              Human Subjects of Classified Research. 62 FR                                                                   new guidance, as follows:
                                              26367–26372. May 13, 1997. https://www.gpo.gov/         Requirements during the delay period
                                              fdsys/pkg/FR-1997-05-13/pdf/97-12699.pdf.               from July 19, 2018 to January 21, 2019.                —Revised OHRP decision charts


                                         VerDate Sep<11>2014   18:16 Jun 18, 2018   Jkt 244001   PO 00000   Frm 00006   Fmt 4701   Sfmt 4700   E:\FR\FM\19JNR2.SGM   19JNR2


                                                                 Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations                                         28501

                                              —Information on the § lll.116                           track of which studies have been                          We do not believe a delay of the
                                                 clinical trial consent form posting                  transitioned to the 2018 Requirements.]                general compliance date beyond January
                                                 location                                                Several alternatives were suggested                 21, 2019 is necessary. As discussed in
                                              —Limited IRB review                                     for how a delay might be structured.                   the NPRM, we continue to believe that
                                              —Broad consent                                          These included:                                        the regulated community will not need
                                              —The new requirement that the                           —Permitting voluntary compliance with                  additional time beyond January 2019 to
                                                 informed consent give the prospective                   the entirety of the 2018 Requirements               comply with the 2018 Requirements.
                                                 subject the information that a                          between July 19, 2018 and January 21,               Most NPRM comments supported the
                                                 reasonable person would want to                         2019                                                idea that January 2019 would be
                                                 know in order to make an informed                    —Keeping the NPRM proposals related                    sufficient to allow for implementation of
                                                 decision about research participation                   to decoupling the effective and                     the 2018 Requirements, provided that
                                              —The new requirement that the                              general compliance dates and the                    the Common Rule departments and
                                                 informed consent begin with a                           early implementation of the three                   agencies issued key guidance.
                                                 concise and focused presentation of                     burden-reducing provisions of the                      We recognize that the implementation
                                                 the key information that is most likely                 2018 Requirements, but delaying the                 structure in this final rule might be
                                                 to assist a prospective subject or                      effective date of the 2018                          confusing to some in the regulated
                                                 legally authorized representative in                    Requirements until at least one year                community. We intend to engage in
                                                 understanding the reasons why one                       after Common Rule departments and                   educational outreach to help the
                                                 might or might not want to participate                  agencies have issued key guidance                   regulated community better understand
                                                 in the research.                                        documents                                           what is permitted and what is not under
                                              —Identifiability                                        —Delaying both the effective and                       the revised transition provision at § ll
                                              —Privacy and confidentiality                               general compliance dates until                      .101(l).]
                                              —Benign behavioral interventions                                                                                  Several commenters indicated that
                                                                                                         January 21, 2019
                                              —Continuing review                                                                                             understanding OHRP’s plan for
                                                                                                      —Delaying both the effective and
                                                                                                                                                             modifying the Federalwide Assurance
                                                 [Response: This final rule adopts the                   general compliance dates beyond
                                                                                                                                                             (‘‘FWA’’) process to comport with the
                                              April 20, 2018 NPRM proposals, with                        January 21, 2019
                                                                                                                                                             2018 Requirements would also be
                                              minor changes made to the regulatory                    —Permitting the use of the three
                                                                                                                                                             helpful. Specific concerns were raised
                                              text for clarification and accuracy. As                    burden-reducing provisions of the
                                                                                                                                                             about the deletion of the option to
                                              stated above, we agree with the                            2018 Requirements, but not requiring
                                                                                                                                                             ‘‘check the box’’ on the FWA and how
                                              comments that the issuance of guidance                     that studies taking advantage of this
                                                                                                                                                             the removal of this option will, in
                                              will be useful for institutions to be able                 flexibility comply with the entirety of
                                                                                                                                                             certain states with separate human
                                              to implement the 2018 Requirements,                        the 2018 Requirements on and after
                                                                                                                                                             subjects requirements, present
                                              and are working to issue such guidance                     January 21, 2019.
                                                                                                                                                             administrative challenges for
                                              promptly. We appreciate the commenter                      A minority of comments indicated                    institutions. Another commenter
                                              input on topics for guidance to be                      concern that the NPRM proposals would                  expressed concern about whether, after
                                              issued by the departments and                           be confusing for the regulated                         January 21, 2019, FWAs would still be
                                              agencies.]                                              community to implement accurately.                     valid given that they would include
                                                 One commenter noted that if Common                   However, several of these comments                     statements and elections no longer
                                              Rule departments and agencies                           indicated that if the Common Rule                      required under the 2018 Requirements.
                                              envisioned a specific way that                          departments and agencies determined                       [Response: We intend to provide the
                                              institutions or IRBs should document                    that moving forward with a delay was                   regulated community with information
                                              the use of the three burden-reducing                    still appropriate, the structure proposed              about how the FWA process will change
                                              provisions in the 2018 Requirements or                  in the NPRM would be acceptable.                       well in advance of any modifications
                                              document the fact that an ongoing study                    Regardless of the delay structure                   that are implemented. The 2018
                                              has transitioned to comply with the                     endorsed, commenters noted that no                     Requirements at § lll.103(b) state
                                              2018 Requirements, that information                     matter the delay option chosen by                      that the ‘‘[assurance] shall be filed in
                                              must be communicated to the regulated                   Common Rule departments and                            such form and manner as the
                                              community as soon as possible.                          agencies, guidance needed to be issued                 department or agency head prescribes.’’
                                                 [Response: We do not believe that                    in order for the regulated community to                To that end, Common Rule departments
                                              there is a need to prescribe how                        make use of the delay period and                       and agencies have significant flexibility
                                              institutions document the decision to                   prepare their institutions.                            in what information is requested in the
                                              use the three burden-reducing                              [Response: We acknowledge that there                assurance process. Questions about non-
                                              provisions of the 2018 Requirements or                  were multiple ways that an                             OHRP assurances will be addressed by
                                              the decision to transition a study to                   implementation delay of the 2018                       the relevant Common Rule departments
                                              comply with the 2018 Requirements (on                   Requirements could be structured. We                   and agencies. With respect to OHRP
                                              or after January 21, 2019), beyond the                  believe that the approach proposed in                  issued FWAs, OHRP wishes to make
                                              requirement that the institution or an                  the NPRM and adopted in this final rule                clear that assurances on file with the
                                              IRB must document and date such                         is the best balance of permitting                      office will still be valid on and after
                                              determination. For example, this                        institutions to implement several of the               January 21, 2019 for their effective
                                              institutional determination could be                    more straightforward provisions of the                 period. Additionally, any changes made
                                              documented in IRB meeting minutes, or                   2018 Requirements before the general                   to the assurance process will take
daltland on DSKBBV9HB2PROD with RULES2




                                              in an IRB reviewer checklist (if an                     compliance date, while granting                        account of the fact that some
                                              institution uses a checklist system). This              Common Rule departments and                            institutions might oversee protocols that
                                              institutional determination could also                  agencies additional time to develop and                comply with the pre-2018 and 2018
                                              be documented in an institution’s                       issue key guidance documents, and                      Requirements.]
                                              existing electronic system, if one exists,              granting institutions additional time to                  One commenter expressed concern
                                              or in a spreadsheet created and                         ensure that their operations are ready to              with how auditors would handle IRBs
                                              maintained by the institution to keep                   implement the 2018 Requirements.                       reviewing protocols governed by both


                                         VerDate Sep<11>2014   20:38 Jun 18, 2018   Jkt 244001   PO 00000   Frm 00007   Fmt 4701   Sfmt 4700   E:\FR\FM\19JNR2.SGM   19JNR2


                                              28502              Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations

                                              the pre-2018 Requirements and the 2018                     [Response: As explained in the April                Requirements at any time before the
                                              Requirements, given that the 2018                       20, 2018 NPRM, we did not propose                      effective date.
                                              Requirements do not require that every                  adding the revised exemption categories                   [Response: This commenter
                                              nondiscriminatory effort will be made to                to § lll.101(l)(4)(i)(A) because                       misunderstood the transition provision
                                              ensure that no IRB consists entirely of                 implementation of these categories                     as written in the first publication of the
                                              men or entirely of women (pre-2018                      would involve significantly greater                    2018 Requirements; the transition
                                              Requirements at § lll.107(b)).                          complications. For example, we noted                   provision published in the January 19,
                                                 [Response: We believe that the § ll                  in the NPRM that these categories use                  2017 final rule revising the Common
                                              .107(a) requirements for diversity on                   terms that are newly defined, or for                   Rule did not include the ability for
                                              IRBs serves the same purpose, and thus                  which revised definitions have been                    institutions to implement all provisions
                                              do not see a conflict between the                       included in the 2018 Requirements, and                 of the 2018 Requirements before the
                                              diversity requirements for IRBs under                   permitting compliance with these                       effective date and general compliance
                                              the pre-2018 Requirements and the 2018                  categories without also selectively                    date.]
                                              Requirements.]                                          adopting revised definitions could be                     As with the comments on the interim
                                                 While the NPRM did not solicit                       problematic. Specifically in regard to                 final rule, a few comments expressed
                                              comments on the requirement for                         § lll.104(d)(4), this exemption                        concern with the waiver provision at
                                              cooperative research to be reviewed by                  involves several regulations and statutes              § lll.101(i) allowing federal
                                              a single IRB (see § lll.114), we                        outside of the scope of the Common                     departments and agencies to waive
                                              received several comments discussing                    Rule. As a result, it is a much more                   some or all provisions of the Common
                                              this provision. Several asked for an                    complicated provision to implement,                    Rule (which could allow research to be
                                              additional 2-year delay before the                      and thus was not included as one of the                conducted on people without their
                                              changes at § lll.114(b) become                          burden-reducing provisions of the 2018                 informed consent). These comments
                                              effective. Others said that this provision              Requirements that institutions could                   additionally expressed concern with
                                              should be amended such that use of a                    voluntarily implement during the delay                 institutions being permitted to
                                              single IRB is voluntary in cooperative                  period. After consideration of the public              implement the exclusion of certain
                                              research. These comments argued that                    comments received, we continue to                      operational activities conducted by
                                              the 2018 Requirements’ preamble                         believe that the approach proposed in                  intelligence agencies during the delay
                                              (published in the January 19, 2017 final                the NPRM makes the most sense.]                        period and suggested that this carve-out
                                              rule) underestimated the costs of the                      One commenter argued that the 2018                  from the definition of research be
                                              single IRB mandate and the confusion                    Requirements should be withdrawn,                      removed from the 2018 Requirements.
                                              that implementing this policy would                     and that Common Rule departments and                      [Response: We are not contemplating
                                              create for investigators. Several of these              agencies should issue several smaller                  modifying the carve-outs from the
                                              comments acknowledged that over time,                   NPRMs to revise specific aspects of the                definition of research. Regarding the
                                              as institutions become accustomed to                    Common Rule.                                           carve-out from the definition of research
                                              developing reliance agreements and                         [Response: We disagree with this                    pertaining to authorized operational
                                              managing the single IRB process, the                    comment. We believe that the 2018                      activities in support of national security
                                              costs currently being experienced would                 Requirements will provide a meaningful                 missions, the January 19, 2017 final rule
                                              decrease.                                               improvement in human subjects                          preamble noted that ‘‘[t]hese authorized
                                                 [Response: We appreciate the                         protection, while reducing                             operational activities, as determined by
                                              comments received on the single IRB of                  administrative burden on institutions.]                each agency, do not include research
                                              record requirement in cooperative                          One commenter proposed that                         activities as defined by the Common
                                              research (§ lll.114(b)). We continue                    institutions or other Common Rule                      Rule, nor have they ever in the past
                                              to believe that a compliance date of                    departments and agencies be required to                been considered regulated by the
                                              January 20, 2020 for this provision gives               file interim reports with HHS about                    Common Rule. This category of activity
                                              institutions sufficient time to prepare                 their status with regard to full                       is removed from the definition of
                                              and implement this requirement. While                   implementation and compliance with                     research to make explicit that the
                                              these commenters anecdotally indicated                  the 2018 Requirements. This commenter                  requirements of the final rule do not
                                              that implementing this requirement has                  suggested that HHS could issue waivers                 apply to authorized operational
                                              been more costly to institutions than the               for full implementation of the rule based              activities in support of national security
                                              January 19, 2017 final rule preamble                    on these interim reports. Additionally,                missions. This clarification is not
                                              estimated, no comment provided data                     such a reporting requirement would                     intended to narrow the scope of the
                                              about the actual costs to implement this                give HHS and other Common Rule                         Common Rule.’’]
                                              provision. In the absence of specific                   departments and agencies the data
                                              data, we retain our cost and benefit                    necessary to determine if another                      III. Delay of the General Compliance
                                              assumptions related to this provision.]                 adjustment to the 2018 Requirements                    Date Until January 21, 2019
                                                 One comment suggested adding the                     might be needed.                                          Through this final rule, the general
                                              exemption category for secondary use                       [Response: We believe that this                     compliance date for the 2018
                                              where consent is not required (§ lll                    approach is impractical and                            Requirements is delayed for a 6-month
                                              .104(d)(4)) to the burden-reducing                      unnecessary. We believe that this final                period until January 21, 2019. Section
                                              provisions. This commenter noted that                   rule will give institutions sufficient time            ll.101(l)(2) is revised to make this
                                              because the inability to implement the                  to implement the 2018 Requirements,                    delay explicit. The dates included in the
                                              revised exemptions during the delay                     which also precludes the need for such                 transition provision, set forth at § lll
daltland on DSKBBV9HB2PROD with RULES2




                                              period (i.e., July 19, 2018 through                     a phased approach.]                                    .101(l)(3), (4), and (5), are also modified
                                              January 20, 2018) accounted for the                        One commenter indicated a desire to                 to reflect this revised general
                                              majority of the costs estimated in the                  see a final rule containing the flexibility            compliance date.
                                              NPRM for this delay, it would be                        included in the original publication of                   As a result of this rule, regulated
                                              preferable for the final rule to permit the             the 2018 Requirements, on January 19,                  entities will be required to comply with
                                              early implementation of this exemption                  2017, that institutions be permitted to                the pre-2018 Requirements prior to
                                              category.                                               implement provisions of the 2018                       January 21, 2019 (putting aside the


                                         VerDate Sep<11>2014   20:34 Jun 18, 2018   Jkt 244001   PO 00000   Frm 00008   Fmt 4701   Sfmt 4700   E:\FR\FM\19JNR2.SGM   19JNR2


                                                                 Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations                                           28503

                                              burden-reducing provisions discussed                    the same set of standards throughout                   of application or proposal) will apply
                                              in section III below). Regulated entities               their duration and will avoid a                        instead of § lll.103(f) of the pre-2018
                                              may not, prior to January 21, 2019,                     circumstance in which such research is                 Requirements.
                                              comply with all provisions of the 2018                  subject to two sets of rules. However, as                 • Pursuant to § ll.101(l)(4)(i)(A)(3),
                                              Requirements, with the exception of the                 described below, institutions may elect                § lll.109(f)(1)(i) and (iii) of the 2018
                                              three burden-reducing provisions, in                    to transition such studies to comply                   Requirements (exceptions to mandated
                                              lieu of all provisions of the pre-2018                  with the 2018 Requirements.                            continuing review) will apply instead of
                                              Requirements. Of course, regulated                                                                             § lll.103(b) of the pre-2018
                                              entities are permitted to adopt                         B. Research Subject to the 2018                        Requirements (as related to the
                                              provisions that do not conflict with the                Requirements (§ lll.101(l)(5))                         requirement for continuing review) and
                                              pre-2018 Requirements, prior to January                   Research initiated (i.e., initially                  in addition to § lll.109 of the pre-
                                              21, 2019. For example, institutions may                 approved by an IRB, or for which IRB                   2018 Requirements.
                                              choose to incorporate additional                        review was waived by the government                       This approach is designed to afford
                                              elements of informed consent that                       pursuant to § lll.101(i), or                           institutions additional time before they
                                              happen to be found in the 2018                          determined to be exempt) on or after                   are required to comply with all
                                              Requirements, or elsewhere, so long as                  January 21, 2019 (the new general                      provisions of the 2018 Requirements,
                                              such implementation does not conflict                   compliance date for the 2018                           while enabling them to take advantage
                                              with the pre-2018 Requirements. In                      Requirements) must be conducted in                     of the three burden-reducing provisions
                                              other words, institutions have the same                 compliance with the 2018                               during the delay period.
                                              flexibility they have always had (i.e., to              Requirements.                                             In addition, beginning on January 21,
                                              exceed the minimum requirements set                                                                            2019, such studies must, for the balance
                                                                                                      C. Research That Transitions To Comply                 of their duration, comply with the 2018
                                              by the regulations).
                                                 The compliance date for the                          With the 2018 Requirements on or After                 Requirements in their entirety.
                                              cooperative research provision of the                   January 21, 2019 (§ lll.101(l)(4)(ii))                    We believe this rule strikes an
                                              2018 Requirements (§ lll.114(b))                           Section ll.101(l)(4)(ii) applies to                 appropriate balance of permitting
                                              remains January 20, 2020.                               studies following the pre-2018                         voluntary early adoption of provisions
                                                                                                      Requirements that transition to comply                 that reduce burdens without creating
                                              IV. Optional Flexibility:                                                                                      significant complexities. An
                                                                                                      with the 2018 Requirements on or after
                                              Implementation of Certain Burden-                                                                              institution’s decision about whether to
                                                                                                      January 21, 2019. In such
                                              Reducing Provisions During the Delay                                                                           transition a study to the 2018
                                                                                                      circumstances, the study must be
                                              Period                                                                                                         Requirements to take advantage of the
                                                                                                      conducted in compliance with the 2018
                                                 As detailed in revised § lll                         Requirements beginning on the                          three burden-reducing provisions might
                                              .101(l)(4) and as set forth below in more               transition date (i.e., the date the                    vary depending on the nature and
                                              detail, during the additional 6-month                   transition determination is documented,                progress of the study, including any
                                              period that the general compliance date                 on or after January 21, 2019) for its                  elements of the study to be conducted
                                              for the 2018 Requirements is delayed                    duration.                                              on or after January 21, 2019. For
                                              (July 19, 2018 through January 20,                                                                             example, studies planning to recruit
                                              2019), institutions may transition a                    D. Research That Transitions To                        some subjects on or after January 21,
                                              research study to the 2018 Requirements                 Comply With the 2018 Requirements                      2019 would have to meet the new
                                              in order to take advantage of three                     During the 6-Month Delay Period (§ ll                  requirements for obtaining the informed
                                              burden-reducing provisions of the 2018                  .101(l)(4)(i))                                         consent of those subjects. In contrast, for
                                              Requirements. This final rule also                         As described in § lll                               studies in which the remaining
                                              restructures § lll.101(l)(3) and (4)                    .101(l)(4)(i)(A), the option of applying               activities consist only of completing
                                              (now numbered (5)) to aid readability. A                the three burden-reducing provisions of                data analyses, the new requirements for
                                              new section (now § lll.101(1)(4))                       the 2018 Requirements during the 6-                    informed consent generally would not
                                              describes how the requirements apply to                 month delay period is only available                   be applicable.
                                              research transitioning to take advantage                with respect to studies that transition to                While the three burden-reducing
                                              of the burden-reducing provisions                       comply with the 2018 Requirements                      provisions are a regulatory package, an
                                              during different time periods. Below, we                between July 19, 2018 through January                  institution that takes advantage of this
                                              provide an overview of the revised                      20, 2019.                                              flexibility may, as a matter of
                                              transition provision to clarify its                        Beginning on the date that the                      institutional policy, adopt a more
                                              application to different types of studies,              transition determination is documented,                stringent standard (such as that of the
                                              including studies taking early advantage                through January 20, 2019, such studies                 pre-2018 Requirements) for any or all of
                                              of the three burden-reducing provisions                 must comply with the pre-2018                          the circumstances addressed by these
                                              of the 2018 Requirements.                               Requirements, except that the studies                  three provisions. For example, if an
                                                                                                      will comply with the three burden-                     institution chooses to adopt a policy
                                              A. Research Subject to the pre-2018                                                                            that studies that qualify for expedited
                                                                                                      reducing provisions instead of or in
                                              Requirements (§ lll.101(l)(3))                                                                                 review under a certain category should
                                                                                                      addition to the comparable pre-2018
                                                As a default, studies initiated (i.e.,                Requirements (specified in § lll                       continue to be subject to annual
                                              initially approved by an IRB, or for                    .101(l)(4)(i)(A)(1)–(3)).                              continuing review, this rule does not
                                              which IRB review was waived by the                         • Pursuant to § lll                                 prevent the institution from adopting
                                              government pursuant to § lll.101(i)                     .101(l)(4)(i)(A)(1), § lll.102(l) of the               and implementing that policy.
daltland on DSKBBV9HB2PROD with RULES2




                                              or determined to be exempt) before                      2018 Requirements (definition of                          Given that studies taking advantage of
                                              January 21, 2019 (the new general                       research) will apply instead of § lll                  this flexibility will be complying with
                                              compliance date for the 2018                            .102(d) of the pre-2018 Requirements).                 provisions from both the pre-2018
                                              Requirements) will continue to be                          • Pursuant to § lll                                 Requirements and the 2018
                                              subject to the pre-2018 Requirements.                   .101(l)(4)(i)(A)(2), § lll.103(d) of the               Requirements during the delay period,
                                              This approach will maintain the ability                 2018 Requirements (revised certification               we explain how some provisions
                                              of institutions to hold such studies to                 requirement that eliminates IRB review                 interact and clarify our intended


                                         VerDate Sep<11>2014   20:34 Jun 18, 2018   Jkt 244001   PO 00000   Frm 00009   Fmt 4701   Sfmt 4700   E:\FR\FM\19JNR2.SGM   19JNR2


                                              28504              Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations

                                              interpretations of particular regulatory                   Section ll.101(l)(4)(ii) applies to                 determination. Under the January 19,
                                              provisions that will apply during the 6-                studies following the pre-2018                         2017 final rule, an institutional
                                              month delay period. For studies electing                Requirements that, at some point on or                 determination that research would
                                              to transition to comply with the 2018                   after January 21, 2019, transition to                  transition to comply with the 2018
                                              Requirements during the 6-month delay                   comply with the 2018 Requirements. If                  Requirements had to be documented by
                                              period (July 19, 2018 through January                   the determination to transition a study                an IRB. Under this rule, such a
                                              20, 2019), once the decision to                         to the 2018 Requirements is                            determination may be documented
                                              transition the study is documented:                     documented on or after January 21,                     either by an IRB or an institution
                                                 1. In applying the definition of                     2019, as of the date of documentation                  (through officials who have the
                                              research under the 2018 Requirements                    the study must be conducted in                         authority to make such determinations
                                              (§ lll.102(l)(3)), the reference to a                   compliance with the 2018 Requirements                  on behalf of the institution). Such
                                              ‘‘public health authority’’ will be given               for its duration.                                      documentation must include the date of
                                              the meaning provided in the definition                     We clarify that the transition                      the transition determination, and
                                              of ‘‘public health authority’’ in the 2018              provision at § lll.101(l)(4) of the                    records documenting the transition
                                              Requirements (§ lll.102(k)). This                       2018 Requirements extends to research                  decision must be retained in accordance
                                              interpretation arises because ‘‘public                  newly initiated during the delay period.               with § lll.115(b).
                                              health authority’’ is defined in the 2018               Research newly initiated between July                     As a general matter, once an
                                              Requirements, but not in the pre-2018                   19, 2018 and January 20, 2019 may be                   institution decides to transition a study
                                              Requirements.                                           either conducted under the pre-2018                    to the 2018 Requirements and that
                                                 2. In applying § lll.103(d) of the                   Requirements, in accordance with § ll                  determination is documented, the date
                                              2018 Requirements, the reference to                     .101(l)(3); or, an institution may                     of documentation will serve as the de
                                              research ‘‘exempted under § ll.104’’                    transition research newly initiated                    facto compliance date for either the
                                              will be interpreted to refer to research                during the delay period to the 2018                    three-burden reducing provisions for
                                              exempted under § lll.101(b) of the                      Requirements, in accordance with § ll                  transition determinations documented
                                              pre-2018 Requirements. This                             .101(l)(4), in which event the research                between July 19, 2018 and January 20,
                                              interpretation arises given that only the               would be conducted under the pre-2018                  2019, or the 2018 Requirements as
                                              exemptions set forth in the pre-2018                    Requirements, with substitution of the                 applied to the study for transition
                                              Requirements will be in effect during                   three burden-reducing provisions of the                determinations documented on or after
                                              the 6-month delay period.                               2018 Requirements for the comparable                   January 21, 2019.
                                                 3. The reference to ‘‘[r]esearch eligible            provisions of the pre-2018                                This final rule has an effective date of
                                              for expedited review in accordance with                 Requirements. In addition, on or after                 July 19, 2018, to enable regulated
                                              § lll.110’’ in § lll.109(f)(1)(i) of                    January 21, 2019, an institution may                   entities to take advantage of the three
                                              the 2018 Requirements will be                           choose to transition research initiated                burden-reducing provisions during the
                                              interpreted to refer to § lll.110 of the                during the delay period that was                       delay period. However, as explained in
                                              pre-2018 Requirements.                                  initially conducted under the pre-2018                 this rule, the requirements a study must
                                                 4. The documentation requirements                    Requirements, to compliance with the                   comply with beginning on July 19, 2018
                                              described in § lll.115(a)(3) of the                     2018 Requirements. In the NPRM,                        are detailed in the transition provision
                                              2018 Requirements (documenting an                       proposed § lll.101(l)(4) referenced                    codified at § lll.101(l)(1)–(5).
                                              IRB’s rationale for conducting                          application by an institution ‘‘engaged                Finally, for consistency, headings were
                                              continuing review not otherwise                         in research’’ to ‘‘ongoing’’ research. In              added to § lll.101(l)(1) and (2).
                                              required) are not applicable during this                order to clarify the Common Rule                       V. Legal Authorities
                                              period.                                                 departments’ and agencies’ intention
                                                 5. Sectionll.103(d) of the 2018                      that research newly initiated during the                 The legal authorities for the
                                              Requirements will be substituted for                    delay period may transition to the 2018                departments and agencies that are
                                              § lll.103(f) of the pre-2018                            Requirements, this final rule no longer                signatories to this action are as follows:
                                              Requirements. Both sections address the                 includes the qualifier of ‘‘ongoing’’ to                 Department of Homeland Security, 5
                                              requirement for certification of research               describe research that transitions to the              U.S.C. 301; Public Law 107–296, sec.
                                              supported by a federal department or                    2018 Requirements in accordance with                   102, 306(c); Public Law 108–458, sec.
                                              agency. In addition to removing the                     § lll.101(l)(4). The final rule at                     8306. Department of Agriculture, 5
                                              requirement that IRBs review grant                      § lll.101(l)(4) also includes the                      U.S.C. 301; 42 U.S.C. 300v–1(b).
                                              applications or proposals, § lll                        additional wording ‘‘planning or’’ before              Department of Energy, 5 U.S.C. 301; 42
                                              .103(d) of the 2018 Requirements                        ‘‘engaged in research’’ to clarify that                U.S.C. 7254; 42 U.S.C. 300v–1(b).
                                              reflects other minor wording changes                    institutions are allowed to take                       National Aeronautics and Space
                                              necessary to accommodate the removal                    advantage of the 2018 Requirements’                    Administration, 5 U.S.C. 301; 42 U.S.C.
                                              of the grant application or proposal                    carve-outs from the definition of                      300v–1(b). Department of Commerce, 5
                                              review requirement or to provide                        research for studies newly initiated                   U.S.C. 301; 42 U.S.C. 300v–1(b).
                                              additional clarifications.                              during the delay period (which would                   Consumer Product Safety Commission,
                                                                                                      allow a study that qualifies for one of                5 U.S.C. 301; 42 U.S.C. 300v–1(b).
                                              E. General Transition Issues                                                                                   Social Security Administration, 5 U.S.C.
                                                                                                      the carve-outs to be conducted without
                                                 The regulatory provisions are not                    prior IRB review and approval or                       301; 42 U.S.C. 289(a). Agency for
                                              prescriptive regarding how an                           application of the other regulatory                    International Development, 5 U.S.C.
                                              institution chooses to make its                         requirements).                                         301; 42 U.S.C. 300v–1(b), unless
daltland on DSKBBV9HB2PROD with RULES2




                                              transition decisions. An institution may                   This final rule revises the                         otherwise noted. Department of Housing
                                              elect to transition research protocols to               requirement, now set forth at § lll                    and Urban Development, 5 U.S.C. 301;
                                              the 2018 Requirements on a protocol-by-                 .101(l)(4), regarding which entity may                 42 U.S.C. 300v–1(b); 3535(d).
                                              protocol basis, or for a class of protocols             document an institution’s decision to                  Department of Labor, 5 U.S.C. 301; 29
                                              (e.g., all minimal risk research), or for               transition research. This change will                  U.S.C. 551. Department of Defense, 5
                                              the institution’s entire research                       offer institutions greater flexibility                 U.S.C. 301. Department of Education, 5
                                              portfolio.                                              regarding who documents the transition                 U.S.C. 301; 20 U.S.C. 1221e–3, 3474.


                                         VerDate Sep<11>2014   20:34 Jun 18, 2018   Jkt 244001   PO 00000   Frm 00010   Fmt 4701   Sfmt 4700   E:\FR\FM\19JNR2.SGM   19JNR2


                                                                 Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations                                         28505

                                              Department of Veterans Affairs, 5 U.S.C.                1. Need for This Final Rule and                           and some entities would experience
                                              301; 38 U.S.C. 501, 7331, 7334; 42                      Summary                                                   costs as a result of this rule.
                                              U.S.C. 300v–1(b). Environmental                                                                                —That 50 percent of regulated entities
                                              Protection Agency, 5 U.S.C. 301; 7                        On January 19, 2017, HHS and 15                         will take advantage of the option to
                                              U.S.C. 136a(a) and 136w(a)(1); 21 U.S.C.                other federal departments and agencies                    implement three burden-reducing
                                              346a(e)(1)(C); sec. 201, Public Law 109–                published the 2018 Requirements                           provisions of the 2018 Requirements
                                              54, 119 Stat. 531; and 42 U.S.C. 300v–                  designed to more thoroughly address                       early. Additionally, the NPRM sought
                                              1(b). Department of Health and Human                    the broader types of research conducted                   comment that would provide insight
                                              Services, 5 U.S.C. 301; 42 U.S.C. 289(a);               or otherwise supported by all of the                      into entities’ views regarding the
                                              42 U.S.C. 300v–1(b). National Science                   Common Rule departments and                               interconnectedness of the 2018
                                              Foundation, 5 U.S.C. 301; 42 U.S.C.                     agencies. In addition, the CPSC adopted                   Requirements’ provisions and thus
                                              300v–1(b). Department of                                the same regulatory changes on                            allow for refinement of the 50 percent
                                              Transportation, 5 U.S.C. 301; 42 U.S.C.                 September 18, 2017. This rule was                         estimate.
                                              300v–1(b).                                              amended in a final rule published in the                  —That this rulemaking will not have
                                                                                                      Federal Register on January 22, 2018                   a significant economic impact on a
                                              VI. Regulatory Impact Analyses                          and adopted by HUD through a final                     substantial number of small entities.
                                                 We have examined the effects of this                 rule published on January 26, 2018.                       We received several comments on the
                                              final rule under Executive Order 12866                    This final rule allows regulated                     costs and benefits associated with the
                                              on Regulatory Planning and Review                       entities to continue to comply with the                April 20, 2018 NPRM to delay the 2018
                                              (September 30, 1993), Executive Order                   pre-2018 requirements until January 21,                Requirements. None of these comments
                                              13563 on Improving Regulation and                       2019. As discussed above, this final rule              provided specific feedback on the cost
                                              Regulatory Review (January 18, 2011),                   also permits institutions, during the                  and benefit assumptions included in the
                                              Executive Order 13771 on Reducing                       period between July 19, 2018 and                       NPRM.
                                              Regulation and Controlling Regulatory                   January 21, 2019, to take advantage of                    These comments indicated that the
                                              Costs (January 30, 2017), the Paperwork                 three provisions in the 2018                           timing and implementation of the
                                              Reduction Act of 1995 (Pub. L. 104–13),                 Requirements intended to minimize                      interim final rule created additional
                                              the Regulatory Flexibility Act (Pub. L.                 burdens on regulated entities. Those                   administrative burden on institutions
                                              96–354, September 19, 1980), the                        three burden-reducing 2018                             that were prepared to implement the
                                              Unfunded Mandates Reform Act of 1995                    Requirements are (1) the 2018                          2018 Requirements on January 19, 2018.
                                              (Pub. L. 104–4), and Executive Order                    Requirements’ definition of ‘‘research,’’                 As discussed above, one comment
                                              13132 on Federalism (August 4, 1999).                   which deems certain activities not to be               noted that if we permitted the
                                                                                                      research, (2) the elimination of the                   exemption at § lll.104(d)(4) for
                                              A. Executive Orders 12866, 13563, and                                                                          secondary research where consent is not
                                              13771                                                   requirement for annual continuing
                                                                                                      review of certain categories of research,              required to be implemented prior to the
                                                 Executive Orders 12866 and 13563                     and (3) the elimination of the                         general compliance date, this delay
                                              direct agencies to assess all costs and                 requirement that IRBs review grant                     would essentially be cost neutral. While
                                              benefits of available regulatory                        applications or proposals related to the               we appreciate that there might be
                                              alternatives and, if regulation is                      research. As described in section III                  economic benefits to permitting the
                                              necessary, to select regulatory                         above, this flexibility is permitted for               early implementation of one or more of
                                              approaches that maximize net benefits                   studies for which an institution makes                 the new or revised exemption
                                              (including potential economic,                          a choice to have those studies be subject              categories, we did not include the
                                              environmental, public health and safety                 to the 2018 Requirements.                              exemptions as one of the provisions of
                                              effects; distributive impacts; and                                                                             the 2018 Requirements institutions can
                                              equity). Executive Order 13563 is                       2. Public Comments on the April 20,                    utilize during the delay period finalized
                                              supplemental to and reaffirms the                       2018 NPRM RIA and Response to                          in this rule because of the added
                                              principles, structures, and definitions                 Comments                                               complexity of implementing the
                                              governing regulatory review as                                                                                 exemptions in the absence of guidance.
                                                                                                        The April 20, 2018 NPRM RIA
                                              established in Executive Order 12866,                                                                             Finally, we received several
                                                                                                      solicited comment on the following
                                              emphasizing the importance of                                                                                  comments indicating that the January
                                                                                                      assumptions:
                                              quantifying both costs and benefits, of                                                                        19, 2017 final rule preamble
                                              reducing costs, of harmonizing rules,                   —That in almost all categories described               underestimated the costs of
                                              and of promoting flexibility. In                          in the RIA for the 2018 Requirements,                implementing the cooperative research
                                              accordance with the provisions of                         the foregone benefits (costs) of                     provision at § lll.114. These
                                              Executive Order 12866, this rule was                      delaying the 2018 Requirements by                    comments argued that, at best, this
                                              submitted to the Office of Management                     six months are what would have been                  provision would represent a shifting of
                                              and Budget (OMB) for review and has                       the benefits of implementing the 2018                administrative costs and burdens, but
                                              been determined to be a ‘‘significant’’                   Requirements during the period of                    would not represent an overall cost
                                              regulatory action. This regulation has                    July 2018 through January of 2019.                   savings. We continue to believe that the
                                              been designated as ‘‘regulatory’’ under                   Similarly, the assumption that, in                   original compliance date of this
                                              Executive Order 13771 (Reducing                           almost all categories described in the               provision in January 2020 gives
                                              Regulation and Controlling Regulatory                     RIA for the 2018 Requirements, the                   institutions sufficient time to prepare
                                              Costs, issued on January 30, 2017). We                    benefits (cost-savings) associated with              and implement this requirement. While
daltland on DSKBBV9HB2PROD with RULES2




                                              estimate that this rule generates $2.02                   delaying the 2018 Requirements by                    these commenters anecdotally indicated
                                              million in annualized costs at a 7%                       six months are what would have been                  that implementing this requirement has
                                              discount rate, discounted relative to                     the costs of implementing the 2018                   been more costly to institutions than the
                                              year 2016, over a perpetual time                          Requirements during the period of                    January 19, 2017 final rule preamble
                                              horizon. Details on the estimated costs                   July 2018 through January of 2019.                   estimated, no commenter provided data
                                              of this final rule can be found in the                  —That some entities will experience                    about the actual costs to implement this
                                              economic analysis below.                                  cost savings as a result of this rule,               provision. In the absence of specific


                                         VerDate Sep<11>2014   18:16 Jun 18, 2018   Jkt 244001   PO 00000   Frm 00011   Fmt 4701   Sfmt 4700   E:\FR\FM\19JNR2.SGM   19JNR2


                                              28506                      Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations

                                              data, we continue with our cost and                                          Requirements as a base for estimating                                       benefits of $6.4 million are estimated
                                              benefit assumptions related to this                                          benefits and costs of delaying the                                          using a 3 percent discount rate;
                                              provision.                                                                   general implementation of the 2018                                          annualized benefits of $5.9 million are
                                                                                                                           Requirements by six months. The time                                        estimated using a 7 percent discount
                                              3. Analysis of Benefits (Cost-Savings)
                                                                                                                           period for the analysis in this RIA is the                                  rate. Annualized costs of $37.2 million
                                              and Costs (Foregone Benefits) 4
                                                                                                                           6-month period from July 2018 to                                            are estimated using a 3 percent discount
                                                The RIA for the 2018 Requirements                                          January 2019.                                                               rate; annualized costs of $34.4 million
                                              described the benefits and costs of 16                                         Table 1 summarizes the quantified                                         are estimated using a 7 percent discount
                                              broad categories of changes finalized.                                       benefits and costs of delaying the                                          rate. Note that all values are represented
                                              The RIA for this final rule uses the                                         general implementation of 2018                                              in millions of 2016 dollars, and 2016 is
                                              information and calculations described                                       Requirements. Over the period of July                                       used as the frame of reference for
                                              in the preamble to the 2018                                                  2018 to January 2019, annualized                                            discounting.

                                              TABLE 1—ALL BENEFITS AND COSTS OF DELAYING THE GENERAL COMPLIANCE DATE FOR THE 2018 REQUIREMENTS BY 6
                                                                                             MONTHS
                                                                                                                               [From July 19, 2018 to January 21, 2019]

                                                                                                                                                                                                                                     Annualized value by
                                                                                                                                                                                                                                          discount rate
                                                                                                                                                                                                                                   (millions of 2016 dollars)

                                                                                                                                                                                                                                  3 Percent                  7 Percent

                                              Benefits (Cost-Savings):
                                                  Quantified Benefits ...........................................................................................................................................                                6.4                        5.9
                                              Costs (Foregone Benefits):
                                                  Quantified Costs ...............................................................................................................................................                             37.4                       34.7



                                                The estimated benefits and costs of                                        months are shown in Table 2 below.                                          used in the RIA of the 2018
                                              delaying the general implementation                                          Note that the categorization shown                                          Requirements.
                                              date of the 2018 Requirements by 6                                           below includes the same 16 categories

                                                      TABLE 2—ACCOUNTING TABLE OF QUANTIFIED BENEFITS (COST-SAVINGS) AND COSTS (FOREGONE BENEFITS) OF
                                                                     DELAYING COMPLIANCE WITH THE 2018 REQUIREMENTS BY 6 MONTHS 5
                                                                                                                                                                                       Annualized value over 1 year by discount rate
                                                                                                                                                                                                 (millions of 2016 dollars)
                                                                               2018 Requirement RIA Category                                                                   Benefits (cost-savings)                            Costs (foregone benefits)

                                                                                                                                                                                 3%                         7%                         3%                         7%

                                              Regulated Community Learning New Requirements and Developing Train-
                                                 ing Materials; OHRP Developing Training and Guidance Materials, and
                                                 Implementing the 2018 Requirements .........................................................                           ........................   ........................   ........................   ........................
                                              Extending Oversight to IRBs Unaffiliated with an Institution Holding an FWA
                                                 (impact to IRBs not operated by an FWA-holding institution) .....................                                                       4.47                       4.14      ........................   ........................
                                              Excluding Activities from the Requirements of the Common Rule Because
                                                 They Are Not Research ...............................................................................                  ........................   ........................                    0.95                       0.88
                                              Clarifying and Harmonizing Regulatory Requirements and Agency Guidance                                                    ........................   ........................   ........................   ........................
                                              Modifying the Assurance Requirements ..........................................................                           ........................   ........................                    0.31                       0.29
                                              Requirement for Written Procedures and Agreements for Reliance on IRBs
                                                 Not Operated by the Engaged Institution (impact to FWA-holding institu-
                                                 tions) .............................................................................................................   ........................   ........................   ........................   ........................
                                              Eliminating the Requirement that the Grant Application or Proposal Undergo
                                                 IRB Review and Approval ............................................................................                   ........................   ........................                      8.5                        7.9
                                              Expansion of Research Activities Exempt from Full IRB Review ...................                                                           0.01                       0.01                       20.8                       19.3
                                              Elimination of Continuing Review of Research Under Specific Conditions ....                                                                1.04                       0.96                       4.10                       3.80
                                              Amending the Expedited Review Procedures .................................................                                ........................   ........................                    2.66                       2.47
                                              Cooperative Research (single IRB mandate in multi-institutional research) 6                                               ........................   ........................   ........................   ........................
                                              Changes in the Basic Elements of Consent, Including Documentation ..........                                              ........................   ........................   ........................   ........................
                                              Obtaining Consent to Secondary Use of Identifiable Biospecimens and
                                                 Identifiable Private Information ....................................................................                  ........................   ........................   ........................   ........................
                                              Elimination of Pre-2018 Rule Requirement to Waive Consent in Certain
                                                 Subject Recruitment Activities .....................................................................                   ........................   ........................                    0.07                       0.06
daltland on DSKBBV9HB2PROD with RULES2




                                              Requirement for Posting of Consent Forms for Clinical Trials Conducted or
                                                 supported by Common Rule Departments or Agencies ..............................                                                        0.85                        0.79      ........................   ........................
                                              Alteration in Waiver for Documentation of Informed Consent in Certain Cir-
                                                 cumstances ..................................................................................................          ........................   ........................   ........................   ........................


                                                4 Note, that the terms ‘‘benefits’’ and ‘‘cost-                            Similarly, the terms ‘‘costs’’ and ‘‘foregone benefits’’
                                              savings’’ are used interchangeably in this RIA.                              are also used interchangeably.



                                         VerDate Sep<11>2014         20:34 Jun 18, 2018          Jkt 244001       PO 00000       Frm 00012        Fmt 4701       Sfmt 4700       E:\FR\FM\19JNR2.SGM              19JNR2


                                                                        Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations                                                                                 28507

                                                     TABLE 2—ACCOUNTING TABLE OF QUANTIFIED BENEFITS (COST-SAVINGS) AND COSTS (FOREGONE BENEFITS) OF
                                                               DELAYING COMPLIANCE WITH THE 2018 REQUIREMENTS BY 6 MONTHS 5—Continued
                                                                                                                                                                           Annualized value over 1 year by discount rate
                                                                                                                                                                                     (millions of 2016 dollars)
                                                                             2018 Requirement RIA Category                                                           Benefits (cost-savings)                Costs (foregone benefits)

                                                                                                                                                                      3%                  7%                     3%                         7%

                                              Cost Savings, as indicated by public comments (unable to attribute to par-
                                                ticular provisions) .........................................................................................              Unquantified                 ........................   ........................



                                                 We assume that in almost all                                        b. Early Implementation of the Three                           assume that the foregone benefits (costs)
                                              categories described in the RIA for the                                Burden-Reducing Provisions of the 2018                         of delaying implementation of these
                                              2018 Requirements the foregone benefits                                Requirements (Explicit Carve-Outs of                           provisions are what would have been
                                              (costs) of delaying the 2018                                           Activities From the Definition of                              the benefits of implementing these
                                              Requirements by 6 months are what                                      Research [§ lll.102(l)]; Eliminating                           provisions in January 2018. Similarly,
                                              would have been the benefits of                                        the Requirement That the Grant                                 we assume that the benefits (cost-
                                              implementing the 2018 Requirements                                     Application or Other Funding Proposal                          savings) associated with delaying the
                                              during the period of July 2018 through                                 Undergo IRB Review and Approval [Pre-                          implementation of these provisions are
                                              January 2019. Similarly, we assume                                     2018 Rule at § lll.103(f)];                                    what would have been the costs of
                                              that, in almost all categories described                               Elimination of Continuing Review of                            implementing these provisions in July
                                              in the RIA for the 2018 Requirements,                                  Research Under Specific Conditions                             2018. We assume that these regulated
                                              the benefits (cost-savings) associated                                 [§§ lll.109(f) and lll.115(a)(3)]                              entities account for 50 percent of the
                                              with delaying the 2018 Requirements by                                    We assume that 50 percent of                                costs and benefits that would have been
                                              6 months are what would have been the                                  regulated entities will take advantage of                      experienced in 2018 absent this delay.
                                              costs of implementing the 2018                                         the option included in this final rule to                         We also assume that institutional or
                                              Requirements during the period of July                                 implement three burden-reducing                                IRB staff at the IRB Administrative staff
                                              2018 through January 2019. We assume                                   provisions of the 2018 Requirements                            level 7 will spend 5 minutes per
                                              this because regulated entities likely                                 prior to the general compliance date. We                       protocol documenting the voluntary
                                              would not have difficulty implementing                                 assume this because an institution’s                           election to use the three burden-
                                              these provisions in the absence of                                     decision about whether to transition a                         reducing 2018 provisions during the
                                              guidance from Common Rule                                                                                                             time period of July 19, 2018 to January
                                                                                                                     study to the 2018 Requirements to take
                                              departments or agencies, and thus could                                                                                               21, 2019.
                                                                                                                     advantage of the three burden-reducing
                                              have been implemented as assumed in                                                                                                      Some members of the regulated
                                                                                                                     provisions might vary depending on the
                                              the economic analysis contained in the                                                                                                community have indicated that even
                                                                                                                     nature and progress of the study,
                                              RIA for the 2018 Requirements.5 6                                                                                                     though the 2018 Requirements yield
                                                 Categories with different assumptions                               including any elements of the study to
                                                                                                                     be conducted on or after January 21,                           cost savings, these institutions are still
                                              are described below.                                                                                                                  hesitant to transition ongoing research
                                                 a. Regulated Community Learning                                     2019. For example, studies planning to
                                                                                                                     recruit some subjects on or after January                      to the 2018 Requirements, largely
                                              New Requirements and Developing                                                                                                       because of the burden of making studies
                                              Training Materials; OHRP Developing                                    21, 2019 would have to meet the new
                                                                                                                     requirements for obtaining the informed                        already in compliance with the pre-2018
                                              Training and Guidance Materials, and                                                                                                  requirements comply with the 2018
                                              Implementing the 2018 Requirements                                     consent of those subjects. In contrast, for
                                                                                                                     studies whose remaining activities                             requirements. Also, some institutions
                                                 We assume that even with the                                                                                                       seem inclined to make all of the
                                              proposed 6-month delay, regulated                                      consist only of completing data
                                                                                                                     analyses, the new requirements for                             transitions at once. This
                                              entities and OHRP will still assume                                                                                                   interconnectedness is key to some of the
                                              costs related to learning the new                                      informed consent would generally not
                                                                                                                     be applicable. Therefore, we assume                            assumptions noted elsewhere in this
                                              requirements and developing training                                                                                                  analysis. For example, if the three
                                              materials. Thus, there are no effects                                  that there are situations in which an
                                                                                                                     institution would want to take                                 burden-reducing provisions are
                                              estimated here.                                                                                                                       considered on their own, a reasonable
                                                 We expect that some entities would                                  advantage of the three burden-reducing
                                                                                                                     provisions, and situations in which an                         assumption would be that 100 percent
                                              experience cost savings as a result of
                                                                                                                     institution would not want to take                             of affected entities would realize the
                                              this final rule, and some entities will
                                                                                                                     advantage of this flexibility. We note                         associated cost savings as soon as
                                              experience costs as a result of this rule,
                                                                                                                     that we intend to publish guidance on                          possible. The use, instead, of a 50
                                              but we lack data to quantify these
                                                                                                                     the carve-outs from the definition of                          percent estimate reflects entities’
                                              effects.
                                                                                                                     research prior to July 19, 2018, which                         possible inclinations to make all
                                                5 Zeroes in Table 2 (represented by —) signify that                  may also impact an institution’s                               transitions at once.
                                              the category has been unaffected by the 6-month                        decision to elect to implement the three                       c. Expansion of Research Activities
                                              delay of the 2018 Requirements. The category could
                                              be unaffected for one of two reasons: (1) No costs
                                                                                                                     burden-reducing provisions or not.                             Exempt From Full IRB Review (§ lll
daltland on DSKBBV9HB2PROD with RULES2




                                              or benefits were associated with the category in the                      Thus, these entities will still obtain                      .104(d))
                                              RIA for the 2018 Requirements; or (2) the costs and                    the benefits and costs described in the
                                                                                                                                                                                       The 2018 Requirements include five
                                              benefits of the provision during the 6-month delay                     RIA for the 2018 Requirements,
                                              are the same as those estimated in the RIA for the                                                                                    new exemption categories and modify
                                                                                                                     implying no effects of this rule for 50
                                              2018 Requirements.
                                                6 Because compliance with this provision is not                      percent of regulated entities. For the                           7 See the RIA to the 2018 Requirements (82 FR

                                              required until 2020, benefits and costs here are not                   regulated entities that do not take                            7149) for more information about the labor
                                              included.                                                              advantage of these flexibilities, we                           categories used in this analysis.



                                         VerDate Sep<11>2014        20:34 Jun 18, 2018       Jkt 244001      PO 00000       Frm 00013      Fmt 4701      Sfmt 4700   E:\FR\FM\19JNR2.SGM       19JNR2


                                              28508                     Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations

                                              all but one exemption that exist in the                                 would not have taken advantage of the                                    4. Analysis of Final Rule Alternative
                                              pre-2018 Requirements. We have                                          expansion in exemptions during this six                                     An alternative to the proposal
                                              received feedback from SACHRP that                                      month-delay. For these entities, we                                      finalized in this rule was to delay the
                                              guidance will be useful for regulated                                   assume that there are no benefits and                                    effective date and general compliance
                                              entities to implement many of the                                       costs of the proposed delay, because                                     date to January 21, 2019.
                                              exemption categories.8 Areas where                                      they would not have changed their                                           Table 3 summarizes the quantified
                                              significant guidance will be helpful                                    operations. We assume that 50 percent                                    benefits and costs of the alternative
                                              include: Applying the categories of the                                 of the regulated entities would have                                     proposal of delaying the general
                                              new exemptions themselves, conducting                                   gone forward with using the new or                                       implementation of 2018 Requirements
                                              limited IRB review (as required in four                                 expanded exemption categories under                                      without the option to implement certain
                                              exemptions), developing and using                                       the 2018 Requirements; for these                                         provisions of the 2018 Requirements.
                                              broad consent (as required in two                                       entities, there are costs of delaying the                                Over the period of July 2018 to January
                                              exemptions), utilizing the exemption for                                implementation of this provision during                                  2019, annualized benefits of $7.4
                                              certain HIPAA covered activities, and                                   the six-month delay proposed in this                                     million are estimated using a 3 percent
                                              understanding which federally                                                                                                                    discount rate; annualized benefits of
                                                                                                                      NPRM.
                                              supported or conducted nonresearch                                                                                                               $6.9 million are estimated using a 7
                                              information collections qualify for                                       We do not have data to support our
                                                                                                                                                                                               percent discount rate. Annualized costs
                                              exemption.                                                              assumption of what percent of regulated
                                                                                                                                                                                               of $50.8 million are estimated using a 3
                                                 Because the guidance documents that                                  entities would have gone forward with                                    percent discount rate; annualized costs
                                              would be helpful to assist regulated                                    the implementation of these provisions                                   of $47.0 million are estimated using a 7
                                              entities in implementing these                                          in the absence of additional guidance,                                   percent discount rate. Note that all
                                              provisions of the 2018 Requirements                                     and what percent would not have gone                                     values are represented in millions of
                                              have not yet been issued, we assume                                     forward.                                                                 2016 dollars, and 2016 is used as the
                                              that 50 percent of the regulated entities                                                                                                        frame of reference for discounting.
                                                         TABLE 3—ALL BENEFITS AND COSTS OF DELAYING COMPLIANCE WITH THE 2018 REQUIREMENTS UNDER THE
                                                                                            ALTERNATIVE PROPOSAL
                                                                                                                                                                                                                       Annualized value by
                                                                                                                                                                                                                            discount rate
                                                                                                                                                                                                                     (millions of 2016 dollars)

                                                                                                                                                                                                                     3 Percent        7 Percent

                                              Benefits (Cost–Savings):
                                                  Quantified Benefits: ..........................................................................................................................................             7.4                  6.9
                                              Costs (Foregone Benefits):
                                                  Quantified Costs ...............................................................................................................................................          50.8                  47.0



                                              B. Paperwork Reduction Act (PRA)                                        involved in human subjects research                                      reducing 2018 Requirements instead of,
                                                 This final rule contains collections of                              conducted or supported or otherwise                                      or in addition to, the comparable
                                              information that are subject to review                                  subject to regulation by any federal                                     provisions of the pre-2018
                                              and approval by the Office of                                           department or agency that takes                                          Requirements. As discussed above, the
                                              Management and Budget (OMB) under                                       administrative action that makes the                                     three burden-reducing 2018
                                              the Paperwork Reduction Act (PRA), as                                   policy applicable to such research.                                      Requirements are (1) the 2018
                                              amended (44 U.S.C. 3501–3520). A                                        § lll.101(l)(4) Compliance Date and                                      Requirements’ definition of ‘‘research’’
                                              description of these provisions is given                                Transition Provision (OMB Control No                                     at § lll.102(l) (instead of § lll
                                              in this document with an estimate of the                                0990–0260)                                                               .102(d) of the pre-2018 Requirements),
                                              annual reporting and recordkeeping                                                                                                               which deems certain activities not to be
                                              burden.                                                                    Section 101(l)(4)(i) permits studies to                               research, (2) the elimination of the
                                                 Title: Federal Policy for the Protection                             transition to the 2018 Requirements                                      requirement that an IRB review the
                                              of Human Subjects.                                                      between July 19, 2018 and January 21,                                    grant application or proposal related to
                                                 Description: In this document is a                                   2019 (which would be the new general                                     the research at § lll.103(d) of the
                                              discussion of the regulatory provisions                                 compliance date for the 2018                                             2018 Requirements (instead of § lll
                                              we believe are subject to the PRA and                                   Requirements). Between July 19, 2018
                                                                                                                                                                                               .103(f) of the pre-2018 Requirements),
                                              the probable information collection                                     and January 21, 2019, institutions that
                                                                                                                                                                                               and (3) the elimination of the
                                              burden associated with these                                            elect to transition studies to the 2018
                                                                                                                                                                                               requirement for annual continuing
                                              provisions. In general, the following                                   Requirements would, after the decision
                                                                                                                      to transition has been documented, be                                    review of certain categories of research
                                              actions trigger the PRA: (i) Reporting;                                                                                                          at § lll.109(f)(1)(i) and (iii) of the
                                              (ii) Recordkeeping.                                                     able to take advantage of the three
                                                                                                                      burden-reducing 2018 Requirements.                                       2018 Requirements (instead of § lll
                                                 Description of Respondents: The
daltland on DSKBBV9HB2PROD with RULES2




                                                                                                                                                                                               .103(b), as related to the requirement for
                                              reporting and recordkeeping                                                This option is described in a revision
                                                                                                                                                                                               continuing review, and in addition to
                                              requirements in this document are                                       to § lll.101(l)(4)(i). As described,
                                                                                                                                                                                               § lll.109 of the pre-2018
                                              imposed on institutions, institutional                                  studies taking advantage of this option
                                              review boards, and investigators                                        would be subject to the three burden-                                    Requirements).

                                               8 See for example, SACHRP Recommendations of                           committee/recommendations/sachrp-
                                              August 2, 2017: https://www.hhs.gov/ohrp/sachrp-                        recommendations/index.html.



                                         VerDate Sep<11>2014        18:16 Jun 18, 2018        Jkt 244001      PO 00000       Frm 00014       Fmt 4701      Sfmt 4700      E:\FR\FM\19JNR2.SGM             19JNR2


                                                                 Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations                                             28509

                                                We estimate that approximately                        We have therefore concluded that this                  adding paragraph (l)(5) to read as
                                              92,084 protocols would take advantage                   action will have no net regulatory                     follows:
                                              of the voluntary election described in                  burden for all directly regulated small
                                                                                                                                                             § lll.101 To what does this policy
                                              § lll.101(l)(4)(i). We estimate that                    entities.
                                                                                                                                                             apply?
                                              institutional staff would spend 5
                                                                                                      D. Unfunded Mandates Reform Act                        *       *     *    *     *
                                              minutes per protocol documenting that
                                              the study will be subject to the three                  (UMRA)                                                    (l) * * *
                                              burden-reducing provisions of the 2018                     Federal mandate that may result in                     (1) Pre-2018 Requirements. * * *
                                              Requirements during the time period of                  the expenditure by State, local, and                      (2) 2018 Requirements. For purposes
                                              July 19, 2018 through January 21, 2019.                 tribal governments, in the aggregate, or               of this section, the 2018 Requirements
                                              We estimate that this provision includes                by the private sector, of $100,000,000 or              means the Federal Policy for the
                                              7,674 burden hours.                                     more (adjusted annually for inflation) in              Protection of Human Subjects
                                                                                                      any one year.’’ In 2018, that threshold                requirements contained in this [part/
                                              C. Regulatory Flexibility Act (RFA)                                                                            subpart]. The general compliance date
                                                                                                      is approximately $150 million. We do
                                                 The Regulatory Flexibility Act (5                    not expect this rule to result in                      for the 2018 Requirements is January 21,
                                              U.S.C. 601 et seq.) (RFA) and the Small                 expenditures that will exceed this                     2019. The compliance date for § lll
                                              Business Regulatory Enforcement and                     amount. This action does not contain                   .114(b) (cooperative research) of the
                                              Fairness Act of 1996, which amended                     any unfunded mandate as described in                   2018 Requirements is January 20, 2020.
                                              the RFA, require agencies that issue a                  UMRA, 2 U.S.C. 1531–1538, and does                        (3) Research subject to pre-2018
                                              regulation to analyze options for                       not significantly or uniquely affect small             requirements. The pre-2018
                                              regulatory relief for small businesses. If              governments.2 U.S.C. 1531–1538, and                    Requirements shall apply to the
                                              a rule has a significant economic impact                does not significantly or uniquely affect              following research, unless the research
                                              on a substantial number of small                        small governments.                                     is transitioning to comply with the 2018
                                              entities, agencies must specifically                                                                           Requirements in accordance with
                                              consider the economic effect of the rule                E. Executive Order 13132: Federalism                   paragraph (l)(4) of this section:
                                              on small entities and analyze regulatory                                                                          (i) Research initially approved by an
                                                                                                        Executive Order 13132 establishes
                                              options that could lessen the impact of                                                                        IRB under the pre-2018 Requirements
                                                                                                      certain requirements that an agency
                                              the rule. The RFA generally defines a                                                                          before January 21, 2019;
                                                                                                      must meet when it promulgates a rule
                                              ‘‘small entity’’ as (1) a proprietary firm                                                                        (ii) Research for which IRB review
                                                                                                      that imposes substantial direct
                                              meeting the size standards of the Small                                                                        was waived pursuant to § lll.101(i)
                                                                                                      requirement costs on state and local
                                              Business Administration (SBA); (2) a                                                                           of the pre-2018 Requirements before
                                                                                                      governments or has federalism
                                              nonprofit organization that is not                                                                             January 21, 2019; and
                                                                                                      implications. We have determined that                     (iii) Research for which a
                                              dominant in its field; or (3) a small
                                              government jurisdiction with a                          this rule would not contain policies that              determination was made that the
                                              population of less than 50,000 (states                  would have substantial direct effects on               research was exempt under § .101(b) of
                                              and individuals are not included in the                 the States, on the relationship between                the pre-2018 Requirements before
                                              definition of ‘‘small entity’’). HHS                    the Federal Government and the States,                 January 21, 2019.
                                              considers a rule to have a significant                  or on the distribution of power and                       (4) Transitioning research. If, on or
                                              economic impact on a substantial                        responsibilities among the various                     after July 19, 2018, an institution
                                              number of small entities if at least 5                  levels of government. The changes in                   planning or engaged in research
                                              percent of small entities experience an                 this rule represent the Federal                        otherwise covered by paragraph (l)(3) of
                                              impact of more than 3 percent of                        Government regulating its own program.                 this section determines that such
                                              revenue.                                                Accordingly, we conclude that the rule                 research instead will transition to
                                                 We have determined that this final                   does not propose policies that have                    comply with the 2018 Requirements, the
                                              rule will not have a significant                        federalism implications as defined in                  institution or an IRB must document
                                              economic impact on a substantial                        Executive Order 13132 and,                             and date such determination.
                                              number of small entities under the RFA.                 consequently, a federalism summary                        (i) If the determination to transition is
                                              In making this determination, the                       impact statement is not required.                      documented between July 19, 2018, and
                                              impact of concern is any significant                      For the reasons set forth in the                     January 20, 2019, the research shall:
                                              adverse economic impact on small                        preamble, the Federal Policy for the                      (A) Beginning on the date of such
                                              entities. An agency may certify that a                  Protection of Human Subjects, as                       documentation through January 20,
                                              rule will not have a significant                        published in the Federal Register on                   2019, comply with the pre-2018
                                              economic impact on a substantial                        January 19, 2017 (82 FR 7149) and as                   Requirements, except that the research
                                              number of small entities if the rule                    adopted in a final rule published by the               shall comply with the following:
                                              relieves regulatory burden, has no net                  CPSC on September 18, 2017 (82 FR                         (1) Section lll.102(l) of the 2018
                                              burden or otherwise has a positive                      43459), and as amended in a final rule                 Requirements (definition of research)
                                              economic effect on the small entities                   published in the Federal Register on                   (instead of § lll.102(d) of the pre-
                                              subject to the rule. This final rule would              January 22, 2018 (83 FR 2885) and                      2018 Requirements);
                                              not impose a regulatory burden for                      adopted by HUD through a final rule                       (2) Section lll.103(d) of the 2018
                                              regulated small entities because it                     published on January 26, 2018 (83 FR                   Requirements (revised certification
                                              would delay the general compliance                      3589), is further amended as follows:                  requirement that eliminates IRB review
                                              date for the 2018 Requirements,                                                                                of application or proposal) (instead of
                                                                                                      Text of the Amended Common Rule
daltland on DSKBBV9HB2PROD with RULES2




                                              allowing the status quo to be retained                                                                         § lll.103(f) of the pre-2018
                                              for the period of delay. Additionally,                  PARTll—PROTECTION OF HUMAN                             Requirements); and
                                              regulated small entities are permitted to               SUBJECTS                                                  (3) Section lll.109(f)(1)(i) and (iii)
                                              comply voluntarily with those aspects                                                                          of the 2018 Requirements (exceptions to
                                              of the 2018 Requirements that do not                      1. Amend § lll.101 by adding a                       mandated continuing review) (instead of
                                              conflict with the pre-2018                              heading for paragraph (l)(1), revising                 § lll.103(b), as related to the
                                              Requirements, prior to January 21, 2019.                paragraphs (l)(2), (3), and (4), and                   requirement for continuing review, and


                                         VerDate Sep<11>2014   18:16 Jun 18, 2018   Jkt 244001   PO 00000   Frm 00015   Fmt 4701   Sfmt 4700   E:\FR\FM\19JNR2.SGM   19JNR2


                                              28510              Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations

                                              in addition to § lll.109, of the pre-                   following research, unless the research                   (iii) Research for which a
                                              2018 Requirements); and                                 is transitioning to comply with the 2018               determination is made that the research
                                                 (B) Beginning on January 21, 2019,                   Requirements in accordance with                        is exempt on or after January 21, 2019.
                                              comply with the 2018 Requirements.                      paragraph (l)(4) of this section:                      *       *    *     *    *
                                                 (ii) If the determination to transition                 (i) Research initially approved by an
                                              is documented on or after January 21,                                                                          Claire M. Grady,
                                                                                                      IRB under the pre-2018 Requirements
                                              2019, the research shall, beginning on                                                                         Deputy Secretary (Acting), Department of
                                                                                                      before January 21, 2019;
                                              the date of such documentation, comply                                                                         Homeland Security.
                                              with the 2018 Requirements.                                (ii) Research for which IRB review
                                                                                                      was waived pursuant to § 46.101(i) of                  DEPARTMENT OF AGRICULTURE
                                                 (5) Research subject to 2018
                                              Requirements. The 2018 Requirements                     the pre-2018 Requirements) before                      List of Subjects in 7 CFR Part 1c
                                              shall apply to the following research:                  January 21, 2019; and
                                                                                                                                                               Human research subjects, Reporting
                                                 (i) Research initially approved by an                   (iii) Research for which a                          and recordkeeping requirements,
                                              IRB on or after January 21, 2019;                       determination was made that the                        Research.
                                                 (ii) Research for which IRB review is                research was exempt under § 46.101(b)
                                                                                                      of the pre-2018 Requirements before                      For the reasons stated in the
                                              waived pursuant to paragraph (i) of this
                                                                                                      January 21, 2019.                                      preamble, Department of Agriculture
                                              section on or after January 21, 2019; and
                                                 (iii) Research for which a                                                                                  further amends 7 CFR part 1c as
                                                                                                         (4) Transitioning research. If, on or               published in the Federal Register on
                                              determination is made that the research                 after July 19, 2018, an institution
                                              is exempt on or after January 21, 2019.                                                                        January 19, 2017 (82 FR 7149), and as
                                                                                                      planning or engaged in research                        amended in an interim final rule
                                              *       *     *     *    *                              otherwise covered by paragraph (l)(3) of               published in the Federal Register on
                                                                                                      this section determines that such                      January 22, 2018 (83 FR 2885), as
                                              DEPARTMENT OF HOMELAND
                                                                                                      research instead will transition to                    follows:
                                              SECURITY
                                                                                                      comply with the 2018 Requirements, the
                                              List of Subjects in 6 CFR Part 46                       institution or an IRB must document                    PART 1c—PROTECTION OF HUMAN
                                                Human research subjects, Reporting                    and date such determination.                           SUBJECTS
                                              and recordkeeping requirements,                            (i) If the determination to transition is
                                              Research.                                               documented between July 19, 2018, and                  ■ 1. The authority citation for part 1c
                                                                                                      January 20, 2019, the research shall:                  continues to read as follows:
                                                For the reasons stated in the
                                              preamble, Department of Homeland                           (A) Beginning on the date of such                     Authority: 5 U.S.C. 301; 42 U.S.C. 300v–
                                              Security further amends 6 CFR part 46                   documentation through January 20,                      1(b).
                                              as published in the Federal Register on                 2019, comply with the pre-2018                         ■ 2. Amend § 1c.101 by adding a
                                              January 19, 2017 (82 FR 7149), and as                   Requirements, except that the research                 heading for paragraph (l)(1), revising
                                              amended in an interim final rule                        shall comply with the following:                       paragraphs (l)(2), (3), and (4), and
                                              published in the Federal Register on                       (1) Section 46.102(l) of the 2018                   adding paragraph (l)(5) to read as
                                              January 22, 2018 (83 FR 2885), as                       Requirements (definition of research)                  follows:
                                              follows:                                                (instead of § 46.102(d) of the pre-2018
                                                                                                                                                             § 1c.101   To what does this policy apply?
                                                                                                      Requirements);
                                              PART 46—PROTECTION OF HUMAN                                                                                    *       *    *     *     *
                                              SUBJECTS                                                   (2) Section 46.103(d) of the 2018                      (l) * * *
                                                                                                      Requirements (revised certification                       (1) Pre-2018 Requirements. * * *
                                              ■ 1. The authority citation for part 46                 requirement that eliminates IRB review                    (2) 2018 Requirements. For purposes
                                              continues to read as follows:                           of application or proposal) (instead of                of this section, the 2018 Requirements
                                                                                                      § 46.103(f) of the pre-2018                            means the Federal Policy for the
                                                Authority: 5 U.S.C. 301; Pub. L. 107–296,
                                              sec. 102, 306(c); Pub. L. 108–458, sec. 8306.           Requirements); and                                     Protection of Human Subjects
                                                                                                         (3) Section 46.109(f)(1)(i) and (iii) of            requirements contained in this part. The
                                              ■ 2. Amend § 46.101 by adding a
                                                                                                      the 2018 Requirements (exceptions to                   general compliance date for the 2018
                                              heading for paragraph (l)(1), revising
                                                                                                      mandated continuing review) (instead of                Requirements is January 21, 2019. The
                                              paragraphs (l)(2), (3), and (4), and
                                                                                                      § 46.103(b), as related to the                         compliance date for § 1c.114(b)
                                              adding paragraph (l)(5) to read as
                                                                                                      requirement for continuing review, and                 (cooperative research) of the 2018
                                              follows:
                                                                                                      in addition to § 46.109, of the pre-2018               Requirements is January 20, 2020.
                                              § 46.101   To what does this policy apply?              Requirements); and                                        (3) Research subject to pre-2018
                                              *     *     *     *     *                                  (B) Beginning on January 21, 2019,                  requirements. The pre-2018
                                                (l) * * *                                             comply with the 2018 Requirements.                     Requirements shall apply to the
                                                (1) Pre-2018 Requirements. * * *                         (ii) If the determination to transition             following research, unless the research
                                                (2) 2018 Requirements. For purposes                   is documented on or after January 21,                  is transitioning to comply with the 2018
                                              of this section, the 2018 Requirements                  2019, the research shall, beginning on                 Requirements in accordance with
                                              means the Federal Policy for the                        the date of such documentation, comply                 paragraph (l)(4) of this section:
                                              Protection of Human Subjects                            with the 2018 Requirements.                               (i) Research initially approved by an
                                              requirements contained in this part. The                                                                       IRB under the pre-2018 Requirements
                                                                                                         (5) Research subject to 2018                        before January 21, 2019;
                                              general compliance date for the 2018
                                                                                                      Requirements. The 2018 Requirements
daltland on DSKBBV9HB2PROD with RULES2




                                              Requirements is January 21, 2019. The                                                                             (ii) Research for which IRB review
                                                                                                      shall apply to the following research:                 was waived pursuant to § 1c.101(i) of
                                              compliance date for § 46.114(b)
                                              (cooperative research) of the 2018                         (i) Research initially approved by an               the pre-2018 Requirements before
                                              Requirements is January 20, 2020.                       IRB on or after January 21, 2019;                      January 21, 2019; and
                                                (3) Research subject to pre-2018                         (ii) Research for which IRB review is                  (iii) Research for which a
                                              requirements. The pre-2018                              waived pursuant to paragraph (i) of this               determination was made that the
                                              Requirements shall apply to the                         section on or after January 21, 2019; and              research was exempt under § 1c.101(b)


                                         VerDate Sep<11>2014   18:16 Jun 18, 2018   Jkt 244001   PO 00000   Frm 00016   Fmt 4701   Sfmt 4700   E:\FR\FM\19JNR2.SGM   19JNR2


                                                                 Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations                                            28511

                                              of the pre-2018 Requirements before                     the Federal Register on January 19,                       (1) Section 745.102(l) of the 2018
                                              January 21, 2019.                                       2017 (82 FR 7149), and as amended in                   Requirements (definition of research)
                                                 (4) Transitioning research. If, on or                an interim final rule published in the                 (instead of § 745.102(d) of the pre-2018
                                              after July 19, 2018, an institution                     Federal Register on January 22, 2018                   Requirements);
                                              planning or engaged in research                         (83 FR 2885), as follows:                                 (2) Section 745.103(d) of the 2018
                                              otherwise covered by paragraph (l)(3) of                                                                       Requirements (revised certification
                                              this section determines that such                       PART 745—PROTECTION OF HUMAN                           requirement that eliminates IRB review
                                              research instead will transition to                     SUBJECTS                                               of application or proposal) (instead of
                                              comply with the 2018 Requirements, the                                                                         § 745.103(f) of the pre-2018
                                                                                                      ■ 1. The authority citation for part 745               Requirements); and
                                              institution or an IRB must document
                                                                                                      continues to read as follows:                             (3) Section 745.109(f)(1)(i) and (iii) of
                                              and date such determination.
                                                 (i) If the determination to transition is              Authority: 5 U.S.C. 301; 42 U.S.C. 7254;             the 2018 Requirements (exceptions to
                                              documented between July 19, 2018, and                   42 U.S.C. 300v–1(b).                                   mandated continuing review) (instead of
                                              January 20, 2019, the research shall:                   ■ 2. Amend § 745.101 by adding a                       § 745.103(b), as related to the
                                                 (A) Beginning on the date of such                    heading for paragraph (l)(1), revising                 requirement for continuing review, and
                                              documentation through January 20,                       paragraphs (l)(2), (3), and (4), and                   in addition to § 745.109, of the pre-2018
                                              2019, comply with the pre-2018                          adding paragraph (l)(5) to read as                     Requirements); and
                                              Requirements, except that the research                  follows:                                                  (B) Beginning on January 21, 2019,
                                              shall comply with the following:                                                                               comply with the 2018 Requirements.
                                                 (1) Section 1c.102(l) of the 2018                    § 745.101    To what does this policy apply?              (ii) If the determination to transition
                                              Requirements (definition of research)                   *       *     *    *     *                             is documented on or after January 21,
                                              (instead of § 1c.102(d) of the pre-2018                    (l) * * *                                           2019, the research shall, beginning on
                                              Requirements);                                             (1) Pre-2018 Requirements. * * *                    the date of such documentation, comply
                                                 (2) Section 1c.103(d) of the 2018                       (2) 2018 Requirements. For purposes                 with the 2018 Requirements.
                                              Requirements (revised certification                     of this section, the 2018 Requirements                    (5) Research subject to 2018
                                              requirement that eliminates IRB review                  means the Federal Policy for the                       Requirements. The 2018 Requirements
                                              of application or proposal) (instead of                 Protection of Human Subjects                           shall apply to the following research:
                                              § 1c.103(f) of the pre-2018                             requirements contained in this part. The                  (i) Research initially approved by an
                                              Requirements); and                                      general compliance date for the 2018                   IRB on or after January 21, 2019;
                                                 (3) Section 1c.109(f)(1)(i) and (iii) of             Requirements is January 21, 2019. The                     (ii) Research for which IRB review is
                                              the 2018 Requirements (exceptions to                    compliance date for § 745.114(b)                       waived pursuant to paragraph (i) of this
                                              mandated continuing review) (instead of                 (cooperative research) of the 2018                     section on or after January 21, 2019; and
                                              § 1c.103(b), as related to the requirement              Requirements is January 20, 2020.                         (iii) Research for which a
                                              for continuing review, and in addition                     (3) Research subject to pre-2018                    determination is made that the research
                                              to § 1c.109, of the pre-2018                            requirements. The pre-2018                             is exempt on or after January 21, 2019.
                                              Requirements); and                                      Requirements shall apply to the                        *       *     *     *    *
                                                 (B) Beginning on January 21, 2019,                   following research, unless the research
                                                                                                      is transitioning to comply with the 2018               Dan Brouillette,
                                              comply with the 2018 Requirements.
                                                 (ii) If the determination to transition              Requirements in accordance with                        Deputy Secretary of Energy.
                                              is documented on or after January 21,                   paragraph (l)(4) of this section:                      NATIONAL AERONAUTICS AND
                                              2019, the research shall, beginning on                     (i) Research initially approved by an
                                                                                                                                                             SPACE ADMINISTRATION
                                              the date of such documentation, comply                  IRB under the pre-2018 Requirements
                                              with the 2018 Requirements.                             before January 21, 2019;                               List of Subjects in 14 CFR Part 1230
                                                                                                         (ii) Research for which IRB review
                                                 (5) Research subject to 2018                                                                                  Human research subjects, Reporting
                                                                                                      was waived pursuant to § 745.101(i) of
                                              Requirements. The 2018 Requirements                                                                            and recordkeeping requirements,
                                                                                                      the pre-2018 Requirements before
                                              shall apply to the following research:                                                                         Research.
                                                                                                      January 21, 2019; and
                                                 (i) Research initially approved by an                                                                         For the reasons stated in the
                                                                                                         (iii) Research for which a
                                              IRB on or after January 21, 2019;                                                                              preamble, National Aeronautics and
                                                                                                      determination was made that the
                                                 (ii) Research for which IRB review is                                                                       Space Administration further amends
                                                                                                      research was exempt under § 745.101(b)
                                              waived pursuant to paragraph (i) of this                                                                       14 CFR part 1230 as published in the
                                                                                                      of the pre-2018 Requirements before
                                              section on or after January 21, 2019; and                                                                      Federal Register on January 19, 2017
                                                                                                      January 21, 2019.
                                                 (iii) Research for which a                              (4) Transitioning research. If, on or               (82 FR 7149), and as amended in an
                                              determination is made that the research                 after July 19, 2018, an institution                    interim final rule published in the
                                              is exempt on or after January 21, 2019.                 planning or engaged in research                        Federal Register on January 22, 2018
                                              *       *     *     *    *                              otherwise covered by paragraph (l)(3) of               (83 FR 2885), as follows:
                                              Chavonda Jacobs-Young,                                  this section determines that such
                                                                                                                                                             PART 1230—PROTECTION OF HUMAN
                                              Acting Deputy Under Secretary for Research,             research instead will transition to
                                                                                                                                                             SUBJECTS
                                              Education, and Economics, USDA.                         comply with the 2018 Requirements, the
                                                                                                      institution or an IRB must document                    ■ 1. The authority citation for part 1230
                                              DEPARTMENT OF ENERGY                                    and date such determination.                           continues to read as follows:
                                              List of Subjects in 10 CFR Part 745                        (i) If the determination to transition is
daltland on DSKBBV9HB2PROD with RULES2




                                                                                                      documented between July 19, 2018, and                    Authority: 5 U.S.C. 301; 42 U.S.C. 300v–
                                                Human research subjects, Reporting                                                                           1(b).
                                                                                                      January 20, 2019, the research shall:
                                              and recordkeeping requirements,                            (A) Beginning on the date of such                   ■ 2. Amend § 1230.101 by adding a
                                              Research.                                               documentation through January 20,                      heading for paragraph (l)(1), revising
                                                For the reasons stated in the                         2019, comply with the pre-2018                         paragraphs (l)(2), (3), and (4), and
                                              preamble, Department of Energy further                  Requirements, except that the research                 adding paragraph (l)(5) to read as
                                              amends 10 CFR part 745 as published in                  shall comply with the following:                       follows:


                                         VerDate Sep<11>2014   18:16 Jun 18, 2018   Jkt 244001   PO 00000   Frm 00017   Fmt 4701   Sfmt 4700   E:\FR\FM\19JNR2.SGM   19JNR2


                                              28512                Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations

                                              § 1230.101       To what does this policy apply?             (ii) If the determination to transition             is transitioning to comply with the 2018
                                              *       *     *    *     *                                is documented on or after January 21,                  Requirements in accordance with
                                                 (l) * * *                                              2019, the research shall, beginning on                 paragraph (l)(4) of this section:
                                                 (1) Pre-2018 Requirements. * * *                       the date of such documentation, comply                    (i) Research initially approved by an
                                                 (2) 2018 Requirements. For purposes                    with the 2018 Requirements.                            IRB under the pre-2018 Requirements
                                              of this section, the 2018 Requirements                       (5) Research subject to 2018                        before January 21, 2019;
                                              means the Federal Policy for the                          Requirements. The 2018 Requirements
                                              Protection of Human Subjects                              shall apply to the following research:                    (ii) Research for which IRB review
                                              requirements contained in this part. The                     (i) Research initially approved by an               was waived pursuant to § 27.101(i) of
                                              general compliance date for the 2018                      IRB on or after January 21, 2019;                      the pre-2018 Requirements before
                                              Requirements is January 21, 2019. The                        (ii) Research for which IRB review is               January 21, 2019; and
                                              compliance date for § 1230.114(b)                         waived pursuant to paragraph (i) of this                  (iii) Research for which a
                                              (cooperative research) of the 2018                        section on or after January 21, 2019; and              determination was made that the
                                              Requirements is January 20, 2020.                            (iii) Research for which a                          research was exempt under § 27.101(b)
                                                 (3) Research subject to pre-2018                       determination is made that the research                of the pre-2018 Requirements before
                                              requirements. The pre-2018                                is exempt on or after January 21, 2019.                January 21, 2019.
                                              Requirements shall apply to the                           *       *     *     *    *                                (4) Transitioning research. If, on or
                                              following research, unless the research                                                                          after July 19, 2018, an institution
                                              is transitioning to comply with the 2018                  James D. Polk,
                                                                                                                                                               planning or engaged in research
                                              Requirements in accordance with                           Chief Health & Medical Officer, National
                                                                                                                                                               otherwise covered by paragraph (l)(3) of
                                              paragraph (l)(4) of this section:                         Aeronautics and Space Administration.
                                                                                                                                                               this section determines that such
                                                 (i) Research initially approved by an                  DEPARTMENT OF COMMERCE                                 research instead will transition to
                                              IRB under the pre-2018 Requirements                                                                              comply with the 2018 Requirements, the
                                              before January 21, 2019;                                  List of Subjects in 15 CFR Part 27
                                                                                                                                                               institution or an IRB must document
                                                 (ii) Research for which IRB review                       Human research subjects, Reporting                   and date such determination.
                                              was waived pursuant to § 1230.101(i) of                   and recordkeeping requirements,
                                              the pre-2018 Requirements before                                                                                    (i) If the determination to transition is
                                                                                                        Research.                                              documented between July 19, 2018, and
                                              January 21, 2019; and
                                                 (iii) Research for which a                               For the reasons stated in the                        January 20, 2019, the research shall:
                                              determination was made that the                           preamble, Department of Commerce
                                                                                                        further amends 15 CFR part 27 as                          (A) Beginning on the date of such
                                              research was exempt under                                                                                        documentation through January 20,
                                              § 1230.101(b) of the pre-2018                             published in the Federal Register on
                                                                                                        January 19, 2017 (82 FR 7149), and as                  2019, comply with the pre-2018
                                              Requirements before January 21, 2019.                                                                            Requirements, except that the research
                                                 (4) Transitioning research. If, on or                  amended in an interim final rule
                                                                                                        published in the Federal Register on                   shall comply with the following:
                                              after July 19, 2018, an institution
                                                                                                        January 22, 2018 (83 FR 2885), as                         (1) Section 27.102(l) of the 2018
                                              planning or engaged in research
                                                                                                        follows:                                               Requirements (definition of research)
                                              otherwise covered by paragraph (l)(3) of
                                                                                                                                                               (instead of § 27.102(d) of the pre-2018
                                              this section determines that such
                                                                                                        PART 27—PROTECTION OF HUMAN                            Requirements);
                                              research instead will transition to
                                                                                                        SUBJECTS                                                  (2) Section 27.103(d) of the 2018
                                              comply with the 2018 Requirements, the
                                              institution or an IRB must document                       ■ 1. The authority citation for part 27                Requirements (revised certification
                                              and date such determination.                              continues to read as follows:                          requirement that eliminates IRB review
                                                 (i) If the determination to transition is                                                                     of application or proposal) (instead of
                                              documented between July 19, 2018, and                       Authority: 5 U.S.C. 301; 42 U.S.C. 300v–             § 27.103(f) of the pre-2018
                                                                                                        1(b).                                                  Requirements); and
                                              January 20, 2019, the research shall:
                                                 (A) Beginning on the date of such                      ■ 2. Amend § 27.101 by adding a                           (3) Section 27.109(f)(1)(i) and (iii) of
                                              documentation through January 20,                         heading for paragraph (l)(1), revising                 the 2018 Requirements (exceptions to
                                              2019, comply with the pre-2018                            paragraphs (l)(2), (3), and (4), and                   mandated continuing review) (instead of
                                              Requirements, except that the research                    adding paragraph (l)(5) to read as                     § 27.103(b), as related to the
                                              shall comply with the following:                          follows:                                               requirement for continuing review, and
                                                 (1) Section 1230.102(l) of the 2018                                                                           in addition to § 27.109, of the pre-2018
                                              Requirements (definition of research)                     § 27.101    To what does this policy apply?
                                                                                                                                                               Requirements); and
                                              (instead of § 1230.102(d) of the pre-2018                 *     *     *     *     *
                                              Requirements);                                              (l) * * *                                               (B) Beginning on January 21, 2019,
                                                 (2) Section 1230.103(d) of the 2018                      (1) Pre-2018 Requirements. * * *                     comply with the 2018 Requirements.
                                              Requirements (revised certification                         (2) 2018 Requirements. For purposes                     (ii) If the determination to transition
                                              requirement that eliminates IRB review                    of this section, the 2018 Requirements                 is documented on or after January 21,
                                              of application or proposal) (instead of                   means the Federal Policy for the                       2019, the research shall, beginning on
                                              § 1230.103(f) of the pre-2018                             Protection of Human Subjects                           the date of such documentation, comply
                                              Requirements); and                                        requirements contained in this part. The               with the 2018 Requirements.
                                                 (3) Section 1230.109(f)(1)(i) and (iii)                general compliance date for the 2018                      (5) Research subject to 2018
                                              of the 2018 Requirements (exceptions to                   Requirements is January 21, 2019. The                  Requirements. The 2018 Requirements
daltland on DSKBBV9HB2PROD with RULES2




                                              mandated continuing review) (instead of                   compliance date for § 27.114(b)                        shall apply to the following research:
                                              § 1230.103(b), as related to the                          (cooperative research) of the 2018
                                              requirement for continuing review, and                    Requirements is January 20, 2020.                         (i) Research initially approved by an
                                              in addition to § 1230.109, of the pre-                      (3) Research subject to pre-2018                     IRB on or after January 21, 2019;
                                              2018 Requirements); and                                   requirements. The pre-2018                                (ii) Research for which IRB review is
                                                 (B) Beginning on January 21, 2019,                     Requirements shall apply to the                        waived pursuant to paragraph (i) of this
                                              comply with the 2018 Requirements.                        following research, unless the research                section on or after January 21, 2019; and


                                         VerDate Sep<11>2014     18:16 Jun 18, 2018   Jkt 244001   PO 00000   Frm 00018   Fmt 4701   Sfmt 4700   E:\FR\FM\19JNR2.SGM   19JNR2


                                                                   Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations                                               28513

                                                 (iii) Research for which a                             research was exempt under                              Administration further amends 20 CFR
                                              determination is made that the research                   § 1028.101(b) of the pre-2018                          part 431 as published in the Federal
                                              is exempt on or after January 21, 2019.                   Requirements before January 21, 2019.                  Register on January 19, 2017 (82 FR
                                              *       *    *     *    *                                    (4) Transitioning research. If, on or               7149), and as amended in an interim
                                                                                                        after July 19, 2018, an institution                    final rule published in the Federal
                                              Wilbur L. Ross,                                           planning or engaged in research                        Register on January 22, 2018 (83 FR
                                              Secretary of Commerce.                                    otherwise covered by paragraph (l)(3) of               2885), as follows:
                                              CONSUMER PRODUCT SAFETY                                   this section determines that such
                                              COMMISSION                                                research instead will transition to                    PART 431—PROTECTION OF HUMAN
                                                                                                        comply with the 2018 Requirements, the                 SUBJECTS
                                              List of Subjects in 16 CFR Part 1028                      institution or an IRB must document
                                                Human research subjects, Reporting                      and date such determination.                           ■ 1. The authority citation for part 431
                                              and recordkeeping requirements,                              (i) If the determination to transition is           continues to read as follows:
                                              Research.                                                 documented between July 19, 2018, and                      Authority: 5 U.S.C. 301; 42 U.S.C. 289(a).
                                                For the reasons stated in the                           January 20, 2019, the research shall:                  ■ 2. Amend § 431.101 by adding a
                                              preamble, Consumer Product Safety                            (A) Beginning on the date of such                   heading for paragraph (l)(1), revising
                                              Commission further amends 16 CFR                          documentation through January 20,                      paragraphs (l)(2), (3), and (4), and
                                              part 1028 as published in the Federal                     2019, comply with the pre-2018                         adding paragraph (l)(5) to read as
                                              Register on January 19, 2017 (82 FR                       Requirements, except that the research                 follows:
                                              7149) and as adopted in a final rule                      shall comply with the following:
                                              published by the CPSC on September                           (1) Section 1028.102(l) of the 2018                 § 431.101    To what does this policy apply?
                                              18, 2017 (82 FR 43459), and as amended                    Requirements (definition of research)                  *       *     *    *     *
                                              in an interim final rule published in the                 (instead of § 1028.102(d) of the pre-2018                 (l) * * *
                                              Federal Register on January 22, 2018                      Requirements);                                            (1) Pre-2018 Requirements. * * *
                                              (83 FR 2885), as follows:                                    (2) Section 1028.103(d) of the 2018                    (2) 2018 Requirements. For purposes
                                                                                                        Requirements (revised certification                    of this section, the 2018 Requirements
                                              PART 1028—PROTECTION OF HUMAN                             requirement that eliminates IRB review                 means the Federal Policy for the
                                              SUBJECTS                                                  of application or proposal) (instead of                Protection of Human Subjects
                                                                                                        § 1028.103(f) of the pre-2018                          requirements contained in this part. The
                                              ■ 1. The authority citation for part 1028                 Requirements); and
                                              continues to read as follows:                                                                                    general compliance date for the 2018
                                                                                                           (3) Section 1028.109(f)(1)(i) and (iii)             Requirements is January 21, 2019. The
                                                Authority: 5 U.S.C. 301; 42 U.S.C. 300v–                of the 2018 Requirements (exceptions to                compliance date for § 431.114(b)
                                              1(b).                                                     mandated continuing review) (instead of                (cooperative research) of the 2018
                                              ■ 2. Amend § 1028.101 by adding a                         § 1028.103(b), as related to the                       Requirements is January 20, 2020.
                                              heading for paragraph (l)(1), revising                    requirement for continuing review, and                    (3) Research subject to pre-2018
                                              paragraphs (l)(2), (3), and (4), and                      in addition to § 1028.109, of the pre-                 requirements. The pre-2018
                                              adding paragraph (l)(5) to read as                        2018 Requirements); and                                Requirements shall apply to the
                                              follows:                                                     (B) Beginning on January 21, 2019,                  following research, unless the research
                                                                                                        comply with the 2018 Requirements.                     is transitioning to comply with the 2018
                                              § 1028.101       To what does this policy apply?             (ii) If the determination to transition             Requirements in accordance with
                                              *       *    *     *     *                                is documented on or after January 21,                  paragraph (l)(4) of this section:
                                                 (l) * * *                                              2019, the research shall, beginning on
                                                 (1) Pre-2018 Requirements. * * *                                                                                 (i) Research initially approved by an
                                                                                                        the date of such documentation, comply                 IRB under the pre-2018 Requirements
                                                 (2) 2018 Requirements. For purposes                    with the 2018 Requirements.
                                              of this section, the 2018 Requirements                                                                           before January 21, 2019;
                                                                                                           (5) Research subject to 2018                           (ii) Research for which IRB review
                                              means the Federal Policy for the                          Requirements. The 2018 Requirements
                                              Protection of Human Subjects                                                                                     was waived pursuant to § 431.101(i) of
                                                                                                        shall apply to the following research:                 the pre-2018 Requirements before
                                              requirements contained in this part. The                     (i) Research initially approved by an
                                              general compliance date for the 2018                                                                             January 21, 2019; and
                                                                                                        IRB on or after January 21, 2019;                         (iii) Research for which a
                                              Requirements is January 21, 2019. The                        (ii) Research for which IRB review is
                                              compliance date for § 1028.114(b)                                                                                determination was made that the
                                                                                                        waived pursuant to paragraph (i) of this               research was exempt under § 431.101(b)
                                              (cooperative research) of the 2018                        section on or after January 21, 2019; and
                                              Requirements is January 20, 2020.                                                                                of the pre-2018 Requirements before
                                                                                                           (iii) Research for which a                          January 21, 2019.
                                                 (3) Research subject to pre-2018
                                                                                                        determination is made that the research                   (4) Transitioning research. If, on or
                                              requirements. The pre-2018
                                                                                                        is exempt on or after January 21, 2019.                after July 19, 2018, an institution
                                              Requirements shall apply to the
                                              following research, unless the research                   *       *     *     *    *                             planning or engaged in research
                                              is transitioning to comply with the 2018                  Alberta E. Mills,
                                                                                                                                                               otherwise covered by paragraph (l)(3) of
                                              Requirements in accordance with                                                                                  this section determines that such
                                                                                                        Secretary, Consumer Product Safety
                                              paragraph (l)(4) of this section:                         Commission.
                                                                                                                                                               research instead will transition to
                                                 (i) Research initially approved by an                                                                         comply with the 2018 Requirements, the
                                              IRB under the pre-2018 Requirements                       SOCIAL SECURITY ADMINISTRATION                         institution or an IRB must document
daltland on DSKBBV9HB2PROD with RULES2




                                              before January 21, 2019;                                  List of Subjects in 20 CFR Part 431                    and date such determination.
                                                 (ii) Research for which IRB review                                                                               (i) If the determination to transition is
                                              was waived pursuant to § 1028.101(i) of                     Human research subjects, Reporting                   documented between July 19, 2018, and
                                              the pre-2018 Requirements before                          and recordkeeping requirements,                        January 20, 2019, the research shall:
                                              January 21, 2019; and                                     Research.                                                 (A) Beginning on the date of such
                                                 (iii) Research for which a                               For the reasons stated in the                        documentation through January 20,
                                              determination was made that the                           preamble, Social Security                              2019, comply with the pre-2018


                                         VerDate Sep<11>2014     18:16 Jun 18, 2018   Jkt 244001   PO 00000   Frm 00019   Fmt 4701   Sfmt 4700   E:\FR\FM\19JNR2.SGM   19JNR2


                                              28514              Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations

                                              Requirements, except that the research                  adding paragraph (l)(5) to read as                        (B) Beginning on January 21, 2019,
                                              shall comply with the following:                        follows:                                               comply with the 2018 Requirements.
                                                 (1) Section 431.102(l) of the 2018                                                                             (ii) If the determination to transition
                                              Requirements (definition of research)                   § 225.101    To what does this policy apply?
                                                                                                                                                             is documented on or after January 21,
                                              (instead of § 431.102(d) of the pre-2018                *       *     *    *     *                             2019, the research shall, beginning on
                                              Requirements);                                             (l) * * *                                           the date of such documentation, comply
                                                 (2) Section 431.103(d) of the 2018                      (1) Pre-2018 Requirements. * * *                    with the 2018 Requirements.
                                              Requirements (revised certification                        (2) 2018 Requirements. For purposes
                                                                                                                                                                (5) Research subject to 2018
                                              requirement that eliminates IRB review                  of this section, the 2018 Requirements
                                                                                                                                                             Requirements. The 2018 Requirements
                                              of application or proposal) (instead of                 means the Federal Policy for the
                                                                                                                                                             shall apply to the following research:
                                                                                                      Protection of Human Subjects
                                              § 431.103(f) of the pre-2018                                                                                      (i) Research initially approved by an
                                                                                                      requirements contained in this part. The
                                              Requirements); and                                                                                             IRB on or after January 21, 2019;
                                                 (3) Section 431.109(f)(1)(i) and (iii) of            general compliance date for the 2018
                                                                                                                                                                (ii) Research for which IRB review is
                                                                                                      Requirements is January 21, 2019. The
                                              the 2018 Requirements (exceptions to                                                                           waived pursuant to paragraph (i) of this
                                                                                                      compliance date for § 225.114(b)
                                              mandated continuing review) (instead of                                                                        section on or after January 21, 2019; and
                                                                                                      (cooperative research) of the 2018
                                              § 431.103(b), as related to the                                                                                   (iii) Research for which a
                                                                                                      Requirements is January 20, 2020.
                                              requirement for continuing review, and                     (3) Research subject to pre-2018                    determination is made that the research
                                              in addition to § 431.109, of the pre-2018               requirements. The pre-2018                             is exempt on or after January 21, 2019.
                                              Requirements); and                                      Requirements shall apply to the                        *       *     *     *    *
                                                 (B) Beginning on January 21, 2019,                   following research, unless the research
                                              comply with the 2018 Requirements.                                                                             Irene Koek,
                                                                                                      is transitioning to comply with the 2018
                                                 (ii) If the determination to transition              Requirements in accordance with
                                                                                                                                                             Senior Deputy Assistant Administrator for
                                              is documented on or after January 21,                                                                          Global Health, U.S. Agency for International
                                                                                                      paragraph (l)(4) of this section:                      Development.
                                              2019, the research shall, beginning on                     (i) Research initially approved by an
                                              the date of such documentation, comply                  IRB under the pre-2018 Requirements                    DEPARTMENT OF HOUSING AND
                                              with the 2018 Requirements.                             before January 21, 2019;                               URBAN DEVELOPMENT
                                                 (5) Research subject to 2018                            (ii) Research for which IRB review
                                              Requirements. The 2018 Requirements                                                                            List of Subjects in 24 CFR Part 60
                                                                                                      was waived pursuant to § 225.101(i) of
                                              shall apply to the following research:                  the pre-2018 Requirements before                          Human research subjects, Reporting
                                                 (i) Research initially approved by an                January 21, 2019; and                                  and recordkeeping requirements,
                                              IRB on or after January 21, 2019;                          (iii) Research for which a                          Research.
                                                 (ii) Research for which IRB review is                determination was made that the                           For the reasons stated in the
                                              waived pursuant to paragraph (i) of this                research was exempt under § 225.101(b)                 preamble, Department of Housing and
                                              section on or after January 21, 2019; and               of the pre-2018 Requirements before                    Urban Development further amends 24
                                                 (iii) Research for which a                           January 21, 2019.                                      CFR part 60 as published in the Federal
                                              determination is made that the research                    (4) Transitioning research. If, on or               Register on January 19, 2017 (82 FR
                                              is exempt on or after January 21, 2019.                 after July 19, 2018, an institution                    7149), and as amended in an interim
                                              *       *     *     *    *                              planning or engaged in research                        final rule published in the Federal
                                                                                                      otherwise covered by paragraph (l)(3) of               Register on January 22, 2018 (83 FR
                                              Nancy Berryhill,
                                                                                                      this section determines that such                      2885), and adopted by HUD through an
                                              Acting Commissioner of Social Security.                 research instead will transition to                    interim final rule published on January
                                              AGENCY FOR INTERNATIONAL                                comply with the 2018 Requirements, the                 26, 2018 (83 FR 3589), as follows:
                                              DEVELOPMENT                                             institution or an IRB must document
                                                                                                      and date such determination.                           PART 60—PROTECTION OF HUMAN
                                              List of Subjects in 22 CFR Part 225                        (i) If the determination to transition is           SUBJECTS
                                                 Human research subjects, Reporting                   documented between July 19, 2018, and
                                              and recordkeeping requirements,                         January 20, 2019, the research shall:                  ■ 1. The authority citation for part 60
                                              Research.                                                  (A) Beginning on the date of such                   continues to read as follows:
                                                                                                      documentation through January 20,
                                                 For the reasons stated in the                                                                                 Authority: 5 U.S.C. 301; 42 U.S.C. 300v-
                                                                                                      2019, comply with the pre-2018
                                              preamble, Agency for International                                                                             1(b) and 3535(d).
                                                                                                      Requirements, except that the research
                                              Development further amends 22 CFR                                                                              ■ 2. Amend § 60.101 by adding a
                                                                                                      shall comply with the following:
                                              part 225 as published in the Federal                       (1) Section 225.102(l) of the 2018                  heading for paragraph (l)(1), revising
                                              Register on January 19, 2017 (82 FR                     Requirements (definition of research)                  paragraphs (l)(2), (3), and (4), and
                                              7149), and as amended in an interim                     (instead of § 225.102(d) of the pre-2018               adding paragraph (l)(5) to read as
                                              final rule published in the Federal                     Requirements);                                         follows:
                                              Register on January 22, 2018 (83 FR                        (2) Section 225.103(d) of the 2018
                                              2885), as follows:                                      Requirements (revised certification                    § 60.101   To what does this policy apply?
                                                                                                      requirement that eliminates IRB review                 *     *     *     *     *
                                              PART 225—PROTECTION OF HUMAN                                                                                     (l) * * *
                                                                                                      of application or proposal) (instead of
                                              SUBJECTS                                                                                                         (1) Pre-2018 Requirements. * * *
                                                                                                      § 225.103(f) of the pre-2018
                                              ■ 1. The authority citation for part 225                Requirements); and                                       (2) 2018 Requirements. For purposes
daltland on DSKBBV9HB2PROD with RULES2




                                              continues to read as follows:                              (3) Section 225.109(f)(1)(i) and (iii) of           of this section, the 2018 Requirements
                                                                                                      the 2018 Requirements (exceptions to                   means the Federal Policy for the
                                                Authority: 5 U.S.C. 301; 42 U.S.C. 300v–              mandated continuing review) (instead of                Protection of Human Subjects
                                              1(b), unless otherwise noted.                           § 225.103(b), as related to the                        requirements contained in this part. The
                                              ■ 2. Amend § 225.101 by adding a                        requirement for continuing review, and                 general compliance date for the 2018
                                              heading for paragraph (l)(1), revising                  in addition to § 225.109, of the pre-2018              Requirements is January 21, 2019. The
                                              paragraphs (l)(2), (3), and (4), and                    Requirements); and                                     compliance date for § 60.114(b)


                                         VerDate Sep<11>2014   18:16 Jun 18, 2018   Jkt 244001   PO 00000   Frm 00020   Fmt 4701   Sfmt 4700   E:\FR\FM\19JNR2.SGM   19JNR2


                                                                 Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations                                            28515

                                              (cooperative research) of the 2018                         (ii) Research for which IRB review is                  (iii) Research for which a
                                              Requirements is January 20, 2020.                       waived pursuant to paragraph (i) of this               determination was made that the
                                                 (3) Research subject to pre-2018                     section on or after January 21, 2019; and              research was exempt under § 21.101(b)
                                              requirements. The pre-2018                                 (iii) Research for which a                          of the pre-2018 Requirements before
                                              Requirements shall apply to the                         determination is made that the research                January 21, 2019.
                                              following research, unless the research                 is exempt on or after January 21, 2019.                   (4) Transitioning research. If, on or
                                              is transitioning to comply with the 2018                *       *    *     *    *                              after July 19, 2018, an institution
                                              Requirements in accordance with                                                                                planning or engaged in research
                                              paragraph (l)(4) of this section:                       Todd M. Richardson,                                    otherwise covered by paragraph (l)(3) of
                                                 (i) Research initially approved by an                Acting General Deputy Assistant Secretary              this section determines that such
                                                                                                      for Policy Development and Research, U.S.              research instead will transition to
                                              IRB under the pre-2018 Requirements                     Department of Housing and Urban
                                              before January 21, 2019;                                                                                       comply with the 2018 Requirements, the
                                                                                                      Development.
                                                 (ii) Research for which IRB review                                                                          institution or an IRB must document
                                              was waived pursuant to § 60.101(i) of                   DEPARTMENT OF LABOR                                    and date such determination.
                                              the pre-2018 Requirements before                                                                                  (i) If the determination to transition is
                                                                                                      List of Subjects in 29 CFR Part 21                     documented between July 19, 2018, and
                                              January 21, 2019; and
                                                                                                        Human research subjects, Reporting                   January 20, 2019, the research shall:
                                                 (iii) Research for which a                                                                                     (A) Beginning on the date of such
                                                                                                      and recordkeeping requirements,
                                              determination was made that the                                                                                documentation through January 20,
                                                                                                      Research.
                                              research was exempt under § 60.101(b)                                                                          2019, comply with the pre-2018
                                              of the pre-2018 Requirements before                       For the reasons stated in the
                                                                                                      preamble, Department of Labor further                  Requirements, except that the research
                                              January 21, 2019.                                                                                              shall comply with the following:
                                                 (4) Transitioning research. If, on or                amends 29 CFR part 21 as published in
                                                                                                      the Federal Register on January 19,                       (1) Section 21.102(l) of the 2018
                                              after July 19, 2018, an institution                                                                            Requirements (definition of research)
                                              planning or engaged in research                         2017 (82 FR 7149), and as amended in
                                                                                                      an interim final rule published in the                 (instead of § 21.102(d) of the pre-2018
                                              otherwise covered by paragraph (l)(3) of                                                                       Requirements);
                                              this section determines that such                       Federal Register on January 22, 2018
                                                                                                                                                                (2) Section 21.103(d) of the 2018
                                              research instead will transition to                     (83 FR 2885), as follows:
                                                                                                                                                             Requirements (revised certification
                                              comply with the 2018 Requirements, the                                                                         requirement that eliminates IRB review
                                                                                                      PART 21—PROTECTION OF HUMAN
                                              institution or an IRB must document                                                                            of application or proposal) (instead of
                                                                                                      SUBJECTS
                                              and date such determination.                                                                                   § 21.103(f) of the pre-2018
                                                 (i) If the determination to transition is            ■ 1. The authority citation for part 21                Requirements); and
                                              documented between July 19, 2018, and                   continues to read as follows:                             (3) Section 21.109(f)(1)(i) and (iii) of
                                              January 20, 2019, the research shall:                                                                          the 2018 Requirements (exceptions to
                                                                                                          Authority: 5 U.S.C. 301; 29 U.S.C. 551.
                                                 (A) Beginning on the date of such                                                                           mandated continuing review) (instead of
                                              documentation through January 20,                       ■ 2. Amend § 21.101 by adding a                        § 21.103(b), as related to the
                                              2019, comply with the pre-2018                          heading for paragraph (l)(1), revising                 requirement for continuing review, and
                                              Requirements, except that the research                  paragraphs (l)(2), (3), and (4), and                   in addition to § 21.109, of the pre-2018
                                              shall comply with the following:                        adding paragraph (l)(5) to read as                     Requirements); and
                                                 (1) Section 60.102(l) of the 2018                    follows:                                                  (B) Beginning on January 21, 2019,
                                              Requirements (definition of research)                                                                          comply with the 2018 Requirements.
                                                                                                      § 21.101    To what does this policy apply?               (ii) If the determination to transition
                                              (instead of § 60.102(d) of the pre-2018
                                                                                                      *       *    *     *     *                             is documented on or after January 21,
                                              Requirements);
                                                                                                         (l) * * *                                           2019, the research shall, beginning on
                                                 (2) Section 60.103(d) of the 2018                       (1) Pre-2018 Requirements. * * *
                                              Requirements (revised certification                                                                            the date of such documentation, comply
                                                                                                         (2) 2018 Requirements. For purposes                 with the 2018 Requirements.
                                              requirement that eliminates IRB review                  of this section, the 2018 Requirements                    (5) Research subject to 2018
                                              of application or proposal) (instead of                 means the Federal Policy for the                       Requirements. The 2018 Requirements
                                              § 60.103(f) of the pre-2018                             Protection of Human Subjects                           shall apply to the following research:
                                              Requirements); and                                      requirements contained in this part. The                  (i) Research initially approved by an
                                                 (3) Section 60.109(f)(1)(i) and (iii) of             general compliance date for the 2018                   IRB on or after January 21, 2019;
                                              the 2018 Requirements (exceptions to                    Requirements is January 21, 2019. The                     (ii) Research for which IRB review is
                                              mandated continuing review) (instead of                 compliance date for § 21.114(b)                        waived pursuant to paragraph (i) of this
                                              § 60.103(b), as related to the                          (cooperative research) of the 2018                     section on or after January 21, 2019; and
                                              requirement for continuing review, and                  Requirements is January 20, 2020.                         (iii) Research for which a
                                              in addition to § 60.109, of the pre-2018                   (3) Research subject to pre-2018                    determination is made that the research
                                              Requirements); and                                      requirements. The pre-2018                             is exempt on or after January 21, 2019.
                                                 (B) Beginning on January 21, 2019,                   Requirements shall apply to the                        *       *     *     *    *
                                              comply with the 2018 Requirements.                      following research, unless the research
                                                 (ii) If the determination to transition                                                                     R. Alexander Acosta,
                                                                                                      is transitioning to comply with the 2018
                                              is documented on or after January 21,                                                                          Secretary of Labor.
                                                                                                      Requirements in accordance with
                                              2019, the research shall, beginning on                  paragraph (l)(4) of this section:                      DEPARTMENT OF DEFENSE
daltland on DSKBBV9HB2PROD with RULES2




                                              the date of such documentation, comply                     (i) Research initially approved by an
                                              with the 2018 Requirements.                             IRB under the pre-2018 Requirements                    List of Subjects in 32 CFR Part 219
                                                 (5) Research subject to 2018                         before January 21, 2019;                                 Human research subjects, Reporting
                                              Requirements. The 2018 Requirements                        (ii) Research for which IRB review                  and recordkeeping requirements,
                                              shall apply to the following research:                  was waived pursuant to § 21.101(i) of                  Research.
                                                 (i) Research initially approved by an                the pre-2018 Requirements before                         For the reasons stated in the
                                              IRB on or after January 21, 2019;                       January 21, 2019; and                                  preamble, Department of Defense


                                         VerDate Sep<11>2014   18:16 Jun 18, 2018   Jkt 244001   PO 00000   Frm 00021   Fmt 4701   Sfmt 4700   E:\FR\FM\19JNR2.SGM   19JNR2


                                              28516              Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations

                                              further amends 32 CFR part 219 as                       Requirements, except that the research                 paragraphs (l)(2), (3), and (4), and
                                              published in the Federal Register on                    shall comply with the following:                       adding paragraph (l)(5) to read as
                                              January 19, 2017 (82 FR 7149), and as                      (1) Section 219.102(l) of the 2018                  follows:
                                              amended in an interim final rule                        Requirements (definition of research)
                                              published in the Federal Register on                    (instead of § 219.102(d) of the pre-2018               § 97.101   To what does this policy apply?
                                              January 22, 2018 (83 FR 2885), as                       Requirements);                                         *       *     *    *     *
                                              follows:                                                   (2) Section 219.103(d) of the 2018                     (l) * * *
                                                                                                      Requirements (revised certification                       (1) Pre-2018 Requirements. * * *
                                              PART 219—PROTECTION OF HUMAN                            requirement that eliminates IRB review                    (2) 2018 Requirements. For purposes
                                              SUBJECTS                                                of application or proposal) (instead of                of this section, the 2018 Requirements
                                                                                                      § 219.103(f) of the pre-2018                           means the Federal Policy for the
                                              ■ 1. The authority citation for part 219                Requirements); and                                     Protection of Human Subjects
                                              continues to read as follows:                              (3) Section 219.109(f)(1)(i) and (iii) of           requirements contained in this subpart.
                                                Authority: 5 U.S.C. 301; 42 U.S.C. 300v–              the 2018 Requirements (exceptions to                   The general compliance date for the
                                              1(b).                                                   mandated continuing review) (instead of                2018 Requirements is January 21, 2019.
                                              ■ 2. Amend § 219.101 by adding a                        § 219.103(b), as related to the                        The compliance date for § 97.114(b)
                                              heading for paragraph (l)(1), revising                  requirement for continuing review, and                 (cooperative research) of the 2018
                                              paragraphs (l)(2), (3), and (4), and                    in addition to § 219.109, of the pre-2018              Requirements is January 20, 2020.
                                                                                                      Requirements); and                                        (3) Research subject to pre-2018
                                              adding paragraph (l)(5) to read as
                                                                                                         (B) Beginning on January 21, 2019,                  requirements. The pre-2018
                                              follows:
                                                                                                      comply with the 2018 Requirements.                     Requirements shall apply to the
                                              § 219.101   To what does this policy apply?                (ii) If the determination to transition             following research, unless the research
                                              *       *     *    *     *                              is documented on or after January 21,                  is transitioning to comply with the 2018
                                                 (l) * * *                                            2019, the research shall, beginning on                 Requirements in accordance with
                                                 (1) Pre-2018 Requirements. * * *                     the date of such documentation, comply                 paragraph (l)(4) of this section:
                                                 (2) 2018 Requirements. For purposes                  with the 2018 Requirements.                               (i) Research initially approved by an
                                              of this section, the 2018 Requirements                     (5) Research subject to 2018                        IRB under the pre-2018 Requirements
                                              means the Federal Policy for the                        Requirements. The 2018 Requirements                    before January 21, 2019;
                                              Protection of Human Subjects                            shall apply to the following research:                    (ii) Research for which IRB review
                                              requirements contained in this part. The                   (i) Research initially approved by an               was waived pursuant to § 97.101(i) of
                                              general compliance date for the 2018                    IRB on or after January 21, 2019;                      the pre-2018 Requirements before
                                              Requirements is January 21, 2019. The                      (ii) Research for which IRB review is               January 21, 2019; and
                                              compliance date for § 219.114(b)                        waived pursuant to paragraph (i) of this                  (iii) Research for which a
                                              (cooperative research) of the 2018                      section on or after January 21, 2019; and              determination was made that the
                                              Requirements is January 20, 2020.                          (iii) Research for which a                          research was exempt under § 97.101(b)
                                                 (3) Research subject to pre-2018                     determination is made that the research                of the pre-2018 Requirements before
                                              requirements. The pre-2018                              is exempt on or after January 21, 2019.                January 21, 2019.
                                              Requirements shall apply to the                                                                                   (4) Transitioning research. If, on or
                                                                                                      *       *     *     *    *                             after July 19, 2018, an institution
                                              following research, unless the research
                                              is transitioning to comply with the 2018                Mary J. Miller,                                        planning or engaged in research
                                              Requirements in accordance with                         Principal Deputy, Assistant Secretary of               otherwise covered by paragraph (l)(3) of
                                              paragraph (l)(4) of this section:                       Defense for Research and Engineering, U.S.             this section determines that such
                                                 (i) Research initially approved by an                Department of Defense.                                 research instead will transition to
                                              IRB under the pre-2018 Requirements                                                                            comply with the 2018 Requirements, the
                                                                                                      DEPARTMENT OF EDUCATION
                                              before January 21, 2019;                                                                                       institution or an IRB must document
                                                 (ii) Research for which IRB review                   List of Subjects in 34 CFR Part 97                     and date such determination.
                                              was waived pursuant to § 219.101(i) of                                                                            (i) If the determination to transition is
                                                                                                        Human research subjects, Reporting
                                              the pre-2018 Requirements before                                                                               documented between July 19, 2018, and
                                                                                                      and recordkeeping requirements,
                                              January 21, 2019; and                                                                                          January 20, 2019, the research shall:
                                                                                                      Research.
                                                 (iii) Research for which a                                                                                     (A) Beginning on the date of such
                                              determination was made that the                           For the reasons stated in the                        documentation through January 20,
                                              research was exempt under § 219.101(b)                  preamble, Department of Education                      2019, comply with the pre-2018
                                              of the pre-2018 Requirements before                     further amends 34 CFR part 97 as                       Requirements, except that the research
                                              January 21, 2019.                                       published in the Federal Register on                   shall comply with the following:
                                                 (4) Transitioning research. If, on or                January 19, 2017 (82 FR 7149), and as                     (1) Section 97.102(l) of the 2018
                                              after July 19, 2018, an institution                     amended in an interim final rule                       Requirements (definition of research)
                                              planning or engaged in research                         published in the Federal Register on                   (instead of § 97.102(d) of the pre-2018
                                              otherwise covered by paragraph (l)(3) of                January 22, 2018 (83 FR 2885), as                      Requirements);
                                              this section determines that such                       follows:                                                  (2) Section 97.103(d) of the 2018
                                              research instead will transition to                                                                            Requirements (revised certification
                                                                                                      PART 97—PROTECTION OF HUMAN                            requirement that eliminates IRB review
                                              comply with the 2018 Requirements, the
                                                                                                      SUBJECTS                                               of application or proposal) (instead of
                                              institution or an IRB must document
daltland on DSKBBV9HB2PROD with RULES2




                                              and date such determination.                            ■ 1. The authority citation for part 97                § 97.103(f) of the pre-2018
                                                 (i) If the determination to transition is            continues to read as follows:                          Requirements); and
                                              documented between July 19, 2018, and                                                                             (3) Section 97.109(f)(1)(i) and (iii) of
                                              January 20, 2019, the research shall:                      Authority: 5 U.S.C. 301; 20 U.S.C. 1221e–           the 2018 Requirements (exceptions to
                                                 (A) Beginning on the date of such                    3, 3474; 42 U.S.C. 300v–1(b).                          mandated continuing review) (instead of
                                              documentation through January 20,                       ■ 2. Amend § 97.101 by adding a                        § 97.103(b), as related to the
                                              2019, comply with the pre-2018                          heading for paragraph (l)(1), revising                 requirement for continuing review, and


                                         VerDate Sep<11>2014   18:16 Jun 18, 2018   Jkt 244001   PO 00000   Frm 00022   Fmt 4701   Sfmt 4700   E:\FR\FM\19JNR2.SGM   19JNR2


                                                                 Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations                                              28517

                                              in addition to § 97.109, of the pre-2018                   (3) Research subject to pre-2018                       (iii) Research for which a
                                              Requirements); and                                      requirements. The pre-2018                             determination is made that the research
                                                 (B) Beginning on January 21, 2019,                   Requirements shall apply to the                        is exempt on or after January 21, 2019.
                                              comply with the 2018 Requirements.                      following research, unless the research                *       *    *     *    *
                                                 (ii) If the determination to transition              is transitioning to comply with the 2018
                                              is documented on or after January 21,                   Requirements in accordance with                        Jacquelyn Hayes-Byrd,
                                              2019, the research shall, beginning on                  paragraph (l)(4) of this section:                      Acting Chief of Staff, Department of Veterans
                                              the date of such documentation, comply                     (i) Research initially approved by an               Affairs.
                                              with the 2018 Requirements.                             IRB under the pre-2018 Requirements                    ENVIRONMENTAL PROTECTION
                                                 (5) Research subject to 2018                         before January 21, 2019;                               AGENCY
                                              Requirements. The 2018 Requirements                        (ii) Research for which IRB review
                                              shall apply to the following research:                  was waived pursuant to § 16.101(i) of                  List of Subjects in 40 CFR Part 26
                                                 (i) Research initially approved by an                the pre-2018 Requirements before                         Human research subjects, Reporting
                                              IRB on or after January 21, 2019;                       January 21, 2019; and                                  and recordkeeping requirements,
                                                 (ii) Research for which IRB review is                   (iii) Research for which a                          Research.
                                              waived pursuant to paragraph (i) of this                determination was made that the                          For the reasons stated in the
                                              section on or after January 21, 2019; and               research was exempt under § 16.101(b)                  preamble, Environmental Protection
                                                 (iii) Research for which a                           of the pre-2018 Requirements before                    Agency further amends 40 CFR part 26
                                              determination is made that the research                 January 21, 2019.                                      as published in the Federal Register on
                                              is exempt on or after January 21, 2019.                    (4) Transitioning research. If, on or               January 19, 2017 (82 FR 7149), and as
                                              *       *     *     *    *                              after July 19, 2018, an institution                    amended in an interim final rule
                                                                                                      planning or engaged in research                        published in the Federal Register on
                                              Betsy DeVos,
                                                                                                      otherwise covered by paragraph (l)(3) of               January 22, 2018 (83 FR 2885), as
                                              Secretary of Education.                                 this section determines that such                      follows:
                                              DEPARTMENT OF VETERANS                                  research instead will transition to
                                              AFFAIRS                                                 comply with the 2018 Requirements, the                 PART 26—PROTECTION OF HUMAN
                                                                                                      institution or an IRB must document                    SUBJECTS
                                              List of Subjects in 38 CFR Part 16                      and date such determination.
                                                Human research subjects, Reporting                       (i) If the determination to transition is           ■ 1. The authority citation for part 26
                                              and recordkeeping requirements,                         documented between July 19, 2018, and                  continues to read as follows:
                                              Research.                                               January 20, 2019, the research shall:                    Authority: 5 U.S.C. 301; 7 U.S.C. 136a(a)
                                                For the reasons stated in the                            (A) Beginning on the date of such                   and 136w(a)(1); 21 U.S.C. 346a(e)(1)(C); sec.
                                              preamble, Department of Veterans                        documentation through January 20,                      201, Pub. L. 109–54, 119 Stat. 531; and 42
                                              Affairs further amends 38 CFR part 16                   2019, comply with the pre-2018                         U.S.C. 300v–1(b).
                                              as published in the Federal Register on                 Requirements, except that the research                 ■ 2. Amend § 26.101 by adding a
                                              January 19, 2017 (82 FR 7149), and as                   shall comply with the following:                       heading for paragraph (l)(1), revising
                                              amended in an interim final rule                           (1) Section 16.102(l) of the 2018                   paragraphs (l)(2), (3), and (4), and
                                              published in the Federal Register on                    Requirements (definition of research)                  adding paragraph (l)(5) to read as
                                              January 22, 2018 (83 FR 2885), as                       (instead of § 16.102(d) of the pre-2018                follows:
                                              follows:                                                Requirements);
                                                                                                         (2) Section 16.103(d) of the 2018                   § 26.101   To what does this policy apply?
                                              PART 16—PROTECTION OF HUMAN                             Requirements (revised certification                    *       *    *     *     *
                                              SUBJECTS                                                requirement that eliminates IRB review                    (l) * * *
                                                                                                      of application or proposal) (instead of                   (1) Pre-2018 Requirements. * * *
                                              ■ 1. The authority citation for part 16                 § 16.103(f) of the pre-2018                               (2) 2018 Requirements. For purposes
                                              continues to read as follows:                           Requirements); and                                     of this section, the 2018 Requirements
                                                Authority: 5 U.S.C. 301; 38 U.S.C. 501,                  (3) Section 16.109(f)(1)(i) and (iii) of            means the Federal Policy for the
                                              7331, 7334; 42 U.S.C. 300v–1(b).                        the 2018 Requirements (exceptions to                   Protection of Human Subjects
                                              ■ 2. Amend § 16.101 by adding a                         mandated continuing review) (instead of                requirements contained in this subpart.
                                              heading for paragraph (l)(1), revising                  § 16.103(b), as related to the                         The general compliance date for the
                                              paragraphs (l)(2), (3), and (4), and                    requirement for continuing review, and                 2018 Requirements is January 21, 2019.
                                              adding paragraph (l)(5) to read as                      in addition to § 16.109, of the pre-2018               The compliance date for § 26.114(b)
                                              follows:                                                Requirements); and                                     (cooperative research) of the 2018
                                                                                                         (B) Beginning on January 21, 2019,                  Requirements is January 20, 2020.
                                              § 16.101   To what does this policy apply?              comply with the 2018 Requirements.                        (3) Research subject to pre-2018
                                              *     *     *     *     *                                  (ii) If the determination to transition             requirements. The pre-2018
                                                (l) * * *                                             is documented on or after January 21,                  Requirements shall apply to the
                                                (1) Pre-2018 Requirements. * * *                      2019, the research shall, beginning on                 following research, unless the research
                                                (2) 2018 Requirements. For purposes                   the date of such documentation, comply                 is transitioning to comply with the 2018
                                              of this section, the 2018 Requirements                  with the 2018 Requirements.                            Requirements in accordance with
                                              means the Federal Policy for the                           (5) Research subject to 2018                        paragraph (l)(4) of this section:
daltland on DSKBBV9HB2PROD with RULES2




                                              Protection of Human Subjects                            Requirements. The 2018 Requirements                       (i) Research initially approved by an
                                              requirements contained in this part. The                shall apply to the following research:                 IRB under the pre-2018 Requirements
                                              general compliance date for the 2018                       (i) Research initially approved by an               before January 21, 2019;
                                              Requirements is January 21, 2019. The                   IRB on or after January 21, 2019;                         (ii) Research for which IRB review
                                              compliance date for § 16.114(b)                            (ii) Research for which IRB review is               was waived pursuant to § 26.101(i) of
                                              (cooperative research) of the 2018                      waived pursuant to paragraph (i) of this               the pre-2018 Requirements before
                                              Requirements is January 20, 2020.                       section on or after January 21, 2019; and              January 21, 2019; and


                                         VerDate Sep<11>2014   18:16 Jun 18, 2018   Jkt 244001   PO 00000   Frm 00023   Fmt 4701   Sfmt 4700   E:\FR\FM\19JNR2.SGM   19JNR2


                                              28518              Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations

                                                 (iii) Research for which a                              For the reasons stated in the                          (A) Beginning on the date of such
                                              determination was made that the                         preamble, Department of Health and                     documentation through January 20,
                                              research was exempt under § 26.101(b)                   Human Services further amends 45 CFR                   2019, comply with the pre-2018
                                              of the pre-2018 Requirements before                     part 46 as published in the Federal                    Requirements, except that the research
                                              January 21, 2019.                                       Register on January 19, 2017 (82 FR                    shall comply with the following:
                                                 (4) Transitioning research. If, on or                7149), and as amended in an interim                       (1) Section 46.102(l) of the 2018
                                              after July 19, 2018, an institution                     final rule published in the Federal                    Requirements (definition of research)
                                              planning or engaged in research                         Register on January 22, 2018 (83 FR                    (instead of § 46.102(d) of the pre-2018
                                              otherwise covered by paragraph (l)(3) of                2885), as follows:                                     Requirements);
                                              this section determines that such                                                                                 (2) Section 46.103(d) of the 2018
                                              research instead will transition to                     PART 46—PROTECTION OF HUMAN                            Requirements (revised certification
                                              comply with the 2018 Requirements, the                  SUBJECTS                                               requirement that eliminates IRB review
                                              institution or an IRB must document                                                                            of application or proposal) (instead of
                                              and date such determination.                            ■ 1. The authority citation for part 46                § 46.103(f) of the pre-2018
                                                 (i) If the determination to transition is            continues to read as follows:                          Requirements); and
                                              documented between July 19, 2018, and                     Authority: 5 U.S.C. 301; 42 U.S.C. 289(a);              (3) Section 46.109(f)(1)(i) and (iii) of
                                              January 20, 2019, the research shall:                   42 U.S.C. 300v–1(b).                                   the 2018 Requirements (exceptions to
                                                 (A) Beginning on the date of such                                                                           mandated continuing review) (instead of
                                                                                                      ■ 2. Amend § 46.101 by adding a
                                              documentation through January 20,                                                                              § 46.103(b), as related to the
                                                                                                      heading for paragraph (l)(1), revising
                                              2019, comply with the pre-2018                                                                                 requirement for continuing review, and
                                                                                                      paragraphs (l)(2), (3), and (4), and
                                              Requirements, except that the research                                                                         in addition to § 46.109, of the pre-2018
                                                                                                      adding paragraph (l)(5) to read as
                                              shall comply with the following:                                                                               Requirements); and
                                                                                                      follows:
                                                 (1) Section 26.102(l) of the 2018                                                                              (B) Beginning on January 21, 2019,
                                              Requirements (definition of research)                   § 46.101    To what does this policy apply?            comply with the 2018 Requirements.
                                              (instead of § 26.102(d) of the pre-2018                 *       *     *    *     *                                (ii) If the determination to transition
                                              Requirements);                                             (l) * * *                                           is documented on or after January 21,
                                                 (2) Section 26.103(d) of the 2018                       (1) Pre-2018 Requirements. * * *                    2019, the research shall, beginning on
                                              Requirements (revised certification                                                                            the date of such documentation, comply
                                                                                                         (2) 2018 Requirements. For purposes
                                              requirement that eliminates IRB review                                                                         with the 2018 Requirements.
                                                                                                      of this section, the 2018 Requirements
                                              of application or proposal) (instead of                                                                           (5) Research subject to 2018
                                                                                                      means the Federal Policy for the
                                              § 26.103(f) of the pre-2018                                                                                    Requirements. The 2018 Requirements
                                                                                                      Protection of Human Subjects
                                              Requirements); and                                                                                             shall apply to the following research:
                                                                                                      requirements contained in this subpart.
                                                 (3) Section 26.109(f)(1)(i) and (iii) of
                                                                                                      The general compliance date for the                       (i) Research initially approved by an
                                              the 2018 Requirements (exceptions to
                                                                                                      2018 Requirements is January 21, 2019.                 IRB on or after January 21, 2019;
                                              mandated continuing review) (instead of
                                                                                                      The compliance date for § 46.114(b)                       (ii) Research for which IRB review is
                                              § 26.103(b), as related to the
                                                                                                      (cooperative research) of the 2018                     waived pursuant to paragraph (i) of this
                                              requirement for continuing review, and
                                                                                                      Requirements is January 20, 2020.                      section on or after January 21, 2019; and
                                              in addition to § 26.109, of the pre-2018
                                                                                                         (3) Research subject to pre-2018                       (iii) Research for which a
                                              Requirements); and
                                                 (B) Beginning on January 21, 2019,                   requirements. The pre-2018                             determination is made that the research
                                              comply with the 2018 Requirements.                      Requirements shall apply to the                        is exempt on or after January 21, 2019.
                                                 (ii) If the determination to transition              following research, unless the research                *       *     *     *    *
                                              is documented on or after January 21,                   is transitioning to comply with the 2018
                                                                                                      Requirements in accordance with                        Alex M. Azar II,
                                              2019, the research shall, beginning on
                                                                                                      paragraph (l)(4) of this section:                      Secretary, U.S. Department of Health and
                                              the date of such documentation, comply                                                                         Human Services.
                                              with the 2018 Requirements.                                (i) Research initially approved by an
                                                 (5) Research subject to 2018                         IRB under the pre-2018 Requirements                    NATIONAL SCIENCE FOUNDATION
                                              Requirements. The 2018 Requirements                     before January 21, 2019;
                                                                                                         (ii) Research for which IRB review                  List of Subjects in 45 CFR Part 690
                                              shall apply to the following research:
                                                 (i) Research initially approved by an                was waived pursuant to § 46.101(i) of                    Human research subjects, Reporting
                                              IRB on or after January 21, 2019;                       the pre-2018 Requirements before                       and recordkeeping requirements,
                                                 (ii) Research for which IRB review is                January 21, 2019; and                                  Research.
                                              waived pursuant to paragraph (i) of this                   (iii) Research for which a                            For the reasons stated in the
                                              section on or after January 21, 2019; and               determination was made that the                        preamble, National Science Foundation
                                                 (iii) Research for which a                           research was exempt under § 46.101(b)                  further amends 45 CFR part 690 as
                                              determination is made that the research                 of the pre-2018 Requirements before                    published in the Federal Register on
                                              is exempt on or after January 21, 2019.                 January 21, 2019.                                      January 19, 2017 (82 FR 7149), and as
                                              *       *     *     *    *                                 (4) Transitioning research. If, on or               amended in an interim final rule
                                                                                                      after July 19, 2018, an institution                    published in the Federal Register on
                                              E. Scott Pruitt,                                        planning or engaged in research                        January 22, 2018 (83 FR 2885), as
                                              Administrator, Environmental Protection                 otherwise covered by paragraph (l)(3) of               follows:
                                              Agency.                                                 this section determines that such
daltland on DSKBBV9HB2PROD with RULES2




                                              DEPARTMENT OF HEALTH AND                                research instead will transition to                    PART 690—PROTECTION OF HUMAN
                                              HUMAN SERVICES                                          comply with the 2018 Requirements, the                 SUBJECTS
                                                                                                      institution or an IRB must document
                                              List of Subjects in 45 CFR Part 46                      and date such determination.                           ■ 1. The authority citation for part 690
                                                Human research subjects, Reporting                       (i) If the determination to transition is           continues to read as follows:
                                              and recordkeeping requirements,                         documented between July 19, 2018, and                    Authority: 5 U.S.C. 301; 42 U.S.C. 300v–
                                              Research.                                               January 20, 2019, the research shall:                  1(b).



                                         VerDate Sep<11>2014   18:16 Jun 18, 2018   Jkt 244001   PO 00000   Frm 00024   Fmt 4701   Sfmt 4700   E:\FR\FM\19JNR2.SGM   19JNR2


                                                                 Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations                                            28519

                                              ■ 2. Amend § 690.101 by adding a                        § 690.103(b), as related to the                        (cooperative research) of the 2018
                                              heading for paragraph (l)(1), revising                  requirement for continuing review, and                 Requirements is January 20, 2020.
                                              paragraphs (l)(2), (3), and (4), and                    in addition to § 690.109, of the pre-2018                 (3) Research subject to pre-2018
                                              adding paragraph (l)(5) to read as                      Requirements); and                                     requirements. The pre-2018
                                              follows:                                                   (B) Beginning on January 21, 2019,                  Requirements shall apply to the
                                                                                                      comply with the 2018 Requirements.                     following research, unless the research
                                              § 690.101   To what does this policy apply?                (ii) If the determination to transition             is transitioning to comply with the 2018
                                              *       *     *    *     *                              is documented on or after January 21,                  Requirements in accordance with
                                                 (l) * * *                                            2019, the research shall, beginning on                 paragraph (l)(4) of this section:
                                                 (1) Pre-2018 Requirements. * * *                     the date of such documentation, comply                    (i) Research initially approved by an
                                                 (2) 2018 Requirements. For purposes                  with the 2018 Requirements.                            IRB under the pre-2018 Requirements
                                              of this section, the 2018 Requirements                     (5) Research subject to 2018                        before January 21, 2019;
                                              means the Federal Policy for the                        Requirements. The 2018 Requirements
                                              Protection of Human Subjects                                                                                      (ii) Research for which IRB review
                                                                                                      shall apply to the following research:                 was waived pursuant to § 11.101(i) of
                                              requirements contained in this part. The                   (i) Research initially approved by an
                                              general compliance date for the 2018                                                                           the pre-2018 Requirements before
                                                                                                      IRB on or after January 21, 2019;                      January 21, 2019; and
                                              Requirements is January 21, 2019. The                      (ii) Research for which IRB review is
                                              compliance date for § 690.114(b)                                                                                  (iii) Research for which a
                                                                                                      waived pursuant to paragraph (i) of this               determination was made that the
                                              (cooperative research) of the 2018                      section on or after January 21, 2019; and
                                              Requirements is January 20, 2020.                                                                              research was exempt under § 11.101(b)
                                                                                                         (iii) Research for which a                          of the pre-2018 Requirements before
                                                 (3) Research subject to pre-2018                     determination is made that the research
                                              requirements. The pre-2018                                                                                     January 21, 2019.
                                                                                                      is exempt on or after January 21, 2019.
                                              Requirements shall apply to the                                                                                   (4) Transitioning research. If, on or
                                                                                                      *       *     *     *    *                             after July 19, 2018, an institution
                                              following research, unless the research
                                              is transitioning to comply with the 2018                Lawrence Rudolph,                                      planning or engaged in research
                                              Requirements in accordance with                         General Counsel, National Science                      otherwise covered by paragraph (l)(3) of
                                              paragraph (l)(4) of this section:                       Foundation.                                            this section determines that such
                                                 (i) Research initially approved by an                                                                       research instead will transition to
                                              IRB under the pre-2018 Requirements                     DEPARTMENT OF TRANSPORTATION                           comply with the 2018 Requirements, the
                                              before January 21, 2019;                                List of Subjects in 49 CFR Part 11                     institution or an IRB must document
                                                 (ii) Research for which IRB review                                                                          and date such determination.
                                                                                                        Human research subjects, Reporting
                                              was waived pursuant to § 690.101(i) of                                                                            (i) If the determination to transition is
                                                                                                      and recordkeeping requirements,
                                              the pre-2018 Requirements before                                                                               documented between July 19, 2018, and
                                                                                                      Research.
                                              January 21, 2019; and                                                                                          January 20, 2019, the research shall:
                                                 (iii) Research for which a                             For the reasons stated in the                           (A) Beginning on the date of such
                                              determination was made that the                         preamble, Department of Transportation                 documentation through January 20,
                                              research was exempt under § 690.101(b)                  further amends 49 CFR part 11 as                       2019, comply with the pre-2018
                                              of the pre-2018 Requirements before                     published in the Federal Register on                   Requirements, except that the research
                                              January 21, 2019.                                       January 19, 2017 (82 FR 7149), and as                  shall comply with the following:
                                                 (4) Transitioning research. If, on or                amended in an interim final rule
                                                                                                                                                                (1) Section 11.102(l) of the 2018
                                              after July 19, 2018, an institution                     published in the Federal Register on
                                                                                                                                                             Requirements (definition of research)
                                              planning or engaged in research                         January 22, 2018 (83 FR 2885), as
                                                                                                                                                             (instead of § 11.102(d) of the pre-2018
                                              otherwise covered by paragraph (l)(3) of                follows:
                                                                                                                                                             Requirements);
                                              this section determines that such                                                                                 (2) Section 11.103(d) of the 2018
                                              research instead will transition to                     PART 11—PROTECTION OF HUMAN
                                                                                                      SUBJECTS                                               Requirements (revised certification
                                              comply with the 2018 Requirements, the                                                                         requirement that eliminates IRB review
                                              institution or an IRB must document                     ■ 1. The authority citation for part 11                of application or proposal) (instead of
                                              and date such determination.                            continues to read as follows:                          § 11.103(f) of the pre-2018
                                                 (i) If the determination to transition is                                                                   Requirements); and
                                              documented between July 19, 2018, and                     Authority: 5 U.S.C. 301; 42 U.S.C. 300v–
                                                                                                      1(b).                                                     (3) Section 11.109(f)(1)(i) and (iii) of
                                              January 20, 2019, the research shall:
                                                 (A) Beginning on the date of such                                                                           the 2018 Requirements (exceptions to
                                                                                                      ■ 2. Amend § 11.101 by adding a
                                              documentation through January 20,                                                                              mandated continuing review) (instead of
                                                                                                      heading for paragraph (l)(1), revising
                                              2019, comply with the pre-2018                                                                                 § 11.103(b), as related to the
                                                                                                      paragraphs (l)(2), (3), and (4), and
                                              Requirements, except that the research                                                                         requirement for continuing review, and
                                                                                                      adding paragraph (l)(5) to read as
                                              shall comply with the following:                                                                               in addition to § 11.109, of the pre-2018
                                                                                                      follows:
                                                 (1) Section 690.102(l) of the 2018                                                                          Requirements); and
                                              Requirements (definition of research)                   § 11.101    To what does this policy apply?               (B) Beginning on January 21, 2019,
                                              (instead of § 690.102(d) of the pre-2018                *     *     *     *     *                              comply with the 2018 Requirements.
                                              Requirements);                                            (l) * * *                                               (ii) If the determination to transition
                                                 (2) Section 690.103(d) of the 2018                     (1) Pre-2018 Requirements. * * *                     is documented on or after January 21,
                                              Requirements (revised certification                       (2) 2018 Requirements. For purposes                  2019, the research shall, beginning on
daltland on DSKBBV9HB2PROD with RULES2




                                              requirement that eliminates IRB review                  of this section, the 2018 Requirements                 the date of such documentation, comply
                                              of application or proposal) (instead of                 means the Federal Policy for the                       with the 2018 Requirements.
                                              § 690.103(f) of the pre-2018                            Protection of Human Subjects                              (5) Research subject to 2018
                                              Requirements); and                                      requirements contained in this part. The               Requirements. The 2018 Requirements
                                                 (3) Section 690.109(f)(1)(i) and (iii) of            general compliance date for the 2018                   shall apply to the following research:
                                              the 2018 Requirements (exceptions to                    Requirements is January 21, 2019. The                     (i) Research initially approved by an
                                              mandated continuing review) (instead of                 compliance date for § 11.114(b)                        IRB on or after January 21, 2019;


                                         VerDate Sep<11>2014   18:16 Jun 18, 2018   Jkt 244001   PO 00000   Frm 00025   Fmt 4701   Sfmt 4700   E:\FR\FM\19JNR2.SGM   19JNR2


                                              28520              Federal Register / Vol. 83, No. 118 / Tuesday, June 19, 2018 / Rules and Regulations

                                                (ii) Research for which IRB review is                    (iii) Research for which a
                                              waived pursuant to paragraph (i) of this                determination is made that the research
                                              section on or after January 21, 2019; and               is exempt on or after January 21, 2019.
                                                                                                      *       *    *     *    *
                                                                                                      Elaine L. Chao,
                                                                                                      Secretary of Transportation.
                                                                                                      [FR Doc. 2018–13187 Filed 6–18–18; 8:45 am]
                                                                                                      BILLING CODE 4150–36–P
daltland on DSKBBV9HB2PROD with RULES2




                                         VerDate Sep<11>2014   18:16 Jun 18, 2018   Jkt 244001   PO 00000   Frm 00026   Fmt 4701   Sfmt 9990   E:\FR\FM\19JNR2.SGM   19JNR2



Document Created: 2018-07-02 11:21:59
Document Modified: 2018-07-02 11:21:59
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionFinal rule.
DatesEffective date: This rule is effective on July 19, 2018. Compliance dates: The general compliance date for the 2018 Requirements in the final rule published in the Federal Register (82 FR 7149, Jan. 19, 2017) and of the final rule published by the Consumer Product Safety Commission in the Federal Register (82 FR 43459, Sept. 18, 2017), which were delayed in the interim final rule published in the Federal Register (83 FR 2885, Jan. 22, 2018), and adopted by HUD through an interim final rule published in the Federal Register (83 FR 3589, Jan. 26, 2018), with the exception of Sec. ___.114(b), is further delayed until January 21, 2019. The compliance date for Sec. ___.114(b) (cooperative research) remains January 20, 2020.
ContactJerry Menikoff, M.D., J.D., Office for Human Research Protections (OHRP), Department of Health and Human Services, 1101 Wootton Parkway, Suite 200, Rockville, MD 20852; telephone: 240-453-6900 or 1-866-447-4777; facsimile: 301-402-2071; email [email protected]
FR Citation83 FR 28497 
RIN Number0937-AA05
CFR Citation10 CFR 745
14 CFR 1230
15 CFR 27
16 CFR 1028
20 CFR 431
22 CFR 225
24 CFR 60
29 CFR 21
32 CFR 219
34 CFR 97
38 CFR 16
40 CFR 26
45 CFR 46
45 CFR 690
49 CFR 11
6 CFR 46
7 CFR 1
CFR AssociatedHuman Research Subjects; Reporting and Recordkeeping Requirements and Research

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR