Emera Energy Services Subsidiary No. 3 LLC (Applicant or EESS- 3) has applied to renew its authority to transmit electric energy from the United States to Canada pursuant to the Federal Power Act.

Federal Register, Volume 83 Issue 119 (Wednesday, June 20, 2018)
[Federal Register Volume 83, Number 119 (Wednesday, June 20, 2018)]
[Notices]
[Pages 28628-28629]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-13230]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[OE Docket No. EA-323-B]


Application To Export Electric Energy; Emera Energy Services 
Subsidiary No. 3 LLC

AGENCY: Office of Electricity, Department of Energy.

ACTION: Notice of application.

-----------------------------------------------------------------------

SUMMARY: Emera Energy Services Subsidiary No. 3 LLC (Applicant or EESS-
3) has applied to renew its authority to transmit electric energy from 
the United States to Canada pursuant to the Federal Power Act.

DATES: Comments, protests, or motions to intervene must be submitted on 
or before July 20, 2018.

ADDRESSES: Comments, protests, motions to intervene, or requests for 
more information should be addressed to: Office of Electricity, Mail 
Code: OE-20, U.S. Department of Energy, 1000 Independence Avenue SW, 
Washington, DC 20585-0350. Because of delays in handling conventional 
mail, it is recommended that documents be transmitted by overnight 
mail, by electronic mail to [email protected], or by 
facsimile to 202-586-8008.

SUPPLEMENTARY INFORMATION: The Department of Energy (DOE) regulates 
exports of electricity from the United States to a foreign country, 
pursuant to sections 301(b) and 402(f) of the Department of Energy 
Organization Act (42 U.S.C. 7151(b), 7172(f)). Such exports require 
authorization under section 202(e) of the Federal Power Act (16 U.S.C. 
824a(e)).
    On October 2, 2013, DOE issued Order No. EA-323-A to EESS-3, which 
authorized the Applicant to transmit electric energy from the United 
States to Canada, effective October 1, 2013, as a power marketer for a 
five-year term using existing international transmission facilities. 
That authority expires on October 1, 2018. On February 22, 2018, EESS-3 
filed an application with DOE for renewal of the export authority 
contained in Order No. EA-323 for an additional five-year term.
    In its application, EESS-3 states that it neither owns nor controls 
any electric generation or transmission facilities, and that it has no 
franchised electric power service area. The electric energy that EESS-3 
proposes to export to Canada would be surplus energy purchased from 
third parties such as electric utilities and Federal power marketing 
agencies pursuant to voluntary agreements. The existing international 
transmission facilities to be utilized by EESS-3 have previously been 
authorized by Presidential permits issued pursuant to Executive Order 
10485, as amended, and are appropriate for open access transmission by 
third parties.
    Procedural matters: Any person desiring to be heard in this 
proceeding should file a comment or protest to the application at the 
address provided above. Protests should be filed in accordance with 
Rule 211 of the Federal Energy Regulatory Commission's (FERC) Rules of 
Practice and Procedures (18 CFR 385.211). Any person desiring to become 
a party to these proceedings should file a motion to intervene at the 
above address in accordance with FERC Rule 214 (18 CFR 385.214). Five 
(5) copies of such comments, protests, or motions to intervene should 
be sent to the address provided above on or before the date listed 
above.
    Comments and other filings concerning EESS-3's application to 
export electric energy to Canada should

[[Page 28629]]

be clearly marked with OE Docket No. EA-323-B. An additional copy is to 
be provided directly to both Bonnie A. Suchman, Suchman Law LLC, 8104 
Paisley Place, Potomac, MD 20854 and Michael G. Henry, Emera Energy 
Services, Inc., 101 Federal St., Suite 1101, Boston, MA 02110.
    A final decision will be made on this application after the 
environmental impacts have been evaluated pursuant to DOE's National 
Environmental Policy Act Implementing Procedures (10 CFR part 1021) and 
after DOE determines that the proposed action will not have an adverse 
impact on the sufficiency of supply or reliability of the U.S. electric 
power supply system.
    Copies of this application will be made available, upon request, 
for public inspection and copying at the address provided above, by 
accessing the program website at http://energy.gov/node/11845, or by 
emailing Angela Troy at [email protected].

    Issued in Washington, DC, on June 12, 2018.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity.
[FR Doc. 2018-13230 Filed 6-19-18; 8:45 am]
BILLING CODE 6450-01-P



                                                28628                        Federal Register / Vol. 83, No. 119 / Wednesday, June 20, 2018 / Notices

                                                DATES:   Comments, protests, or motions                 above address in accordance with FERC                  DC 20585–0350. Because of delays in
                                                to intervene must be submitted on or                    Rule 214 (18 CFR 385.214). Five (5)                    handling conventional mail, it is
                                                before July 20, 2018.                                   copies of such comments, protests, or                  recommended that documents be
                                                ADDRESSES: Comments, protests,                          motions to intervene should be sent to                 transmitted by overnight mail, by
                                                motions to intervene, or requests for                   the address provided above on or before                electronic mail to Electricity.Exports@
                                                more information should be addressed                    the date listed above.                                 hq.doe.gov, or by facsimile to 202–586–
                                                to: Office of Electricity, Mail Code: OE–                  Comments and other filings                          8008.
                                                20, U.S. Department of Energy, 1000                     concerning EESS–5’s application to                     SUPPLEMENTARY INFORMATION: The
                                                Independence Avenue SW, Washington,                     export electric energy to Canada should                Department of Energy (DOE) regulates
                                                DC 20585–0350. Because of delays in                     be clearly marked with OE Docket No.                   exports of electricity from the United
                                                handling conventional mail, it is                       EA–325–B. An additional copy is to be                  States to a foreign country, pursuant to
                                                recommended that documents be                           provided directly to both Bonnie A.                    sections 301(b) and 402(f) of the
                                                transmitted by overnight mail, by                       Suchman, Suchman Law LLC, 8104                         Department of Energy Organization Act
                                                electronic mail to Electricity.Exports@                 Paisley Place, Potomac, MD 20854 and                   (42 U.S.C. 7151(b), 7172(f)). Such
                                                hq.doe.gov, or by facsimile to 202–586–                 Michael G. Henry, Emera Energy                         exports require authorization under
                                                8008.                                                   Services, Inc., 101 Federal St., Suite                 section 202(e) of the Federal Power Act
                                                SUPPLEMENTARY INFORMATION: The
                                                                                                        1101, Boston, MA 02110.                                (16 U.S.C. 824a(e)).
                                                Department of Energy (DOE) regulates                       A final decision will be made on this                  On October 2, 2013, DOE issued
                                                exports of electricity from the United                  application after the environmental                    Order No. EA–323–A to EESS–3, which
                                                States to a foreign country, pursuant to                impacts have been evaluated pursuant                   authorized the Applicant to transmit
                                                sections 301(b) and 402(f) of the                       to DOE’s National Environmental Policy                 electric energy from the United States to
                                                Department of Energy Organization Act                   Act Implementing Procedures (10 CFR                    Canada, effective October 1, 2013, as a
                                                (42 U.S.C. 7151(b), 7172(f)). Such                      part 1021) and after DOE determines                    power marketer for a five-year term
                                                exports require authorization under                     that the proposed action will not have                 using existing international
                                                section 202(e) of the Federal Power Act                 an adverse impact on the sufficiency of                transmission facilities. That authority
                                                (16 U.S.C. 824a(e)).                                    supply or reliability of the U.S. electric             expires on October 1, 2018. On February
                                                   On October 2, 2013, DOE issued                       power supply system.                                   22, 2018, EESS–3 filed an application
                                                Order No. EA–325–A to EESS–5, which                        Copies of this application will be                  with DOE for renewal of the export
                                                authorized the Applicant to transmit                    made available, upon request, for public               authority contained in Order No. EA–
                                                electric energy from the United States to               inspection and copying at the address                  323 for an additional five-year term.
                                                Canada, effective October 1, 2013, as a                 provided above, by accessing the                          In its application, EESS–3 states that
                                                power marketer for a five-year term                     program website at http://energy.gov/                  it neither owns nor controls any electric
                                                using existing international                            node/11845, or by emailing Angela Troy                 generation or transmission facilities,
                                                transmission facilities. That authority                 at Angela.Troy@hq.doe.gov.                             and that it has no franchised electric
                                                expires on October 1, 2018. On February                   Issued in Washington, DC, on June 12,                power service area. The electric energy
                                                22, 2018, EESS–5 filed an application                   2018.                                                  that EESS–3 proposes to export to
                                                with DOE for renewal of the export                      Christopher Lawrence,                                  Canada would be surplus energy
                                                authority contained in Order No. EA–                    Electricity Policy Analyst, Office of Electricity.     purchased from third parties such as
                                                325 for an additional five-year term.                   [FR Doc. 2018–13232 Filed 6–19–18; 8:45 am]            electric utilities and Federal power
                                                   In its application, EESS–5 states that               BILLING CODE 6450–01–P                                 marketing agencies pursuant to
                                                it neither owns nor controls any electric                                                                      voluntary agreements. The existing
                                                generation or transmission facilities,                                                                         international transmission facilities to
                                                and that it has no franchised electric                  DEPARTMENT OF ENERGY                                   be utilized by EESS–3 have previously
                                                power service area. The electric energy                                                                        been authorized by Presidential permits
                                                                                                        [OE Docket No. EA–323–B]
                                                that EESS–5 proposes to export to                                                                              issued pursuant to Executive Order
                                                Canada would be surplus energy                          Application To Export Electric Energy;                 10485, as amended, and are appropriate
                                                purchased from third parties such as                    Emera Energy Services Subsidiary No.                   for open access transmission by third
                                                electric utilities and Federal power                    3 LLC                                                  parties.
                                                marketing agencies pursuant to                                                                                    Procedural matters: Any person
                                                voluntary agreements. The existing                      AGENCY: Office of Electricity,                         desiring to be heard in this proceeding
                                                international transmission facilities to                Department of Energy.                                  should file a comment or protest to the
                                                be utilized by EESS–5 have previously                   ACTION: Notice of application.                         application at the address provided
                                                been authorized by Presidential permits                                                                        above. Protests should be filed in
                                                issued pursuant to Executive Order                      SUMMARY:   Emera Energy Services                       accordance with Rule 211 of the Federal
                                                10485, as amended, and are appropriate                  Subsidiary No. 3 LLC (Applicant or                     Energy Regulatory Commission’s (FERC)
                                                for open access transmission by third                   EESS–3) has applied to renew its                       Rules of Practice and Procedures (18
                                                parties.                                                authority to transmit electric energy                  CFR 385.211). Any person desiring to
                                                   Procedural matters: Any person                       from the United States to Canada                       become a party to these proceedings
                                                desiring to be heard in this proceeding                 pursuant to the Federal Power Act.                     should file a motion to intervene at the
                                                should file a comment or protest to the                 DATES: Comments, protests, or motions                  above address in accordance with FERC
                                                application at the address provided                     to intervene must be submitted on or                   Rule 214 (18 CFR 385.214). Five (5)
sradovich on DSK3GMQ082PROD with NOTICES




                                                above. Protests should be filed in                      before July 20, 2018.                                  copies of such comments, protests, or
                                                accordance with Rule 211 of the Federal                 ADDRESSES: Comments, protests,                         motions to intervene should be sent to
                                                Energy Regulatory Commission’s (FERC)                   motions to intervene, or requests for                  the address provided above on or before
                                                Rules of Practice and Procedures (18                    more information should be addressed                   the date listed above.
                                                CFR 385.211). Any person desiring to                    to: Office of Electricity, Mail Code: OE–                 Comments and other filings
                                                become a party to these proceedings                     20, U.S. Department of Energy, 1000                    concerning EESS–3’s application to
                                                should file a motion to intervene at the                Independence Avenue SW, Washington,                    export electric energy to Canada should


                                           VerDate Sep<11>2014   17:58 Jun 19, 2018   Jkt 244001   PO 00000   Frm 00022   Fmt 4703   Sfmt 4703   E:\FR\FM\20JNN1.SGM   20JNN1


                                                                             Federal Register / Vol. 83, No. 119 / Wednesday, June 20, 2018 / Notices                                                   28629

                                                be clearly marked with OE Docket No.                    exports of electricity from the United                 impacts have been evaluated pursuant
                                                EA–323–B. An additional copy is to be                   States to a foreign country, pursuant to               to DOE’s National Environmental Policy
                                                provided directly to both Bonnie A.                     sections 301(b) and 402(f) of the                      Act Implementing Procedures (10 CFR
                                                Suchman, Suchman Law LLC, 8104                          Department of Energy Organization Act                  part 1021) and after DOE determines
                                                Paisley Place, Potomac, MD 20854 and                    (42 U.S.C. 7151(b), 7172(f)). Such                     that the proposed action will not have
                                                Michael G. Henry, Emera Energy                          exports require authorization under                    an adverse impact on the sufficiency of
                                                Services, Inc., 101 Federal St., Suite                  section 202(e) of the Federal Power Act                supply or reliability of the U.S. electric
                                                1101, Boston, MA 02110.                                 (16 U.S.C. 824a(e)).                                   power supply system.
                                                   A final decision will be made on this                   On October 2, 2013, DOE issued                         Copies of this application will be
                                                application after the environmental                     Order No. EA–324–A to EESS–4, which                    made available, upon request, for public
                                                impacts have been evaluated pursuant                    authorized the Applicant to transmit                   inspection and copying at the address
                                                to DOE’s National Environmental Policy                  electric energy from the United States to              provided above, by accessing the
                                                Act Implementing Procedures (10 CFR                     Canada, effective October 1, 2013, as a                program website at http://energy.gov/
                                                part 1021) and after DOE determines                     power marketer for a five-year term                    node/11845, or by emailing Angela Troy
                                                that the proposed action will not have                  using existing international                           at Angela.Troy@hq.doe.gov.
                                                an adverse impact on the sufficiency of                 transmission facilities. That authority                  Issued in Washington, DC, on June 12,
                                                supply or reliability of the U.S. electric              expires on October 1, 2018. On February                2018.
                                                power supply system.                                    22, 2018, EESS–4 filed an application                  Christopher Lawrence,
                                                   Copies of this application will be                   with DOE for renewal of the export                     Electricity Policy Analyst, Office of Electricity.
                                                made available, upon request, for public                authority contained in Order No. EA–
                                                                                                                                                               [FR Doc. 2018–13229 Filed 6–19–18; 8:45 am]
                                                inspection and copying at the address                   324 for an additional five-year term.
                                                                                                                                                               BILLING CODE 6450–01–P
                                                provided above, by accessing the                           In its application, EESS–4 states that
                                                program website at http://energy.gov/                   it neither owns nor controls any electric
                                                node/11845, or by emailing Angela Troy                  generation or transmission facilities,
                                                                                                                                                               DEPARTMENT OF ENERGY
                                                at Angela.Troy@hq.doe.gov.                              and that it has no franchised electric
                                                                                                        power service area. The electric energy                Notice of Availability of Guidance and
                                                  Issued in Washington, DC, on June 12,
                                                2018.
                                                                                                        that EESS–4 proposes to export to                      Application for Hydroelectric Incentive
                                                                                                        Canada would be surplus energy                         Program
                                                Christopher Lawrence,
                                                                                                        purchased from third parties such as
                                                Electricity Policy Analyst, Office of Electricity.      electric utilities and Federal power                   AGENCY:  Water Power Technologies
                                                [FR Doc. 2018–13230 Filed 6–19–18; 8:45 am]             marketing agencies pursuant to                         Office, Office of Energy Efficiency and
                                                BILLING CODE 6450–01–P                                  voluntary agreements. The existing                     Renewable Energy, Department of
                                                                                                        international transmission facilities to               Energy.
                                                                                                        be utilized by EESS–4 have previously                  ACTION: Notice of availability of
                                                DEPARTMENT OF ENERGY                                    been authorized by Presidential permits                guidance and open application period.
                                                [OE Docket No. EA–324–B]                                issued pursuant to Executive Order
                                                                                                        10485, as amended, and are appropriate                 SUMMARY:    The U.S. Department of
                                                Application to Export Electric Energy;                  for open access transmission by third                  Energy (DOE) gives notice of updated
                                                Emera Energy Services Subsidiary No.                    parties.                                               guidance for the Energy Policy Act of
                                                4 LLC                                                      Procedural matters: Any person                      2005 program. The guidance describes
                                                                                                        desiring to be heard in this proceeding                the hydroelectric incentive payment
                                                AGENCY: Office of Electricity,                          should file a comment or protest to the                requirements and explains the type of
                                                Department of Energy.                                   application at the address provided                    information that owners or authorized
                                                ACTION: Notice of Application.                          above. Protests should be filed in                     operators of qualified hydroelectric
                                                                                                        accordance with Rule 211 of the Federal                facilities must provide DOE when
                                                SUMMARY:   Emera Energy Services                                                                               applying for hydroelectric incentive
                                                                                                        Energy Regulatory Commission’s (FERC)
                                                Subsidiary No. 4 LLC (Applicant or                                                                             payments. This incentive is available for
                                                                                                        Rules of Practice and Procedures (18
                                                EESS–4) has applied to renew its                                                                               electric energy generated and sold for a
                                                                                                        CFR 385.211). Any person desiring to
                                                authority to transmit electric energy                                                                          specified 10-year period as authorized
                                                                                                        become a party to these proceedings
                                                from the United States to Canada                                                                               under the Energy Policy Act of 2005. In
                                                                                                        should file a motion to intervene at the
                                                pursuant to the Federal Power Act.                                                                             Congressional appropriations for
                                                                                                        above address in accordance with FERC
                                                DATES: Comments, protests, or motions                                                                          Federal fiscal year 2018, DOE received
                                                                                                        Rule 214 (18 CFR 385.214). Five (5)
                                                to intervene must be submitted on or                    copies of such comments, protests, or                  funds to support this hydroelectric
                                                before July 20, 2018.                                   motions to intervene should be sent to                 incentive program. At this time, DOE is
                                                ADDRESSES: Comments, protests,                          the address provided above on or before                only accepting applications from
                                                motions to intervene, or requests for                   the date listed above.                                 owners and authorized operators of
                                                more information should be addressed                       Comments and other filings                          qualified hydroelectric facilities for
                                                to: Office of Electricity, Mail Code: OE–               concerning EESS–4’s application to                     hydroelectricity generated and sold in
                                                20, U.S. Department of Energy, 1000                     export electric energy to Canada should                calendar year 2017.
                                                Independence Avenue SW, Washington,                     be clearly marked with OE Docket No.                   DATES: DOE is currently accepting
                                                DC 20585–0350. Because of delays in                     EA–324–B. An additional copy is to be                  applications from June 20, 2018 through
                                                handling conventional mail, it is                                                                              July 20, 2018. Applications must be sent
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        provided directly to both Bonnie A.
                                                recommended that documents be                           Suchman, Suchman Law LLC, 8104                         to hydroincentive@ee.doe.gov by
                                                transmitted by overnight mail, by                       Paisley Place, Potomac, MD 20854 and                   midnight EDT, July 20, 2018, or they
                                                electronic mail to Electricity.Exports@                 Michael G. Henry, Emera Energy                         will not be considered timely filed for
                                                hq.doe.gov, or by facsimile to 202–586–                 Services, Inc., 101 Federal St., Suite                 calendar year 2017 incentive payments.
                                                8008.                                                   1101, Boston, MA 02110.                                ADDRESSES: Interested parties are to
                                                SUPPLEMENTARY INFORMATION: The                             A final decision will be made on this               submit applications electronically to
                                                Department of Energy (DOE) regulates                    application after the environmental                    hydroincentive@ee.doe.gov. DOE’s


                                           VerDate Sep<11>2014   17:58 Jun 19, 2018   Jkt 244001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\20JNN1.SGM   20JNN1



Document Created: 2018-06-20 00:19:17
Document Modified: 2018-06-20 00:19:17
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of application.
DatesComments, protests, or motions to intervene must be submitted on or before July 20, 2018.