83_FR_29900 83 FR 29777 - Agency Information Collection Extension

83 FR 29777 - Agency Information Collection Extension

DEPARTMENT OF ENERGY
Energy Information Administration

Federal Register Volume 83, Issue 123 (June 26, 2018)

Page Range29777-29778
FR Document2018-13678

EIA submitted an information collection request for extension as required by the Paperwork Reduction Act of 1995. The information collection requests a three-year extension with changes to Form EIA- 63C, Densified Biomass Fuel Report under OMB Control Number 1905-0209. Form EIA-63C collects data on wood pellet fuel and other densified biomass fuel production, sales, and inventory levels from U.S. manufacturing facilities of densified biomass fuel products for the purpose of estimating densified biomass fuel consumption in the United States, as well as production, sales, and inventory at state, regional, and national levels.

Federal Register, Volume 83 Issue 123 (Tuesday, June 26, 2018)
[Federal Register Volume 83, Number 123 (Tuesday, June 26, 2018)]
[Notices]
[Pages 29777-29778]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-13678]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Energy Information Administration


Agency Information Collection Extension

AGENCY: U.S. Energy Information Administration (EIA), U.S. Department 
of Energy (DOE).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: EIA submitted an information collection request for extension 
as required by the Paperwork Reduction Act of 1995. The information 
collection requests a three-year extension with changes to Form EIA-
63C, Densified Biomass Fuel Report under OMB Control Number 1905-0209. 
Form EIA-63C collects data on wood pellet fuel and other densified 
biomass fuel production, sales, and inventory levels from U.S. 
manufacturing facilities of densified biomass fuel products for the 
purpose of estimating densified biomass fuel consumption in the United 
States, as well as production, sales, and inventory at state, regional, 
and national levels.

DATES: EIA must receive all comments on this proposed information 
collection no later than July 26, 2018. If you anticipate any 
difficulties in submitting your comments by the deadline, contact the 
DOE Desk Officer at 202-395-0710.

ADDRESSES: Written comments should be sent to:
DOE Desk Officer: Brandon Debruhl, Office of Information and Regulatory 
Affairs, Office of Management and Budget, New Executive Office 
Building, Room 10102, 735 17th Street NW, Washington, DC 20503, Email: 
[email protected].
and to:
Connor Murphy, U.S. Department of Energy, U.S. Energy Information 
Administration, 1000 Independence Ave. SW, Washington, DC 20585, Email: 
[email protected].

FOR FURTHER INFORMATION CONTACT: Requests for additional information or 
copies of the information collection instrument and instructions, 
should be directed to Connor Murphy at 202-287-5982, or by email 
[email protected]. You can view Form EIA-63C Densified Biomass Fuel 
Report online at https://www.eia.gov/survey/#eia-63c.

SUPPLEMENTARY INFORMATION: This information collection request 
contains:
    (1) OMB No. 1905-0209;
    (2) Information Collection Request Title: Densified Biomass Fuel 
Report;
    (3) Type of Request: Three-year extension with changes;
    (4) Purpose: Form EIA-63C Densified Biomass Fuel Report is part of 
EIA's comprehensive energy data program. The survey collects 
information on the manufacture, shipment, exports, energy 
characteristics, and sales of pellet fuels and other densified biomass 
fuel products data from facilities that manufacture densified biomass 
fuel products, primarily pellet fuels, for energy applications. The 
data collected are a primary source of information for the nation's 
growing production of biomass products for heating and electric power 
generation, for use in both domestic and foreign markets.
    (4a) Changes to Information Collection: Respondents will no longer 
have to answer the following six questions:

 Part 2 Question 2.2 ``What is the operational month''
 Part 2 Question 2.4 ``What is the total installed horsepower 
of the pellet extrusion machinery at this facility''
 Part 2. Question 2.6 ``What is the planned maximum annual 
production capacity at this facility''
 Part 2. Question 2.7 ``What is the planned total installed 
horsepower of the pellet extrusion machinery at this facility''
 Part 3. Question 3.2 ``In the reporting period, did the mill 
utilize any portion of the above feedstock for uses other than 
transformation into densified biomass products, such as to operate the 
mill, produce electricity (combined heat and power) or other beneficial 
use of energy produced (such as heating/cooling)''
 Part 4. Question 4.2 ``Export Port.''

    EIA also removed the requirement to report quantity, 
characteristics, inventory, and revenue data on compressed fuel logs, 
bricks and briquettes from on questions 3.3, 3.4 and 4.1.
    Finally, the due date for annual respondents (small biomass fuel 
manufacturers having a capacity of less than 10,000 tons per year or 
planned facilities) to report is changed from February 1 to June 1 to 
coincide with the industry's off-season and ease their reporting burden 
during the heating season which is their busiest time of the year. 
Respondents that need to file annually will only need to report limited 
data in Parts 1 and 2 of the form;
    (5) Annual Estimated Number of Respondents: 108;
    (6) Annual Estimated Number of Total Responses: 1,065;
    (7) Annual Estimated Number of Burden Hours: 1,467;
    (8) Annual Estimated Reporting and Recordkeeping Cost Burden: The 
cost of the burden hours is estimated to be $111,026 (1,467 burden 
hours times $75.69 per hour). EIA estimates that there are no 
additional costs to respondents associated with the survey other than 
the costs associated with the burden hours.
    Statutory Authority: Section 13(b) of the Federal Energy 
Administration Act of 1974, Pub. L. 93-275, codified as 15 U.S.C. 
772(b) and the DOE Organization Act of 1977, Pub. L. 95-91, codified at 
42 U.S.C. 7101 et seq.


[[Page 29778]]


    Issued in Washington, DC, on June 15, 2018.
Nanda Srinivasan
Director, Office of Survey Development and Statistical Integration U.S. 
Energy Information Administration.
[FR Doc. 2018-13678 Filed 6-25-18; 8:45 am]
 BILLING CODE 6450-01-P



                                                                               Federal Register / Vol. 83, No. 123 / Tuesday, June 26, 2018 / Notices                                            29777

                                                ADDRESSES:   Written comments should                    Control Number 1905–0209. Form EIA–                      (4a) Changes to Information
                                                be sent to the OMB Desk Officer, Office                 63C collects data on wood pellet fuel                  Collection: Respondents will no longer
                                                of Information and Regulatory Affairs,                  and other densified biomass fuel                       have to answer the following six
                                                Office of Management and Budget, New                    production, sales, and inventory levels                questions:
                                                Executive Office Building, 735 17th                     from U.S. manufacturing facilities of                  • Part 2 Question 2.2 ‘‘What is the
                                                Street NW, Room 10102, Washington,                      densified biomass fuel products for the                  operational month’’
                                                DC 20503 and to Alesia Gant, U.S.                       purpose of estimating densified biomass
                                                Department of Energy, 1000                              fuel consumption in the United States,                 • Part 2 Question 2.4 ‘‘What is the total
                                                Independence Avenue SW, Washington,                     as well as production, sales, and                        installed horsepower of the pellet
                                                DC 20585–1615, or by email at                           inventory at state, regional, and national               extrusion machinery at this facility’’
                                                alesia.gant@hq.doe.gov; Ms. Gant may                    levels.                                                • Part 2. Question 2.6 ‘‘What is the
                                                also be contacted at (202) 287–1476.                    DATES: EIA must receive all comments
                                                                                                                                                                 planned maximum annual production
                                                FOR FURTHER INFORMATION CONTACT:                        on this proposed information collection                  capacity at this facility’’
                                                Requests for additional information or                  no later than July 26, 2018. If you                    • Part 2. Question 2.7 ‘‘What is the
                                                copies of the information collection                    anticipate any difficulties in submitting                planned total installed horsepower of
                                                instrument and instructions should be                   your comments by the deadline, contact                   the pellet extrusion machinery at this
                                                directed to Alesia Gant at the address                  the DOE Desk Officer at 202–395–0710.                    facility’’
                                                listed above.                                           ADDRESSES: Written comments should                     • Part 3. Question 3.2 ‘‘In the reporting
                                                SUPPLEMENTARY INFORMATION: This                         be sent to:                                              period, did the mill utilize any
                                                information collection request contains:                DOE Desk Officer: Brandon Debruhl,                       portion of the above feedstock for uses
                                                   (1) OMB No. 1910–0600;                                 Office of Information and Regulatory                   other than transformation into
                                                   (2) Information Collection Request                     Affairs, Office of Management and                      densified biomass products, such as
                                                Title: Industrial Relations;                              Budget, New Executive Office                           to operate the mill, produce electricity
                                                   (3) Type of Request: Renewal;                                                                                 (combined heat and power) or other
                                                   (4) Purpose: This information is                       Building, Room 10102, 735 17th
                                                                                                          Street NW, Washington, DC 20503,                       beneficial use of energy produced
                                                required for management oversight of                                                                             (such as heating/cooling)’’
                                                the Department of Energy’s Facilities                     Email: Brandon_F_DeBruhl@
                                                Management Contractors and to ensure                      omb.eop.gov.                                         • Part 4. Question 4.2 ‘‘Export Port.’’
                                                that the programmatic and                               and to:                                                  EIA also removed the requirement to
                                                administrative management                                                                                      report quantity, characteristics,
                                                                                                        Connor Murphy, U.S. Department of
                                                requirements of the contracts are                                                                              inventory, and revenue data on
                                                                                                          Energy, U.S. Energy Information
                                                managed efficiently and effectively;                                                                           compressed fuel logs, bricks and
                                                   (5) Annual Estimated Number of                         Administration, 1000 Independence
                                                                                                                                                               briquettes from on questions 3.3, 3.4
                                                Respondents: 42;                                          Ave. SW, Washington, DC 20585,
                                                                                                                                                               and 4.1.
                                                   (6) Annual Estimated Number of                         Email: DensifiedBiomass2018@
                                                                                                          eia.gov.                                               Finally, the due date for annual
                                                Total Responses: 316;                                                                                          respondents (small biomass fuel
                                                   (7) Annual Estimated Number of                       FOR FURTHER INFORMATION CONTACT:                       manufacturers having a capacity of less
                                                Burden Hours: 4,093;                                    Requests for additional information or                 than 10,000 tons per year or planned
                                                   (8) Annual Estimated Reporting and                   copies of the information collection                   facilities) to report is changed from
                                                Recordkeeping Cost Burden: $0.                          instrument and instructions, should be                 February 1 to June 1 to coincide with
                                                  Authority: 42 U.S.C. 7256; 48 CFR                     directed to Connor Murphy at 202–287–                  the industry’s off-season and ease their
                                                970.0370–1.                                             5982, or by email Connor.Murphy@                       reporting burden during the heating
                                                  Issued in Washington, DC on June 18,                  eia.gov. You can view Form EIA–63C                     season which is their busiest time of the
                                                2018.                                                   Densified Biomass Fuel Report online at                year. Respondents that need to file
                                                John R. Bashista,                                       https://www.eia.gov/survey/#eia-63c.                   annually will only need to report
                                                Director, Office of Acquisition Management.             SUPPLEMENTARY INFORMATION: This                        limited data in Parts 1 and 2 of the form;
                                                [FR Doc. 2018–13677 Filed 6–25–18; 8:45 am]             information collection request contains:                 (5) Annual Estimated Number of
                                                BILLING CODE 6450–01–P
                                                                                                          (1) OMB No. 1905–0209;                               Respondents: 108;
                                                                                                          (2) Information Collection Request                     (6) Annual Estimated Number of
                                                                                                        Title: Densified Biomass Fuel Report;                  Total Responses: 1,065;
                                                DEPARTMENT OF ENERGY                                      (3) Type of Request: Three-year
                                                                                                        extension with changes;                                  (7) Annual Estimated Number of
                                                Energy Information Administration                         (4) Purpose: Form EIA–63C Densified                  Burden Hours: 1,467;
                                                                                                        Biomass Fuel Report is part of EIA’s                     (8) Annual Estimated Reporting and
                                                Agency Information Collection                           comprehensive energy data program.                     Recordkeeping Cost Burden: The cost of
                                                Extension                                               The survey collects information on the                 the burden hours is estimated to be
                                                AGENCY: U.S. Energy Information                         manufacture, shipment, exports, energy                 $111,026 (1,467 burden hours times
                                                Administration (EIA), U.S. Department                   characteristics, and sales of pellet fuels             $75.69 per hour). EIA estimates that
                                                of Energy (DOE).                                        and other densified biomass fuel                       there are no additional costs to
                                                                                                        products data from facilities that                     respondents associated with the survey
                                                ACTION: Notice.
                                                                                                        manufacture densified biomass fuel                     other than the costs associated with the
sradovich on DSK3GMQ082PROD with NOTICES




                                                SUMMARY:   EIA submitted an information                 products, primarily pellet fuels, for                  burden hours.
                                                collection request for extension as                     energy applications. The data collected                  Statutory Authority: Section 13(b) of
                                                required by the Paperwork Reduction                     are a primary source of information for                the Federal Energy Administration Act
                                                Act of 1995. The information collection                 the nation’s growing production of                     of 1974, Pub. L. 93–275, codified as 15
                                                requests a three-year extension with                    biomass products for heating and                       U.S.C. 772(b) and the DOE Organization
                                                changes to Form EIA–63C, Densified                      electric power generation, for use in                  Act of 1977, Pub. L. 95–91, codified at
                                                Biomass Fuel Report under OMB                           both domestic and foreign markets.                     42 U.S.C. 7101 et seq.


                                           VerDate Sep<11>2014   17:24 Jun 25, 2018   Jkt 244001   PO 00000   Frm 00037   Fmt 4703   Sfmt 4703   E:\FR\FM\26JNN1.SGM   26JNN1


                                                29778                          Federal Register / Vol. 83, No. 123 / Tuesday, June 26, 2018 / Notices

                                                  Issued in Washington, DC, on June 15,                 time on the specified comment date.                    receive email notification when a
                                                2018.                                                   Protests may be considered, but                        document is added to a subscribed
                                                Nanda Srinivasan                                        intervention is necessary to become a                  docket(s). For assistance with any FERC
                                                Director, Office of Survey Development and              party to the proceeding.                               Online service, please email
                                                Statistical Integration U.S. Energy                        eFiling is encouraged. More detailed                FERCOnlineSupport@ferc.gov, or call
                                                Information Administration.                             information relating to filing                         (866) 208–3676 (toll free). For TTY, call
                                                [FR Doc. 2018–13678 Filed 6–25–18; 8:45 am]             requirements, interventions, protests,                 (202) 502–8659.
                                                BILLING CODE 6450–01–P                                  service, and qualifying facilities filings               Comment Date: 5:00 p.m. Eastern
                                                                                                        can be found at: http://www.ferc.gov/                  Time on July 6, 2018.
                                                                                                        docs-filing/efiling/filing-req.pdf. For                  Dated: June 19, 2018.
                                                DEPARTMENT OF ENERGY                                    other information, call (866) 208–3676                 Kimberly D. Bose,
                                                                                                        (toll free). For TTY, call (202) 502–8659.
                                                Federal Energy Regulatory                                                                                      Secretary.
                                                Commission                                                Dated: June 20, 2018.                                [FR Doc. 2018–13595 Filed 6–25–18; 8:45 am]
                                                                                                        Nathaniel J. Davis, Sr.,                               BILLING CODE 6717–01–P
                                                Combined Notice of Filings #1                           Deputy Secretary.
                                                                                                        [FR Doc. 2018–13662 Filed 6–25–18; 8:45 am]
                                                   Take notice that the Commission
                                                                                                        BILLING CODE 6717–01–P                                 DEPARTMENT OF ENERGY
                                                received the following electric rate
                                                filings:                                                                                                       Federal Energy Regulatory
                                                   Docket Numbers: ER18–1274–001.                       DEPARTMENT OF ENERGY                                   Commission
                                                   Applicants: Duke Energy Ohio, Inc.,
                                                Duke Energy Kentucky, Inc., PJM                                                                                [Project No. 14878–000]
                                                                                                        Federal Energy Regulatory
                                                Interconnection, L.L.C.                                 Commission                                             FreedomWorks, LLC; Notice of
                                                   Description: Compliance filing: DEOK
                                                                                                        [Docket No. EL18–172–000]                              Preliminary Permit Application
                                                submits compliance filing re:
                                                                                                                                                               Accepted for Filing and Soliciting
                                                Commission’s 6/1/2018 order to be
                                                                                                        American Municipal Power, Inc.; Notice                 Comments, Motions To Intervene, and
                                                effective 1/1/2012.
                                                                                                        of Filing                                              Competing Applications
                                                   Filed Date: 6/20/18.
                                                   Accession Number: 20180620–5090.                        Take notice that on June 15, 2018,                     On June 1, 2018, FreedomWorks, LLC,
                                                   Comments Due: 5 p.m. ET 7/11/18.                     American Municipal Power, Inc.                         filed an application for a preliminary
                                                   Docket Numbers: ER18–1808–000.                       submitted an application for approval of               permit, pursuant to section 4(f) of the
                                                   Applicants: Midcontinent                             revenue requirement for reactive power                 Federal Power Act (FPA), proposing to
                                                Independent System Operator, Inc.                       service in MISO.                                       study the feasibility of the Mt. Storm
                                                   Description: § 205(d) Rate Filing:                      Any person desiring to intervene or to              Pumped Storage Hydro Project to be
                                                2018–06–20 Termination of SA 2998                       protest this filing must file in                       located near Bismarck in Grant County,
                                                Exelon-MISO ENRIS Agreement (J371)                      accordance with Rules 211 and 214 of                   West Virginia. The sole purpose of a
                                                to be effective 7/31/2018.                              the Commission’s Rules of Practice and                 preliminary permit, if issued, is to grant
                                                   Filed Date: 6/20/18.                                 Procedure (18 CFR 385.211, 385.214).                   the permit holder priority to file a
                                                   Accession Number: 20180620–5021.                     Protests will be considered by the                     license application during the permit
                                                   Comments Due: 5 p.m. ET 7/11/18.                     Commission in determining the                          term. A preliminary permit does not
                                                   Docket Numbers: ER18–1809–000.                       appropriate action to be taken, but will               authorize the permit holder to perform
                                                   Applicants: Entergy Arkansas, Inc.                   not serve to make protestants parties to               any land-disturbing activities or
                                                   Description: Request of Entergy                      the proceeding. Any person wishing to                  otherwise enter upon lands or waters
                                                Arkansas, Inc. for Temporary and                        become a party must file a notice of                   owned by others without the owners’
                                                Limited Waiver of Rate Schedule.                        intervention or motion to intervene, as                express permission.
                                                   Filed Date: 6/19/18.                                 appropriate. Such notices, motions, or                    The proposed project would consist of
                                                   Accession Number: 20180619–5132.                     protests must be filed on or before the                the following: (1) An existing Mt. Storm
                                                   Comments Due: 5 p.m. ET 7/10/18.                     comment date. On or before the                         Lake as an upper reservoir with a
                                                   Docket Numbers: ER18–1810–000.                       comment date, it is not necessary to                   surface area of 1,200 acres and a storage
                                                   Applicants: Midcontinent                             serve motions to intervene or protests                 capacity of 44,000 acre-feet at a surface
                                                Independent System Operator, Inc.                       on persons other than the Applicant.                   elevation of approximately 3,200 feet
                                                   Description: § 205(d) Rate Filing:                      The Commission encourages                           above mean sea level (msl); (2) as many
                                                2018–06–20_Termination of SA 3050 SC                    electronic submission of protests and                  as two new lower reservoirs with a
                                                Interconnection-ITCM GIA (J298) to be                   interventions in lieu of paper using the               combined surface area of 690 acres and
                                                effective 6/21/2018.                                    ‘‘eFiling’’ link at http://www.ferc.gov.               a combined storage capacity of 12,000
                                                   Filed Date: 6/20/18.                                 Persons unable to file electronically                  acre-feet at a surface elevation of 2,350
                                                   Accession Number: 20180620–5037.                     should submit an original and 5 copies                 to 2,425 feet msl created through
                                                   Comments Due: 5 p.m. ET 7/11/18.                     of the protest or intervention to the                  construction of new semi-circular dams
                                                   The filings are accessible in the                    Federal Energy Regulatory Commission,                  and/or dikes; (3) as many as eight new
                                                Commission’s eLibrary system by                         888 First Street NE, Washington, DC                    10,000-foot-long, 4-foot-diameter
                                                                                                        20426.                                                 penstocks connecting the upper
sradovich on DSK3GMQ082PROD with NOTICES




                                                clicking on the links or querying the
                                                docket number.                                             This filing is accessible on-line at                reservoir and lower reservoir; (4) two
                                                   Any person desiring to intervene or                  http://www.ferc.gov, using the                         new 300-foot-long, 50-foot-wide, 25-
                                                protest in any of the above proceedings                 ‘‘eLibrary’’ link and is available for                 foot-high powerhouses containing four
                                                must file in accordance with Rules 211                  review in the Commission’s Public                      turbine-generator units with a total rated
                                                and 214 of the Commission’s                             Reference Room in Washington, DC.                      capacity of 1,000 megawatts; (5) a new
                                                Regulations (18 CFR 385.211 and                         There is an ‘‘eSubscription’’ link on the              transmission line connecting the
                                                385.214) on or before 5:00 p.m. Eastern                 website that enables subscribers to                    powerhouse to a nearby electric grid


                                           VerDate Sep<11>2014   17:24 Jun 25, 2018   Jkt 244001   PO 00000   Frm 00038   Fmt 4703   Sfmt 4703   E:\FR\FM\26JNN1.SGM   26JNN1



Document Created: 2018-06-26 00:51:57
Document Modified: 2018-06-26 00:51:57
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice.
DatesEIA must receive all comments on this proposed information collection no later than July 26, 2018. If you anticipate any difficulties in submitting your comments by the deadline, contact the DOE Desk Officer at 202-395-0710.
ContactRequests for additional information or copies of the information collection instrument and instructions, should be directed to Connor Murphy at 202-287-5982, or by email [email protected] You can view Form EIA-63C Densified Biomass Fuel Report online at https://www.eia.gov/survey/#eia-63c.
FR Citation83 FR 29777 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR