83_FR_28748 83 FR 28629 - Notice of Availability of Guidance and Application for Hydroelectric Incentive Program

83 FR 28629 - Notice of Availability of Guidance and Application for Hydroelectric Incentive Program

DEPARTMENT OF ENERGY

Federal Register Volume 83, Issue 119 (June 20, 2018)

Page Range28629-28630
FR Document2018-13233

The U.S. Department of Energy (DOE) gives notice of updated guidance for the Energy Policy Act of 2005 program. The guidance describes the hydroelectric incentive payment requirements and explains the type of information that owners or authorized operators of qualified hydroelectric facilities must provide DOE when applying for hydroelectric incentive payments. This incentive is available for electric energy generated and sold for a specified 10-year period as authorized under the Energy Policy Act of 2005. In Congressional appropriations for Federal fiscal year 2018, DOE received funds to support this hydroelectric incentive program. At this time, DOE is only accepting applications from owners and authorized operators of qualified hydroelectric facilities for hydroelectricity generated and sold in calendar year 2017.

Federal Register, Volume 83 Issue 119 (Wednesday, June 20, 2018)
[Federal Register Volume 83, Number 119 (Wednesday, June 20, 2018)]
[Notices]
[Pages 28629-28630]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-13233]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY


Notice of Availability of Guidance and Application for 
Hydroelectric Incentive Program

AGENCY: Water Power Technologies Office, Office of Energy Efficiency 
and Renewable Energy, Department of Energy.

ACTION: Notice of availability of guidance and open application period.

-----------------------------------------------------------------------

SUMMARY: The U.S. Department of Energy (DOE) gives notice of updated 
guidance for the Energy Policy Act of 2005 program. The guidance 
describes the hydroelectric incentive payment requirements and explains 
the type of information that owners or authorized operators of 
qualified hydroelectric facilities must provide DOE when applying for 
hydroelectric incentive payments. This incentive is available for 
electric energy generated and sold for a specified 10-year period as 
authorized under the Energy Policy Act of 2005. In Congressional 
appropriations for Federal fiscal year 2018, DOE received funds to 
support this hydroelectric incentive program. At this time, DOE is only 
accepting applications from owners and authorized operators of 
qualified hydroelectric facilities for hydroelectricity generated and 
sold in calendar year 2017.

DATES: DOE is currently accepting applications from June 20, 2018 
through July 20, 2018. Applications must be sent to 
[email protected] by midnight EDT, July 20, 2018, or they will 
not be considered timely filed for calendar year 2017 incentive 
payments.

ADDRESSES: Interested parties are to submit applications electronically 
to [email protected]. DOE's

[[Page 28630]]

guidance is available at: https://www.energy.gov/eere/water/downloads/federal-register-notice-epact-2005-section-242-hydroelectric-incentive-0.

FOR FURTHER INFORMATION CONTACT: Questions may be addressed to Corey 
Vezina, U.S. Department of Energy, Golden Field Office, 15013 Denver 
West Parkway, Golden, CO 80401, (240) 562-1382 or by email at 
[email protected]. Further instruction can be found in the 
guidance posted at https://www.energy.gov/eere/water/downloads/federal-register-notice-epact-2005-section-242-hydroelectric-incentive-0. 
Electronic communications are recommended for correspondence and 
required for submission of application information.

SUPPLEMENTARY INFORMATION: In the Energy Policy Act of 2005 (EPAct 
2005; Pub. L. 109-58), Congress established a new program to support 
the expansion of hydropower energy development at existing dams and 
impoundments through an incentive payment procedure. Under Section 242 
of EPAct 2005, the Secretary of Energy is directed to provide incentive 
payments to the owner or authorized operator of qualified hydroelectric 
facilities for energy generated and sold by a qualified hydroelectric 
facility for a specified 10-year period (See 42 U.S.C. 15881). The 2018 
Consolidated Appropriations Act authorized funding for the Section 242 
program for conventional hydropower under EPAct 2005. In FY 2018, DOE 
allocated $6.6M for this purpose.
    Recently DOE made minor updates to clarify its Guidance for the 
Energy Policy Act of 2005 Section 242. The Guidance is available at: 
https://www.energy.gov/eere/water/downloads/federal-register-notice-epact-2005-section-242-hydroelectric-incentive-0. Each application will 
be reviewed based on the Guidance. DOE has updated its Guidance to 
clarify eligible rehabilitation on existing facilities that have been 
offline because of disrepair or dismantling for at least five 
consecutive years immediately prior to October 1, 2005 and returning 
online with new hydroelectric power on or before September 30, 2015 
(see the second of three qualifications in Section III). DOE also 
updated its Guidance to re-emphasize the statutory deadline by which 
new hydropower generation must be placed into operation at a non-
powered or powered dam as on or after October 1, 2005 and on or before 
September 30, 2015 (see Section IV). DOE notes that applicants that 
received incentive payments for prior calendar years must submit a full 
application addressing all eligibility requirements for 
hydroelectricity generated and sold in calendar year 2017. As 
authorized under Section 242 of EPAct 2005, and as explained in the 
Guidance, DOE also notes that it will only accept applications from 
qualified hydroelectric facilities that began operations at an existing 
dam or conduit during the inclusive period beginning October 1, 2005, 
and ending on September 30, 2015. Therefore, although DOE is accepting 
applications for full calendar year 2017 production, the qualified 
hydroelectric facility must have begun operations starting October 1, 
2005, through September 30, 2015, for DOE to consider the application.
    When submitting information to DOE for Section 242 program, it is 
recommended that applicants carefully read and review the completed 
content of the Guidance for this process. When reviewing applications, 
DOE may corroborate the information provided with information that DOE 
finds through FERC e-filings, contact with power off-taker, and other 
due diligence measure carried out by reviewing officials. DOE may 
require the applicant to conduct and submit an independent audit at its 
own expense, or DOE may conduct an audit to verify the number of 
kilowatt-hours claimed to have been generated and sold by the qualified 
hydroelectric facility and for which an incentive payment has been 
requested or made.

    Issued in Washington, DC on June 13, 2018.
Timothy Unruh,
Deputy Assistant Secretary for Renewable Power, Energy Efficiency and 
Renewable Power.
[FR Doc. 2018-13233 Filed 6-19-18; 8:45 am]
BILLING CODE 6450-01-P



                                                                             Federal Register / Vol. 83, No. 119 / Wednesday, June 20, 2018 / Notices                                                   28629

                                                be clearly marked with OE Docket No.                    exports of electricity from the United                 impacts have been evaluated pursuant
                                                EA–323–B. An additional copy is to be                   States to a foreign country, pursuant to               to DOE’s National Environmental Policy
                                                provided directly to both Bonnie A.                     sections 301(b) and 402(f) of the                      Act Implementing Procedures (10 CFR
                                                Suchman, Suchman Law LLC, 8104                          Department of Energy Organization Act                  part 1021) and after DOE determines
                                                Paisley Place, Potomac, MD 20854 and                    (42 U.S.C. 7151(b), 7172(f)). Such                     that the proposed action will not have
                                                Michael G. Henry, Emera Energy                          exports require authorization under                    an adverse impact on the sufficiency of
                                                Services, Inc., 101 Federal St., Suite                  section 202(e) of the Federal Power Act                supply or reliability of the U.S. electric
                                                1101, Boston, MA 02110.                                 (16 U.S.C. 824a(e)).                                   power supply system.
                                                   A final decision will be made on this                   On October 2, 2013, DOE issued                         Copies of this application will be
                                                application after the environmental                     Order No. EA–324–A to EESS–4, which                    made available, upon request, for public
                                                impacts have been evaluated pursuant                    authorized the Applicant to transmit                   inspection and copying at the address
                                                to DOE’s National Environmental Policy                  electric energy from the United States to              provided above, by accessing the
                                                Act Implementing Procedures (10 CFR                     Canada, effective October 1, 2013, as a                program website at http://energy.gov/
                                                part 1021) and after DOE determines                     power marketer for a five-year term                    node/11845, or by emailing Angela Troy
                                                that the proposed action will not have                  using existing international                           at Angela.Troy@hq.doe.gov.
                                                an adverse impact on the sufficiency of                 transmission facilities. That authority                  Issued in Washington, DC, on June 12,
                                                supply or reliability of the U.S. electric              expires on October 1, 2018. On February                2018.
                                                power supply system.                                    22, 2018, EESS–4 filed an application                  Christopher Lawrence,
                                                   Copies of this application will be                   with DOE for renewal of the export                     Electricity Policy Analyst, Office of Electricity.
                                                made available, upon request, for public                authority contained in Order No. EA–
                                                                                                                                                               [FR Doc. 2018–13229 Filed 6–19–18; 8:45 am]
                                                inspection and copying at the address                   324 for an additional five-year term.
                                                                                                                                                               BILLING CODE 6450–01–P
                                                provided above, by accessing the                           In its application, EESS–4 states that
                                                program website at http://energy.gov/                   it neither owns nor controls any electric
                                                node/11845, or by emailing Angela Troy                  generation or transmission facilities,
                                                                                                                                                               DEPARTMENT OF ENERGY
                                                at Angela.Troy@hq.doe.gov.                              and that it has no franchised electric
                                                                                                        power service area. The electric energy                Notice of Availability of Guidance and
                                                  Issued in Washington, DC, on June 12,
                                                2018.
                                                                                                        that EESS–4 proposes to export to                      Application for Hydroelectric Incentive
                                                                                                        Canada would be surplus energy                         Program
                                                Christopher Lawrence,
                                                                                                        purchased from third parties such as
                                                Electricity Policy Analyst, Office of Electricity.      electric utilities and Federal power                   AGENCY:  Water Power Technologies
                                                [FR Doc. 2018–13230 Filed 6–19–18; 8:45 am]             marketing agencies pursuant to                         Office, Office of Energy Efficiency and
                                                BILLING CODE 6450–01–P                                  voluntary agreements. The existing                     Renewable Energy, Department of
                                                                                                        international transmission facilities to               Energy.
                                                                                                        be utilized by EESS–4 have previously                  ACTION: Notice of availability of
                                                DEPARTMENT OF ENERGY                                    been authorized by Presidential permits                guidance and open application period.
                                                [OE Docket No. EA–324–B]                                issued pursuant to Executive Order
                                                                                                        10485, as amended, and are appropriate                 SUMMARY:    The U.S. Department of
                                                Application to Export Electric Energy;                  for open access transmission by third                  Energy (DOE) gives notice of updated
                                                Emera Energy Services Subsidiary No.                    parties.                                               guidance for the Energy Policy Act of
                                                4 LLC                                                      Procedural matters: Any person                      2005 program. The guidance describes
                                                                                                        desiring to be heard in this proceeding                the hydroelectric incentive payment
                                                AGENCY: Office of Electricity,                          should file a comment or protest to the                requirements and explains the type of
                                                Department of Energy.                                   application at the address provided                    information that owners or authorized
                                                ACTION: Notice of Application.                          above. Protests should be filed in                     operators of qualified hydroelectric
                                                                                                        accordance with Rule 211 of the Federal                facilities must provide DOE when
                                                SUMMARY:   Emera Energy Services                                                                               applying for hydroelectric incentive
                                                                                                        Energy Regulatory Commission’s (FERC)
                                                Subsidiary No. 4 LLC (Applicant or                                                                             payments. This incentive is available for
                                                                                                        Rules of Practice and Procedures (18
                                                EESS–4) has applied to renew its                                                                               electric energy generated and sold for a
                                                                                                        CFR 385.211). Any person desiring to
                                                authority to transmit electric energy                                                                          specified 10-year period as authorized
                                                                                                        become a party to these proceedings
                                                from the United States to Canada                                                                               under the Energy Policy Act of 2005. In
                                                                                                        should file a motion to intervene at the
                                                pursuant to the Federal Power Act.                                                                             Congressional appropriations for
                                                                                                        above address in accordance with FERC
                                                DATES: Comments, protests, or motions                                                                          Federal fiscal year 2018, DOE received
                                                                                                        Rule 214 (18 CFR 385.214). Five (5)
                                                to intervene must be submitted on or                    copies of such comments, protests, or                  funds to support this hydroelectric
                                                before July 20, 2018.                                   motions to intervene should be sent to                 incentive program. At this time, DOE is
                                                ADDRESSES: Comments, protests,                          the address provided above on or before                only accepting applications from
                                                motions to intervene, or requests for                   the date listed above.                                 owners and authorized operators of
                                                more information should be addressed                       Comments and other filings                          qualified hydroelectric facilities for
                                                to: Office of Electricity, Mail Code: OE–               concerning EESS–4’s application to                     hydroelectricity generated and sold in
                                                20, U.S. Department of Energy, 1000                     export electric energy to Canada should                calendar year 2017.
                                                Independence Avenue SW, Washington,                     be clearly marked with OE Docket No.                   DATES: DOE is currently accepting
                                                DC 20585–0350. Because of delays in                     EA–324–B. An additional copy is to be                  applications from June 20, 2018 through
                                                handling conventional mail, it is                                                                              July 20, 2018. Applications must be sent
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        provided directly to both Bonnie A.
                                                recommended that documents be                           Suchman, Suchman Law LLC, 8104                         to hydroincentive@ee.doe.gov by
                                                transmitted by overnight mail, by                       Paisley Place, Potomac, MD 20854 and                   midnight EDT, July 20, 2018, or they
                                                electronic mail to Electricity.Exports@                 Michael G. Henry, Emera Energy                         will not be considered timely filed for
                                                hq.doe.gov, or by facsimile to 202–586–                 Services, Inc., 101 Federal St., Suite                 calendar year 2017 incentive payments.
                                                8008.                                                   1101, Boston, MA 02110.                                ADDRESSES: Interested parties are to
                                                SUPPLEMENTARY INFORMATION: The                             A final decision will be made on this               submit applications electronically to
                                                Department of Energy (DOE) regulates                    application after the environmental                    hydroincentive@ee.doe.gov. DOE’s


                                           VerDate Sep<11>2014   17:58 Jun 19, 2018   Jkt 244001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\20JNN1.SGM   20JNN1


                                                28630                        Federal Register / Vol. 83, No. 119 / Wednesday, June 20, 2018 / Notices

                                                guidance is available at: https://                      for hydroelectricity generated and sold                   Take notice that the Commission
                                                www.energy.gov/eere/water/downloads/                    in calendar year 2017. As authorized                   received the following exempt
                                                federal-register-notice-epact-2005-                     under Section 242 of EPAct 2005, and                   wholesale generator filings:
                                                section-242-hydroelectric-incentive-0.                  as explained in the Guidance, DOE also                    Docket Numbers: EG18–101–000.
                                                FOR FURTHER INFORMATION CONTACT:                        notes that it will only accept                            Applicants: Torrecillas Wind Energy,
                                                Questions may be addressed to Corey                     applications from qualified                            LLC.
                                                Vezina, U.S. Department of Energy,                      hydroelectric facilities that began                       Description: Notice of Self-
                                                Golden Field Office, 15013 Denver West                  operations at an existing dam or conduit               Certification of Exempt Wholesale
                                                Parkway, Golden, CO 80401, (240) 562–                   during the inclusive period beginning                  Generator Status of Torrecillas Wind
                                                1382 or by email at hydroincentive@                     October 1, 2005, and ending on                         Energy, LLC.
                                                ee.doe.gov. Further instruction can be                  September 30, 2015. Therefore, although                   Filed Date: 6/14/18.
                                                found in the guidance posted at https://                DOE is accepting applications for full                    Accession Number: 20180614–5147.
                                                www.energy.gov/eere/water/downloads/                    calendar year 2017 production, the                        Comments Due: 5 p.m. ET 7/5/18.
                                                federal-register-notice-epact-2005-                     qualified hydroelectric facility must                     Take notice that the Commission
                                                section-242-hydroelectric-incentive-0.                  have begun operations starting October                 received the following electric rate
                                                Electronic communications are                           1, 2005, through September 30, 2015, for               filings:
                                                recommended for correspondence and                      DOE to consider the application.
                                                                                                                                                                  Docket Numbers: ER18–1420–001.
                                                required for submission of application                     When submitting information to DOE                     Applicants: California Independent
                                                information.                                            for Section 242 program, it is                         System Operator Corporation.
                                                SUPPLEMENTARY INFORMATION: In the                       recommended that applicants carefully                     Description: Tariff Amendment:
                                                Energy Policy Act of 2005 (EPAct 2005;                  read and review the completed content                  2018–06–14 Amendment to Certificate
                                                Pub. L. 109–58), Congress established a                 of the Guidance for this process. When                 of Concurrence for ARES Nevada UFA
                                                new program to support the expansion                    reviewing applications, DOE may                        Metadata to be effective 3/13/2018.
                                                of hydropower energy development at                     corroborate the information provided                      Filed Date: 6/14/18.
                                                existing dams and impoundments                          with information that DOE finds                           Accession Number: 20180614–5082.
                                                through an incentive payment                            through FERC e-filings, contact with                      Comments Due: 5 p.m. ET 6/25/18.
                                                procedure. Under Section 242 of EPAct                   power off-taker, and other due diligence
                                                                                                                                                                  Docket Numbers: ER18–1771–000.
                                                2005, the Secretary of Energy is directed               measure carried out by reviewing
                                                                                                                                                                  Applicants: Langdon Renewables,
                                                to provide incentive payments to the                    officials. DOE may require the applicant
                                                                                                                                                               LLC.
                                                owner or authorized operator of                         to conduct and submit an independent
                                                                                                                                                                  Description: Amendment to June 11,
                                                qualified hydroelectric facilities for                  audit at its own expense, or DOE may
                                                                                                                                                               2017 Langdon Renewables, LLC tariff
                                                energy generated and sold by a qualified                conduct an audit to verify the number
                                                                                                                                                               filing.
                                                hydroelectric facility for a specified 10-              of kilowatt-hours claimed to have been
                                                                                                                                                                  Filed Date: 6/14/18.
                                                year period (See 42 U.S.C. 15881). The                  generated and sold by the qualified
                                                                                                                                                                  Accession Number: 20180614–5081.
                                                2018 Consolidated Appropriations Act                    hydroelectric facility and for which an
                                                                                                                                                                  Comments Due: 5 p.m. ET 7/2/18.
                                                authorized funding for the Section 242                  incentive payment has been requested
                                                                                                        or made.                                                  Docket Numbers: ER18–1786–000.
                                                program for conventional hydropower                                                                               Applicants: Northern States Power
                                                under EPAct 2005. In FY 2018, DOE                         Issued in Washington, DC on June 13,                 Company, a Wisconsin corporation
                                                allocated $6.6M for this purpose.                       2018.
                                                                                                                                                               Northern States Power Company, a
                                                   Recently DOE made minor updates to                   Timothy Unruh,                                         Minnesota Corporation.
                                                clarify its Guidance for the Energy                     Deputy Assistant Secretary for Renewable                  Description: § 205(d) Rate Filing:
                                                Policy Act of 2005 Section 242. The                     Power, Energy Efficiency and Renewable                 20180614_Benson IA 205 to be effective
                                                Guidance is available at: https://                      Power.
                                                                                                                                                               6/29/2018.
                                                www.energy.gov/eere/water/downloads/                    [FR Doc. 2018–13233 Filed 6–19–18; 8:45 am]               Filed Date: 6/14/18.
                                                federal-register-notice-epact-2005-                     BILLING CODE 6450–01–P                                    Accession Number: 20180614–5058.
                                                section-242-hydroelectric-incentive-0.
                                                                                                                                                                  Comments Due: 5 p.m. ET 7/5/18.
                                                Each application will be reviewed based
                                                on the Guidance. DOE has updated its                    DEPARTMENT OF ENERGY                                      Take notice that the Commission
                                                Guidance to clarify eligible                                                                                   received the following foreign utility
                                                rehabilitation on existing facilities that              Federal Energy Regulatory                              company status filings:
                                                have been offline because of disrepair or               Commission                                                Docket Numbers: FC18–6–000.
                                                dismantling for at least five consecutive                                                                         Applicants: Solfuture Gestión, S.L.U.
                                                years immediately prior to October 1,                   Combined Notice of Filings #2                             Description: Notification of Self-
                                                2005 and returning online with new                                                                             Certification of Foreign Utility Company
                                                                                                           Take notice that the Commission
                                                hydroelectric power on or before                                                                               Status of I Solfuture Gestion, S.L.U.
                                                                                                        received the following electric corporate
                                                September 30, 2015 (see the second of                                                                             Filed Date: 6/13/18.
                                                                                                        filings:                                                  Accession Number: 20180613–5163.
                                                three qualifications in Section III). DOE
                                                also updated its Guidance to re-                           Docket Numbers: EC18–102–000.                          Comments Due: 5 p.m. ET 7/5/18.
                                                emphasize the statutory deadline by                        Applicants: Duke Energy Indiana,                       The filings are accessible in the
                                                which new hydropower generation must                    LLC, AEP Indiana Michigan                              Commission’s eLibrary system by
                                                be placed into operation at a non-                      Transmission Company, Inc.                             clicking on the links or querying the
sradovich on DSK3GMQ082PROD with NOTICES




                                                powered or powered dam as on or after                      Description: Application for                        docket number.
                                                October 1, 2005 and on or before                        Authorization Under Section 203 of the                    Any person desiring to intervene or
                                                September 30, 2015 (see Section IV).                    Federal Power Act of Duke Energy                       protest in any of the above proceedings
                                                DOE notes that applicants that received                 Indiana, LLC, et al.                                   must file in accordance with Rules 211
                                                incentive payments for prior calendar                      Filed Date: 6/14/18.                                and 214 of the Commission’s
                                                years must submit a full application                       Accession Number: 20180614–5097.                    Regulations (18 CFR 385.211 and
                                                addressing all eligibility requirements                    Comments Due: 5 p.m. ET 7/5/18.                     385.214) on or before 5:00 p.m. Eastern


                                           VerDate Sep<11>2014   17:58 Jun 19, 2018   Jkt 244001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\20JNN1.SGM   20JNN1



Document Created: 2018-06-20 00:20:11
Document Modified: 2018-06-20 00:20:11
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of availability of guidance and open application period.
DatesDOE is currently accepting applications from June 20, 2018 through July 20, 2018. Applications must be sent to [email protected] by midnight EDT, July 20, 2018, or they will not be considered timely filed for calendar year 2017 incentive payments.
FR Citation83 FR 28629 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR