83_FR_30570 83 FR 30445 - Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Electric Arc Furnace Steelmaking Facilities (Renewal)

83 FR 30445 - Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Electric Arc Furnace Steelmaking Facilities (Renewal)

ENVIRONMENTAL PROTECTION AGENCY

Federal Register Volume 83, Issue 125 (June 28, 2018)

Page Range30445-30446
FR Document2018-13923

The Environmental Protection Agency (EPA) has submitted an information collection request (ICR)--NESHAP for Electric Arc Furnace Steelmaking Facilities (Renewal), EPA ICR Number 2277.04, OMB Control Number 2060-0608--to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through June 30, 2018. Public comments were previously requested via the Federal Register on June 29, 2017 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An Agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Federal Register, Volume 83 Issue 125 (Thursday, June 28, 2018)
[Federal Register Volume 83, Number 125 (Thursday, June 28, 2018)]
[Notices]
[Pages 30445-30446]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-13923]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[EPA-HQ-OECA-2013-0323; FRL-9979-58-OEI]


Information Collection Request Submitted to OMB for Review and 
Approval; Comment Request; NESHAP for Electric Arc Furnace Steelmaking 
Facilities (Renewal)

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) has submitted an 
information collection request (ICR)--NESHAP for Electric Arc Furnace 
Steelmaking Facilities (Renewal), EPA ICR Number 2277.04, OMB Control 
Number 2060-0608--to the Office of Management and Budget (OMB) for 
review and approval in accordance with the Paperwork Reduction Act. 
This is a proposed extension of the ICR, which is currently approved 
through June 30, 2018. Public comments were previously requested via 
the Federal Register on June 29, 2017 during a 60-day comment period. 
This notice allows for an additional 30 days for public comments. A 
fuller description of the ICR is given below, including its estimated 
burden and cost to the public. An Agency may neither conduct nor 
sponsor, and a person is not required to respond to, a collection of 
information unless it displays a currently valid OMB control number.

DATES: Additional comments may be submitted on or before July 30, 2018.

ADDRESSES: Submit your comments, referencing EPA-HQ-OECA-2013-0323, to: 
(1) EPA online using www.regulations.gov (our preferred method); or by 
email to [email protected]; or by mail to: EPA Docket Center, 
Environmental Protection Agency, Mail Code 28221T, 1200 Pennsylvania 
Ave. NW, Washington, DC 20460; and (2) OMB via email to: 
[email protected]. Address comments to OMB Desk Officer for 
EPA.
    EPA's policy is that all comments received will be included in the 
public docket without change, including any personal information 
provided, unless the comment includes profanity, threats, information 
claimed to be Confidential Business Information (CBI), or other 
information whose disclosure is restricted by statute.

FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring, 
Assistance, and Media Programs Division, Office of Compliance, Mail 
Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, 
Washington, DC 20460; telephone number: (202) 564-2970; fax number: 
(202) 564-0050; email address: [email protected].

SUPPLEMENTARY INFORMATION: Supporting documents, which explain in 
detail the information that the EPA will be collecting, are available 
in the public docket for this ICR. The docket can be viewed online at 
www.regulations.gov or in person at the EPA Docket Center, WJC West, 
Room 3334, 1301 Constitution Ave. NW, Washington, DC. The telephone 
number for the Docket Center is 202-566-1744. For additional 
information about EPA's public docket, visit: http://www.epa.gov/dockets.
    Abstract: The National Emission Standards for Hazardous Air 
Pollutants (NESHAP) for Area Sources: Electric Arc Furnace Steelmaking 
Facilities (40 CFR part 63, subpart YYYYY) apply to existing and new 
Electric Arc Furnace (EAF) steelmaking facilities that are area sources 
of hazardous air pollutants (HAP) emissions. The standards establish 
particulate matter (PM) emission limits for control devices and opacity 
limits for melt shops, pollution prevention requirements for ferrous 
scrap that is melted in EAFs, and monitoring, reporting, and 
recordkeeping requirements. New facilities include those that commenced 
construction or reconstruction after the date of proposal. In general, 
all NESHAP standards require initial notifications, performance tests, 
and periodic reports by the owners/operators of the affected 
facilities. They are also required to maintain records of the 
occurrence and duration of any startup, shutdown, or malfunction in the 
operation of an affected facility, or any period during which the 
monitoring system is inoperative. These notifications, reports, and 
records are essential in determining compliance, and are required of 
all affected facilities subject to NESHAP.
    Form numbers: None.

[[Page 30446]]

    Respondents/affected entities: Owners or operators of electric arc 
furnace steelmaking facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart YYYYY).
    Estimated number of respondents: 91 (total).
    Frequency of response: Initially, semiannually and occasionally.
    Total estimated burden: 4,450 hours per year. Burden is defined at 
5 CFR 1320.3(b).
    Total estimated cost: $467,000 per year, which includes no 
annualized capital and/or operation & maintenance costs.
    Changes in the estimates: There is an increase in burden hours and 
number of responses in this ICR compared to the previous ICR. This 
adjustment is due to (1) this ICR adjusts the number of affected 
sources subject to the rule based on the latest available data; (2) 
this ICR corrects the number of sources keeping records and entering 
information in record system, as well as the number of sources 
estimated to submit SSM reports; and (3) consistent with the Terms of 
Clearance, this ICR assumes all existing respondents will have to 
familiarize with the regulatory requirements each year.

Courtney Kerwin,
Director, Regulatory Support Division.
[FR Doc. 2018-13923 Filed 6-27-18; 8:45 am]
BILLING CODE 6560-50-P



                                                                            Federal Register / Vol. 83, No. 125 / Thursday, June 28, 2018 / Notices                                            30445

                                              (7) arsenic, nickel and polychlorinated                 Additionally, there is an adjustment                   20460; and (2) OMB via email to: oira_
                                              biphenyl (PCB) limits for new, existing                 decrease because the total number of                   submission@omb.eop.gov. Address
                                              and reconstructed Soderberg potlines;                   affected sources has decreased as                      comments to OMB Desk Officer for EPA.
                                              (8) new work practice standards for                     compared to the most recently-approved                    EPA’s policy is that all comments
                                              anode bake furnaces, paste production                   ICR. There is an adjustment decrease in                received will be included in the public
                                              plants and potlines; and (9) eliminates                 the total estimated capital and O&M                    docket without change, including any
                                              the exemptions for periods of startup,                  costs as compared to the most recently                 personal information provided, unless
                                              shutdown, and malfunctions (SSM). The                   approved ICR. This decrease occurred                   the comment includes profanity, threats,
                                              amendment also reduces the testing                      because there is a decrease in the total               information claimed to be Confidential
                                              frequency for total fluoride (TF) from                  number of respondents subject to the                   Business Information (CBI), or other
                                              prebake and Soderberg potlines and                      rule.                                                  information whose disclosure is
                                              POM from Soderberg potlines from                                                                               restricted by statute.
                                                                                                      Courtney Kerwin,
                                              monthly to semiannually. These                                                                                 FOR FURTHER INFORMATION CONTACT:
                                              regulations apply to the following                      Director, Regulatory Support Division.
                                                                                                                                                             Patrick Yellin, Monitoring, Assistance,
                                              affected sources at a primary aluminum                  [FR Doc. 2018–13922 Filed 6–27–18; 8:45 am]
                                                                                                                                                             and Media Programs Division, Office of
                                              reduction plant are covered: Each new                   BILLING CODE 6560–50–P
                                                                                                                                                             Compliance, Mail Code 2227A,
                                              and existing pitch storage tank, potline,                                                                      Environmental Protection Agency, 1200
                                              paste production plant and anode bake                                                                          Pennsylvania Ave. NW, Washington, DC
                                              furnace that is located at a plant site that            ENVIRONMENTAL PROTECTION
                                                                                                      AGENCY                                                 20460; telephone number: (202) 564–
                                              is a major source as defined at § 63.2                                                                         2970; fax number: (202) 564–0050;
                                              (except for anode bake furnaces that are                [EPA–HQ–OECA–2013–0323; FRL–9979–                      email address: yellin.patrick@epa.gov.
                                              not located on the same site as a                       58–OEI]                                                SUPPLEMENTARY INFORMATION:
                                              primary aluminum reduction plant).                                                                             Supporting documents, which explain
                                              New facilities include those that                       Information Collection Request
                                                                                                      Submitted to OMB for Review and                        in detail the information that the EPA
                                              commenced construction or                                                                                      will be collecting, are available in the
                                              reconstruction after the date of proposal.              Approval; Comment Request; NESHAP
                                                                                                      for Electric Arc Furnace Steelmaking                   public docket for this ICR. The docket
                                                 In general, all NESHAP standards                                                                            can be viewed online at
                                              require initial notifications,                          Facilities (Renewal)
                                                                                                                                                             www.regulations.gov or in person at the
                                              performance tests, and periodic reports                 AGENCY: Environmental Protection                       EPA Docket Center, WJC West, Room
                                              by the owners/operators of the affected                 Agency (EPA).                                          3334, 1301 Constitution Ave. NW,
                                              facilities. They are also required to                                                                          Washington, DC. The telephone number
                                                                                                      ACTION: Notice.
                                              maintain records of the occurrence and                                                                         for the Docket Center is 202–566–1744.
                                              duration of any startup, shutdown, or                   SUMMARY:   The Environmental Protection                For additional information about EPA’s
                                              malfunction in the operation of an                      Agency (EPA) has submitted an                          public docket, visit: http://
                                              affected facility, or any period during                 information collection request (ICR)—                  www.epa.gov/dockets.
                                              which the monitoring system is                          NESHAP for Electric Arc Furnace                           Abstract: The National Emission
                                              inoperative. These notifications, reports,              Steelmaking Facilities (Renewal), EPA                  Standards for Hazardous Air Pollutants
                                              and records are essential in determining                ICR Number 2277.04, OMB Control                        (NESHAP) for Area Sources: Electric
                                              compliance, and are required of all                     Number 2060–0608—to the Office of                      Arc Furnace Steelmaking Facilities (40
                                              affected facilities subject to NESHAP.                  Management and Budget (OMB) for                        CFR part 63, subpart YYYYY) apply to
                                                 Form numbers: None.                                  review and approval in accordance with
                                                 Respondents/affected entities:                                                                              existing and new Electric Arc Furnace
                                                                                                      the Paperwork Reduction Act. This is a                 (EAF) steelmaking facilities that are area
                                              Primary aluminum reduction plants.                      proposed extension of the ICR, which is
                                                 Respondent’s obligation to respond:                                                                         sources of hazardous air pollutants
                                                                                                      currently approved through June 30,                    (HAP) emissions. The standards
                                              Mandatory (40 CFR part 63, subpart LL).                 2018. Public comments were previously
                                                 Estimated number of respondents: 11                                                                         establish particulate matter (PM)
                                                                                                      requested via the Federal Register on                  emission limits for control devices and
                                              (total).                                                June 29, 2017 during a 60-day comment
                                                 Frequency of response: Initially and                                                                        opacity limits for melt shops, pollution
                                                                                                      period. This notice allows for an                      prevention requirements for ferrous
                                              semiannually.
                                                 Total estimated burden: 71,900 hours                 additional 30 days for public comments.                scrap that is melted in EAFs, and
                                              (per year). Burden is defined at 5 CFR                  A fuller description of the ICR is given               monitoring, reporting, and
                                              1320.3(b).                                              below, including its estimated burden                  recordkeeping requirements. New
                                                 Total estimated cost: $7,630,000 (per                and cost to the public. An Agency may                  facilities include those that commenced
                                              year), which includes $78,500 in either                 neither conduct nor sponsor, and a                     construction or reconstruction after the
                                              annualized capital/startup and/or                       person is not required to respond to, a                date of proposal. In general, all NESHAP
                                              operation & maintenance costs.                          collection of information unless it                    standards require initial notifications,
                                                 Changes in the estimates: There is an                displays a currently valid OMB control                 performance tests, and periodic reports
                                              adjustment decrease in the total                        number.                                                by the owners/operators of the affected
                                              estimated burden as currently identified                DATES: Additional comments may be                      facilities. They are also required to
                                              in the OMB Inventory of Approved                        submitted on or before July 30, 2018.                  maintain records of the occurrence and
                                              Burdens. This decrease is primarily due                 ADDRESSES: Submit your comments,                       duration of any startup, shutdown, or
                                              to a program change. The 2015                           referencing EPA–HQ–OECA–2013–                          malfunction in the operation of an
amozie on DSK3GDR082PROD with NOTICES1




                                              amendment reduces the frequency of TF                   0323, to: (1) EPA online using                         affected facility, or any period during
                                              performance tests from monthly to                       www.regulations.gov (our preferred                     which the monitoring system is
                                              semiannually. This ICR combines                         method); or by email to docket.oeca@                   inoperative. These notifications, reports,
                                              burden from the existing provisions                     epa.gov; or by mail to: EPA Docket                     and records are essential in determining
                                              with the burden associated with the                     Center, Environmental Protection                       compliance, and are required of all
                                              2015 amendment to the rule, resulting                   Agency, Mail Code 28221T, 1200                         affected facilities subject to NESHAP.
                                              in a net decrease in burden.                            Pennsylvania Ave. NW, Washington, DC                      Form numbers: None.


                                         VerDate Sep<11>2014   17:08 Jun 27, 2018   Jkt 244001   PO 00000   Frm 00049   Fmt 4703   Sfmt 4703   E:\FR\FM\28JNN1.SGM   28JNN1


                                              30446                         Federal Register / Vol. 83, No. 125 / Thursday, June 28, 2018 / Notices

                                                 Respondents/affected entities:                       Pennsylvania Ave. NW, Washington, DC                   under all sections of TSCA. Some of the
                                              Owners or operators of electric arc                     20460–0001; telephone number: (202)                    information may be claimed or
                                              furnace steelmaking facilities.                         564–8257; email address:                               determined to be CBI.
                                                 Respondent’s obligation to respond:                  sherlock.scott@epa.gov.                                   EPA is issuing this notice to inform
                                              Mandatory (40 CFR part 63, subpart                        For general information contact: The                 all submitters of information under all
                                              YYYYY).                                                 TSCA-Hotline, ABVI-Goodwill, 422                       sections of TSCA that EPA may provide
                                                 Estimated number of respondents: 91                  South Clinton Ave., Rochester, NY                      IEI access to these CBI materials on a
                                              (total).                                                14620; telephone number: (202) 554–                    need-to-know basis only. All access to
                                                 Frequency of response: Initially,                    1404; email address: TSCA-Hotline@                     TSCA CBI under this contract will take
                                              semiannually and occasionally.                          epa.gov.                                               place at EPA Headquarters IEI’s site
                                                 Total estimated burden: 4,450 hours                                                                         located in Cambridge, MA, in
                                                                                                      SUPPLEMENTARY INFORMATION:
                                              per year. Burden is defined at 5 CFR                                                                           accordance with EPA’s TSCA CBI
                                              1320.3(b).                                              I. General Information                                 Protection Manual.
                                                 Total estimated cost: $467,000 per                                                                             Access to TSCA data, including CBI,
                                                                                                      A. Does this action apply to me?
                                              year, which includes no annualized                                                                             will continue until March 31, 2023. If
                                              capital and/or operation & maintenance                     This action is directed to the public               the contract is extended, this access will
                                              costs.                                                  in general. This action may, however, be               also continue for the duration of the
                                                 Changes in the estimates: There is an                of interest to all who manufacture,                    extended contract without further
                                              increase in burden hours and number of                  process, or distribute industrial                      notice.
                                              responses in this ICR compared to the                   chemicals. Since other entities may also                  IEI personnel will be required to sign
                                              previous ICR. This adjustment is due to                 be interested, the Agency has not                      nondisclosure agreements and will be
                                              (1) this ICR adjusts the number of                      attempted to describe all the specific                 briefed on appropriate security
                                              affected sources subject to the rule                    entities that may be affected by this                  procedures before they are permitted
                                              based on the latest available data; (2)                 action.                                                access to TSCA CBI.
                                              this ICR corrects the number of sources                 B. How can I get copies of this document                 Authority: 15 U.S.C. 2601 et seq.
                                              keeping records and entering                            and other related information?
                                              information in record system, as well as                                                                         Dated: June 20, 2018.
                                              the number of sources estimated to                         The docket for this action, identified              Pamela S. Myrick,
                                              submit SSM reports; and (3) consistent                  by docket identification (ID) number                   Director, Information Management Division,
                                              with the Terms of Clearance, this ICR                   EPA–HQ–OPPT–2003–0004, is available                    Office of Pollution Prevention and Toxics.
                                              assumes all existing respondents will                   at http://www.regulations.gov or at the                [FR Doc. 2018–13945 Filed 6–27–18; 8:45 am]
                                              have to familiarize with the regulatory                 Office of Pollution Prevention and                     BILLING CODE 6560–50–P
                                              requirements each year.                                 Toxics Docket (OPPT Docket),
                                                                                                      Environmental Protection Agency
                                              Courtney Kerwin,                                        Docket Center (EPA/DC), West William                   ENVIRONMENTAL PROTECTION
                                              Director, Regulatory Support Division.                  Jefferson Clinton Bldg., Rm. 3334, 1301                AGENCY
                                              [FR Doc. 2018–13923 Filed 6–27–18; 8:45 am]             Constitution Ave. NW, Washington, DC.
                                                                                                      The Public Reading Room is open from                   [EPA–HQ–OARM–2018–0028; FRL–9979–
                                              BILLING CODE 6560–50–P
                                                                                                                                                             95–OEI]
                                                                                                      8:30 a.m. to 4:30 p.m., Monday through
                                                                                                      Friday, excluding legal holidays. The                  Information Collection Request
                                              ENVIRONMENTAL PROTECTION                                telephone number for the Public                        Submitted to OMB for Review and
                                              AGENCY                                                  Reading Room is (202) 566–1744, and                    Approval; Comment Request;
                                              [EPA–HQ–OPPT–2003–0004; FRL–9979–45]                    the telephone number for the OPPT                      Contractor Conflicts of Interest
                                                                                                      Docket is (202) 566–0280. Please review                (Renewal)
                                              Access to Confidential Business                         the visitor instructions and additional
                                              Information by Industrial Economics                     information about the docket available                 AGENCY: Environmental Protection
                                              Incorporated                                            at http://www.epa.gov/dockets.                         Agency (EPA).
                                                                                                                                                             ACTION: Notice.
                                              AGENCY: Environmental Protection                        II. What action is the Agency taking?
                                              Agency (EPA).                                              Under EPA contract number GS–10F–                   SUMMARY:   The Environmental Protection
                                              ACTION: Notice.                                         0061N, order number 68HEOH18F1498,                     Agency has submitted an information
                                                                                                      contractor Industrial Economics                        collection request (ICR), ‘‘Contractor
                                              SUMMARY:   EPA has authorized its                       Incorporated (IEI) of 2067 Massachusetts               Conflicts of Interest’’ (EPA ICR No.
                                              contractor, Industrial Economics                        Ave, Suite 4, Cambridge, MA will assist                1550.11, OMB Control No. 2030–0023)
                                              Incorporated of Cambridge, MA, to                       the Office of Enforcement and                          to the Office of Management and Budget
                                              access information which has been                       Compliance Assurance (OECA) in                         (OMB) for review and approval in
                                              submitted to EPA under all sections of                  preparing financial analysis of the firms,             accordance with the Paperwork
                                              the Toxic Substances Control Act                        individuals, and organizations that are                Reduction Act. This is a proposed
                                              (TSCA). Some of the information may be                  the subject of EPA enforcement actions                 extension of the ICR, which is currently
                                              claimed or determined to be                             taken under TSCA.                                      approved through June 30, 2018. Public
                                              Confidential Business Information (CBI).                   In accordance with 40 CFR 2.306(j),                 comments were previously requested
                                              DATES: Access to the confidential data                  EPA has determined that under EPA                      via the Federal Register on March 2,
amozie on DSK3GDR082PROD with NOTICES1




                                              will occur no sooner than July 5, 2018.                 contract number GS–10F–0061N, order                    2018 during a 60-day comment period.
                                              FOR FURTHER INFORMATION CONTACT:                        number 68HEOH18F1498, IEI will                         This notice allows for an additional 30
                                                For technical information contact:                    require access to CBI submitted to EPA                 days for public comments. A fuller
                                              Scott Sherlock, Environmental                           under all sections of TSCA to perform                  description of the ICR is given below,
                                              Assistance Division (7408M), Office of                  successfully the duties specified under                including its estimated burden and cost
                                              Pollution Prevention and Toxics,                        the contract. IEI personnel will be given              to the public. An agency may not
                                              Environmental Protection Agency, 1200                   access to information submitted to EPA                 conduct or sponsor and a person is not


                                         VerDate Sep<11>2014   17:08 Jun 27, 2018   Jkt 244001   PO 00000   Frm 00050   Fmt 4703   Sfmt 4703   E:\FR\FM\28JNN1.SGM   28JNN1



Document Created: 2018-11-06 09:55:22
Document Modified: 2018-11-06 09:55:22
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice.
DatesAdditional comments may be submitted on or before July 30, 2018.
ContactPatrick Yellin, Monitoring, Assistance, and Media Programs Division, Office of Compliance, Mail Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, Washington, DC 20460; telephone number: (202) 564-2970; fax number:
FR Citation83 FR 30445 