83_FR_34110 83 FR 33972 - Environmental Impact Statement; Hays County, Texas

83 FR 33972 - Environmental Impact Statement; Hays County, Texas

DEPARTMENT OF TRANSPORTATION
Federal Highway Administration

Federal Register Volume 83, Issue 138 (July 18, 2018)

Page Range33972-33973
FR Document2018-15301

FHWA, on behalf of TxDOT, is issuing this notice to advise the public that an EIS will be prepared for a proposed transportation project to construct a new location four lane roadway in and near the City of Kyle in Hays County. The roadway would start west of Kyle and run east to Interstate 35 (I-35), and may follow portions of existing Ranch-to-Market (RM) 150, from west of Arroyo Ranch Road, running east to I-35.

Federal Register, Volume 83 Issue 138 (Wednesday, July 18, 2018)
[Federal Register Volume 83, Number 138 (Wednesday, July 18, 2018)]
[Notices]
[Pages 33972-33973]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-15301]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Highway Administration


Environmental Impact Statement; Hays County, Texas

AGENCY: Texas Department of Transportation (TxDOT), Federal Highway 
Administration (FHWA), Department of Transportation.

ACTION: Federal notice of intent to prepare an Environmental Impact 
Statement (EIS).

-----------------------------------------------------------------------

SUMMARY: FHWA, on behalf of TxDOT, is issuing this notice to advise the 
public that an EIS will be prepared for a proposed transportation 
project to construct a new location four lane roadway in and near the 
City of Kyle in Hays County. The roadway would start west of Kyle and 
run east to Interstate 35 (I-35), and may follow portions of existing 
Ranch-to-Market (RM) 150, from west of Arroyo Ranch Road, running east 
to I-35.

FOR FURTHER INFORMATION CONTACT: Carlos Swonke, Division Director, 
TxDOT Environmental Affairs Division, 125 East 11th Street, Austin, 
Texas 78701; Phone (512) 416-2734; email: [email protected]. 
TxDOT's normal business hours are 8:00 a.m.-5:00 p.m. (central time), 
Monday through Friday.

SUPPLEMENTARY INFORMATION: The environmental review, consultation, and 
other actions required by applicable Federal environmental laws for 
this project are being, or have been, carried-out by TxDOT pursuant to 
23 U.S.C. 327 and a Memorandum of Understanding dated December 16, 
2014, and executed by FHWA and TxDOT.
    TxDOT will prepare an EIS for the proposed construction of a new 
location four lane roadway in and near the City of Kyle in Hays County. 
The roadway would start west of Kyle and run east to I-35, and may 
follow portions of existing RM 150, from west of Arroyo Ranch Road, 
running east to I-35. The proposed project is included in the Capital 
Area Metropolitan Planning Organization (CAMPO) 2040 Metropolitan 
Transportation Plan, 2015, as a new location four-lane roadway that may 
follow portions of the existing RM 150 roadway. The proposed project is 
approximately 6 miles long.
    Proposed improvements to Ranch to Market (RM) 150 are needed 
because the existing two-lane facility is inadequate to handle existing 
and future traffic volumes between I-35 and RM 150 west of Kyle, 
resulting in congestion and safety concerns. In addition, the overall 
transportation network does not provide sufficient linkage to I-35 to 
handle existing and future traffic volumes in this growing area of Hays 
County. The current two-lane facility does not meet current design 
standards, does not meet the Level of Service to meet increasing travel 
demand and does not provide a safe and adequate crossing of the Union 
Pacific Railroad. In addition, regional population growth continues to 
increase demand for additional capacity and access in this corridor and 
the region. The purpose of the proposed project is to relieve 
congestion and improve safety along the existing RM 150 corridor 
between RM 150 west of Kyle and I-35.
    The EIS will develop and evaluate alternatives intended to satisfy 
the identified purpose and need. The alternatives will include a range 
of build alternatives and a no-build alternative within the study 
corridor, which is generally bounded to the north by RM 150 south of 
Indian Hills Trail, to the east by the existing RM 150 east of Arroyo 
Ranch Road and through the city of Kyle to I-35, to the south by the 
intersection of Yarrington Rd. and I-35, and to the west by the Blanco 
River.
    The roadway build alternatives may include limited access and non-
limited access (arterial) design. The EIS will evaluate potential 
impacts from construction and operation of the proposed project, 
including, but not limited to, the following: Transportation impacts, 
air quality and noise impacts; water quality impacts including storm 
water runoff, water recharge zone impacts; impacts to waters of the 
United States, including wetlands; impacts to floodplains; impacts to 
historic and archeological resources; socio-economic impacts including 
environmental justice and limited English proficiency populations; 
impacts to land use, vegetation and wildlife, including threatened and 
endangered species and habitat impacts; impacts to or potential 
displacement of residents and businesses; and impacts to aesthetic and 
visual resources. TxDOT will issue a single Final EIS and Record of 
Decision document pursuant to 23 U.S.C. 139(n)(2), unless TxDOT 
determines statutory criteria or practicability considerations preclude 
issuance of the combined document.
    Anticipated state and federal permits, pending selection of 
alternatives and field surveys, may include, but are not limited to, 
the following: United States Army Corps of Engineers (USACE) Section 
404 permit, Texas Commission on Environmental Quality (TCEQ) Section 
401 Water Quality Certification; TCEQ Texas Pollutant Discharge 
Elimination System (TPDES) permit, Advisory Council for Historic 
Preservation (ACHP) Section 106 (National Historic Preservation Act) 
approval, and United States Fish and Wildlife Service Section 7 
(Endangered Species Act) permits and approval.
    Public involvement is a critical component of the project 
development process and will continue throughout the development of the 
EIS. A draft project coordination plan has been developed in accordance 
with 23 U.S.C.

[[Page 33973]]

139, Efficient Environmental Reviews for Project Decision Making, to 
identify and document opportunities for project involvement by the 
public and other agencies.
    The project coordination plan will promote involvement from 
stakeholders, agencies and the public as well as describe the proposed 
project, the roles of the agencies and the public, the proposed project 
purpose and need, schedule, level of detail for alternatives analysis, 
and the proposed process for coordination and communication. The plan 
will be available for public review, input, and comments at public 
meetings, including scoping meetings held in accordance with the 
National Environmental Policy Act (NEPA) and upon request at the TxDOT 
Austin District Office.
    In accordance with 23 U.S.C. 139, cooperating agencies, 
participating agencies and the public will be given an opportunity for 
continued input on the proposed project. A public scoping meeting is 
planned for the summer of 2018. An agency scoping meeting will also be 
held with participating and cooperating agencies. The purpose of the 
agency and public scoping meetings is to present the project studies 
completed to date and identify significant and other relevant issues 
related to the proposed RM 150 corridor as part of the NEPA process. 
The scoping meetings will provide an opportunity for participating 
agencies, cooperating agencies, and the public to review and comment on 
the draft project coordination plan and schedule, the proposed project 
purpose and need, the range of alternatives developed to date to be 
considered and evaluated in the EIS, and methodologies and level of 
detail for analyzing alternatives.
    In addition to the agency and public scoping meetings, a public 
hearing will be held. Public notice will be given of the time and place 
of the meetings and hearing. To ensure that the full range of issues 
related to the proposed project is addressed and all significant issues 
are identified, comments and suggestions are invited from all 
interested parties. Such comments or questions concerning this proposed 
action should be directed to TxDOT at the address provided above.

(Catalog of Federal Domestic Assistance Program Number 20.205, 
Highway Planning and Construction.)


    Issued on: July 10, 2018.
Michael T. Leary,
Director, Planning and Program Development, Federal Highway 
Administration.
[FR Doc. 2018-15301 Filed 7-17-18; 8:45 am]
 BILLING CODE 4910-22-P



                                              33972                                   Federal Register / Vol. 83, No. 138 / Wednesday, July 18, 2018 / Notices

                                                                                                Fiscal year       ACTION: Federal notice of intent to                   access in this corridor and the region.
                                                                                                 2019 raw         prepare an Environmental Impact                       The purpose of the proposed project is
                                                              Country                           cane sugar        Statement (EIS).                                      to relieve congestion and improve safety
                                                                                                allocations                                                             along the existing RM 150 corridor
                                                                                                  (MTRV)          SUMMARY:   FHWA, on behalf of TxDOT,                  between RM 150 west of Kyle and I–35.
                                                                                                                  is issuing this notice to advise the                     The EIS will develop and evaluate
                                              Congo ...................................                 7,258
                                              Costa Rica ............................                  15,796
                                                                                                                  public that an EIS will be prepared for               alternatives intended to satisfy the
                                              Cote d’Ivoire .........................                   7,258     a proposed transportation project to                  identified purpose and need. The
                                              Dominican Republic ..............                       185,335     construct a new location four lane                    alternatives will include a range of build
                                              Ecuador ................................                 11,584     roadway in and near the City of Kyle in               alternatives and a no-build alternative
                                              El Salvador ...........................                  27,379     Hays County. The roadway would start                  within the study corridor, which is
                                              Fiji .........................................            9,477     west of Kyle and run east to Interstate               generally bounded to the north by RM
                                              Gabon ...................................                 7,258     35 (I–35), and may follow portions of                 150 south of Indian Hills Trail, to the
                                              Guatemala ............................                   50,546     existing Ranch-to-Market (RM) 150,                    east by the existing RM 150 east of
                                              Guyana .................................                 12,636     from west of Arroyo Ranch Road,                       Arroyo Ranch Road and through the city
                                              Haiti .......................................             7,258     running east to I–35.                                 of Kyle to I–35, to the south by the
                                              Honduras ..............................                  10,530     FOR FURTHER INFORMATION CONTACT:
                                              India ......................................              8,424                                                           intersection of Yarrington Rd. and I–35,
                                                                                                                  Carlos Swonke, Division Director,                     and to the west by the Blanco River.
                                              Jamaica ................................                 11,584
                                              Madagascar ..........................                     7,258     TxDOT Environmental Affairs Division,                    The roadway build alternatives may
                                              Malawi ...................................               10,530     125 East 11th Street, Austin, Texas                   include limited access and non-limited
                                              Mauritius ...............................                12,636     78701; Phone (512) 416–2734; email:                   access (arterial) design. The EIS will
                                              Mexico ..................................                 7,258     carlos.swonke@txdot.gov. TxDOT’s                      evaluate potential impacts from
                                              Mozambique .........................                     13,690     normal business hours are 8:00 a.m.–                  construction and operation of the
                                              Nicaragua .............................                  22,114     5:00 p.m. (central time), Monday                      proposed project, including, but not
                                              Panama ................................                  30,538     through Friday.                                       limited to, the following: Transportation
                                              Papua New Guinea ..............                           7,258     SUPPLEMENTARY INFORMATION: The                        impacts, air quality and noise impacts;
                                              Paraguay ..............................                   7,258     environmental review, consultation, and               water quality impacts including storm
                                              Peru ......................................              43,175     other actions required by applicable                  water runoff, water recharge zone
                                              Philippines ............................                142,160                                                           impacts; impacts to waters of the United
                                                                                                                  Federal environmental laws for this
                                              South Africa ..........................                  24,220
                                                                                                                  project are being, or have been, carried-             States, including wetlands; impacts to
                                              St. Kitts & Nevis ...................                     7,258
                                              Swaziland .............................                  16,849     out by TxDOT pursuant to 23 U.S.C. 327                floodplains; impacts to historic and
                                              Taiwan ..................................                12,636     and a Memorandum of Understanding                     archeological resources; socio-economic
                                              Thailand ................................                14,743     dated December 16, 2014, and executed                 impacts including environmental justice
                                              Trinidad & Tobago ................                        7,371     by FHWA and TxDOT.                                    and limited English proficiency
                                              Uruguay ................................                  7,258        TxDOT will prepare an EIS for the                  populations; impacts to land use,
                                              Zimbabwe .............................                   12,636     proposed construction of a new location               vegetation and wildlife, including
                                                                                                                  four lane roadway in and near the City                threatened and endangered species and
                                                These allocations are based on the                                of Kyle in Hays County. The roadway                   habitat impacts; impacts to or potential
                                              countries’ historical shipments to the                              would start west of Kyle and run east to              displacement of residents and
                                              United States. The allocations of the in-                           I–35, and may follow portions of                      businesses; and impacts to aesthetic and
                                              quota quantities of the raw cane sugar                              existing RM 150, from west of Arroyo                  visual resources. TxDOT will issue a
                                              TRQ to countries that are net importers                             Ranch Road, running east to I–35. The                 single Final EIS and Record of Decision
                                              of sugar are conditioned on receipt of                              proposed project is included in the                   document pursuant to 23 U.S.C.
                                              the appropriate verifications of origin,                            Capital Area Metropolitan Planning                    139(n)(2), unless TxDOT determines
                                              and certificates for quota eligibility must                         Organization (CAMPO) 2040                             statutory criteria or practicability
                                              accompany imports from any country                                  Metropolitan Transportation Plan, 2015,               considerations preclude issuance of the
                                                                                                                  as a new location four-lane roadway that              combined document.
                                              for which an allocation has been
                                                                                                                  may follow portions of the existing RM                   Anticipated state and federal permits,
                                              provided. Raw cane sugar for Fiscal
                                                                                                                  150 roadway. The proposed project is                  pending selection of alternatives and
                                              Year 2019 TRQs may enter the United
                                                                                                                  approximately 6 miles long.                           field surveys, may include, but are not
                                              States as of October 1, 2018.                                          Proposed improvements to Ranch to                  limited to, the following: United States
                                              Robert Lighthizer,                                                  Market (RM) 150 are needed because the                Army Corps of Engineers (USACE)
                                              United States Trade Representative.                                 existing two-lane facility is inadequate              Section 404 permit, Texas Commission
                                              [FR Doc. 2018–15266 Filed 7–17–18; 8:45 am]                         to handle existing and future traffic                 on Environmental Quality (TCEQ)
                                                                                                                  volumes between I–35 and RM 150 west                  Section 401 Water Quality Certification;
                                              BILLING CODE 3290–F8–P
                                                                                                                  of Kyle, resulting in congestion and                  TCEQ Texas Pollutant Discharge
                                                                                                                  safety concerns. In addition, the overall             Elimination System (TPDES) permit,
                                                                                                                  transportation network does not provide               Advisory Council for Historic
                                              DEPARTMENT OF TRANSPORTATION                                        sufficient linkage to I–35 to handle                  Preservation (ACHP) Section 106
                                                                                                                  existing and future traffic volumes in                (National Historic Preservation Act)
                                              Federal Highway Administration                                      this growing area of Hays County. The                 approval, and United States Fish and
                                                                                                                  current two-lane facility does not meet               Wildlife Service Section 7 (Endangered
amozie on DSK3GDR082PROD with NOTICES1




                                              Environmental Impact Statement; Hays                                current design standards, does not meet               Species Act) permits and approval.
                                              County, Texas                                                       the Level of Service to meet increasing                  Public involvement is a critical
                                                                                                                  travel demand and does not provide a                  component of the project development
                                              AGENCY: Texas Department of                                         safe and adequate crossing of the Union               process and will continue throughout
                                              Transportation (TxDOT), Federal                                     Pacific Railroad. In addition, regional               the development of the EIS. A draft
                                              Highway Administration (FHWA),                                      population growth continues to increase               project coordination plan has been
                                              Department of Transportation.                                       demand for additional capacity and                    developed in accordance with 23 U.S.C.


                                         VerDate Sep<11>2014         19:19 Jul 17, 2018        Jkt 244001   PO 00000   Frm 00056   Fmt 4703   Sfmt 4703   E:\FR\FM\18JYN1.SGM   18JYN1


                                                                           Federal Register / Vol. 83, No. 138 / Wednesday, July 18, 2018 / Notices                                               33973

                                              139, Efficient Environmental Reviews                     DEPARTMENT OF TRANSPORTATION                          (Project). The Project has been advanced
                                              for Project Decision Making, to identify                                                                       in accordance with the requirements of
                                              and document opportunities for project                   Federal Highway Administration                        the Council on Environmental Quality
                                              involvement by the public and other                                                                            regulations for implementing the
                                              agencies.                                                Hunts Point Interstate Access                         procedural provisions of the National
                                                 The project coordination plan will                    Improvement Project; Comment Period                   Environmental Policy Act (NEPA) (40
                                              promote involvement from stakeholders,                   Extension                                             CFR parts 1500 through 1508), the
                                              agencies and the public as well as                       AGENCY:   Federal Highway                             FHWA Environmental Impact and
                                              describe the proposed project, the roles                 Administration (FHWA), DOT.                           Related Procedures; Final Rule (23 CFR
                                              of the agencies and the public, the                      ACTION: Notice of availability of Draft               part 771), and the NYSDOT Procedures
                                              proposed project purpose and need,                       Environmental Impact Statement (DEIS)                 for Implementation of the State
                                              schedule, level of detail for alternatives               for the Hunts Point Access Improvement                Environmental Quality Review Act at 17
                                              analysis, and the proposed process for                   Project; extension of comment period.                 New York Codes, Rules, and
                                              coordination and communication. The                                                                            Regulations Part 15.
                                              plan will be available for public review,                SUMMARY:   The FHWA is extending the                     The Project is located on and in the
                                              input, and comments at public                            comment period for a notice of                        immediate vicinity of the Hunts Point
                                              meetings, including scoping meetings                     availability for a DEIS for the Hunts                 Peninsula in Bronx County, New York.
                                              held in accordance with the National                     Point Access Improvement Project,                     The purpose of the Project is to provide
                                              Environmental Policy Act (NEPA) and                      which was published on June 1, 2018.                  improved access between the Hunts
                                              upon request at the TxDOT Austin                         The original comment period is set to                 Point Peninsula and Sheridan
                                              District Office.                                         close on July 16, 2018. The extension is              Boulevard and the Bruckner Expressway
                                                 In accordance with 23 U.S.C. 139,                     based on the FHWA’s desire to allow                   for automobiles and trucks traveling to
                                              cooperating agencies, participating                      interested parties sufficient time to                 and from the commercial businesses
                                              agencies and the public will be given an                 review and provide comprehensive                      located on the peninsula. In addition,
                                              opportunity for continued input on the                   comments on this DEIS. Therefore, the                 the Project will address structural and
                                              proposed project. A public scoping                       closing date for comments is changed to               operational deficiencies related to the
                                              meeting is planned for the summer of                     July 31, 2018, which will provide those               existing infrastructure within the
                                              2018. An agency scoping meeting will                     interested in commenting additional                   established project limits.
                                              also be held with participating and                      time to discuss, evaluate, and submit                    The DDR/DEIS describes the Project;
                                              cooperating agencies. The purpose of                     responses.                                            the consideration of social, economic,
                                              the agency and public scoping meetings                                                                         and environmental effects that would
                                                                                                       DATES: The comment period for the
                                              is to present the project studies                                                                              result from implementation of the
                                              completed to date and identify                           notice of availability for the DEIS for the
                                                                                                       Hunts Point Access Improvement                        Project; and measures to mitigate
                                              significant and other relevant issues                                                                          adverse effects.
                                              related to the proposed RM 150 corridor                  Project, which was published on June 1,
                                                                                                       2018, at 83 FR 25451, is extended.                       The DDR/DEIS will be available for
                                              as part of the NEPA process. The                                                                               review during business hours at the
                                              scoping meetings will provide an                         Comments must be received on or
                                                                                                       before July 31, 2018.                                 following locations on and after June 1,
                                              opportunity for participating agencies,                                                                        2018:
                                              cooperating agencies, and the public to                  ADDRESSES: Requests for further
                                              review and comment on the draft                          information or submission of comments                 • Hunts Point Public Library, 877
                                              project coordination plan and schedule,                  regarding the Project may be sent to                     Southern Boulevard, Bronx, NY
                                              the proposed project purpose and need,                   huntspoint@dot.ny.gov or the                          • Bronx Library Center, 310 East
                                              the range of alternatives developed to                   individuals listed below.                                Kingsbridge Road, Bronx, NY
                                              date to be considered and evaluated in                   Erik Koester, P.E., Project Director,                 • West Farms Branch Library, 2085
                                              the EIS, and methodologies and level of                    Region 11, NYS Department of                           Honeywell Avenue, Bronx, NY
                                              detail for analyzing alternatives.                         Transportation, 47–40 21st Street,                  • Soundview Library, 660 Soundview
                                                 In addition to the agency and public                    Long Island City, NY 11101, Phone                      Avenue, Bronx, NY
                                              scoping meetings, a public hearing will                    (718) 482–4683                                      • Parkchester Library, 1985 Westchester
                                              be held. Public notice will be given of                  Sara Gross, P.E., Area Engineer, Federal                 Avenue, Bronx, NY
                                              the time and place of the meetings and                     Highway Administration, Leo O’Brien                 • Bronx Community Board 1, 3024
                                              hearing. To ensure that the full range of                  Federal Building, 11A Clinton                          Third Avenue, Bronx, NY
                                              issues related to the proposed project is                  Avenue, Suite 719, Albany, NY                       • Bronx Community Board 2, 1029 E
                                              addressed and all significant issues are                   12207, Phone: (518) 431–4127                           163 Street, Bronx, NY
                                              identified, comments and suggestions                                                                           • Bronx Community Board 3, 1426
                                                                                                       SUPPLEMENTARY INFORMATION:
                                              are invited from all interested parties.                                                                          Boston Road, Bronx, NY
                                              Such comments or questions concerning                    Background                                            • Bronx Community Board 6, 1932
                                              this proposed action should be directed                    On June 1, 2018, at 83 FR 25451, a                     Arthur Avenue, Rm. 403–A, Bronx,
                                              to TxDOT at the address provided                         notice of availability, including a Draft                NY
                                              above.                                                   Environmental Impact Statement for the                • Bronx Community Board 9, 1967
                                                                                                       Hunts Point Access Improvement                           Turnbull Avenue #7, Bronx, NY
                                              (Catalog of Federal Domestic Assistance
                                                                                                       Project, published in the Federal                     • Casita Maria, 928 Simpson Street,
                                              Program Number 20.205, Highway Planning                                                                           Bronx, NY
                                              and Construction.)                                       Register. The New York State
                                                                                                                                                             • The Point, 940 Garrison Avenue,
amozie on DSK3GDR082PROD with NOTICES1




                                                                                                       Department of Transportation
                                                Issued on: July 10, 2018.                                                                                       Bronx, NY
                                                                                                       (NYSDOT), in cooperation with the
                                              Michael T. Leary,                                                                                              • Bronx Borough Hall, 851 Grand
                                                                                                       FHWA, has prepared a Draft Design
                                              Director, Planning and Program Development,
                                                                                                                                                                Concourse, Bronx, NY
                                                                                                       Report/Draft Environmental Impact
                                              Federal Highway Administration.                          Statement/Draft Section 4(f) Evaluation                  The DDR/DEIS may also be accessed
                                              [FR Doc. 2018–15301 Filed 7–17–18; 8:45 am]              (DDR/DEIS) for the Hunts Point                        at https://www.dot.ny.gov/SouthBronx.
                                              BILLING CODE 4910–22–P                                   Interstate Access Improvement Project                   Authority: 40 CFR 1506.9 and 10.



                                         VerDate Sep<11>2014   19:19 Jul 17, 2018   Jkt 244001   PO 00000   Frm 00057   Fmt 4703   Sfmt 4703   E:\FR\FM\18JYN1.SGM   18JYN1



Document Created: 2018-11-06 10:24:45
Document Modified: 2018-11-06 10:24:45
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionFederal notice of intent to prepare an Environmental Impact Statement (EIS).
ContactCarlos Swonke, Division Director, TxDOT Environmental Affairs Division, 125 East 11th Street, Austin, Texas 78701; Phone (512) 416-2734; email: [email protected] TxDOT's normal business hours are 8:00 a.m.-5:00 p.m. (central time), Monday through Friday.
FR Citation83 FR 33972 