83_FR_29904 83 FR 29781 - Peak Hour Power, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

83 FR 29781 - Peak Hour Power, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 123 (June 26, 2018)

Page Range29781-29781
FR Document2018-13707

Federal Register, Volume 83 Issue 123 (Tuesday, June 26, 2018)
[Federal Register Volume 83, Number 123 (Tuesday, June 26, 2018)]
[Notices]
[Page 29781]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-13707]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14877-000]


Peak Hour Power, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On May 17, 2018, Peak Hour Power, LLC, filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of the Silver Creek Pumped 
Storage Project to be located on Silver Creek Reservoir in Schuylkill 
County, Pennsylvania. The sole purpose of a preliminary permit, if 
issued, is to grant the permit holder priority to file a license 
application during the permit term. A preliminary permit does not 
authorize the permit holder to perform any land-disturbing activities 
or otherwise enter upon lands or waters owned by others without the 
owners' express permission.
    The proposed project would consist of the following: (1) A new 
8,000-foot-long, 125- to 175-foot-high roller-compacted concrete or 
rock-filled semi-circular dam and/or dike forming an upper reservoir 
having a surface area of 150 acres and a total storage capacity between 
approximately 8,000 and 10,000 acre-feet at a normal maximum water 
surface elevation between approximately 1,650 and 1,750 feet above mean 
sea level (msl); (2) a lower reservoir encompassing the existing Silver 
Creek Reservoir and neighboring abandoned mines land and having a 
surface area of 100 acres and a total storage capacity of 10,000 acre-
feet at a normal maximum water surface elevation between 1,200 and 
1,300 feet msl; (3) a 3,000-foot-long tunnel connecting the upper and 
lower reservoirs; (4) a powerhouse containing two turbine units with a 
total rated capacity of 250 megawatts; (5) a 2-mile-long transmission 
line connecting to an existing 230-kilovolt (kV) line or a 4000-foot-
long transmission line connecting to an existing 69-kV line; and (6) 
appurtenant facilities. Possible initial fill water would come from 
local inflow, including groundwater. The proposed project would have an 
annual generation of 784,750 megawatt-hours.
    Applicant Contact: Paul DiRenzo, Peak Hour Power, LLC, 214 
Norwegian Woods Drive, Pottsville, PA 17901; phone: 570-617-7810.
    FERC Contact: Monir Chowdhury; phone: (202) 502-6736.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-14877-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's website at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14877) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: June 20, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-13707 Filed 6-25-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                               Federal Register / Vol. 83, No. 123 / Tuesday, June 26, 2018 / Notices                                                  29781

                                                docket(s). For assistance with any FERC                 DEPARTMENT OF ENERGY                                      Deadline for filing comments, motions
                                                Online service, please email                                                                                   to intervene, competing applications
                                                FERCOnlineSupport@ferc.gov, or call                     Federal Energy Regulatory                              (without notices of intent), or notices of
                                                (866) 208–3676 (toll free). For TTY, call               Commission                                             intent to file competing applications: 60
                                                (202) 502–8659.                                                                                                days from the issuance of this notice.
                                                                                                        [Project No. 14877–000]                                Competing applications and notices of
                                                  Comment Date: 5:00 p.m. Eastern
                                                                                                                                                               intent must meet the requirements of 18
                                                Time on July 10, 2018.                                  Peak Hour Power, LLC; Notice of                        CFR 4.36.
                                                  Dated: June 20, 2018.                                 Preliminary Permit Application                            The Commission strongly encourages
                                                                                                        Accepted for Filing and Soliciting                     electronic filing. Please file comments,
                                                Nathaniel J. Davis, Sr.,
                                                                                                        Comments, Motions To Intervene, and                    motions to intervene, notices of intent,
                                                Deputy Secretary.                                       Competing Applications
                                                [FR Doc. 2018–13664 Filed 6–25–18; 8:45 am]
                                                                                                                                                               and competing applications using the
                                                                                                           On May 17, 2018, Peak Hour Power,                   Commission’s eFiling system at http://
                                                BILLING CODE 6717–01–P
                                                                                                        LLC, filed an application for a                        www.ferc.gov/docs-filing/efiling.asp.
                                                                                                        preliminary permit, pursuant to section                Commenters can submit brief comments
                                                                                                        4(f) of the Federal Power Act (FPA),                   up to 6,000 characters, without prior
                                                DEPARTMENT OF ENERGY
                                                                                                        proposing to study the feasibility of the              registration, using the eComment system
                                                Federal Energy Regulatory                               Silver Creek Pumped Storage Project to                 at http://www.ferc.gov/docs-filing/
                                                                                                        be located on Silver Creek Reservoir in                ecomment.asp. You must include your
                                                Commission
                                                                                                        Schuylkill County, Pennsylvania. The                   name and contact information at the end
                                                                                                        sole purpose of a preliminary permit, if               of your comments. For assistance,
                                                [Docket No. IN18–7–000]                                                                                        please contact FERC Online Support at
                                                                                                        issued, is to grant the permit holder
                                                                                                        priority to file a license application                 FERCOnlineSupport@ferc.gov, (866)
                                                Footprint Power LLC; Footprint Power                                                                           208–3676 (toll free), or (202) 502–8659
                                                Salem Harbor Operations LLC; Notice                     during the permit term. A preliminary
                                                                                                        permit does not authorize the permit                   (TTY). In lieu of electronic filing, please
                                                of Designation of Commission Staff as                                                                          send a paper copy to: Secretary, Federal
                                                Non-Decisional                                          holder to perform any land-disturbing
                                                                                                        activities or otherwise enter upon lands               Energy Regulatory Commission, 888
                                                                                                        or waters owned by others without the                  First Street NE, Washington, DC 20426.
                                                   With respect to an order issued by the                                                                      The first page of any filing should
                                                Commission in the above-captioned                       owners’ express permission.
                                                                                                           The proposed project would consist of               include docket number P–14877–000.
                                                docket,1 with the exceptions noted                                                                                More information about this project,
                                                                                                        the following: (1) A new 8,000-foot-long,
                                                below, the staff of the Office of                                                                              including a copy of the application, can
                                                                                                        125- to 175-foot-high roller-compacted
                                                Enforcement are designated as non-                                                                             be viewed or printed on the ‘‘eLibrary’’
                                                                                                        concrete or rock-filled semi-circular
                                                decisional in deliberations by the                                                                             link of the Commission’s website at
                                                                                                        dam and/or dike forming an upper
                                                Commission in this docket.                              reservoir having a surface area of 150                 http://www.ferc.gov/docs-filing/
                                                Accordingly, pursuant to 18 CFR                         acres and a total storage capacity                     elibrary.asp. Enter the docket number
                                                385.2202 (2017), they will not serve as                 between approximately 8,000 and                        (P–14877) in the docket number field to
                                                advisors to the Commission or take part                 10,000 acre-feet at a normal maximum                   access the document. For assistance,
                                                in the Commission’s review of any offer                 water surface elevation between                        contact FERC Online Support.
                                                of settlement. Likewise, as non-                        approximately 1,650 and 1,750 feet                       Dated: June 20, 2018.
                                                decisional staff, pursuant to 18 CFR                    above mean sea level (msl); (2) a lower                Kimberly D. Bose,
                                                385.2201 (2017), they are prohibited                    reservoir encompassing the existing                    Secretary.
                                                from communicating with advisory staff                  Silver Creek Reservoir and neighboring                 [FR Doc. 2018–13707 Filed 6–25–18; 8:45 am]
                                                concerning any deliberations in this                    abandoned mines land and having a                      BILLING CODE 6717–01–P
                                                docket.                                                 surface area of 100 acres and a total
                                                   Exceptions to this designation as non-               storage capacity of 10,000 acre-feet at a
                                                decisional are:                                         normal maximum water surface                           DEPARTMENT OF ENERGY
                                                                                                        elevation between 1,200 and 1,300 feet
                                                Jeremy Medovoy                                          msl; (3) a 3,000-foot-long tunnel                      Federal Energy Regulatory
                                                Catherine Collins                                       connecting the upper and lower                         Commission
                                                                                                        reservoirs; (4) a powerhouse containing
                                                Katherine Walsh                                         two turbine units with a total rated                   Combined Notice of Filings
                                                Mark Nagle                                              capacity of 250 megawatts; (5) a 2-mile-                 Take notice that the Commission has
                                                Benjamin Jarrett                                        long transmission line connecting to an                received the following Natural Gas
                                                                                                        existing 230-kilovolt (kV) line or a 4000-             Pipeline Rate and Refund Report filings:
                                                John Karp                                               foot-long transmission line connecting
                                                Alfred Jasins                                           to an existing 69-kV line; and (6)                     Filings Instituting Proceedings
                                                  Dated: June 20, 2018.                                 appurtenant facilities. Possible initial                 Docket Numbers: RP16–1299–004.
                                                                                                        fill water would come from local inflow,                 Applicants: Kinetica Energy Express,
                                                Kimberly D. Bose,
                                                                                                        including groundwater. The proposed                    LLC.
                                                Secretary.                                              project would have an annual
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                                 Description: Compliance filing
                                                [FR Doc. 2018–13706 Filed 6–25–18; 8:45 am]             generation of 784,750 megawatt-hours.                  Compliance Filing to be effective 4/12/
                                                BILLING CODE 6717–01–P                                     Applicant Contact: Paul DiRenzo,                    2017.
                                                                                                        Peak Hour Power, LLC, 214 Norwegian                      Filed Date: 6/18/18.
                                                                                                        Woods Drive, Pottsville, PA 17901;                       Accession Number: 20180618–5054.
                                                                                                        phone: 570–617–7810.                                     Comments Due: 5 p.m. ET 7/2/18.
                                                  1 Footprint Power LLC, et al., 163 FERC ¶ 61,198         FERC Contact: Monir Chowdhury;                        Docket Numbers: RP18–899–000.
                                                (2018).                                                 phone: (202) 502–6736.                                   Applicants: Equitrans, L.P.


                                           VerDate Sep<11>2014   17:24 Jun 25, 2018   Jkt 244001   PO 00000   Frm 00041   Fmt 4703   Sfmt 4703   E:\FR\FM\26JNN1.SGM   26JNN1



Document Created: 2018-06-26 00:52:03
Document Modified: 2018-06-26 00:52:03
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 29781 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR