83_FR_28755 83 FR 28636 - Notice of Availability of the Environmental Assessment for the Sierrita Gas Pipeline LLC Proposed Sierrita Compressor Expansion Project

83 FR 28636 - Notice of Availability of the Environmental Assessment for the Sierrita Gas Pipeline LLC Proposed Sierrita Compressor Expansion Project

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 119 (June 20, 2018)

Page Range28636-28636
FR Document2018-13193

Federal Register, Volume 83 Issue 119 (Wednesday, June 20, 2018)
[Federal Register Volume 83, Number 119 (Wednesday, June 20, 2018)]
[Notices]
[Page 28636]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-13193]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP18-37-000;CP18-38-000]


Notice of Availability of the Environmental Assessment for the 
Sierrita Gas Pipeline LLC Proposed Sierrita Compressor Expansion 
Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared an environmental assessment (EA) for the 
Sierrita Compressor Expansion Project, proposed by Sierrita Gas 
Pipeline LLC (Sierrita) in the above-referenced dockets. Sierrita filed 
an application in Docket No. CP18-37-000 requesting a Certificate of 
Public Convenience and Necessity pursuant to section 7(c) of the 
Natural Gas Act to construct and operate certain natural gas pipeline 
facilities. Specifically, Sierrita requests authorization to construct 
a new 15,900 horsepower natural gas compressor station on its existing 
Line No. 2177 pipeline system in Pima County, Arizona. Additionally, in 
Docket No. CP18-38-000, Sierrita is requesting an amendment to its 
section 3 authorization and its Presidential Permit.
    The EA assesses the potential environmental effects of the 
construction and operation of the Sierrita Compressor Expansion Project 
in accordance with the requirements of the National Environmental 
Policy Act. The FERC staff concludes that approval of the proposed 
project, with appropriate mitigating measures, would not constitute a 
major federal action significantly affecting the quality of the human 
environment.
    The proposed Sierrita Compressor Expansion Project includes the 
following facilities:
     One new 15,900 horsepower compressor station (Sierrita 
Compressor Station);
     approximately 1,000 feet of suction and discharge piping 
and various station yard auxiliary facilities to connect the Sierrita 
Compressor Station with Sierrita's existing Line No. 2177;
     one new 10-inch Ultrasonic meter at the existing San 
Joaquin Meter Station on Line No. 2177; and
     the relocation of the existing Mainline Valve 2 and an 
associated inspection tool launcher and receiver from milepost 1.2 to 
milepost 6.5 on Line No. 2177.
    The FERC staff mailed copies of the EA to federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American tribes; 
potentially affected landowners and other interested individuals and 
groups; and newspapers and libraries in the project area. In addition, 
the EA is available for public viewing on the FERC's website 
(www.ferc.gov) using the eLibrary link. A limited number of copies of 
the EA are available for distribution and public inspection at: Federal 
Energy Regulatory Commission, Public Reference Room, 888 First Street 
NE, Room 2A, Washington, DC 20426, (202) 502-8371.
    Any person wishing to comment on the EA may do so. Your comments 
should focus on the EA's disclosure and discussion of potential 
environmental effects, reasonable alternatives, and measures to avoid 
or lessen environmental impacts. The more specific your comments, the 
more useful they will be. To ensure that the Commission has the 
opportunity to consider your comments prior to making its decision on 
this project, it is important that we receive your comments in 
Washington, DC on or before 5:00 p.m. Eastern Time on July 13, 2018.
    For your convenience, there are three methods you can use to file 
your comments with the Commission. In all instances please reference 
the applicable project docket number (CP18-37 and/or CP18-38) with your 
submission. The Commission encourages electronic filing of comments and 
has staff available to assist you at (866) 208-3676 or 
FercOnlineSupport@ferc.gov.
    (1) You can file your comments electronically using the eComment 
feature located on the Commission's website (www.ferc.gov) under the 
link to Documents and Filings. Using eComment is an easy method for 
submitting brief, text-only comments on a project;
    (2) You can also file your comments electronically using the 
eFiling feature located on the Commission's website (www.ferc.gov) 
under the link to Documents and Filings. With eFiling, you can provide 
comments in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on eRegister. You must select the type of filing you are making. A 
comment on a particular project is considered a ``Comment on a 
Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 
20426.
    Any person seeking to become a party to the proceeding must file a 
motion to intervene pursuant to Rule 214 of the Commission's Rules of 
Practice and Procedures (18 CFR 385.214). Only intervenors have the 
right to seek rehearing or judicial review of the Commission's 
decision. The Commission grants affected landowners and others with 
environmental concerns intervenor status upon showing good cause by 
stating that they have a clear and direct interest in this proceeding 
which no other party can adequately represent. Simply filing 
environmental comments will not give you intervenor status, but you do 
not need intervenor status to have your comments considered.
    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on General Search, and enter the docket number in 
the Docket Number field, excluding the last three digits (i.e., CP18-
37). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of all formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.

    Dated: June 13, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-13193 Filed 6-19-18; 8:45 am]
BILLING CODE 6717-01-P



                                                28636                        Federal Register / Vol. 83, No. 119 / Wednesday, June 20, 2018 / Notices

                                                Commission in this proceeding, in                          • one new 10-inch Ultrasonic meter                  with your submission. New eFiling
                                                accordance with 18 CFR 4.34(b) and                      at the existing San Joaquin Meter                      users must first create an account by
                                                385.2010.                                               Station on Line No. 2177; and                          clicking on eRegister. You must select
                                                  Dated: June 13, 2018.
                                                                                                           • the relocation of the existing                    the type of filing you are making. A
                                                                                                        Mainline Valve 2 and an associated                     comment on a particular project is
                                                Kimberly D. Bose,
                                                                                                        inspection tool launcher and receiver                  considered a ‘‘Comment on a Filing’’; or
                                                Secretary.                                              from milepost 1.2 to milepost 6.5 on
                                                [FR Doc. 2018–13208 Filed 6–19–18; 8:45 am]                                                                       (3) You can file a paper copy of your
                                                                                                        Line No. 2177.
                                                                                                                                                               comments by mailing them to the
                                                BILLING CODE 6717–01–P                                     The FERC staff mailed copies of the
                                                                                                                                                               following address: Kimberly D. Bose,
                                                                                                        EA to federal, state, and local
                                                                                                        government representatives and                         Secretary, Federal Energy Regulatory
                                                DEPARTMENT OF ENERGY                                    agencies; elected officials;                           Commission, 888 First Street NE, Room
                                                                                                        environmental and public interest                      1A, Washington, DC 20426.
                                                Federal Energy Regulatory                               groups; Native American tribes;                           Any person seeking to become a party
                                                Commission                                              potentially affected landowners and                    to the proceeding must file a motion to
                                                                                                        other interested individuals and groups;               intervene pursuant to Rule 214 of the
                                                [Docket Nos. CP18–37–000;CP18–38–000]                   and newspapers and libraries in the                    Commission’s Rules of Practice and
                                                                                                        project area. In addition, the EA is                   Procedures (18 CFR 385.214). Only
                                                Notice of Availability of the                           available for public viewing on the                    intervenors have the right to seek
                                                Environmental Assessment for the                        FERC’s website (www.ferc.gov) using the                rehearing or judicial review of the
                                                Sierrita Gas Pipeline LLC Proposed                      eLibrary link. A limited number of                     Commission’s decision. The
                                                Sierrita Compressor Expansion Project                   copies of the EA are available for                     Commission grants affected landowners
                                                  The staff of the Federal Energy                       distribution and public inspection at:                 and others with environmental concerns
                                                Regulatory Commission (FERC or                          Federal Energy Regulatory Commission,                  intervenor status upon showing good
                                                Commission) has prepared an                             Public Reference Room, 888 First Street                cause by stating that they have a clear
                                                environmental assessment (EA) for the                   NE, Room 2A, Washington, DC 20426,                     and direct interest in this proceeding
                                                Sierrita Compressor Expansion Project,                  (202) 502–8371.                                        which no other party can adequately
                                                                                                           Any person wishing to comment on                    represent. Simply filing environmental
                                                proposed by Sierrita Gas Pipeline LLC
                                                                                                        the EA may do so. Your comments                        comments will not give you intervenor
                                                (Sierrita) in the above-referenced
                                                                                                        should focus on the EA’s disclosure and                status, but you do not need intervenor
                                                dockets. Sierrita filed an application in
                                                                                                        discussion of potential environmental                  status to have your comments
                                                Docket No. CP18–37–000 requesting a
                                                                                                        effects, reasonable alternatives, and                  considered.
                                                Certificate of Public Convenience and                   measures to avoid or lessen
                                                Necessity pursuant to section 7(c) of the                                                                         Additional information about the
                                                                                                        environmental impacts. The more
                                                Natural Gas Act to construct and operate                                                                       project is available from the
                                                                                                        specific your comments, the more useful
                                                certain natural gas pipeline facilities.                                                                       Commission’s Office of External Affairs,
                                                                                                        they will be. To ensure that the
                                                Specifically, Sierrita requests                                                                                at (866) 208–FERC, or on the FERC
                                                                                                        Commission has the opportunity to
                                                authorization to construct a new 15,900                                                                        website (www.ferc.gov) using the
                                                                                                        consider your comments prior to
                                                horsepower natural gas compressor                                                                              eLibrary link. Click on the eLibrary link,
                                                                                                        making its decision on this project, it is
                                                station on its existing Line No. 2177                                                                          click on General Search, and enter the
                                                                                                        important that we receive your
                                                pipeline system in Pima County,                                                                                docket number in the Docket Number
                                                                                                        comments in Washington, DC on or
                                                Arizona. Additionally, in Docket No.                                                                           field, excluding the last three digits (i.e.,
                                                                                                        before 5:00 p.m. Eastern Time on July
                                                CP18–38–000, Sierrita is requesting an                                                                         CP18–37). Be sure you have selected an
                                                                                                        13, 2018.
                                                amendment to its section 3                                 For your convenience, there are three               appropriate date range. For assistance,
                                                authorization and its Presidential                      methods you can use to file your                       please contact FERC Online Support at
                                                Permit.                                                 comments with the Commission. In all                   FercOnlineSupport@ferc.gov or toll free
                                                  The EA assesses the potential                         instances please reference the                         at (866) 208–3676, or for TTY, contact
                                                environmental effects of the                            applicable project docket number                       (202) 502–8659. The eLibrary link also
                                                construction and operation of the                       (CP18–37 and/or CP18–38) with your                     provides access to the texts of all formal
                                                Sierrita Compressor Expansion Project                   submission. The Commission                             documents issued by the Commission,
                                                in accordance with the requirements of                  encourages electronic filing of                        such as orders, notices, and
                                                the National Environmental Policy Act.                  comments and has staff available to                    rulemakings.
                                                The FERC staff concludes that approval                  assist you at (866) 208–3676 or                           In addition, the Commission offers a
                                                of the proposed project, with                           FercOnlineSupport@ferc.gov.                            free service called eSubscription which
                                                appropriate mitigating measures, would                     (1) You can file your comments                      allows you to keep track of all formal
                                                not constitute a major federal action                   electronically using the eComment                      issuances and submittals in specific
                                                significantly affecting the quality of the              feature located on the Commission’s                    dockets. This can reduce the amount of
                                                human environment.                                      website (www.ferc.gov) under the link to               time you spend researching proceedings
                                                  The proposed Sierrita Compressor                      Documents and Filings. Using                           by automatically providing you with
                                                Expansion Project includes the                          eComment is an easy method for                         notification of these filings, document
                                                following facilities:                                   submitting brief, text-only comments on                summaries, and direct links to the
                                                  • One new 15,900 horsepower
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        a project;                                             documents. Go to www.ferc.gov/docs-
                                                compressor station (Sierrita Compressor                    (2) You can also file your comments                 filing/esubscription.asp.
                                                Station);                                               electronically using the eFiling feature                 Dated: June 13, 2018.
                                                  • approximately 1,000 feet of suction                 located on the Commission’s website
                                                and discharge piping and various                        (www.ferc.gov) under the link to                       Kimberly D. Bose,
                                                station yard auxiliary facilities to                    Documents and Filings. With eFiling,                   Secretary.
                                                connect the Sierrita Compressor Station                 you can provide comments in a variety                  [FR Doc. 2018–13193 Filed 6–19–18; 8:45 am]
                                                with Sierrita’s existing Line No. 2177;                 of formats by attaching them as a file                 BILLING CODE 6717–01–P




                                           VerDate Sep<11>2014   17:58 Jun 19, 2018   Jkt 244001   PO 00000   Frm 00030   Fmt 4703   Sfmt 9990   E:\FR\FM\20JNN1.SGM   20JNN1



Document Created: 2018-06-20 00:19:50
Document Modified: 2018-06-20 00:19:50
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 28636 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR