83_FR_3149 83 FR 3134 - Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule for Environmental Review of the Rivervale South to Market Project

83 FR 3134 - Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule for Environmental Review of the Rivervale South to Market Project

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 15 (January 23, 2018)

Page Range3134-3135
FR Document2018-01112

Federal Register, Volume 83 Issue 15 (Tuesday, January 23, 2018)
[Federal Register Volume 83, Number 15 (Tuesday, January 23, 2018)]
[Notices]
[Pages 3134-3135]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-01112]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-490-000]


Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule 
for Environmental Review of the Rivervale South to Market Project

    On August 31, 2017, Transcontinental Gas Pipe Line Company, LLC 
(Transco) filed an application in Docket No. CP17-490-000 requesting a 
Certificate of Public Convenience and Necessity pursuant to Section 
7(c) of the Natural Gas Act to construct and operate certain natural 
gas pipeline facilities entirely within New Jersey. The proposed 
project is known as the Rivervale South to Market Project (Project), 
and would enable Transco to provide an additional 190 million cubic 
feet (MMcf) per day of firm transportation service to meet supply needs 
for the 2019/2020 winter heating season.
    On September 15, 2017, the Federal Energy Regulatory Commission 
(Commission or FERC) issued its Notice of Application for the Project. 
Among other things, that notice alerted agencies issuing federal 
authorizations of the requirement to complete all necessary reviews and 
to reach a final decision on a request for a federal authorization 
within 90 days of the date of issuance of the Commission staff's 
Environmental Assessment (EA) for the Project. This instant notice 
identifies the FERC staff's planned schedule for the completion of the 
EA for the Project.

Schedule for Environmental Review

Issuance of EA--March 16, 2018
90-day Federal Authorization Decision Deadline--June 14, 2018

    If a schedule change becomes necessary, additional notice will be 
provided so that the relevant agencies are kept informed of the 
Project's progress.

Project Description

    Transco proposes to construct, modify, upgrade, and operate various 
facilities in connection with its proposed Rivervale South to Market 
Project in Bergen, Hudson, and Union Counties, New Jersey. According to 
Transco, the Project would increase the firm delivery transportation 
capacity of its existing pipeline system by 190 MMcf per day of natural 
gas from the Rivervale interconnection to existing Compressor Station 
210 in Mercer County and the Central Manhattan meter and regulation 
station (M&R) station in Hudson County. The Compressor Station 210 
pooling point would receive 140 MMcf, and the Central Manhattan M&R 
would receive 50 MMcf.
    The Project would consist of the following facilities:
     Construct 0.61 mile of 42-inch-diameter pipeline loop \1\ 
along Transco's Mainline A, from mileposts 1825.80 to 1826.41 (Bergen 
County);
---------------------------------------------------------------------------

    \1\ A loop is a segment of pipe that is usually installed 
adjacent to an existing pipeline and connected to it at both ends. 
The loop allows more gas to be moved through the system.
---------------------------------------------------------------------------

     uprate 10.35 miles of the existing 24-inch-diameter North 
New Jersey Extension from the Paramus M&R station (Bergen County) to 
the Orange and Rockland M&R station (Bergen County). The North New 
Jersey Extension would be uprated from a maximum allowable operating 
pressure of 650 pounds per square inch gauge (``psig'') to 812 psig;
     upgrade the existing valves, including overpressure 
protection valves, and yard piping, and related activities at the 
Paramus, Central Manhattan, Orange and Rockland, and Emerson M&R 
stations; and
     construct additional facilities, such as mainline valves, 
cathodic protection, internal inspection device (pig \2\) launchers and 
receivers, and communication equipment.
---------------------------------------------------------------------------

    \2\ A pig is a tool that the pipeline company inserts into and 
pushes through the pipeline for cleaning the pipeline, conducting 
internal inspections, or other purposes.
---------------------------------------------------------------------------

Background

    On October 19, 2017, the Commission issued a Notice of Intent to 
Prepare an Environmental Assessment for the Proposed Rivervale South to 
Market Project and Request for Comments on Environmental Issues (NOI). 
The NOI was sent to affected landowners; federal, state, and local 
government agencies; elected officials; environmental and public 
interest groups; Native American tribes; other interested parties; and 
local libraries and newspapers. In response to the NOI, the Commission 
received comments from the Borough of Emerson, New Jersey; the U.S. 
Fish and Wildlife Service; the U.S. Environmental Protection Agency; 
Food & Water Watch; and the New Jersey Sierra Club. Additionally, in 
response to the Notice of Application, the Commission received comments 
from the Hackensack Riverkeeper. The primary issues raised by the 
commentors are impacts on drinking water, wetlands, and wildlife; the 
necessity of the Project; pipeline safety; pollution prevention 
practices; the continued reliance on fossil fuels; long-term 
environmental impacts; improper segmentation; evaluation of cumulative, 
indirect, and secondary impacts; environmental impacts from increased 
shale gas development; evaluation of alternatives, including those 
outside FERC's jurisdiction; climate change; environmental justice; and 
the need for an Environmental Impact Statement.

Additional Information

    In order to receive notification of the issuance of the EA and to 
keep track of all formal issuances and submittals in specific dockets, 
the Commission offers a free service called eSubscription. This

[[Page 3135]]

can reduce the amount of time you spend researching proceedings by 
automatically providing you with notification of these filings, 
document summaries, and direct links to the documents. Go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Additional information about the Project is available from the 
Commission's Office of External Affairs at (866) 208-FERC or on the 
FERC website (www.ferc.gov). Using the eLibrary link, select General 
Search from the eLibrary menu, enter the selected date range and Docket 
Number excluding the last three digits (i.e., CP17-490), and follow the 
instructions. For assistance with access to eLibrary, the helpline can 
be reached at (866) 208-3676, TTY (202) 502-8659, or at 
FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC website also 
provides access to the texts of formal documents issued by the 
Commission, such as orders, notices, and rule makings.

    Dated: January 17, 2018.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2018-01112 Filed 1-22-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                3134                          Federal Register / Vol. 83, No. 15 / Tuesday, January 23, 2018 / Notices

                                                gathering system in the Powder River                    pursuant to Section 7(c) of the Natural                Extension from the Paramus M&R
                                                Basin of Wyoming, all as more fully                     Gas Act to construct and operate certain               station (Bergen County) to the Orange
                                                explained in the petition.                              natural gas pipeline facilities entirely               and Rockland M&R station (Bergen
                                                   Any person desiring to intervene or to               within New Jersey. The proposed                        County). The North New Jersey
                                                protest this filing must file in                        project is known as the Rivervale South                Extension would be uprated from a
                                                accordance with Rules 211 and 214 of                    to Market Project (Project), and would                 maximum allowable operating pressure
                                                the Commission’s Rules of Practice and                  enable Transco to provide an additional                of 650 pounds per square inch gauge
                                                Procedure (18 CFR 385.211, 385.214).                    190 million cubic feet (MMcf) per day                  (‘‘psig’’) to 812 psig;
                                                Protests will be considered by the                      of firm transportation service to meet                    • upgrade the existing valves,
                                                Commission in determining the                           supply needs for the 2019/2020 winter                  including overpressure protection
                                                appropriate action to be taken, but will                heating season.                                        valves, and yard piping, and related
                                                not serve to make protestants parties to                   On September 15, 2017, the Federal                  activities at the Paramus, Central
                                                the proceeding. Any person wishing to                   Energy Regulatory Commission                           Manhattan, Orange and Rockland, and
                                                become a party must file a notice of                    (Commission or FERC) issued its Notice                 Emerson M&R stations; and
                                                intervention or motion to intervene, as                 of Application for the Project. Among                     • construct additional facilities, such
                                                appropriate. Such notices, motions, or                  other things, that notice alerted agencies             as mainline valves, cathodic protection,
                                                protests must be filed on or before the                 issuing federal authorizations of the                  internal inspection device (pig 2)
                                                comment date. Anyone filing a motion                    requirement to complete all necessary                  launchers and receivers, and
                                                to intervene or protest must serve a copy               reviews and to reach a final decision on               communication equipment.
                                                of that document on the Petitioner.                     a request for a federal authorization                  Background
                                                   The Commission encourages                            within 90 days of the date of issuance
                                                                                                        of the Commission staff’s Environmental                   On October 19, 2017, the Commission
                                                electronic submission of protests and
                                                                                                        Assessment (EA) for the Project. This                  issued a Notice of Intent to Prepare an
                                                interventions in lieu of paper using the
                                                                                                        instant notice identifies the FERC staff’s             Environmental Assessment for the
                                                eFiling link at http://www.ferc.gov.
                                                                                                        planned schedule for the completion of                 Proposed Rivervale South to Market
                                                Persons unable to file electronically                                                                          Project and Request for Comments on
                                                should submit an original and 5 copies                  the EA for the Project.
                                                                                                                                                               Environmental Issues (NOI). The NOI
                                                of the protest or intervention to the                   Schedule for Environmental Review                      was sent to affected landowners; federal,
                                                Federal Energy Regulatory Commission,                                                                          state, and local government agencies;
                                                                                                        Issuance of EA—March 16, 2018
                                                888 First Street NE, Washington, DC                     90-day Federal Authorization Decision                  elected officials; environmental and
                                                20426.                                                     Deadline—June 14, 2018                              public interest groups; Native American
                                                   This filing is accessible on-line at                                                                        tribes; other interested parties; and local
                                                                                                           If a schedule change becomes
                                                http://www.ferc.gov, using the eLibrary                                                                        libraries and newspapers. In response to
                                                                                                        necessary, additional notice will be
                                                link and is available for review in the                                                                        the NOI, the Commission received
                                                                                                        provided so that the relevant agencies
                                                Commission’s Public Reference Room in                                                                          comments from the Borough of
                                                                                                        are kept informed of the Project’s
                                                Washington, DC. There is an                                                                                    Emerson, New Jersey; the U.S. Fish and
                                                                                                        progress.
                                                eSubscription link on the website that                                                                         Wildlife Service; the U.S.
                                                enables subscribers to receive email                    Project Description                                    Environmental Protection Agency; Food
                                                notification when a document is added                      Transco proposes to construct,                      & Water Watch; and the New Jersey
                                                to a subscribed docket(s). For assistance               modify, upgrade, and operate various                   Sierra Club. Additionally, in response to
                                                with any FERC Online service, please                    facilities in connection with its                      the Notice of Application, the
                                                email FERCOnlineSupport@ferc.gov, or                    proposed Rivervale South to Market                     Commission received comments from
                                                call (866) 208–3676 (toll free). For TTY,               Project in Bergen, Hudson, and Union                   the Hackensack Riverkeeper. The
                                                call (202) 502–8659.                                    Counties, New Jersey. According to                     primary issues raised by the
                                                   Comment Date: 5:00 p.m. Eastern time                 Transco, the Project would increase the                commentors are impacts on drinking
                                                on February 9, 2018.                                    firm delivery transportation capacity of               water, wetlands, and wildlife; the
                                                  Dated: January 17, 2018.                              its existing pipeline system by 190                    necessity of the Project; pipeline safety;
                                                Kimberly D. Bose,                                       MMcf per day of natural gas from the                   pollution prevention practices; the
                                                Secretary.                                              Rivervale interconnection to existing                  continued reliance on fossil fuels; long-
                                                [FR Doc. 2018–01110 Filed 1–22–18; 8:45 am]
                                                                                                        Compressor Station 210 in Mercer                       term environmental impacts; improper
                                                                                                        County and the Central Manhattan                       segmentation; evaluation of cumulative,
                                                BILLING CODE 6717–01–P
                                                                                                        meter and regulation station (M&R)                     indirect, and secondary impacts;
                                                                                                        station in Hudson County. The                          environmental impacts from increased
                                                DEPARTMENT OF ENERGY                                    Compressor Station 210 pooling point                   shale gas development; evaluation of
                                                                                                        would receive 140 MMcf, and the                        alternatives, including those outside
                                                Federal Energy Regulatory                               Central Manhattan M&R would receive                    FERC’s jurisdiction; climate change;
                                                Commission                                              50 MMcf.                                               environmental justice; and the need for
                                                                                                           The Project would consist of the                    an Environmental Impact Statement.
                                                [Docket No. CP17–490–000]                               following facilities:
                                                                                                           • Construct 0.61 mile of 42-inch-                   Additional Information
                                                Transcontinental Gas Pipe Line                          diameter pipeline loop 1 along Transco’s                  In order to receive notification of the
                                                Company, LLC; Notice of Schedule for                    Mainline A, from mileposts 1825.80 to                  issuance of the EA and to keep track of
sradovich on DSK3GMQ082PROD with NOTICES




                                                Environmental Review of the Rivervale                   1826.41 (Bergen County);                               all formal issuances and submittals in
                                                South to Market Project                                    • uprate 10.35 miles of the existing                specific dockets, the Commission offers
                                                   On August 31, 2017, Transcontinental                 24-inch-diameter North New Jersey                      a free service called eSubscription. This
                                                Gas Pipe Line Company, LLC (Transco)                      1 A loop is a segment of pipe that is usually          2 A pig is a tool that the pipeline company inserts
                                                filed an application in Docket No.                      installed adjacent to an existing pipeline and         into and pushes through the pipeline for cleaning
                                                CP17–490–000 requesting a Certificate                   connected to it at both ends. The loop allows more     the pipeline, conducting internal inspections, or
                                                of Public Convenience and Necessity                     gas to be moved through the system.                    other purposes.



                                           VerDate Sep<11>2014   17:59 Jan 22, 2018   Jkt 244001   PO 00000   Frm 00025   Fmt 4703   Sfmt 4703   E:\FR\FM\23JAN1.SGM   23JAN1


                                                                              Federal Register / Vol. 83, No. 15 / Tuesday, January 23, 2018 / Notices                                                  3135

                                                can reduce the amount of time you                          i. FERC Contact: Steve Kartalia at                  For assistance, contact FERC Online
                                                spend researching proceedings by                        (202) 502–6131; or email at                            Support.
                                                automatically providing you with                        stephen.kartalia@ferc.gov.
                                                notification of these filings, document                    j. Ampersand Moretown Hydro, LLC                      Dated: January 17, 2018.
                                                summaries, and direct links to the                      filed its request to use the Traditional               Kimberly D. Bose,
                                                documents. Go to www.ferc.gov/docs-                     Licensing Process on November 20,                      Secretary.
                                                filing/esubscription.asp.                               2017. Ampersand Moretown Hydro,                        [FR Doc. 2018–01111 Filed 1–22–18; 8:45 am]
                                                   Additional information about the                     LLC provided public notice of its                      BILLING CODE 6717–01–P
                                                Project is available from the                           request on November 30, 2017. In a
                                                Commission’s Office of External Affairs                 letter dated January 17, 2018, the
                                                at (866) 208–FERC or on the FERC                        Director of the Division of Hydropower                 DEPARTMENT OF ENERGY
                                                website (www.ferc.gov). Using the                       Licensing approved Ampersand
                                                eLibrary link, select General Search                    Mortetown Hydro, LLC’s request to use                  Federal Energy Regulatory
                                                from the eLibrary menu, enter the                       the Traditional Licensing Process.                     Commission
                                                selected date range and Docket Number                      k. With this notice, we are initiating
                                                                                                        informal consultation with the U.S. Fish               Combined Notice of Filings
                                                excluding the last three digits (i.e.,
                                                CP17–490), and follow the instructions.                 and Wildlife Service and NOAA                            Take notice that the Commission has
                                                For assistance with access to eLibrary,                 Fisheries under section 7 of the                       received the following Natural Gas
                                                the helpline can be reached at (866)                    Endangered Species Act and the joint                   Pipeline Rate and Refund Report filings:
                                                208–3676, TTY (202) 502–8659, or at                     agency regulations thereunder at 50 CFR
                                                                                                        part 402; and NOAA Fisheries under                     Filings Instituting Proceedings
                                                FERCOnlineSupport@ferc.gov. The
                                                eLibrary link on the FERC website also                  section 305(b) of the Magnuson-Stevens                    Docket Numbers: RP18–349–000.
                                                provides access to the texts of formal                  Fishery Conservation and Management                       Applicants: East Tennessee Natural
                                                documents issued by the Commission,                     Act and implementing regulations at 50                 Gas, LLC.
                                                such as orders, notices, and rule                       CFR 600.920. We are also initiating                       Description: § 4(d) Rate Filing: Duke
                                                makings.                                                consultation with the Vermont State                    K410135 Release for 2018–04–01 to be
                                                                                                        Historic Preservation Officer, as                      effective 4/1/2018.
                                                  Dated: January 17, 2018.                              required by section 106 of the National                   Filed Date: 1/16/18.
                                                Kimberly D. Bose,                                       Historic Preservation Act, and the                        Accession Number: 20180116–5073.
                                                Secretary.                                              implementing regulations of the                           Comments Due: 5 p.m. ET 1/29/18.
                                                [FR Doc. 2018–01112 Filed 1–22–18; 8:45 am]             Advisory Council on Historic                              Docket Numbers: RP18–350–000.
                                                BILLING CODE 6717–01–P                                  Preservation at 36 CFR 800.2.                             Applicants: East Tennessee Natural
                                                                                                           l. Ampersand Moretown Hydro, LLC                    Gas, LLC.
                                                                                                        filed a Pre-Application Document (PAD;                    Description: § 4(d) Rate Filing: Duke
                                                DEPARTMENT OF ENERGY                                    including a proposed process plan and                  K410135 Release for 2018–11–01 to be
                                                                                                        schedule) with the Commission,                         effective 11/1/2018.
                                                Federal Energy Regulatory                               pursuant to 18 CFR 5.6 of the                             Filed Date: 1/16/18.
                                                Commission                                              Commission’s regulations.                                 Accession Number: 20180116–5075.
                                                                                                           m. A copy of the PAD is available for                  Comments Due: 5 p.m. ET 1/29/18.
                                                [Project No. 5944–023]                                  review at the Commission in the Public
                                                                                                        Reference Room or may be viewed on                        Docket Numbers: RP18–351–000.
                                                                                                        the Commission’s website (http://                         Applicants: East Tennessee Natural
                                                Ampersand Moretown Hydro, LLC;
                                                                                                        www.ferc.gov), using the eLibrary link.                Gas, LLC.
                                                Notice of Intent To File License
                                                                                                        Enter the docket number, excluding the                    Description: § 4(d) Rate Filing: Duke
                                                Application, Filing of Pre-Application
                                                                                                        last three digits in the docket number                 K410135 Release for 2019–04–01 to be
                                                Document, and Approving Use of the
                                                                                                        field to access the document. For                      effective 4/1/2019.
                                                Traditional Licensing Process
                                                                                                                                                                  Filed Date: 1/16/18.
                                                                                                        assistance, contact FERC Online
                                                  a. Type of Filing: Notice of Intent to                                                                          Accession Number: 20180116–5076.
                                                                                                        Support at FERCOnlineSupport@
                                                File License Application and Request to                                                                           Comments Due: 5 p.m. ET 1/29/18.
                                                                                                        ferc.gov, (866) 208–3676 (toll free), or
                                                Use the Traditional Licensing Process.                  (202) 502–8659 (TTY). A copy is also                      Docket Numbers: RP18–352–000.
                                                  b. Project No.: 5944–023.                             available for inspection and                              Applicants: East Tennessee Natural
                                                  c. Date Filed: November 20, 2017.                     reproduction at 5594 Route 100B,                       Gas, LLC.
                                                  d. Submitted By: Ampersand                            Moretown, VT 05660.                                       Description: § 4(d) Rate Filing: Duke
                                                Moretown Hydro, LLC.                                       n. The licensee states its unequivocal              K410135 Release for 2019–11–01 to be
                                                  e. Name of Project: Moretown No. 8                    intent to submit an application for a                  effective 11/1/2019.
                                                Project.                                                subsequent license for Project No. 5944.                  Filed Date: 1/16/18.
                                                  f. Location: On the Mad River, near                   Pursuant to 18 CFR 16.20, each                            Accession Number: 20180116–5077.
                                                the town of Moretown, in Washington                     application for a subsequent license and                  Comments Due: 5 p.m. ET 1/29/18.
                                                County, Vermont. No federal lands are                   any competing license applications                        Docket Numbers: RP18–353–000.
                                                occupied by the project works or located                must be filed with the Commission at                      Applicants: Northern Natural Gas
                                                within the project boundary.                            least 24 months prior to the expiration                Company.
                                                  g. Filed Pursuant to: 18 CFR 5.3 and                                                                            Description: § 4(d) Rate Filing:
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        of the existing license. All applications
                                                5.5 of the Commission’s regulations.                    for license for this project must be filed             20180116 Rate Schedule TF and
                                                  h. Potential Applicant Contact: Sayad                 by November 30, 2020.                                  Miscellaneous Filing to be effective
                                                Moudachirou, Ampersand Energy                              o. Register online at http://                       2/16/2018.
                                                Partners, LLC, 717 Atlantic Avenue,                     www.ferc.gov/docs-filing/                                 Filed Date: 1/16/18.
                                                Suite 1A, Boston, MA 02111; (617) 933–                  esubscription.asp to be notified via                      Accession Number: 20180116–5191.
                                                7206; email—sayad@                                      email of new filings and issuances                        Comments Due: 5 p.m. ET 1/29/18.
                                                ampersandenergy.com.                                    related to this or other pending projects.                Docket Numbers: RP18–354–000.


                                           VerDate Sep<11>2014   17:59 Jan 22, 2018   Jkt 244001   PO 00000   Frm 00026   Fmt 4703   Sfmt 4703   E:\FR\FM\23JAN1.SGM   23JAN1



Document Created: 2018-01-23 01:09:05
Document Modified: 2018-01-23 01:09:05
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 3134 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR