83_FR_34066 83 FR 33928 - Notice of Intent To Prepare an Environmental Assessment for the Proposed Portland Xpress Project, and Request for Comments on Environmental Issues: Portland Natural Gas Transmission System

83 FR 33928 - Notice of Intent To Prepare an Environmental Assessment for the Proposed Portland Xpress Project, and Request for Comments on Environmental Issues: Portland Natural Gas Transmission System

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 138 (July 18, 2018)

Page Range33928-33930
FR Document2018-15321

Federal Register, Volume 83 Issue 138 (Wednesday, July 18, 2018)
[Federal Register Volume 83, Number 138 (Wednesday, July 18, 2018)]
[Notices]
[Pages 33928-33930]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-15321]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-506-000]


Notice of Intent To Prepare an Environmental Assessment for the 
Proposed Portland Xpress Project, and Request for Comments on 
Environmental Issues: Portland Natural Gas Transmission System

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Portland Xpress Project 
involving construction and operation of facilities by Portland Natural 
Gas Transmission Systems (Portland) to Portland owned, and Portland and 
Maritime jointly owned, facilities in Cumberland and York Counties, 
Maine and Middlesex County, Massachusetts. The Commission will use this 
EA in its decision-making process to determine whether the project is 
in the public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies about issues regarding the project. The National Environmental 
Policy Act (NEPA) requires the Commission to take into account the 
environmental impacts that could result from its action whenever it 
considers the issuance of a Certificate of Public Convenience and 
Necessity. NEPA also requires the Commission to discover concerns the 
public may have about proposals. This process is referred to as 
``scoping.'' The main goal of the scoping process is to focus the 
analysis in the EA on the important environmental issues. By this 
notice, the Commission requests public comments on the scope of the 
issues to address in the EA. To ensure that your comments are timely 
and properly recorded, please submit your comments so that the 
Commission receives them in Washington, DC on or before 5:00 p.m. 
Eastern Time on August 13, 2018.

[[Page 33929]]

    You can make a difference by submitting your specific comments or 
concerns about the project. Your comments should focus on the potential 
environmental effects, reasonable alternatives, and measures to avoid 
or lessen environmental impacts. Your input will help the Commission 
staff determine what issues they need to evaluate in the EA. Commission 
staff will consider and address all filed comments during the 
preparation of the EA.
    If you sent comments on this project to the Commission before the 
opening of this docket on June 19, 2018, you will need to file those 
comments in Docket No. CP18-506-000 to ensure they are considered as 
part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable easement agreement. You 
are not required to enter into an agreement. However, if the Commission 
approves the project, that approval conveys with it the right of 
eminent domain. Therefore, if you and the company do not reach an 
easement agreement, the pipeline company could initiate condemnation 
proceedings in court. In such instances, compensation would be 
determined by a judge in accordance with state law.
    Portland provided landowners with a fact sheet prepared by the FERC 
entitled ``An Interstate Natural Gas Facility On My Land? What Do I 
Need To Know?'' This fact sheet addresses a number of typically asked 
questions, including the use of eminent domain and how to participate 
in the Commission's proceedings. It is also available for viewing on 
the FERC website (www.ferc.gov).

Public Participation

    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has staff available to assist you at (866) 208-
3676 or FercOnlineSupport@ferc.gov. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to Documents and Filings. Using eComment is an easy 
method for submitting brief, text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to Documents and Filings. With eFiling, you can provide 
comments in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You will be asked to select the type of filing you 
are making; a comment on a particular project is considered a ``Comment 
on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(CP18-506-000) with your submission: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, 
Washington, DC 20426.

Summary of the Proposed Project

    Portland proposes to perform the following activities for 
construction of the project to provide 24,375 million cubic feet per 
day (Mcf/d) to Portland owned facilities, and 22,339 Mcf/d on Portland 
and Maritimes jointly owned facilities.

Westbrook Compressor Station (CS), Cumberland County, Maine

     Install a new electrical control building with motor 
control center, emergency generator building and generator and 
ancillary equipment; and

Eliot CS, York County, Maine

     Expansion of the existing building to include one new 
6,300 horsepower (hp) gas-fired compression unit and ancillary 
equipment; and
     Install an auxiliary building housing a replacement 
emergency generator and boiler.

Dracut Meter and Regulator (M&R) Station, Middlesex County, 
Massachusetts

     Install a low flow meter and transmitters and replace 
ultrasonic meter assemblies;
     Install a new 86-hp emergency generator; and
     Installation of ancillary equipment.
    The general location of the project facilities is shown in appendix 
1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called ``eLibrary'' or from the Commission's Public 
Reference Room, 888 First Street NE, Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed facilities would disturb 21.6 acres of 
land for the aboveground facilities. The Westbrook CS would utilize 8.4 
acres, the Eliot CS would require 11.9 acres, and the Dracut M&R would 
disrupt 1.3 acres during construction. Construction access to each of 
the three sites would be from existing permanent access roads. No land 
outside the existing compressor station or meter station properties 
would be impacted for construction or operations of the Project.

The EA Process

    The EA will discuss impacts that could occur as a result of the 
construction and operation of the proposed project under these general 
headings:
     Geology and soils;
     land use;
     water resources, fisheries, and wetlands;
     cultural resources;
     vegetation and wildlife;
     air quality and noise;
     endangered and threatened species;
     public safety; and
     cumulative impacts.

    Commission staff will also evaluate reasonable alternatives to the 
proposed project or portions of the project, and make recommendations 
on how to lessen or avoid impacts on the various resource areas.
    The EA will present Commission staffs' independent analysis of the 
issues. The EA will be available in the public record through eLibrary. 
Commission staff will consider and address all comments on the EA 
before making recommendations to the Commission. To ensure Commission 
staff have the opportunity to address your comments, please carefully 
follow the instructions in the Public Participation section, beginning 
on page 2.
    With this notice, the Commission is asking agencies with 
jurisdiction by law and/or special expertise with respect to the 
environmental issues of this project to formally cooperate in the 
preparation of the EA.\2\ Agencies that would like to request 
cooperating agency status should follow the instructions for filing

[[Page 33930]]

comments provided under the Public Participation section of this 
notice.
---------------------------------------------------------------------------

    \2\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultation Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, the Commission is using this notice to initiate 
consultation with the applicable State Historic Preservation Offices 
(SHPO), and to solicit their views and those of other government 
agencies, interested Indian tribes, and the public on the project's 
potential effects on historic properties.\3\ Commission staff will 
define the project-specific Area of Potential Effects (APE) in 
consultation with the SHPOs as the project develops. On natural gas 
facility projects, the APE at a minimum encompasses all areas subject 
to ground disturbance (examples include construction right-of-way, 
contractor/pipe storage yards, compressor stations, and access roads). 
The EA for this project will document findings on the impacts on 
historic properties and summarize the status of consultations under 
section 106.
---------------------------------------------------------------------------

    \3\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project. Commission staff will update the environmental 
mailing list as the analysis proceeds to ensure that information 
related to this environmental review is sent to all individuals, 
organizations, and government entities interested in and/or potentially 
affected by the proposed project.
    If the Commission publishes and distributes the EA, copies will be 
sent to the environmental mailing list for public review and comment. 
If you would prefer to receive a paper copy of the document instead of 
a CD version or would like to remove your name from the mailing list, 
please return the attached ``Mailing List Update Form'' (appendix 2).

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website at www.ferc.gov using the ``eLibrary'' link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number 
in the ``Docket Number'' field, excluding the last three digits (i.e., 
CP18-506). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or (866) 208-3676, or for TTY, contact (202) 
502-8659. The eLibrary link also provides access to the texts of all 
formal documents issued by the Commission, such as orders, notices, and 
rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, public sessions or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: July 12, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-15321 Filed 7-17-18; 8:45 am]
 BILLING CODE 6717-01-P



                                              33928                        Federal Register / Vol. 83, No. 138 / Wednesday, July 18, 2018 / Notices

                                              previously authorized by the                             to the proceedings for this project                   and 5 copies of the protest or
                                              Commission in Docket No. CP12–508–                       should, on or before the comment date                 intervention to the Federal Energy
                                              000. This new pipeline would be                          stated below, file with the Federal                   Regulatory Commission, 888 First Street
                                              capable of supplying feed gas to, and                    Energy Regulatory Commission, 888                     NE, Washington, DC 20426.
                                              bringing natural gas from, the Stage 3                   First Street NE, Washington, DC 20426,                  Comment Date: August 2, 2018.
                                              LNG Facilities. The Stage 3 Pipeline                     a motion to intervene in accordance                     Dated: July 12, 2018.
                                              would be integrated and operated as                      with the requirements of the
                                                                                                                                                             Kimberly D. Bose,
                                              part of the Corpus Christi Pipeline                      Commission’s Rules of Practice and
                                                                                                                                                             Secretary.
                                              system, all as more fully set forth in the               Procedure (18 CFR 385.214 or 385.211)
                                              application which is on file with the                    and the Regulations under the NGA (18                 [FR Doc. 2018–15322 Filed 7–17–18; 8:45 am]
                                              Commission and open for public                           CFR 157.10). A person obtaining party                 BILLING CODE 6717–01–P
                                              inspection.                                              status will be placed on the service list
                                                 On June 9, 2015, the Commission staff                 maintained by the Secretary of the
                                              granted the applicants’ request to utilize               Commission and will receive copies of                 DEPARTMENT OF ENERGY
                                              the National Environmental Policy Act                    all documents filed by the applicant and
                                              (NEPA) Pre-Filing Process and assigned                                                                         Federal Energy Regulatory
                                                                                                       by all other parties. A party must submit
                                              Docket No. PF15–26–000 to staff                                                                                Commission
                                                                                                       7 copies of filings made with the
                                              activities involving the project. Now, as                Commission and must mail a copy to                    [Docket No. CP18–506–000]
                                              of the filing of this application on June                the applicant and to every other party in
                                              28, 2018, the NEPA Pre-Filing Process                    the proceeding. Only parties to the                   Notice of Intent To Prepare an
                                              for this project has ended. From this                    proceeding can ask for court review of                Environmental Assessment for the
                                              time forward, this proceeding will be                    Commission orders in the proceeding.                  Proposed Portland Xpress Project, and
                                              conducted in Docket Nos. CP18–512–                          However, a person does not have to                 Request for Comments on
                                              000 and CP18–513–000, as noted in the                    intervene in order to have comments                   Environmental Issues: Portland
                                              caption of this Notice.                                  considered. The second way to                         Natural Gas Transmission System
                                                 The filing may also be viewed on the                  participate is by filing with the
                                              web at http://www.ferc.gov using the                                                                             The staff of the Federal Energy
                                                                                                       Secretary of the Commission, as soon as
                                              ‘‘eLibrary’’ link. Enter the docket                                                                            Regulatory Commission (FERC or
                                                                                                       possible, an original and two copies of
                                              number excluding the last three digits in                comments in support of or in opposition               Commission) will prepare an
                                              the docket number field to access the                    to this project. The Commission will                  environmental assessment (EA) that will
                                              document. For assistance, please contact                 consider these comments in                            discuss the environmental impacts of
                                              FERC at FERCOnlineSupport@ferc.gov                       determining the appropriate action to be              the Portland Xpress Project involving
                                              or toll free at (866) 208–3676, or TTY,                  taken, but the filing of a comment alone              construction and operation of facilities
                                              (202) 502–8659.                                          will not serve to make the filer a party              by Portland Natural Gas Transmission
                                                 Any questions regarding the proposed                  to the proceeding. The Commission’s                   Systems (Portland) to Portland owned,
                                              project should be directed to Karri                      rules require that persons filing                     and Portland and Maritime jointly
                                              Mahmoud, Cheniere Energy, Inc., 700                      comments in opposition to the project                 owned, facilities in Cumberland and
                                              Milam Street, Suite 1900, Houston,                       provide copies of their protests only to              York Counties, Maine and Middlesex
                                              Texas 77002, or by calling (713) 375–                    the party or parties directly involved in             County, Massachusetts. The
                                              5000 or by email at Karri.Mahmoud@                       the protest.                                          Commission will use this EA in its
                                              cheniere.com.                                               Persons who wish to comment only                   decision-making process to determine
                                                 Pursuant to section 157.9 of the                      on the environmental review of this                   whether the project is in the public
                                              Commission’s rules, 18 CFR 157.9,                        project should submit an original and                 convenience and necessity.
                                              within 90 days of this Notice the                        two copies of their comments to the                     This notice announces the opening of
                                              Commission staff will either: Complete                   Secretary of the Commission.                          the scoping process the Commission
                                              its environmental assessment (EA) and                    Environmental commenters will be                      will use to gather input from the public
                                              place it into the Commission’s public                    placed on the Commission’s                            and interested agencies about issues
                                              record (eLibrary) for this proceeding; or                environmental mailing list, will receive              regarding the project. The National
                                              issue a Notice of Schedule for                           copies of the environmental documents,                Environmental Policy Act (NEPA)
                                              Environmental Review. If a Notice of                     and will be notified of meetings                      requires the Commission to take into
                                              Schedule for Environmental Review is                     associated with the Commission’s                      account the environmental impacts that
                                              issued, it will indicate, among other                    environmental review process.                         could result from its action whenever it
                                              milestones, the anticipated date for the                 Environmental commenters will not be                  considers the issuance of a Certificate of
                                              Commission staff’s issuance of the EA                    required to serve copies of filed                     Public Convenience and Necessity.
                                              for this proposal. The filing of the EA                  documents on all other parties.                       NEPA also requires the Commission to
                                              in the Commission’s public record for                    However, the non-party commenters                     discover concerns the public may have
                                              this proceeding or the issuance of a                     will not receive copies of all documents              about proposals. This process is referred
                                              Notice of Schedule for Environmental                     filed by other parties or issued by the               to as ‘‘scoping.’’ The main goal of the
                                              Review will serve to notify federal and                  Commission (except for the mailing of                 scoping process is to focus the analysis
                                              state agencies of the timing for the                     environmental documents issued by the                 in the EA on the important
                                              completion of all necessary reviews, and                 Commission) and will not have the right               environmental issues. By this notice, the
                                              the subsequent need to complete all                      to seek court review of the                           Commission requests public comments
amozie on DSK3GDR082PROD with NOTICES1




                                              federal authorizations within 90 days of                 Commission’s final order.                             on the scope of the issues to address in
                                              the date of issuance of the Commission                      The Commission strongly encourages                 the EA. To ensure that your comments
                                              staff’s EA.                                              electronic filings of comments, protests              are timely and properly recorded, please
                                                 There are two ways to become                          and interventions in lieu of paper using              submit your comments so that the
                                              involved in the Commission’s review of                   the ‘‘eFiling’’ link at http://                       Commission receives them in
                                              this project. First, any person wishing to               www.ferc.gov. Persons unable to file                  Washington, DC on or before 5:00 p.m.
                                              obtain legal status by becoming a party                  electronically should submit an original              Eastern Time on August 13, 2018.


                                         VerDate Sep<11>2014   19:19 Jul 17, 2018   Jkt 244001   PO 00000   Frm 00012   Fmt 4703   Sfmt 4703   E:\FR\FM\18JYN1.SGM   18JYN1


                                                                           Federal Register / Vol. 83, No. 138 / Wednesday, July 18, 2018 / Notices                                                    33929

                                                 You can make a difference by                             (1) You can file your comments                     Land Requirements for Construction
                                              submitting your specific comments or                     electronically using the eComment                       Construction of the proposed facilities
                                              concerns about the project. Your                         feature, which is located on the                      would disturb 21.6 acres of land for the
                                              comments should focus on the potential                   Commission’s website (www.ferc.gov)                   aboveground facilities. The Westbrook
                                              environmental effects, reasonable                        under the link to Documents and                       CS would utilize 8.4 acres, the Eliot CS
                                              alternatives, and measures to avoid or                   Filings. Using eComment is an easy                    would require 11.9 acres, and the Dracut
                                              lessen environmental impacts. Your                       method for submitting brief, text-only                M&R would disrupt 1.3 acres during
                                              input will help the Commission staff                     comments on a project;                                construction. Construction access to
                                              determine what issues they need to                          (2) You can file your comments
                                                                                                                                                             each of the three sites would be from
                                              evaluate in the EA. Commission staff                     electronically by using the eFiling
                                                                                                                                                             existing permanent access roads. No
                                              will consider and address all filed                      feature, which is located on the
                                                                                                       Commission’s website (www.ferc.gov)                   land outside the existing compressor
                                              comments during the preparation of the                                                                         station or meter station properties
                                              EA.                                                      under the link to Documents and
                                                                                                       Filings. With eFiling, you can provide                would be impacted for construction or
                                                 If you sent comments on this project                                                                        operations of the Project.
                                              to the Commission before the opening of                  comments in a variety of formats by
                                              this docket on June 19, 2018, you will                   attaching them as a file with your                    The EA Process
                                              need to file those comments in Docket                    submission. New eFiling users must
                                                                                                                                                                The EA will discuss impacts that
                                              No. CP18–506–000 to ensure they are                      first create an account by clicking on
                                                                                                                                                             could occur as a result of the
                                              considered as part of this proceeding.                   ‘‘eRegister.’’ You will be asked to select
                                                                                                                                                             construction and operation of the
                                                 This notice is being sent to the                      the type of filing you are making; a
                                                                                                                                                             proposed project under these general
                                              Commission’s current environmental                       comment on a particular project is
                                                                                                                                                             headings:
                                                                                                       considered a ‘‘Comment on a Filing’’; or
                                              mailing list for this project. State and
                                                                                                          (3) You can file a paper copy of your                 • Geology and soils;
                                              local government representatives should
                                                                                                       comments by mailing them to the                          • land use;
                                              notify their constituents of this                                                                                 • water resources, fisheries, and
                                                                                                       following address. Be sure to reference
                                              proposed project and encourage them to                                                                         wetlands;
                                                                                                       the project docket number (CP18–506–
                                              comment on their areas of concern.                                                                                • cultural resources;
                                                                                                       000) with your submission: Kimberly D.
                                                 If you are a landowner receiving this                                                                          • vegetation and wildlife;
                                                                                                       Bose, Secretary, Federal Energy
                                              notice, a pipeline company                                                                                        • air quality and noise;
                                                                                                       Regulatory Commission, 888 First Street                  • endangered and threatened species;
                                              representative may contact you about                     NE, Room 1A, Washington, DC 20426.
                                              the acquisition of an easement to                                                                                 • public safety; and
                                              construct, operate, and maintain the                     Summary of the Proposed Project                          • cumulative impacts.
                                              proposed facilities. The company would                     Portland proposes to perform the                       Commission staff will also evaluate
                                              seek to negotiate a mutually acceptable                  following activities for construction of              reasonable alternatives to the proposed
                                              easement agreement. You are not                          the project to provide 24,375 million                 project or portions of the project, and
                                              required to enter into an agreement.                     cubic feet per day (Mcf/d) to Portland                make recommendations on how to
                                              However, if the Commission approves                      owned facilities, and 22,339 Mcf/d on                 lessen or avoid impacts on the various
                                              the project, that approval conveys with                  Portland and Maritimes jointly owned                  resource areas.
                                              it the right of eminent domain.                          facilities.                                              The EA will present Commission
                                              Therefore, if you and the company do                                                                           staffs’ independent analysis of the
                                              not reach an easement agreement, the                     Westbrook Compressor Station (CS),                    issues. The EA will be available in the
                                              pipeline company could initiate                          Cumberland County, Maine                              public record through eLibrary.
                                              condemnation proceedings in court. In                      • Install a new electrical control                  Commission staff will consider and
                                              such instances, compensation would be                    building with motor control center,                   address all comments on the EA before
                                              determined by a judge in accordance                      emergency generator building and                      making recommendations to the
                                              with state law.                                          generator and ancillary equipment; and                Commission. To ensure Commission
                                                 Portland provided landowners with a                                                                         staff have the opportunity to address
                                                                                                       Eliot CS, York County, Maine
                                              fact sheet prepared by the FERC entitled                                                                       your comments, please carefully follow
                                              ‘‘An Interstate Natural Gas Facility On                    • Expansion of the existing building                the instructions in the Public
                                              My Land? What Do I Need To Know?’’                       to include one new 6,300 horsepower                   Participation section, beginning on page
                                              This fact sheet addresses a number of                    (hp) gas-fired compression unit and                   2.
                                              typically asked questions, including the                 ancillary equipment; and                                 With this notice, the Commission is
                                              use of eminent domain and how to                           • Install an auxiliary building                     asking agencies with jurisdiction by law
                                              participate in the Commission’s                          housing a replacement emergency                       and/or special expertise with respect to
                                              proceedings. It is also available for                    generator and boiler.                                 the environmental issues of this project
                                              viewing on the FERC website                              Dracut Meter and Regulator (M&R)                      to formally cooperate in the preparation
                                              (www.ferc.gov).                                          Station, Middlesex County,                            of the EA.2 Agencies that would like to
                                                                                                       Massachusetts                                         request cooperating agency status
                                              Public Participation                                                                                           should follow the instructions for filing
                                                                                                          • Install a low flow meter and
                                                For your convenience, there are three
                                                                                                       transmitters and replace ultrasonic
                                              methods you can use to submit your                                                                             appendices were sent to all those receiving this
                                                                                                       meter assemblies;                                     notice in the mail and are available at www.ferc.gov
                                              comments to the Commission. The
                                                                                                          • Install a new 86-hp emergency
amozie on DSK3GDR082PROD with NOTICES1




                                                                                                                                                             using the link called ‘‘eLibrary’’ or from the
                                              Commission encourages electronic filing                                                                        Commission’s Public Reference Room, 888 First
                                                                                                       generator; and
                                              of comments and has staff available to                      • Installation of ancillary equipment.             Street NE, Washington, DC 20426, or call (202) 502–
                                              assist you at (866) 208–3676 or                             The general location of the project                8371. For instructions on connecting to eLibrary,
                                              FercOnlineSupport@ferc.gov. Please                                                                             refer to the last page of this notice.
                                                                                                       facilities is shown in appendix 1.1                     2 The Council on Environmental Quality
                                              carefully follow these instructions so                                                                         regulations addressing cooperating agency
                                              that your comments are properly                            1 The appendices referenced in this notice will     responsibilities are at Title 40, Code of Federal
                                              recorded.                                                not appear in the Federal Register. Copies of         Regulations, Part 1501.6.



                                         VerDate Sep<11>2014   19:19 Jul 17, 2018   Jkt 244001   PO 00000   Frm 00013   Fmt 4703   Sfmt 4703   E:\FR\FM\18JYN1.SGM   18JYN1


                                              33930                         Federal Register / Vol. 83, No. 138 / Wednesday, July 18, 2018 / Notices

                                              comments provided under the Public                        the document instead of a CD version or               information collection request (ICR),
                                              Participation section of this notice.                     would like to remove your name from                   Production, Import, Export, Destruction,
                                                                                                        the mailing list, please return the                   Transhipment, and Exempted Uses of
                                              Consultation Under Section 106 of the
                                                                                                        attached ‘‘Mailing List Update Form’’                 Ozone-Depleting Substances (EPA ICR
                                              National Historic Preservation Act
                                                                                                        (appendix 2).                                         No. 1432.34, OMB Control No. 2060–
                                                 In accordance with the Advisory                                                                              0170), to the Office of Management and
                                              Council on Historic Preservation’s                        Additional Information                                Budget (OMB) for review and approval
                                              implementing regulations for section                         Additional information about the                   in accordance with the Paperwork
                                              106 of the National Historic                              project is available from the                         Reduction Act. This is a proposed
                                              Preservation Act, the Commission is                       Commission’s Office of External Affairs,              revision of the ICR, which is currently
                                              using this notice to initiate consultation                at (866) 208–FERC, or on the FERC                     approved through October 2018. Public
                                              with the applicable State Historic                        website at www.ferc.gov using the                     comments were previously requested
                                              Preservation Offices (SHPO), and to                       ‘‘eLibrary’’ link. Click on the eLibrary              via the Federal Register on January 19,
                                              solicit their views and those of other                    link, click on ‘‘General Search’’ and                 2018 during a 60-day comment period.
                                              government agencies, interested Indian                    enter the docket number in the ‘‘Docket               This notice allows for an additional 30
                                              tribes, and the public on the project’s                   Number’’ field, excluding the last three              days for public comments. A fuller
                                              potential effects on historic properties.3                digits (i.e., CP18–506). Be sure you have             description of the ICR is given below,
                                              Commission staff will define the                          selected an appropriate date range. For               including its estimated burden and cost
                                              project-specific Area of Potential Effects                assistance, please contact FERC Online                to the public. An agency may not
                                              (APE) in consultation with the SHPOs                      Support at FercOnlineSupport@ferc.gov                 conduct or sponsor and a person is not
                                              as the project develops. On natural gas                   or (866) 208–3676, or for TTY, contact                required to respond to a collection of
                                              facility projects, the APE at a minimum                   (202) 502–8659. The eLibrary link also                information unless it displays a
                                              encompasses all areas subject to ground                   provides access to the texts of all formal            currently valid OMB control number.
                                              disturbance (examples include                             documents issued by the Commission,                   DATES: Additional comments may be
                                              construction right-of-way, contractor/                    such as orders, notices, and                          submitted on or before August 17, 2018.
                                              pipe storage yards, compressor stations,                  rulemakings.                                          ADDRESSES: Submit your comments,
                                              and access roads). The EA for this                           In addition, the Commission offers a               referencing Docket ID Number EPA–
                                              project will document findings on the                     free service called eSubscription which               HW–OAR–2017–0639, to EPA online
                                              impacts on historic properties and                        allows you to keep track of all formal                using www.regulations.gov or by mail
                                              summarize the status of consultations                     issuances and submittals in specific                  to: EPA Docket Center, Environmental
                                              under section 106.                                        dockets. This can reduce the amount of                Protection Agency, Mail Code 28221T,
                                              Environmental Mailing List                                time you spend researching proceedings                1200 Pennsylvania Ave. NW,
                                                                                                        by automatically providing you with                   Washington, DC 20460, and OMB via
                                                 The environmental mailing list                         notification of these filings, document               email to oira_submission@omb.eop.gov.
                                              includes federal, state, and local                        summaries, and direct links to the                    Address comments to OMB Desk Officer
                                              government representatives and                            documents. Go to www.ferc.gov/docs-                   for EPA.
                                              agencies; elected officials;                              filing/esubscription.asp.                               EPA’s policy is that all comments
                                              environmental and public interest                            Finally, public sessions or site visits            received will be included in the public
                                              groups; Native American Tribes; other                     will be posted on the Commission’s                    docket without change including any
                                              interested parties; and local libraries                   calendar located at www.ferc.gov/                     personal information provided, unless
                                              and newspapers. This list also includes                   EventCalendar/EventsList.aspx along                   the comment includes profanity, threats,
                                              all affected landowners (as defined in                    with other related information.                       information claimed to be Confidential
                                              the Commission’s regulations) who are                                                                           Business Information (CBI) or other
                                                                                                          Dated: July 12, 2018.
                                              potential right-of-way grantors, whose                                                                          information whose disclosure is
                                              property may be used temporarily for                      Kimberly D. Bose,
                                                                                                                                                              restricted by statute.
                                              project purposes, or who own homes                        Secretary.
                                                                                                                                                              FOR FURTHER INFORMATION CONTACT:
                                              within certain distances of aboveground                   [FR Doc. 2018–15321 Filed 7–17–18; 8:45 am]
                                                                                                                                                              Katherine Sleasman, Stratospheric
                                              facilities, and anyone who submits                        BILLING CODE 6717–01–P
                                                                                                                                                              Protection Division, (6205T),
                                              comments on the project. Commission                                                                             Environmental Protection Agency, 1200
                                              staff will update the environmental                                                                             Pennsylvania Ave. NW, Washington, DC
                                              mailing list as the analysis proceeds to                  ENVIRONMENTAL PROTECTION                              20460; telephone number: (202) 564–
                                              ensure that information related to this                   AGENCY                                                7716; fax number: (202) 343–2338;
                                              environmental review is sent to all                                                                             email address: sleasman.katherine@
                                                                                                        [EPA–HQ–OAR–2017–0639; FRL—9980–77–
                                              individuals, organizations, and                           OEI]                                                  epa.gov.
                                              government entities interested in and/or
                                              potentially affected by the proposed                                                                            SUPPLEMENTARY INFORMATION:
                                                                                                        Information Collection Request
                                              project.                                                                                                        Supporting documents, which explain
                                                                                                        Submitted to OMB for Review and
                                                 If the Commission publishes and                                                                              in detail the information that the EPA
                                                                                                        Approval; Comment Request;
                                              distributes the EA, copies will be sent                                                                         will be collecting, are available in the
                                                                                                        Production, Import, Export,
                                              to the environmental mailing list for                                                                           public docket for this ICR. The docket
                                                                                                        Destruction, Transhipment, and
                                              public review and comment. If you                                                                               can be viewed online at
                                                                                                        Exempted Uses of Ozone-Depleting
                                              would prefer to receive a paper copy of                                                                         www.regulations.gov or in person at the
amozie on DSK3GDR082PROD with NOTICES1




                                                                                                        Substances (Renewal)
                                                                                                                                                              EPA Docket Center, WJC West, Room
                                                3 The Advisory Council on Historic Preservation’s       AGENCY: Environmental Protection                      3334, 1301 Constitution Ave. NW,
                                              regulations are at Title 36, Code of Federal              Agency (EPA).                                         Washington, DC. The telephone number
                                              Regulations, Part 800. Those regulations define                                                                 for the Docket Center is 202–566–1744.
                                              historic properties as any prehistoric or historic        ACTION: Notice.
                                              district, site, building, structure, or object included
                                                                                                                                                              For additional information about EPA’s
                                              in or eligible for inclusion in the National Register     SUMMARY: The Environmental Protection                 public docket, visit https://
                                              of Historic Places.                                       Agency (EPA) has submitted an                         www.epa.gov/dockets.


                                         VerDate Sep<11>2014    19:19 Jul 17, 2018   Jkt 244001   PO 00000   Frm 00014   Fmt 4703   Sfmt 4703   E:\FR\FM\18JYN1.SGM   18JYN1



Document Created: 2018-11-06 10:24:34
Document Modified: 2018-11-06 10:24:34
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 33928 

2025 Federal Register | Disclaimer | Privacy Policy