83_FR_30589 83 FR 30464 - Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Changes to Containment Cooling and Spent Fuel Pool Makeup Strategies

83 FR 30464 - Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Changes to Containment Cooling and Spent Fuel Pool Makeup Strategies

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 83, Issue 125 (June 28, 2018)

Page Range30464-30465
FR Document2018-13860

The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment Nos. 126 and 125 to Combined Licenses (COLs), NPF-91 and NPF-92, respectively. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company; Oglethorpe Power Corporation; MEAG Power SPVM, LLC; MEAG Power SPVJ, LLC; MEAG Power SPVP, LLC; and the City of Dalton, Georgia (the licensee), for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.

Federal Register, Volume 83 Issue 125 (Thursday, June 28, 2018)
[Federal Register Volume 83, Number 125 (Thursday, June 28, 2018)]
[Notices]
[Pages 30464-30465]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-13860]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-025 and 52-026; NRC-2008-0252]


Southern Nuclear Operating Company, Inc.; Vogtle Electric 
Generating Plant, Units 3 and 4; Changes to Containment Cooling and 
Spent Fuel Pool Makeup Strategies

AGENCY: Nuclear Regulatory Commission.

ACTION: Exemption and combined license amendment; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is granting an 
exemption to allow a departure from the certification information of 
Tier 1 of the generic design control document (DCD) and is issuing 
License Amendment Nos. 126 and 125 to Combined Licenses (COLs), NPF-91 
and NPF-92, respectively. The COLs were issued to Southern Nuclear 
Operating Company, Inc., and Georgia Power Company; Oglethorpe Power 
Corporation; MEAG Power SPVM, LLC; MEAG Power SPVJ, LLC; MEAG Power 
SPVP, LLC; and the City of Dalton, Georgia (the licensee), for 
construction and operation of the Vogtle Electric Generating Plant 
(VEGP) Units 3 and 4, located in Burke County, Georgia.
    The granting of the exemption allows the changes to Tier 1 
information asked for in the amendment. Because the acceptability of 
the exemption was determined in part by the acceptability of the 
amendment, the exemption and amendment are being issued concurrently.

DATES: The exemption and amendment were issued on June 7, 2018.

ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking website: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0252. Address 
questions about NRC dockets to Jennifer Borges; 301-287-9127; email: 
[email protected]. For technical questions, contact the 
individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document. The request for the amendments and exemptions were submitted 
by letter dated July 14, 2017, and is available in ADAMS under 
Accession No. ML17198A596.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Peter Hearn, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; 
telephone: 301-415-1189; email: [email protected].

SUPPLEMENTARY INFORMATION: 

I. Introduction

    The NRC is granting an exemption from paragraph B of section III, 
``Scope and Contents,'' of appendix D, ``Design Certification Rule for 
the AP1000 Design,'' to part 52 of title 10 of the Code of Federal 
Regulations (10 CFR), and issuing License Amendment Nos. 126 and 125 to 
COLs, NPF-91 and NPF-92, respectively, to the licensee. The exemption 
is required by Paragraph A.4 of Section VIII, ``Processes for Changes 
and Departures,'' Appendix D, to 10 CFR part 52 to allow the licensee 
to depart from Tier 1 information. With the requested amendment, the 
licensee sought proposed changes that would revise Tier 1 information 
to change the inspected volume for the spent fuel pool and cask 
washdown pit with corresponding changes to the minimum volumes and 
reference measurement locations, and add an inspection for the minimum 
volume for the cask loading pit.
    Part of the justification for granting the exemption was provided 
by the review of the amendment. Because the exemption is necessary in 
order to issue the requested license amendment, the

[[Page 30465]]

NRC granted the exemption and issued the amendment concurrently, rather 
than in sequence. This included issuing a combined safety evaluation 
containing the NRC staff's review of both the exemption request and the 
license amendment. The exemption met all applicable regulatory criteria 
set forth in 10 CFR 50.12, 10 CFR 52.7, and section VIII.A.4 of 
appendix D to 10 CFR part 52. The license amendment was found to be 
acceptable as well. The combined safety evaluation is available in 
ADAMS under Accession No. ML18100A079.
    Identical exemption documents (except for referenced unit numbers 
and license numbers) were issued to the licensee for VEGP Units 3 and 4 
(COLs NPF-91 and NPF-92). The exemption documents for VEGP Units 3 and 
4 can be found in ADAMS under Accession Nos. ML18100A071 and 
ML18100A073, respectively. The exemption is reproduced (with the 
exception of abbreviated titles and additional citations) in Section II 
of this document. The amendment documents for COLs NPF-91 and NPF-92 
are available in ADAMS under Accession Nos. ML18100A074 and 
ML18100A077, respectively. A summary of the amendment documents is 
provided in Section III of this document.

II. Exemption

    Reproduced below is the exemption document issued to VEGP Units 3 
and 4. It makes reference to the combined safety evaluation that 
provides the reasoning for the findings made by the NRC (and listed 
under Item 1) in order to grant the exemption:
    1. In an application dated July 14, 2017, the licensee requested 
from the NRC or Commission an exemption to allow departures from Tier 1 
information in the certified Design Control Document (DCD) incorporated 
by reference in 10 CFR part 52, appendix D, ``Design Certification Rule 
for the AP1000 Design,'' as part of license amendment request (LAR) 17-
021, ``Changes to Containment Coolant and Spent Fuel Makeup 
Strategies.''
    For the reasons set forth in Section 3.1 of the NRC staff's Safety 
Evaluation, which can be found in ADAMS under Accession No. 
ML18100A079, the Commission finds that:
    A. The exemption is authorized by law;
    B. the exemption presents no undue risk to public health and 
safety;
    C. the exemption is consistent with the common defense and 
security;
    D. special circumstances are present in that the application of the 
rule in this circumstance is not necessary to serve the underlying 
purpose of the rule;
    E. the special circumstances outweigh any decrease in safety that 
may result from the reduction in standardization caused by the 
exemption; and
    F. the exemption will not result in a significant decrease in the 
level of safety otherwise provided by the design.
    2. Accordingly, the licensee is granted an exemption from the 
certified DCD Tier 1 information, as described in the licensee's 
request dated July 14, 2017. This exemption is related to, and 
necessary for, the granting of License Amendment Nos. 126 (Unit 3) and 
125 (Unit 4), which is being issued concurrently with this exemption.
    3. As explained in Section 5.0 of the NRC staff's Safety Evaluation 
(ADAMS Accession No. ML18100A079), this exemption meets the eligibility 
criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment needs to be prepared in 
connection with the issuance of the exemption.
    This exemption is effective as of the date of its issuance.

III. License Amendment Request

    By letter dated July 14, 2017 (ADAMS Accession No. ML17198A596), 
the licensee requested that the NRC amend the COLs for VEGP Units 3 and 
4, COLs NPF-91 and NPF-92. The proposed amendments are described in 
Section I of this document.
    The Commission has determined for these amendments that the 
application complies with the standards and requirements of the Atomic 
Energy Act of 1954, as amended (the Act), and the Commission's rules 
and regulations. The Commission has made appropriate findings as 
required by the Act and the Commission's rules and regulations in 10 
CFR chapter I, which are set forth in the license amendment.
    A notice of consideration of issuance of amendment to facility 
operating license or COL, as applicable, proposed no significant 
hazards consideration determination, and opportunity for a hearing in 
connection with these actions, was published in the Federal Register on 
November 22, 2017 (82 FR 55654). No comments were received during the 
30-day comment period.
    The Commission has determined that these amendments satisfy the 
criteria for categorical exclusion in accordance with 10 CFR 51.22. 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment need be prepared for these 
amendments.

IV. Conclusion

    Using the reasons set forth in the combined safety evaluation, the 
staff granted the exemption and issued the amendment that the licensee 
requested on July 14, 2017. The exemption and amendment were issued on 
June 7, 2018, as part of a combined package to the licensee (ADAMS 
Accession No. ML18100A069).

    Dated at Rockville, Maryland, this 22nd day of June, 2018.

    For the Nuclear Regulatory Commission.
Paul B. Kallan,
Acting Branch Chief, Licensing Branch 4, Division of Licensing, Siting, 
and Environmental Analysis, Office of New Reactors.
[FR Doc. 2018-13860 Filed 6-27-18; 8:45 am]
BILLING CODE 7590-01-P



                                              30464                         Federal Register / Vol. 83, No. 125 / Thursday, June 28, 2018 / Notices

                                              CFR 51.22(c)(9). Therefore, pursuant to                   For the Nuclear Regulatory Commission.               in the FOR FURTHER INFORMATION
                                              10 CFR 51.22(b), no environmental                       Jennifer L. Dixon-Herrity,                             CONTACT section of this document.
                                              impact statement or environmental                       Chief, Licensing Branch 4, Division of                    • NRC’s Agencywide Documents
                                              assessment needs to be prepared in                      Licensing, Siting, and Environmental                   Access and Management System
                                              connection with the issuance of the                     Analysis, Office of New Reactors.                      (ADAMS): You may obtain publicly-
                                              exemption.                                              [FR Doc. 2018–13892 Filed 6–27–18; 8:45 am]            available documents online in the
                                                4. This exemption is effective as of the              BILLING CODE 7590–01–P                                 ADAMS Public Documents collection at
                                              date of its issuance.                                                                                          http://www.nrc.gov/reading-rm/
                                                                                                                                                             adams.html. To begin the search, select
                                              III. License Amendment Request                          NUCLEAR REGULATORY                                     ‘‘ADAMS Public Documents’’ and then
                                                 By letter dated September 25, 2017, as               COMMISSION                                             select ‘‘Begin Web-based ADAMS
                                              supplemented by letters dated                           [Docket Nos. 52–025 and 52–026; NRC–
                                                                                                                                                             Search.’’ For problems with ADAMS,
                                              November 16, 2017, December 18, 2017,                   2008–0252]                                             please contact the NRC’s Public
                                              and February 14, 2018, (ADAMS                                                                                  Document Room (PDR) reference staff at
                                              Accession No. ML17268A188,                              Southern Nuclear Operating Company,                    1–800–397–4209, 301–415–4737, or by
                                              ML17320A808, ML17352B003 and                            Inc.; Vogtle Electric Generating Plant,                email to pdr.resource@nrc.gov. The
                                              ML18045A082, respectively), the                         Units 3 and 4; Changes to Containment                  ADAMS accession number for each
                                              licensee requested that the NRC amend                   Cooling and Spent Fuel Pool Makeup                     document referenced (if it is available in
                                              the COLs for VEGP, Units 3 and 4,                       Strategies                                             ADAMS) is provided the first time that
                                              COLs, NPF–91 and NPF–92. The                                                                                   it is mentioned in this document. The
                                                                                                      AGENCY:  Nuclear Regulatory                            request for the amendments and
                                              proposed amendment is described in                      Commission.
                                              Section I of this Federal Register notice.                                                                     exemptions were submitted by letter
                                                                                                      ACTION: Exemption and combined                         dated July 14, 2017, and is available in
                                                 The Commission has determined for
                                                                                                      license amendment; issuance.                           ADAMS under Accession No.
                                              these amendments that the application
                                                                                                                                                             ML17198A596.
                                              complies with the standards and                         SUMMARY:    The U.S. Nuclear Regulatory                   • NRC’s PDR: You may examine and
                                              requirements of the Atomic Energy Act                   Commission (NRC) is granting an                        purchase copies of public documents at
                                              of 1954, as amended (the Act), and the                  exemption to allow a departure from the                the NRC’s PDR, Room O1–F21, One
                                              Commission’s rules and regulations.                     certification information of Tier 1 of the             White Flint North, 11555 Rockville
                                              The Commission has made appropriate                     generic design control document (DCD)                  Pike, Rockville, Maryland 20852.
                                              findings as required by the Act and the                 and is issuing License Amendment Nos.
                                              Commission’s rules and regulations in                                                                          FOR FURTHER INFORMATION CONTACT:
                                                                                                      126 and 125 to Combined Licenses
                                              10 CFR chapter I, which are set forth in                                                                       Peter Hearn, Office of New Reactors,
                                                                                                      (COLs), NPF–91 and NPF–92,
                                              the license amendment.                                                                                         U.S. Nuclear Regulatory Commission,
                                                                                                      respectively. The COLs were issued to
                                                                                                                                                             Washington, DC 20555–0001; telephone:
                                                 A notice of consideration of issuance                Southern Nuclear Operating Company,
                                                                                                                                                             301–415–1189; email: Peter.Hearn@
                                              of amendment to facility operating                      Inc., and Georgia Power Company;
                                                                                                                                                             nrc.gov.
                                              license or COL, as applicable, proposed                 Oglethorpe Power Corporation; MEAG
                                              no significant hazards consideration                    Power SPVM, LLC; MEAG Power SPVJ,                      SUPPLEMENTARY INFORMATION:
                                              determination, and opportunity for a                    LLC; MEAG Power SPVP, LLC; and the                     I. Introduction
                                              hearing in connection with these                        City of Dalton, Georgia (the licensee), for
                                              actions, was published in the Federal                   construction and operation of the Vogtle                  The NRC is granting an exemption
                                              Register on December 19, 2017 (82 FR                    Electric Generating Plant (VEGP) Units                 from paragraph B of section III, ‘‘Scope
                                              60229). No comments were received                       3 and 4, located in Burke County,                      and Contents,’’ of appendix D, ‘‘Design
                                              during the 30-day comment period.                       Georgia.                                               Certification Rule for the AP1000
                                                                                                        The granting of the exemption allows                 Design,’’ to part 52 of title 10 of the
                                                 The Commission has determined that
                                                                                                      the changes to Tier 1 information asked                Code of Federal Regulations (10 CFR),
                                              these amendments satisfy the criteria for
                                                                                                      for in the amendment. Because the                      and issuing License Amendment Nos.
                                              categorical exclusion in accordance
                                                                                                      acceptability of the exemption was                     126 and 125 to COLs, NPF–91 and NPF–
                                              with 10 CFR 51.22. Therefore, pursuant
                                                                                                      determined in part by the acceptability                92, respectively, to the licensee. The
                                              to 10 CFR 51.22(b), no environmental
                                                                                                      of the amendment, the exemption and                    exemption is required by Paragraph A.4
                                              impact statement or environmental
                                                                                                      amendment are being issued                             of Section VIII, ‘‘Processes for Changes
                                              assessment need be prepared for these
                                                                                                      concurrently.                                          and Departures,’’ Appendix D, to 10
                                              amendments.
                                                                                                                                                             CFR part 52 to allow the licensee to
                                              IV. Conclusion                                          DATES: The exemption and amendment                     depart from Tier 1 information. With the
                                                                                                      were issued on June 7, 2018.                           requested amendment, the licensee
                                                Using the reasons set forth in the                    ADDRESSES: Please refer to Docket ID                   sought proposed changes that would
                                              combined safety evaluation, the staff                   NRC–2008–0252 when contacting the                      revise Tier 1 information to change the
                                              granted the exemptions and issued the                   NRC about the availability of                          inspected volume for the spent fuel pool
                                              amendments that the licensee requested                  information regarding this document.                   and cask washdown pit with
                                              on September 25, 2017, as                               You may obtain publicly-available                      corresponding changes to the minimum
                                              supplemented by letters dated                           information related to this document                   volumes and reference measurement
                                              November 16, 2017, December 18, 2017,                   using any of the following methods:                    locations, and add an inspection for the
amozie on DSK3GDR082PROD with NOTICES1




                                              and February 14, 2018.                                    • Federal Rulemaking website: Go to                  minimum volume for the cask loading
                                                The exemptions and amendments                         http://www.regulations.gov and search                  pit.
                                              were issued on March 29, 2018, as part                  for Docket ID NRC–2008–0252. Address                      Part of the justification for granting
                                              of a combined package to the licensee                   questions about NRC dockets to Jennifer                the exemption was provided by the
                                              (ADAMS Accession No. ML18075A094).                      Borges; 301–287–9127; email:                           review of the amendment. Because the
                                                Dated at Rockville, Maryland, on June 22,             Jennifer.Borges@nrc.gov. For technical                 exemption is necessary in order to issue
                                              2018.                                                   questions, contact the individual listed               the requested license amendment, the


                                         VerDate Sep<11>2014   17:08 Jun 27, 2018   Jkt 244001   PO 00000   Frm 00068   Fmt 4703   Sfmt 4703   E:\FR\FM\28JNN1.SGM   28JNN1


                                                                            Federal Register / Vol. 83, No. 125 / Thursday, June 28, 2018 / Notices                                                  30465

                                              NRC granted the exemption and issued                       E. the special circumstances outweigh               IV. Conclusion
                                              the amendment concurrently, rather                      any decrease in safety that may result
                                                                                                                                                               Using the reasons set forth in the
                                              than in sequence. This included issuing                 from the reduction in standardization
                                                                                                                                                             combined safety evaluation, the staff
                                              a combined safety evaluation containing                 caused by the exemption; and
                                                                                                                                                             granted the exemption and issued the
                                              the NRC staff’s review of both the                         F. the exemption will not result in a               amendment that the licensee requested
                                              exemption request and the license                       significant decrease in the level of safety            on July 14, 2017. The exemption and
                                              amendment. The exemption met all                        otherwise provided by the design.                      amendment were issued on June 7,
                                              applicable regulatory criteria set forth in                2. Accordingly, the licensee is granted             2018, as part of a combined package to
                                              10 CFR 50.12, 10 CFR 52.7, and section                  an exemption from the certified DCD                    the licensee (ADAMS Accession No.
                                              VIII.A.4 of appendix D to 10 CFR part                   Tier 1 information, as described in the                ML18100A069).
                                              52. The license amendment was found                     licensee’s request dated July 14, 2017.
                                              to be acceptable as well. The combined                                                                           Dated at Rockville, Maryland, this 22nd
                                                                                                      This exemption is related to, and                      day of June, 2018.
                                              safety evaluation is available in ADAMS                 necessary for, the granting of License
                                              under Accession No. ML18100A079.                                                                                 For the Nuclear Regulatory Commission.
                                                                                                      Amendment Nos. 126 (Unit 3) and 125
                                                 Identical exemption documents                                                                               Paul B. Kallan,
                                                                                                      (Unit 4), which is being issued
                                              (except for referenced unit numbers and                                                                        Acting Branch Chief, Licensing Branch 4,
                                                                                                      concurrently with this exemption.
                                              license numbers) were issued to the                                                                            Division of Licensing, Siting, and
                                              licensee for VEGP Units 3 and 4 (COLs                      3. As explained in Section 5.0 of the               Environmental Analysis, Office of New
                                              NPF–91 and NPF–92). The exemption                       NRC staff’s Safety Evaluation (ADAMS                   Reactors.
                                              documents for VEGP Units 3 and 4 can                    Accession No. ML18100A079), this                       [FR Doc. 2018–13860 Filed 6–27–18; 8:45 am]
                                              be found in ADAMS under Accession                       exemption meets the eligibility criteria               BILLING CODE 7590–01–P
                                              Nos. ML18100A071 and ML18100A073,                       for categorical exclusion set forth in 10
                                              respectively. The exemption is                          CFR 51.22(c)(9). Therefore, pursuant to
                                              reproduced (with the exception of                       10 CFR 51.22(b), no environmental                      NUCLEAR REGULATORY
                                              abbreviated titles and additional                       impact statement or environmental                      COMMISSION
                                              citations) in Section II of this document.              assessment needs to be prepared in
                                              The amendment documents for COLs                        connection with the issuance of the
                                                                                                                                                             [NRC–2018–0127; Docket Nos. 50–259, 50–
                                              NPF–91 and NPF–92 are available in                      exemption.                                             260, 50–296, and 72–052; Docket Nos. 50–
                                              ADAMS under Accession Nos.                                 This exemption is effective as of the               327, 50–328, and 72–034; Docket Nos. 50–
                                              ML18100A074 and ML18100A077,                            date of its issuance.                                  390, 50–391, and 72–1048]
                                              respectively. A summary of the                          III. License Amendment Request
                                              amendment documents is provided in                                                                             Tennessee Valley Authority, Browns
                                              Section III of this document.                              By letter dated July 14, 2017 (ADAMS                Ferry Nuclear Plant, Units 1, 2, and 3,
                                                                                                      Accession No. ML17198A596), the                        and Independent Spent Fuel Storage
                                              II. Exemption                                           licensee requested that the NRC amend                  Installation; Sequoyah Nuclear Plant,
                                                 Reproduced below is the exemption                    the COLs for VEGP Units 3 and 4, COLs                  Units 1 and 2, and Independent Spent
                                              document issued to VEGP Units 3 and                     NPF–91 and NPF–92. The proposed                        Fuel Storage Installation; Watts Bar
                                              4. It makes reference to the combined                   amendments are described in Section I                  Nuclear Plant, Units 1 and 2, and
                                              safety evaluation that provides the                     of this document.                                      Independent Spent Fuel Storage
                                              reasoning for the findings made by the                     The Commission has determined for                   Installation
                                              NRC (and listed under Item 1) in order                  these amendments that the application                  AGENCY:  Nuclear Regulatory
                                              to grant the exemption:                                 complies with the standards and                        Commission.
                                                 1. In an application dated July 14,                  requirements of the Atomic Energy Act
                                              2017, the licensee requested from the                                                                          ACTION: License amendment request;
                                                                                                      of 1954, as amended (the Act), and the
                                              NRC or Commission an exemption to                                                                              opportunity to comment, request a
                                                                                                      Commission’s rules and regulations.
                                              allow departures from Tier 1                                                                                   hearing, and petition for leave to
                                                                                                      The Commission has made appropriate
                                              information in the certified Design                                                                            intervene.
                                                                                                      findings as required by the Act and the
                                              Control Document (DCD) incorporated                     Commission’s rules and regulations in
                                              by reference in 10 CFR part 52,                                                                                SUMMARY:   The U.S. Nuclear Regulatory
                                                                                                      10 CFR chapter I, which are set forth in               Commission (NRC) is considering
                                              appendix D, ‘‘Design Certification Rule                 the license amendment.
                                              for the AP1000 Design,’’ as part of                                                                            issuance of amendments to Renewed
                                                                                                         A notice of consideration of issuance               Facility Operating License Nos. DPR–33,
                                              license amendment request (LAR) 17–                     of amendment to facility operating
                                              021, ‘‘Changes to Containment Coolant                                                                          DPR–52, and DPR–68 for the Browns
                                                                                                      license or COL, as applicable, proposed                Ferry Nuclear Plant (Browns Ferry),
                                              and Spent Fuel Makeup Strategies.’’                     no significant hazards consideration
                                                 For the reasons set forth in Section 3.1                                                                    Units 1, 2, and 3, respectively; Renewed
                                                                                                      determination, and opportunity for a                   Facility Operating License Nos. DPR–77
                                              of the NRC staff’s Safety Evaluation,
                                                                                                      hearing in connection with these                       and DPR–79 for the Sequoyah Nuclear
                                              which can be found in ADAMS under
                                                                                                      actions, was published in the Federal                  Plant (Sequoyah), Units 1 and 2,
                                              Accession No. ML18100A079, the
                                                                                                      Register on November 22, 2017 (82 FR                   respectively; and Facility Operating
                                              Commission finds that:
                                                 A. The exemption is authorized by                    55654). No comments were received                      License Nos. NPF–90 and NPF–96 for
                                              law;                                                    during the 30-day comment period.                      the Watts Bar Nuclear Plant (Watts Bar),
                                                 B. the exemption presents no undue                      The Commission has determined that                  Units 1 and 2, respectively. The
amozie on DSK3GDR082PROD with NOTICES1




                                              risk to public health and safety;                       these amendments satisfy the criteria for              proposed amendments would revise the
                                                 C. the exemption is consistent with                  categorical exclusion in accordance                    implementation date for the NRC-
                                              the common defense and security;                        with 10 CFR 51.22. Therefore, pursuant                 approved license amendments to
                                                 D. special circumstances are present                 to 10 CFR 51.22(b), no environmental                   upgrade the Emergency Action Level
                                              in that the application of the rule in this             impact statement or environmental                      (EAL) schemes for Browns Ferry, Units
                                              circumstance is not necessary to serve                  assessment need be prepared for these                  1, 2, and 3; Sequoyah, Units 1 and 2;
                                              the underlying purpose of the rule;                     amendments.                                            and Watts Bar, Units 1 and 2.


                                         VerDate Sep<11>2014   17:08 Jun 27, 2018   Jkt 244001   PO 00000   Frm 00069   Fmt 4703   Sfmt 4703   E:\FR\FM\28JNN1.SGM   28JNN1



Document Created: 2018-11-06 09:55:39
Document Modified: 2018-11-06 09:55:39
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionExemption and combined license amendment; issuance.
DatesThe exemption and amendment were issued on June 7, 2018.
ContactPeter Hearn, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-1189; email: [email protected]
FR Citation83 FR 30464 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR