83 FR 33925 - Commission Information Collection Activities (FERC-725E); Comment Request; Revision

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 138 (July 18, 2018)

Page Range33925-33927
FR Document2018-15325

In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is submitting its information collection FERC-725E (Mandatory Reliability Standards for the Western Electric Coordinating Council) to the Office of Management and Budget (OMB) for review of the information collection requirements. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. On May 11, 2018, the Commission previously issued a Notice in the Federal Register requesting public comments. The Commission received no comments on the FERC-725E and is making this notation in its submittal to OMB.

Federal Register, Volume 83 Issue 138 (Wednesday, July 18, 2018)
[Federal Register Volume 83, Number 138 (Wednesday, July 18, 2018)]
[Notices]
[Pages 33925-33927]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-15325]



[[Page 33925]]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. RD18-1-000, RD18-2-000, RD18-3-000 and RD18-5-000]


Commission Information Collection Activities (FERC-725E); Comment 
Request; Revision

AGENCY: Federal Energy Regulatory Commission, Department of Energy.

ACTION: Comment request.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is submitting its information collection FERC-725E (Mandatory 
Reliability Standards for the Western Electric Coordinating Council) to 
the Office of Management and Budget (OMB) for review of the information 
collection requirements. Any interested person may file comments 
directly with OMB and should address a copy of those comments to the 
Commission as explained below. On May 11, 2018, the Commission 
previously issued a Notice in the Federal Register requesting public 
comments. The Commission received no comments on the FERC-725E and is 
making this notation in its submittal to OMB.

DATES: Comments on the collection of information are due by August 17, 
2018.

ADDRESSES: Comments filed with OMB, identified by the OMB Control No. 
1902-0246, should be sent via email to the Office of Information and 
Regulatory Affairs: oira_submission@omb.gov. Attention: Federal Energy 
Regulatory Commission Desk Officer. The Desk Officer may also be 
reached via telephone at 202-395-0710.
    A copy of the comments should also be sent to the Commission, in 
Docket Nos. RD18-1-000, RD18-2-000, RD18-3-000, and RD18-5-000 by 
either of the following methods:
     eFiling at Commission's website: http://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE, 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
DataClearance@FERC.gov, by telephone at (202) 502-8663, and by fax at 
(202) 273-0873.

SUPPLEMENTARY INFORMATION: 
    Title: FERC-725E, Mandatory Reliability Standards for the Western 
Electric Coordinating Council.
    OMB Control No.: 1902-0246.
    Type of Request: Revision to FERC-725E information collection 
requirements, as discussed in Docket Nos. RD18-1-000 and RD18-3-000.
    Abstract: The North American Electric Reliability Corporation 
(NERC) and Western Electricity Coordinating Council (WECC) filed four 
joint petitions to modify/retire WECC regional Reliability Standards.
    On March 8 2018, NERC and WECC filed a joint petition in Docket No. 
RD18-2-000 \1\ requesting Commission approval of:
---------------------------------------------------------------------------

    \1\ The joint petition and exhibits are posted in the 
Commission's eLibrary system in Docket No. RD18-2-000 (BAL-004-WECC-
3 Petition).
---------------------------------------------------------------------------

     Regional Reliability Standard BAL-004-WECC-3 (Automatic 
Time Error Correction), and
     the retirement of existing regional Reliability Standard 
BAL-004-WECC-2.
    The petition states: ``Regional Reliability Standard BAL-004-WECC-3 
seeks to maintain Interconnection frequency and to ensure that Time 
Error Corrections and Primary Inadvertent Interchange (``PII'') payback 
are effectively conducted in a manner that does not adversely affect 
the reliability of the [Western] Interconnection.'' \2\ The proposed 
modifications to the standard focus on the entities using a common 
tool. All other proposed changes are for clarification. The Commission 
is not changing the reporting requirements, nor is it modifying the 
burden, cost or respondents with this collection, and sees this as a 
non-material or non-substantive change to a currently approved 
collection.
---------------------------------------------------------------------------

    \2\ BAL-004-WECC-3 Petition, page 1.
---------------------------------------------------------------------------

    On March 16, 2018, NERC and WECC filed a joint petition in Docket 
No. RD18-5-000 \3\ requesting Commission approval of:
---------------------------------------------------------------------------

    \3\ The joint petition and exhibits are posted in the 
Commission's eLibrary system in Docket No. RD18-5-000 (FAC-501-WECC-
2 Petition).
---------------------------------------------------------------------------

     Regional Reliability Standard FAC-501-WECC-2 (Transmission 
Maintenance), and
     the retirement of existing regional Reliability Standard 
FAC-501-WECC-1.
    The petition states: ``The purpose of FAC-501-WECC-2 is to ensure 
the Transmission Owner of a transmission path identified in the table 
titled ``Major WECC Transfer Paths in the Bulk Electric System'' 
(``WECC Transfer Path Table'' or ``Table''), including associated 
facilities, has a Transmission Maintenance and Inspection Plan 
(``TMIP'') and performs and documents maintenance and inspection 
activities in accordance with the TMIP.'' The modifications to the 
existing standard are for clarification of the transmission owner's 
obligations and to directly incorporate the list of applicable 
transmission paths. This list is currently posted on the WECC website 
and has not changed. The Commission is not changing reporting 
requirements nor is it modifying the burden, cost or respondents with 
this collection, and sees this as a non-material or non-substantive 
change to a currently approved collection.
    The Commission's request to OMB will reflect the following:
     Elimination of the burden associated with regional 
Reliability Standard VAR-002-WECC-2 (Automatic Voltage Regulators), 
which is proposed for retirement (addressed in Docket No. RD18-1 and 
discussed below); \4\
---------------------------------------------------------------------------

    \4\ The joint petition and exhibits are posted in the 
Commission's eLibrary system in Docket No. RD18-1-000 (VAR-002-WECC-
2 Petition).
---------------------------------------------------------------------------

     elimination of the burden associated with regional 
Reliability Standard PRC-004-WECC-2 (Protection System and Remedial 
Action Scheme Misoperation), which is proposed for retirement 
(addressed in Docket No. RD18-3 and discussed below),\5\
---------------------------------------------------------------------------

    \5\ The joint petition and exhibits are posted in the 
Commission's eLibrary system in Docket No. RD18-3-000 (WECC PRC-004-
WECC-2 Retirement Petition).
---------------------------------------------------------------------------

     non-material or non-substantive changes (discussed above) 
in Docket Nos. RD18-2 and RD18-5.
    On March 7, 2018, NERC and WECC filed a joint petition in Docket 
No. RD18-1-000 requesting Commission approval to retire the WECC 
regional Reliability Standard VAR-002-WECC-2 (Automatic Voltage 
Regulators). According to the petition, the purpose of the proposed 
retirement is based on WECC's experience with regional Reliability 
Standard VAR-002-WECC-2 which has shown that the reliability-related 
issues addressed in the regional standard are adequately addressed by 
the continent-wide voltage and reactive

[[Page 33926]]

(``VAR'') Reliability Standards \6\ and that retention of the regional 
standard would not provide additional benefits for reliability.
---------------------------------------------------------------------------

    \6\ The burdens related to continent-wide Reliability Standards 
VAR-001-4.2 (Voltage and Reactive Control) and VAR-002-4.1 
(Generator Operation for Maintenance Network Voltage Schedules) are 
included in FERC-725A (Mandatory Reliability Standards for the Bulk-
Power System, OMB Control No. 1902-0244).
---------------------------------------------------------------------------

    On March 9, 2018, NERC and WECC filed a joint petition in Docket 
No. RD18-3-000 requesting Commission approval to retire the WECC 
regional Reliability Standard PRC-004-WECC-2 (Protection System and 
Remedial Action Scheme Misoperation). The purpose of the proposed 
retirement is based on NERC and WECC's belief that since the initial 
development of this regional standard, other continent-wide Reliability 
Standards \7\ have been developed that have made the requirements of 
this regional Reliability Standard redundant and no longer necessary 
for reliability in the Western Interconnection.
---------------------------------------------------------------------------

    \7\ The burdens related to continent-wide Reliability Standards 
mentioned in the petition: FAC-003-4 (Transmission Vegetation 
Management) are included in FERC-725M (Mandatory Reliability 
Standards for the Bulk-Power System, OMB Control No. 1902-0263); 
PRC-001-1.1(ii) (System Protection Coordination) are included in 
FERC-725A (Mandatory Reliability Standards for the Bulk-Power 
System, OMB Control No. 1902-0244); PRC-004-5(i) (Protection System 
Misoperation Identification and Correction), PRC-005-6 (Protection 
System, Automatic Reclosing, and Sudden Pressure Relaying 
Maintenance), PRC-012-2 (Remedial Action Schemes) are included in 
FERC-725G (Mandatory Reliability Standards for the Bulk-Power 
System: PRC Standards, OMB Control No. 1902-0252); PRC-016-1 
(Remedial Action Scheme Misoperations), PRC-017-1 (Remedial Action 
Scheme Maintenance and Testing), TOP-001-3 (Transmission Operations) 
and TOP-003-3 (Operational Reliability Data) are included in FERC-
725A (Mandatory Reliability Standards for the Bulk-Power System, OMB 
Control No. 1902-0244).
---------------------------------------------------------------------------

    Type of Respondents: Transmission owners, transmission operators, 
generator operators, and generator owners.
    Estimate of Annual Burden: \8\ Details follow on the changes in 
Docket Nos. RD18-1-000 and RD18-3-000 which will be submitted to OMB 
for approval in a consolidated package under FERC-725E.
---------------------------------------------------------------------------

    \8\ The Commission defines burden as the total time, effort, or 
financial resources expended by persons to generate, maintain, 
retain, or disclose or provide information to or for a Federal 
agency. For further explanation of what is included in the 
information collection burden, reference 5 Code of Federal 
Regulations 1320.3.
---------------------------------------------------------------------------

    Estimate of Changes to Burden Due to Docket No. RD18-1: The 
Commission estimates the reduction in the annual public reporting 
burden for the FERC-725E (due to the retirement of regional Reliability 
Standard VAR-002-WECC-2) as follows:9 10
---------------------------------------------------------------------------

    \9\ The reductions in burden and cost shown in the table are the 
same figures as those in the current OMB-approved inventory for the 
reporting and recordkeeping requirements that are now being retired.
    \10\ The hourly cost (for salary plus benefits) uses the figures 
from the Bureau of Labor Statistics for three positions involved in 
the reporting and recordkeeping requirements. These figures include 
salary (http://bls.gov/oes/current/naics2_22.htm) and benefits 
(http://www.bls.gov/news.release/ecec.nr0.htm) and are: Manager: 
$89.07/hour, Engineer: $64.91/hour, and File Clerk: $31.19/hour.
    The hourly cost for the reporting requirements ($76.99) is an 
average of the cost of a manager and engineer. The hourly cost for 
recordkeeping requirements uses the cost of a file clerk.

            FERC-725E, Mandatory Reliability Standards for the Western Electric Coordinating Council, Reductions Due to Docket No. RD18-1-000
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                   Annual number                                          Total annual
                                     Number of     of responses    Annual number     Average burden     burden hours and
             Entity                 respondents         per        of responses    hours and cost per   total annual cost     Cost per respondent  ($)
                                                    respondents                      response  ($)             ($)
                                             (1)             (2)     (1) * (2) =  (4)................  (3) * (4) = (5)...  (5) / (1) = (6)
                                                                             (3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                  Retirement of Regional Reliability Standard VAR-002-WECC-2 and Associated Reductions
--------------------------------------------------------------------------------------------------------------------------------------------------------
Reporting Requirements
 (Annually):
    Generator Operators.........             228               1             228  10 hr.; $769.90....  2,280 hr.;          $770 (reduction).
                                                                                                        $175,537
                                                                                                        (reduction).
    Transmission Operators                    86               4             344  10 hr.; $769.90....  3,440 hr.;          $3,080 (reduction).
     applicable to standard VAR-                                                                        $264,846
     002.                                                                                               (reduction).
Recordkeeping Requirements
 (Annually):
    Generator Operators.........             228               1             228  1 hr.; $31.19......  228 hr.; $7,111     $31 (reduction).
                                                                                                        (reduction).
    Transmission Operators                    86               1              86  4 hr.; $124.76.....  344 hr.; $10,729    $125 (reduction).
     applicable to standard VAR-                                                                        (reduction).
     002.
                                 -----------------------------------------------------------------------------------------------------------------------
        Total Reduction.........  ..............  ..............             886  ...................  6,292 hr.;
                                                                                                        $458,223
                                                                                                        (reduction).
--------------------------------------------------------------------------------------------------------------------------------------------------------


[[Page 33927]]

    Estimate of Changes to Burden Due to Docket No. RD18-3: The 
Commission estimates the reduction in the annual public reporting 
burden for the FERC-725E (due to the retirement of regional Reliability 
Standard PRC-004-WECC-2) as follows: 11 12
---------------------------------------------------------------------------

    \11\ The reductions in burden and cost shown in the table are 
the same figures as those in the current OMB-approved inventory for 
the reporting and recordkeeping requirements, now being retired.
    \12\ The hourly cost (for salary plus benefits) uses the figures 
from the Bureau of Labor Statistics for three positions involved in 
the reporting and recordkeeping requirements. These figures include 
salary (http://bls.gov/oes/current/naics2_22.htm) and benefits 
(http://www.bls.gov/news.release/ecec.nr0.htm) and are: Manager: 
$89.07/hour, Engineer: $64.91/hour, and File Clerk: $31.19/hour.
    The hourly cost for the reporting requirements ($76.99) is an 
average of the cost of a manager and engineer. The hourly cost for 
recordkeeping requirements uses the cost of a file clerk.

            FERC-725E, Mandatory Reliability Standards for the Western Electric Coordinating Council, Reductions Due to Docket No. RD18-3-000
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                   Annual number                                          Total annual
                                     Number of     of responses    Annual number     Average burden     burden hours and
             Entity                 respondents         per         of response    hours and cost per   total annual cost     Cost per respondent  ($)
                                                    respondents                      response  ($)             ($)
                                             (1)             (2)     (1) * (2) =  (4)................  (3) * (4) = (5)...  (5) / (1) = (6)
                                                                             (3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                  Retirement of regional Reliability Standard PRC-004-WECC-2 and Associated Reductions
--------------------------------------------------------------------------------------------------------------------------------------------------------
Reporting Requirements
 (Annually):
    Transmission Owners that                   5               2              10  40 hr.; $3,079.60..  400 hr.; $30,796    $6,159 (reduction).
     operate qualified transfer                                                                         (reduction).
     paths.
Recordkeeping Requirements
 (Annually):
    Transmission Owners that                   5               1               5  6 hr.; $187.14.....  30 hr.; $936        $187 (reduction).
     operate qualified transfer                                                                         (reduction).
     paths.
                                 -----------------------------------------------------------------------------------------------------------------------
        Total Reduction.........  ..............  ..............              15  ...................  430 hr.; $31,732
                                                                                                        (reduction).
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Total Reduction in Burden for FERC-725E, for Submittal to OMB. The 
total reduction in burden due to the proposed retirements of regional 
Reliability Standards VAR-002-WECC-2 and PRC-004-WECC-2 is detailed 
below:
     Total Reduction of Annual Responses: 901.
     Total Reduction of Burden Hours: 6,722.
     Total Reduction of Burden Cost: $489,955.
    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.

    Dated: July 12, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-15325 Filed 7-17-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                           Federal Register / Vol. 83, No. 138 / Wednesday, July 18, 2018 / Notices                                                       33925

                                              DEPARTMENT OF ENERGY                                        Docket: Users interested in receiving                   • the retirement of existing regional
                                                                                                       automatic notification of activity in this              Reliability Standard FAC–501–WECC–1.
                                              Federal Energy Regulatory                                docket or in viewing/downloading                           The petition states: ‘‘The purpose of
                                              Commission                                               comments and issuances in this docket                   FAC–501–WECC–2 is to ensure the
                                                                                                       may do so at http://www.ferc.gov/docs-                  Transmission Owner of a transmission
                                              [Docket Nos. RD18–1–000, RD18–2–000,
                                                                                                       filing/docs-filing.asp.                                 path identified in the table titled ‘‘Major
                                              RD18–3–000 and RD18–5–000]
                                                                                                       FOR FURTHER INFORMATION CONTACT:                        WECC Transfer Paths in the Bulk
                                              Commission Information Collection                        Ellen Brown may be reached by email                     Electric System’’ (‘‘WECC Transfer Path
                                              Activities (FERC–725E); Comment                          at DataClearance@FERC.gov, by                           Table’’ or ‘‘Table’’), including associated
                                              Request; Revision                                        telephone at (202) 502–8663, and by fax                 facilities, has a Transmission
                                                                                                       at (202) 273–0873.                                      Maintenance and Inspection Plan
                                              AGENCY:  Federal Energy Regulatory                                                                               (‘‘TMIP’’) and performs and documents
                                                                                                       SUPPLEMENTARY INFORMATION:
                                              Commission, Department of Energy.                                                                                maintenance and inspection activities in
                                                                                                          Title: FERC–725E, Mandatory
                                              ACTION: Comment request.                                 Reliability Standards for the Western                   accordance with the TMIP.’’ The
                                                                                                       Electric Coordinating Council.                          modifications to the existing standard
                                              SUMMARY:    In compliance with the                                                                               are for clarification of the transmission
                                                                                                          OMB Control No.: 1902–0246.
                                              requirements of the Paperwork                                                                                    owner’s obligations and to directly
                                                                                                          Type of Request: Revision to FERC–
                                              Reduction Act of 1995, the Federal                                                                               incorporate the list of applicable
                                                                                                       725E information collection
                                              Energy Regulatory Commission                                                                                     transmission paths. This list is currently
                                                                                                       requirements, as discussed in Docket
                                              (Commission or FERC) is submitting its                                                                           posted on the WECC website and has
                                                                                                       Nos. RD18–1–000 and RD18–3–000.
                                              information collection FERC–725E                                                                                 not changed. The Commission is not
                                                                                                          Abstract: The North American
                                              (Mandatory Reliability Standards for the                                                                         changing reporting requirements nor is
                                                                                                       Electric Reliability Corporation (NERC)
                                              Western Electric Coordinating Council)                                                                           it modifying the burden, cost or
                                                                                                       and Western Electricity Coordinating
                                              to the Office of Management and Budget                                                                           respondents with this collection, and
                                                                                                       Council (WECC) filed four joint
                                              (OMB) for review of the information                                                                              sees this as a non-material or non-
                                                                                                       petitions to modify/retire WECC
                                              collection requirements. Any interested                                                                          substantive change to a currently
                                                                                                       regional Reliability Standards.
                                              person may file comments directly with                                                                           approved collection.
                                                                                                          On March 8 2018, NERC and WECC
                                              OMB and should address a copy of
                                                                                                       filed a joint petition in Docket No.                       The Commission’s request to OMB
                                              those comments to the Commission as
                                                                                                       RD18–2–000 1 requesting Commission                      will reflect the following:
                                              explained below. On May 11, 2018, the
                                                                                                       approval of:                                               • Elimination of the burden
                                              Commission previously issued a Notice
                                                                                                          • Regional Reliability Standard BAL–                 associated with regional Reliability
                                              in the Federal Register requesting
                                                                                                       004–WECC–3 (Automatic Time Error                        Standard VAR–002–WECC–2
                                              public comments. The Commission
                                                                                                       Correction), and                                        (Automatic Voltage Regulators), which
                                              received no comments on the FERC–
                                                                                                          • the retirement of existing regional                is proposed for retirement (addressed in
                                              725E and is making this notation in its
                                                                                                       Reliability Standard BAL–004–WECC–2.                    Docket No. RD18–1 and discussed
                                              submittal to OMB.
                                                                                                          The petition states: ‘‘Regional                      below); 4
                                              DATES: Comments on the collection of                     Reliability Standard BAL–004–WECC–3
                                              information are due by August 17, 2018.                                                                             • elimination of the burden
                                                                                                       seeks to maintain Interconnection
                                              ADDRESSES: Comments filed with OMB,
                                                                                                                                                               associated with regional Reliability
                                                                                                       frequency and to ensure that Time Error
                                              identified by the OMB Control No.                                                                                Standard PRC–004–WECC–2 (Protection
                                                                                                       Corrections and Primary Inadvertent
                                              1902–0246, should be sent via email to                                                                           System and Remedial Action Scheme
                                                                                                       Interchange (‘‘PII’’) payback are
                                              the Office of Information and Regulatory                                                                         Misoperation), which is proposed for
                                                                                                       effectively conducted in a manner that
                                              Affairs: oira_submission@omb.gov.                                                                                retirement (addressed in Docket No.
                                                                                                       does not adversely affect the reliability
                                              Attention: Federal Energy Regulatory                                                                             RD18–3 and discussed below),5
                                                                                                       of the [Western] Interconnection.’’ 2 The
                                              Commission Desk Officer. The Desk                        proposed modifications to the standard                     • non-material or non-substantive
                                              Officer may also be reached via                          focus on the entities using a common                    changes (discussed above) in Docket
                                              telephone at 202–395–0710.                               tool. All other proposed changes are for                Nos. RD18–2 and RD18–5.
                                                 A copy of the comments should also                    clarification. The Commission is not                       On March 7, 2018, NERC and WECC
                                              be sent to the Commission, in Docket                     changing the reporting requirements,                    filed a joint petition in Docket No.
                                              Nos. RD18–1–000, RD18–2–000, RD18–                       nor is it modifying the burden, cost or                 RD18–1–000 requesting Commission
                                              3–000, and RD18–5–000 by either of the                   respondents with this collection, and                   approval to retire the WECC regional
                                              following methods:                                       sees this as a non-material or non-                     Reliability Standard VAR–002–WECC–2
                                                 • eFiling at Commission’s website:                    substantive change to a currently                       (Automatic Voltage Regulators).
                                              http://www.ferc.gov/docs-filing/                         approved collection.                                    According to the petition, the purpose
                                              efiling.asp.                                                On March 16, 2018, NERC and WECC                     of the proposed retirement is based on
                                                 • Mail/Hand Delivery/Courier:                         filed a joint petition in Docket No.                    WECC’s experience with regional
                                              Federal Energy Regulatory Commission,                    RD18–5–000 3 requesting Commission                      Reliability Standard VAR–002–WECC–2
                                              Secretary of the Commission, 888 First                   approval of:                                            which has shown that the reliability-
                                              Street NE, Washington, DC 20426.                            • Regional Reliability Standard FAC–                 related issues addressed in the regional
                                                 Instructions: All submissions must be                 501–WECC–2 (Transmission                                standard are adequately addressed by
                                              formatted and filed in accordance with                   Maintenance), and                                       the continent-wide voltage and reactive
amozie on DSK3GDR082PROD with NOTICES1




                                              submission guidelines at: http://
                                              www.ferc.gov/help/submission-                              1 The joint petition and exhibits are posted in the     4 The joint petition and exhibits are posted in the

                                              guide.asp. For user assistance contact                   Commission’s eLibrary system in Docket No. RD18–        Commission’s eLibrary system in Docket No. RD18–
                                                                                                       2–000 (BAL–004–WECC–3 Petition).                        1–000 (VAR–002–WECC–2 Petition).
                                              FERC Online Support by email at                            2 BAL–004–WECC–3 Petition, page 1.                      5 The joint petition and exhibits are posted in the
                                              ferconlinesupport@ferc.gov, or by phone                    3 The joint petition and exhibits are posted in the   Commission’s eLibrary system in Docket No. RD18–
                                              at: (866) 208–3676 (toll-free), or (202)                 Commission’s eLibrary system in Docket No. RD18–        3–000 (WECC PRC–004–WECC–2 Retirement
                                              502–8659 for TTY.                                        5–000 (FAC–501–WECC–2 Petition).                        Petition).



                                         VerDate Sep<11>2014   19:19 Jul 17, 2018   Jkt 244001   PO 00000   Frm 00009   Fmt 4703   Sfmt 4703   E:\FR\FM\18JYN1.SGM    18JYN1


                                              33926                         Federal Register / Vol. 83, No. 138 / Wednesday, July 18, 2018 / Notices

                                              (‘‘VAR’’) Reliability Standards 6 and that                         initial development of this regional                                     Estimate of Annual Burden: 8 Details
                                              retention of the regional standard would                           standard, other continent-wide                                         follow on the changes in Docket Nos.
                                              not provide additional benefits for                                Reliability Standards 7 have been                                      RD18–1–000 and RD18–3–000 which
                                              reliability.                                                       developed that have made the                                           will be submitted to OMB for approval
                                                 On March 9, 2018, NERC and WECC                                 requirements of this regional Reliability                              in a consolidated package under FERC–
                                              filed a joint petition in Docket No.                               Standard redundant and no longer                                       725E.
                                              RD18–3–000 requesting Commission                                   necessary for reliability in the Western                                 Estimate of Changes to Burden Due to
                                              approval to retire the WECC regional                               Interconnection.                                                       Docket No. RD18–1: The Commission
                                              Reliability Standard PRC–004–WECC–2                                                                                                       estimates the reduction in the annual
                                              (Protection System and Remedial Action                               Type of Respondents: Transmission                                    public reporting burden for the FERC–
                                              Scheme Misoperation). The purpose of                               owners, transmission operators,                                        725E (due to the retirement of regional
                                              the proposed retirement is based on                                generator operators, and generator                                     Reliability Standard VAR–002–WECC–
                                              NERC and WECC’s belief that since the                              owners.                                                                2) as follows:9 10

                                               FERC–725E, MANDATORY RELIABILITY STANDARDS FOR THE WESTERN ELECTRIC COORDINATING COUNCIL, REDUCTIONS
                                                                                  DUE TO DOCKET NO. RD18–1–000
                                                                                                        Annual                                       Average burden                      Total annual burden
                                                                                                                                  Annual
                                                                           Number of                  number of                                     hours and cost per                     hours and total          Cost per respondent
                                                      Entity                                                                    number of
                                                                          respondents               responses per                                       response                             annual cost                    ($)
                                                                                                                                responses
                                                                                                     respondents                                           ($)                                   ($)

                                                                                  (1)                        (2)               (1) * (2) = (3)                   (4)                         (3) * (4) = (5)            (5) ÷ (1) = (6)

                                                                         Retirement of Regional Reliability Standard VAR–002–WECC–2 and Associated Reductions

                                              Reporting Require-
                                                ments (Annually):
                                                   Generator Oper-                        228                             1               228      10 hr.; $769.90 ........             2,280 hr.; $175,537        $770 (reduction).
                                                      ators.                                                                                                                              (reduction).
                                                   Transmission                              86                           4               344      10 hr.; $769.90 ........             3,440 hr.; $264,846        $3,080 (reduction).
                                                      Operators ap-                                                                                                                       (reduction).
                                                      plicable to
                                                      standard
                                                      VAR–002.
                                              Recordkeeping Re-
                                                quirements (Annu-
                                                ally):
                                                   Generator Oper-                        228                             1               228      1 hr.; $31.19 ............           228 hr.; $7,111 (re-       $31 (reduction).
                                                      ators.                                                                                                                              duction).
                                                   Transmission                              86                           1                 86     4 hr.; $124.76 ..........            344 hr.; $10,729 (re-      $125 (reduction).
                                                      Operators ap-                                                                                                                       duction).
                                                      plicable to
                                                      standard
                                                      VAR–002.

                                                       Total Re-         ........................   ........................              886      ..................................   6,292 hr.; $458,223
                                                         duction.                                                                                                                         (reduction).




                                                6 The burdens related to continent-wide                          Sudden Pressure Relaying Maintenance), PRC–012–                          9 The reductions in burden and cost shown in the

                                              Reliability Standards VAR–001–4.2 (Voltage and                     2 (Remedial Action Schemes) are included in                            table are the same figures as those in the current
                                              Reactive Control) and VAR–002–4.1 (Generator                       FERC–725G (Mandatory Reliability Standards for                         OMB-approved inventory for the reporting and
                                              Operation for Maintenance Network Voltage                          the Bulk-Power System: PRC Standards, OMB                              recordkeeping requirements that are now being
                                              Schedules) are included in FERC–725A (Mandatory                    Control No. 1902–0252); PRC–016–1 (Remedial
                                                                                                                                                                                        retired.
                                              Reliability Standards for the Bulk-Power System,                   Action Scheme Misoperations), PRC–017–1
                                                                                                                                                                                          10 The hourly cost (for salary plus benefits) uses
                                              OMB Control No. 1902–0244).                                        (Remedial Action Scheme Maintenance and
                                                7 The burdens related to continent-wide                          Testing), TOP–001–3 (Transmission Operations)                          the figures from the Bureau of Labor Statistics for
                                              Reliability Standards mentioned in the petition:                   and TOP–003–3 (Operational Reliability Data) are                       three positions involved in the reporting and
                                                                                                                 included in FERC–725A (Mandatory Reliability
amozie on DSK3GDR082PROD with NOTICES1




                                              FAC–003–4 (Transmission Vegetation Management)                                                                                            recordkeeping requirements. These figures include
                                              are included in FERC–725M (Mandatory Reliability                   Standards for the Bulk-Power System, OMB Control                       salary (http://bls.gov/oes/current/naics2_22.htm)
                                              Standards for the Bulk-Power System, OMB Control                   No. 1902–0244).                                                        and benefits (http://www.bls.gov/news.release/
                                              No. 1902–0263); PRC–001–1.1(ii) (System                               8 The Commission defines burden as the total
                                                                                                                                                                                        ecec.nr0.htm) and are: Manager: $89.07/hour,
                                              Protection Coordination) are included in FERC–                     time, effort, or financial resources expended by                       Engineer: $64.91/hour, and File Clerk: $31.19/hour.
                                              725A (Mandatory Reliability Standards for the                      persons to generate, maintain, retain, or disclose or
                                              Bulk-Power System, OMB Control No. 1902–0244);                     provide information to or for a Federal agency. For                      The hourly cost for the reporting requirements
                                              PRC–004–5(i) (Protection System Misoperation                       further explanation of what is included in the                         ($76.99) is an average of the cost of a manager and
                                              Identification and Correction), PRC–005–6                          information collection burden, reference 5 Code of                     engineer. The hourly cost for recordkeeping
                                              (Protection System, Automatic Reclosing, and                       Federal Regulations 1320.3.                                            requirements uses the cost of a file clerk.


                                         VerDate Sep<11>2014   19:19 Jul 17, 2018     Jkt 244001      PO 00000         Frm 00010    Fmt 4703     Sfmt 4703     E:\FR\FM\18JYN1.SGM             18JYN1


                                                                             Federal Register / Vol. 83, No. 138 / Wednesday, July 18, 2018 / Notices                                                                                 33927

                                                Estimate of Changes to Burden Due to                              public reporting burden for the FERC–                                    Reliability Standard PRC–004–WECC–2)
                                              Docket No. RD18–3: The Commission                                   725E (due to the retirement of regional                                  as follows: 11 12
                                              estimates the reduction in the annual

                                               FERC–725E, MANDATORY RELIABILITY STANDARDS FOR THE WESTERN ELECTRIC COORDINATING COUNCIL, REDUCTIONS
                                                                                  DUE TO DOCKET NO. RD18–3–000
                                                                                                         Annual                                         Average burden                      Total annual burden
                                                                                                                                  Annual
                                                                            Number of                  number of                                       hours and cost per                     hours and total          Cost per respondent
                                                       Entity                                                                    number of
                                                                           respondents               responses per                                         response                             annual cost                    ($)
                                                                                                                                 response
                                                                                                      respondents                                             ($)                                   ($)

                                                                                   (1)                        (2)               (1) * (2) = (3)                     (4)                         (3) * (4) = (5)            (5) ÷ (1) = (6)

                                                                          Retirement of regional Reliability Standard PRC–004–WECC–2 and Associated Reductions

                                              Reporting Require-
                                                ments (Annually):
                                                   Transmission                                 5                         2                  10       40 hr.; $3,079.60 .....              400 hr.; $30,796 (re-      $6,159 (reduction).
                                                      Owners that                                                                                                                            duction).
                                                      operate quali-
                                                      fied transfer
                                                      paths.
                                              Recordkeeping Re-
                                                quirements (Annu-
                                                ally):
                                                   Transmission                                 5                         1                     5     6 hr.; $187.14 ..........            30 hr.; $936 (reduc-       $187 (reduction).
                                                      Owners that                                                                                                                            tion).
                                                      operate quali-
                                                      fied transfer
                                                      paths.

                                                        Total Re-         ........................   ........................                15       ..................................   430 hr.; $31,732 (re-
                                                          duction.                                                                                                                           duction).



                                                Total Reduction in Burden for FERC–                                 Dated: July 12, 2018.                                                  expansion project consists of the
                                              725E, for Submittal to OMB. The total                               Kimberly D. Bose,                                                        addition of seven midscale liquefaction
                                              reduction in burden due to the proposed                             Secretary.                                                               trains and one liquefied natural gas
                                              retirements of regional Reliability                                 [FR Doc. 2018–15325 Filed 7–17–18; 8:45 am]                              (LNG) storage tank (Stage 3 LNG
                                              Standards VAR–002–WECC–2 and PRC–                                   BILLING CODE 6717–01–P                                                   Facilities). Corpus Christi Liquefaction,
                                              004–WECC–2 is detailed below:                                                                                                                LLC (CCL) is currently constructing the
                                                • Total Reduction of Annual                                                                                                                liquefaction project, and would provide
                                              Responses: 901.                                                     DEPARTMENT OF ENERGY                                                     interconnects between the liquefaction
                                                • Total Reduction of Burden Hours:                                                                                                         project and the Stage 3 LNG Facilities,
                                              6,722.                                                              Federal Energy Regulatory                                                as well as control building
                                                                                                                  Commission                                                               modifications to accommodate the Stage
                                                • Total Reduction of Burden Cost:
                                              $489,955.                                                           [Docket Nos. CP18–512–000; CP18–513–                                     3 LNG Facilities.
                                                Comments: Comments are invited on:                                000; PF15–26–000]                                                           In addition, pursuant to section 7(c) of
                                              (1) Whether the collection of                                                                                                                the NGA, and in accordance with parts
                                                                                                                  Notice of Application: Corpus Christi
                                              information is necessary for the proper                                                                                                      157 and 380 of the Commission’s
                                                                                                                  Liquefaction Stage III, LLC; Corpus
                                              performance of the functions of the                                                                                                          regulations, Cheniere Corpus Christi
                                                                                                                  Christi Liquefaction, LLC; Cheniere
                                              Commission, including whether the                                                                                                            Pipeline, LP (CCPL) filed an application
                                                                                                                  Corpus Christi Pipeline, LP
                                              information will have practical utility;                                                                                                     for authorization to construct, own,
                                              (2) the accuracy of the agency’s estimate                             Take notice that on June 28, 2018,                                     operate, and maintain new interstate
                                              of the burden and cost of the collection                            Corpus Christi Liquefaction Stage III,                                   natural gas pipeline, compression, and
                                              of information, including the validity of                           LLC (CCL Stage III) filed an application                                 related facilities in San Patricio County,
                                              the methodology and assumptions used;                               under section 3(a) of the Natural Gas                                    Texas (Stage 3 Pipeline). The Stage 3
                                              (3) ways to enhance the quality, utility                            Act (NGA) and parts 153 and 380 of the                                   Pipeline, which would be
                                              and clarity of the information collection;                          Commission’s regulations for                                             approximately 21 miles long and 42
                                              and (4) ways to minimize the burden of                              authorization to site, construct, and                                    inches in diameter, would originate at
                                              the collection of information on those                              operate an expansion of the Corpus                                       CCPL’s Sinton Compressor Station and
                                              who are to respond, including the use                               Christi Liquefaction Project, previously                                 generally run parallel to CCPL’s existing
                                              of automated collection techniques or                               approved by the Commission in Docket                                     48-inch-diameter interstate natural gas
amozie on DSK3GDR082PROD with NOTICES1




                                              other forms of information technology.                              No. CP12–507–000. The proposed                                           pipeline (Corpus Christi Pipeline)
                                                11 The reductions in burden and cost shown in                     three positions involved in the reporting and                              The hourly cost for the reporting requirements
                                              the table are the same figures as those in the current              recordkeeping requirements. These figures include                        ($76.99) is an average of the cost of a manager and
                                              OMB-approved inventory for the reporting and                        salary (http://bls.gov/oes/current/naics2_22.htm)                        engineer. The hourly cost for recordkeeping
                                              recordkeeping requirements, now being retired.                      and benefits (http://www.bls.gov/news.release/                           requirements uses the cost of a file clerk.
                                                12 The hourly cost (for salary plus benefits) uses                ecec.nr0.htm) and are: Manager: $89.07/hour,
                                              the figures from the Bureau of Labor Statistics for                 Engineer: $64.91/hour, and File Clerk: $31.19/hour.



                                         VerDate Sep<11>2014    19:19 Jul 17, 2018     Jkt 244001      PO 00000         Frm 00011    Fmt 4703       Sfmt 4703     E:\FR\FM\18JYN1.SGM             18JYN1



Document Created: 2018-11-06 10:25:08
Document Modified: 2018-11-06 10:25:08
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionComment request.
DatesComments on the collection of information are due by August 17, 2018.
ContactEllen Brown may be reached by email at [email protected], by telephone at (202) 502-8663, and by fax at (202) 273-0873.
FR Citation83 FR 33925 