83_FR_35171 83 FR 35029 - Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Consistency and Clarification Changes to Annex Building, Auxiliary Building, and Basemat ITAAC

83 FR 35029 - Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Consistency and Clarification Changes to Annex Building, Auxiliary Building, and Basemat ITAAC

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 83, Issue 142 (July 24, 2018)

Page Range35029-35031
FR Document2018-15783

The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment Nos. 128 and 127 to Combined License (COL) Nos. NPF- 91 and NPF-92, respectively. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, and the City of Dalton, Georgia (the licensee); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.

Federal Register, Volume 83 Issue 142 (Tuesday, July 24, 2018)
[Federal Register Volume 83, Number 142 (Tuesday, July 24, 2018)]
[Notices]
[Pages 35029-35031]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-15783]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-025 and 52-026; NRC-2008-0252]


Southern Nuclear Operating Company, Inc.; Vogtle Electric 
Generating Plant, Units 3 and 4; Consistency and Clarification Changes 
to Annex Building, Auxiliary Building, and Basemat ITAAC

AGENCY: Nuclear Regulatory Commission.

ACTION: Exemption and combined license amendment; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is granting an 
exemption to allow a departure from the certification information of 
Tier 1 of the generic design control document (DCD) and is issuing 
License Amendment Nos. 128 and 127 to Combined License (COL) Nos. NPF-
91 and NPF-92, respectively. The COLs were issued to Southern Nuclear 
Operating Company, Inc., and Georgia Power Company, Oglethorpe Power 
Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power 
SPVP, LLC, and the City of Dalton, Georgia (the licensee); for 
construction and operation of the Vogtle Electric Generating Plant 
(VEGP) Units 3 and 4, located in Burke County, Georgia.
    The granting of the exemption allows the changes to Tier 1 
information asked for in the amendment. Because the acceptability of 
the exemption was determined in part by the acceptability of the 
amendment, the exemption and amendment are being issued concurrently.

DATES: The exemption and amendment were issued on June 27, 2018.

ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Website: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0252. Address 
questions about NRC dockets to Jennifer Borges, telephone: 301-287-
9127; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document. The request for the amendment and exemption was submitted by 
letter dated December 15, 2017 (ADAMS Accession No. ML17349A924), as 
supplemented by letter dated April 6, 2018 (ADAMS Accession No. 
ML18096A718).
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One

[[Page 35030]]

White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Chandu Patel, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; 
telephone: 301-415-3025; email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Introduction

    The NRC is granting an exemption from paragraph B of section III, 
``Scope and Contents,'' of appendix D, ``Design Certification Rule for 
the AP1000,'' to part 52 of title 10 of the Code of Federal Regulations 
(10 CFR), and issuing License Amendment Nos. 128 and 127 to COL Nos. 
NPF-91 and NPF-92, respectively, to the licensee. The exemption is 
required by paragraph A.4 of section VIII, ``Processes for Changes and 
Departures,'' appendix D, to 10 CFR part 52 to allow the licensee to 
depart from Tier 1 information. With the requested amendment, the 
licensee sought proposed changes to plant-specific DCD Tier 2 and Tier 
2* information and related changes to plant-specific Tier 1 
information, with corresponding changes to Inspections, Tests, 
Analyses, and Acceptance Criteria (ITAAC) in COL Appendix C. 
Specifically, the proposed changes clarify the thickness of the Nuclear 
Island Basemat, revise wall thicknesses and descriptions in the 
Auxiliary Building, and clarify floor thicknesses in the Annex 
Building.
    Part of the justification for granting the exemption was provided 
by the review of the amendment. Because the exemption is necessary in 
order to issue the requested license amendment, the NRC granted the 
exemption and issued the amendment concurrently, rather than in 
sequence. This included issuing a combined safety evaluation containing 
the NRC staff's review of both the exemption request and the license 
amendment. The exemption met all applicable regulatory criteria set 
forth in sections 50.12, 52.7, and section VIII.A.4 of appendix D to 10 
CFR part 52. The license amendment was found to be acceptable as well. 
The combined safety evaluation is available in ADAMS under Accession 
No. ML18138A252.
    Identical exemption documents (except for referenced unit numbers 
and license numbers) were issued to the licensee for VEGP Units 3 and 4 
(COL Nos. NPF-91 and NPF-92). The exemption documents for VEGP Units 3 
and 4 can be found in ADAMS under Accession Nos. ML18138A246 and 
ML18138A247, respectively. The exemption is reproduced (with the 
exception of abbreviated titles and additional citations) in Section II 
of this document. The amendment documents for COL Nos. NPF-91 and NPF-
92 are available in ADAMS under Accession Nos. ML18138A248 and 
ML18138A250, respectively. A summary of the amendment documents is 
provided in Section III of this document.

II. Exemption

    Reproduced below is the exemption document issued to VEGP Units 3 
and Unit 4. It makes reference to the combined safety evaluation that 
provides the reasoning for the findings made by the NRC (and listed 
under Item 1) in order to grant the exemption:
    1. In a letter dated December 15, 2017, as supplemented by letter 
dated April 6, 2018, the Southern Nuclear Operating Company (SNC) 
requested from the Commission an exemption to allow departures from 
Tier 1 information in the certified DCD incorporated by reference in 10 
CFR part 52, Appendix D, as part of license amendment request 17-040, 
``Consistency and Clarification Changes to Annex Building, Auxiliary 
Building and Basemat ITAAC.''
    For the reasons set forth in Section 3.2 of the NRC staff's Safety 
Evaluation, which can be found in ADAMS under Accession No. 
ML18138A252, the Commission finds that:
    A. The exemption is authorized by law;
    B. the exemption presents no undue risk to public health and 
safety;
    C. the exemption is consistent with the common defense and 
security;
    D. special circumstances are present in that the application of the 
rule in this circumstance is not necessary to serve the underlying 
purpose of the rule;
    E. the special circumstances outweigh any decrease in safety that 
may result from the reduction in standardization caused by the 
exemption; and
    F. the exemption will not result in a significant decrease in the 
level of safety otherwise provided by the design.
    2. Accordingly, SNC is granted an exemption from the certified DCD 
Tier 1 information, with corresponding changes to Appendix C of the 
Facility Combined License, as described in the licensee's request dated 
December 15, 2017, as supplemented by letter dated April 6, 2018. This 
exemption is related to, and necessary for the granting of License 
Amendment No. 128 (Unit 3) and No. 127 (Unit 4), which is being issued 
concurrently with this exemption.
    3. As explained in Section 5.0 of the NRC staff's Safety Evaluation 
(ADAMS Accession No. ML18138A252), this exemption meets the eligibility 
criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment needs to be prepared in 
connection with the issuance of the exemption.
    4. This exemption is effective as of the date of its issuance.

III. License Amendment Request

    By letter dated December 15, 2017 (ADAMS Accession No. 
ML17349A924), as supplemented by letter dated April 6, 2018 (ADAMS 
Accession No. ML18096A718), the licensee requested that the NRC amend 
the COLs for VEGP, Units 3 and 4, COL Nos. NPF-91 and NPF-92. The 
proposed amendment is described in Section I of this Federal Register 
notice.
    The Commission has determined for these amendments that the 
application complies with the standards and requirements of the Atomic 
Energy Act of 1954, as amended (the Act), and the Commission's rules 
and regulations. The Commission has made appropriate findings as 
required by the Act and the Commission's rules and regulations in 10 
CFR chapter I, which are set forth in the license amendment.
    A notice of consideration of issuance of amendment to facility 
operating license or COL, as applicable, proposed no significant 
hazards consideration determination, and opportunity for a hearing in 
connection with these actions, was published in the Federal Register on 
March 6, 2018 (83 FR 9555). No comments were received during the 30-day 
comment period.
    The Commission has determined that these amendments satisfy the 
criteria for categorical exclusion in accordance with 10 CFR 51.22. 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment need be prepared for these 
amendments.

IV. Conclusion

    Using the reasons set forth in the combined safety evaluation, the 
staff granted the exemptions and issued the amendments that the 
licensee requested on December 15, 2017, as supplemented by letter 
dated April 6, 2018.
    The exemptions and amendments were issued on June 27, 2018, as part 
of a combined package to the licensee (ADAMS Accession No. 
ML18138A244).

    Dated at Rockville, Maryland, this 19th day of July 2018.


[[Page 35031]]


    For the Nuclear Regulatory Commission.

Paul B. Kallan,
Acting Chief, Licensing Branch 4, Division of Licensing, Siting, and 
Environmental Analysis, Office of New Reactors.
[FR Doc. 2018-15783 Filed 7-23-18; 8:45 am]
BILLING CODE 7590-01-P



                                                                                  Federal Register / Vol. 83, No. 142 / Tuesday, July 24, 2018 / Notices                                           35029

                                                     Estimated Burden Hours per                               Estimated Number of Respondents:                   Nos. NPF–91 and NPF–92, respectively.
                                                  Response: 1.83.                                          200.                                                  The COLs were issued to Southern
                                                     Estimated Total Annual Burden                            Estimated Number of Responses per                  Nuclear Operating Company, Inc., and
                                                  Hours: 884.                                              Respondent: 1.10.                                     Georgia Power Company, Oglethorpe
                                                     OMB Number: 3133–0154.                                   Estimated Total Annual Responses:                  Power Corporation, MEAG Power
                                                     Type of Review: Extension of a                        220.                                                  SPVM, LLC, MEAG Power SPVJ, LLC,
                                                  currently approved collection.                              Estimated Burden Hours per                         MEAG Power SPVP, LLC, and the City
                                                     Title: Prompt Corrective Action, 12                   Response: 1.                                          of Dalton, Georgia (the licensee); for
                                                  CFR 702 (Subparts A–D).                                     Estimated Total Annual Burden                      construction and operation of the Vogtle
                                                     Abstract: Section 216 of the Federal                  Hours: 220.                                           Electric Generating Plant (VEGP) Units
                                                  Credit Union Act (12 U.S.C. 1790d)                          Request for Comments: Comments                     3 and 4, located in Burke County,
                                                  mandates prompt corrective action                        submitted in response to this notice will             Georgia.
                                                  (PCA) requirements for federally                         be summarized and included in the                       The granting of the exemption allows
                                                  insured credit unions (FICUs) that                       request for Office of Management and                  the changes to Tier 1 information asked
                                                  become less than well capitalized.                       Budget approval. All comments will                    for in the amendment. Because the
                                                  Section 216 requires the NCUA Board to                   become a matter of public record. The                 acceptability of the exemption was
                                                  (1) adopt, by regulation, a system of                    public is invited to submit comments                  determined in part by the acceptability
                                                  prompt corrective action to restore the                  concerning: (a) Whether the collection                of the amendment, the exemption and
                                                  net worth of inadequately capitalized                    of information is necessary for the                   amendment are being issued
                                                  FICUs; and (2) develop an alternative                    proper execution of the function of the               concurrently.
                                                  system of prompt corrective action for                   agency, including whether the
                                                                                                           information will have practical utility;              DATES:   The exemption and amendment
                                                  new credit unions that carries out the
                                                                                                           (b) the accuracy of the agency’s estimate             were issued on June 27, 2018.
                                                  purpose of PCA while allowing an FICU
                                                  reasonable time to build its net worth to                of the burden of the collection of                    ADDRESSES: Please refer to Docket ID
                                                  an adequately capitalized level. Part 702                information, including the validity of                NRC–2008–0252 when contacting the
                                                  implements the statutory requirements.                   the methodology and assumptions used;                 NRC about the availability of
                                                  The purpose of PCA is to resolve the                     (c) ways to enhance the quality, utility,             information regarding this document.
                                                  problems of FICUs at the least possible                  and clarity of the information to be                  You may obtain publicly-available
                                                  long-term loss to the National Credit                    collected; and (d) ways to minimize the               information related to this document
                                                  Union Share Insurance Fund (NCUSIF).                     burden of the collection of the                       using any of the following methods:
                                                     Affected Public: Private Sector: Not-                 information on the respondents,                          • Federal Rulemaking Website: Go to
                                                  for-profit institutions.                                 including the use of automated                        http://www.regulations.gov and search
                                                     Estimated Number of Respondents:                      collection techniques or other forms of               for Docket ID NRC–2008–0252. Address
                                                  642.                                                     information technology.                               questions about NRC dockets to Jennifer
                                                     Estimated Number of Responses per                       By Gerard Poliquin, Secretary of the Board,         Borges, telephone: 301–287–9127;
                                                  Respondent: 1.                                           the National Credit Union Administration, on          email: Jennifer.Borges@nrc.gov. For
                                                     Estimated Total Annual Reponses:                      July 19, 2018.                                        technical questions, contact the
                                                  642.                                                       Dated: July 19, 2018.                               individual listed in the FOR FURTHER
                                                     Estimated Burden Hours per                            Dawn D. Wolfgang,                                     INFORMATION CONTACT section of this
                                                  Response: 5.99.                                          NCUA PRA Clearance Officer.                           document.
                                                     Estimated Total Annual Burden                         [FR Doc. 2018–15796 Filed 7–23–18; 8:45 am]
                                                                                                                                                                    • NRC’s Agencywide Documents
                                                  Hours: 3,847.                                                                                                  Access and Management System
                                                                                                           BILLING CODE 7535–01–P
                                                     OMB Number: 3133–0192.                                                                                      (ADAMS): You may obtain publicly-
                                                     Type of Review: Extension of a                                                                              available documents online in the
                                                  currently approved collection.                                                                                 ADAMS Public Documents collection at
                                                                                                           NUCLEAR REGULATORY                                    http://www.nrc.gov/reading-rm/
                                                     Title: Involuntary Liquidation Proof of               COMMISSION
                                                  Claim Form.                                                                                                    adams.html. To begin the search, select
                                                     Form: NCUA Form 7250.                                 [Docket Nos. 52–025 and 52–026; NRC–                  ‘‘ADAMS Public Documents’’ and then
                                                     Abstract: In accordance with 12 CFR                   2008–0252]                                            select ‘‘Begin Web-based ADAMS
                                                  part 709, the NCUA is appointed                                                                                Search.’’ For problems with ADAMS,
                                                  liquidating agent of a credit union when                 Southern Nuclear Operating Company,                   please contact the NRC’s Public
                                                  the credit union is placed into                          Inc.; Vogtle Electric Generating Plant,               Document Room (PDR) reference staff at
                                                  involuntary liquidation. Section 709.6                   Units 3 and 4; Consistency and                        1–800–397–4209, 301–415–4737, or by
                                                  instructs creditors to present a written                 Clarification Changes to Annex                        email to pdr.resource@nrc.gov. The
                                                  claim to the liquidating agent by the                    Building, Auxiliary Building, and                     ADAMS accession number for each
                                                  date specified in the notice to creditors.               Basemat ITAAC                                         document referenced (if it is available in
                                                  Those creditors making a claim must                      AGENCY:  Nuclear Regulatory                           ADAMS) is provided the first time that
                                                  document their claim in writing and                      Commission.                                           it is mentioned in this document. The
                                                  submit a form to the liquidating agent.                  ACTION: Exemption and combined
                                                                                                                                                                 request for the amendment and
                                                  In addition, the liquidating agent may                   license amendment; issuance.                          exemption was submitted by letter
                                                                                                                                                                 dated December 15, 2017 (ADAMS
jstallworth on DSKBBY8HB2PROD with NOTICES




                                                  require a claimant to submit
                                                  supplemental evidence to support its                     SUMMARY:    The U.S. Nuclear Regulatory               Accession No. ML17349A924), as
                                                  claim. This collection of information is                 Commission (NRC) is granting an                       supplemented by letter dated April 6,
                                                  necessary to protect the National Credit                 exemption to allow a departure from the               2018 (ADAMS Accession No.
                                                  Union Share Insurance Fund in                            certification information of Tier 1 of the            ML18096A718).
                                                  determining valid claims.                                generic design control document (DCD)                    • NRC’s PDR: You may examine and
                                                     Affected Public: Private Sector: Not-                 and is issuing License Amendment Nos.                 purchase copies of public documents at
                                                  for-profit institutions.                                 128 and 127 to Combined License (COL)                 the NRC’s PDR, Room O1–F21, One


                                             VerDate Sep<11>2014   13:59 Jul 23, 2018   Jkt 244001   PO 00000   Frm 00049   Fmt 4703   Sfmt 4703   E:\FR\FM\24JYN1.SGM   24JYN1


                                                  35030                           Federal Register / Vol. 83, No. 142 / Tuesday, July 24, 2018 / Notices

                                                  White Flint North, 11555 Rockville                       exception of abbreviated titles and                   for categorical exclusion set forth in 10
                                                  Pike, Rockville, Maryland 20852.                         additional citations) in Section II of this           CFR 51.22(c)(9). Therefore, pursuant to
                                                  FOR FURTHER INFORMATION CONTACT:                         document. The amendment documents                     10 CFR 51.22(b), no environmental
                                                  Chandu Patel, Office of New Reactors,                    for COL Nos. NPF–91 and NPF–92 are                    impact statement or environmental
                                                  U.S. Nuclear Regulatory Commission,                      available in ADAMS under Accession                    assessment needs to be prepared in
                                                  Washington, DC 20555–0001; telephone:                    Nos. ML18138A248 and ML18138A250,                     connection with the issuance of the
                                                  301–415–3025; email: Chandu.Patel@                       respectively. A summary of the                        exemption.
                                                  nrc.gov.                                                 amendment documents is provided in
                                                                                                           Section III of this document.                           4. This exemption is effective as of the
                                                  SUPPLEMENTARY INFORMATION:                                                                                     date of its issuance.
                                                                                                           II. Exemption
                                                  I. Introduction                                                                                                III. License Amendment Request
                                                                                                              Reproduced below is the exemption
                                                     The NRC is granting an exemption
                                                                                                           document issued to VEGP Units 3 and                      By letter dated December 15, 2017
                                                  from paragraph B of section III, ‘‘Scope
                                                                                                           Unit 4. It makes reference to the                     (ADAMS Accession No. ML17349A924),
                                                  and Contents,’’ of appendix D, ‘‘Design
                                                                                                           combined safety evaluation that                       as supplemented by letter dated April 6,
                                                  Certification Rule for the AP1000,’’ to
                                                                                                           provides the reasoning for the findings               2018 (ADAMS Accession No.
                                                  part 52 of title 10 of the Code of Federal
                                                                                                           made by the NRC (and listed under Item                ML18096A718), the licensee requested
                                                  Regulations (10 CFR), and issuing
                                                                                                           1) in order to grant the exemption:                   that the NRC amend the COLs for VEGP,
                                                  License Amendment Nos. 128 and 127                          1. In a letter dated December 15, 2017,
                                                  to COL Nos. NPF–91 and NPF–92,                                                                                 Units 3 and 4, COL Nos. NPF–91 and
                                                                                                           as supplemented by letter dated April 6,              NPF–92. The proposed amendment is
                                                  respectively, to the licensee. The                       2018, the Southern Nuclear Operating
                                                  exemption is required by paragraph A.4                                                                         described in Section I of this Federal
                                                                                                           Company (SNC) requested from the
                                                  of section VIII, ‘‘Processes for Changes                                                                       Register notice.
                                                                                                           Commission an exemption to allow
                                                  and Departures,’’ appendix D, to 10 CFR                  departures from Tier 1 information in                    The Commission has determined for
                                                  part 52 to allow the licensee to depart                  the certified DCD incorporated by                     these amendments that the application
                                                  from Tier 1 information. With the                        reference in 10 CFR part 52, Appendix                 complies with the standards and
                                                  requested amendment, the licensee                        D, as part of license amendment request               requirements of the Atomic Energy Act
                                                  sought proposed changes to plant-                        17–040, ‘‘Consistency and Clarification               of 1954, as amended (the Act), and the
                                                  specific DCD Tier 2 and Tier 2*                          Changes to Annex Building, Auxiliary                  Commission’s rules and regulations.
                                                  information and related changes to                       Building and Basemat ITAAC.’’                         The Commission has made appropriate
                                                  plant-specific Tier 1 information, with                     For the reasons set forth in Section 3.2           findings as required by the Act and the
                                                  corresponding changes to Inspections,                    of the NRC staff’s Safety Evaluation,                 Commission’s rules and regulations in
                                                  Tests, Analyses, and Acceptance                          which can be found in ADAMS under                     10 CFR chapter I, which are set forth in
                                                  Criteria (ITAAC) in COL Appendix C.                      Accession No. ML18138A252, the                        the license amendment.
                                                  Specifically, the proposed changes                       Commission finds that:
                                                  clarify the thickness of the Nuclear                                                                              A notice of consideration of issuance
                                                                                                              A. The exemption is authorized by
                                                  Island Basemat, revise wall thicknesses                  law;                                                  of amendment to facility operating
                                                  and descriptions in the Auxiliary                           B. the exemption presents no undue                 license or COL, as applicable, proposed
                                                  Building, and clarify floor thicknesses                  risk to public health and safety;                     no significant hazards consideration
                                                  in the Annex Building.                                      C. the exemption is consistent with                determination, and opportunity for a
                                                     Part of the justification for granting                the common defense and security;                      hearing in connection with these
                                                  the exemption was provided by the                           D. special circumstances are present               actions, was published in the Federal
                                                  review of the amendment. Because the                     in that the application of the rule in this           Register on March 6, 2018 (83 FR 9555).
                                                  exemption is necessary in order to issue                 circumstance is not necessary to serve                No comments were received during the
                                                  the requested license amendment, the                     the underlying purpose of the rule;                   30-day comment period.
                                                  NRC granted the exemption and issued                        E. the special circumstances outweigh                 The Commission has determined that
                                                  the amendment concurrently, rather                       any decrease in safety that may result                these amendments satisfy the criteria for
                                                  than in sequence. This included issuing                  from the reduction in standardization                 categorical exclusion in accordance
                                                  a combined safety evaluation containing                  caused by the exemption; and
                                                  the NRC staff’s review of both the                                                                             with 10 CFR 51.22. Therefore, pursuant
                                                                                                              F. the exemption will not result in a
                                                  exemption request and the license                        significant decrease in the level of safety           to 10 CFR 51.22(b), no environmental
                                                  amendment. The exemption met all                         otherwise provided by the design.                     impact statement or environmental
                                                  applicable regulatory criteria set forth in                 2. Accordingly, SNC is granted an                  assessment need be prepared for these
                                                  sections 50.12, 52.7, and section                        exemption from the certified DCD Tier                 amendments.
                                                  VIII.A.4 of appendix D to 10 CFR part                    1 information, with corresponding                     IV. Conclusion
                                                  52. The license amendment was found                      changes to Appendix C of the Facility
                                                  to be acceptable as well. The combined                   Combined License, as described in the                   Using the reasons set forth in the
                                                  safety evaluation is available in ADAMS                  licensee’s request dated December 15,                 combined safety evaluation, the staff
                                                  under Accession No. ML18138A252.                         2017, as supplemented by letter dated                 granted the exemptions and issued the
                                                     Identical exemption documents                         April 6, 2018. This exemption is related              amendments that the licensee requested
                                                  (except for referenced unit numbers and                  to, and necessary for the granting of                 on December 15, 2017, as supplemented
                                                  license numbers) were issued to the
jstallworth on DSKBBY8HB2PROD with NOTICES




                                                                                                           License Amendment No. 128 (Unit 3)                    by letter dated April 6, 2018.
                                                  licensee for VEGP Units 3 and 4 (COL                     and No. 127 (Unit 4), which is being
                                                                                                                                                                   The exemptions and amendments
                                                  Nos. NPF–91 and NPF–92). The                             issued concurrently with this
                                                  exemption documents for VEGP Units 3                                                                           were issued on June 27, 2018, as part of
                                                                                                           exemption.
                                                  and 4 can be found in ADAMS under                           3. As explained in Section 5.0 of the              a combined package to the licensee
                                                  Accession Nos. ML18138A246 and                           NRC staff’s Safety Evaluation (ADAMS                  (ADAMS Accession No. ML18138A244).
                                                  ML18138A247, respectively. The                           Accession No. ML18138A252), this                        Dated at Rockville, Maryland, this 19th day
                                                  exemption is reproduced (with the                        exemption meets the eligibility criteria              of July 2018.



                                             VerDate Sep<11>2014   13:59 Jul 23, 2018   Jkt 244001   PO 00000   Frm 00050   Fmt 4703   Sfmt 4703   E:\FR\FM\24JYN1.SGM   24JYN1


                                                                                  Federal Register / Vol. 83, No. 142 / Tuesday, July 24, 2018 / Notices                                          35031

                                                     For the Nuclear Regulatory Commission.                faxing a request to 202–326–4042; or                  burden of this collection of information
                                                  Paul B. Kallan,                                          calling 202–326–4040 during normal                    is 1,770 hours and $439,500.
                                                  Acting Chief, Licensing Branch 4, Division               business hours. (TTY users may call the                  Section 303(k) of the Employee
                                                  of Licensing, Siting, and Environmental                  Federal relay service toll-free at 1–800–             Retirement Income Security Act of 1974
                                                  Analysis, Office of New Reactors.                        877–8339 and ask to be connected to                   (ERISA) and section 430(k) of the
                                                  [FR Doc. 2018–15783 Filed 7–23–18; 8:45 am]              202–326–4040.) The reportable events                  Internal Revenue Code of 1986 (Code)
                                                  BILLING CODE 7590–01–P
                                                                                                           regulation, forms, and instructions are               impose a lien in favor of an
                                                                                                           available at http://www.pbgc.gov.                     underfunded single-employer plan that
                                                                                                                                                                 is covered by PBGC’s termination
                                                                                                           FOR FURTHER INFORMATION CONTACT:
                                                                                                                                                                 insurance program if (1) any person fails
                                                  PENSION BENEFIT GUARANTY                                 Stephanie Cibinic, Deputy Assistant
                                                                                                                                                                 to make a required payment when due,
                                                  CORPORATION                                              General Counsel for Regulatory Affairs
                                                                                                                                                                 and (2) the unpaid balance of that
                                                                                                           (cibinic.stephanie@pbgc.gov; 202–326–
                                                  Proposed Submission of Information                                                                             payment (including interest), when
                                                                                                           4400 ext. 3839), or Deborah C. Murphy,
                                                  Collections for OMB Review; Comment                                                                            added to the aggregate unpaid balance
                                                                                                           Assistant General Counsel
                                                  Request; Reportable Events; Notice of                                                                          of all preceding payments for which
                                                                                                           (murphy.deborah@pbgc.gov; 202–326–
                                                  Failure To Make Required                                                                                       payment was not made when due
                                                                                                           4400 ext. 3451 (leave voice message)),                (including interest), exceeds $1 million.
                                                  Contributions                                            Office of the General Counsel, Pension                (For this purpose, a plan is underfunded
                                                                                                           Benefit Guaranty Corporation, 1200 K                  if its funding target attainment
                                                  AGENCY: Pension Benefit Guaranty
                                                                                                           Street NW, Washington, DC 20005–                      percentage is less than 100 percent.) The
                                                  Corporation.
                                                                                                           4026. (TTY users may call the Federal                 lien is upon all property and rights to
                                                  ACTION: Notice of intention to request                   relay service toll-free at 1–800–877–
                                                  extension of OMB approval.                                                                                     property belonging to the person or
                                                                                                           8339 and ask to be connected to 202–                  persons that are liable for required
                                                  SUMMARY:   The Pension Benefit Guaranty                  326–4400 and either of the above                      contributions (i.e., a contributing
                                                  Corporation (PBGC) intends to request                    extensions.)                                          sponsor and each member of the
                                                  that the Office of Management and                        SUPPLEMENTARY INFORMATION:     Section                controlled group of which that
                                                  Budget (OMB) extend approval, under                      4043 of the Employee Retirement                       contributing sponsor is a member).
                                                  the Paperwork Reduction Act, of                          Income Security Act of 1974 (ERISA)                      Only PBGC (or, at its direction, the
                                                  collections of information under PBGC’s                  requires plan administrators and plan                 plan’s contributing sponsor or a member
                                                  regulation on Reportable Events and                      sponsors to report certain plan and                   of the same controlled group) may
                                                  Certain Other Notification Requirements                  employer events to PBGC. The reporting                perfect and enforce this lien. ERISA and
                                                  (OMB control numbers 1212–0013 and                       requirements give PBGC notice of events               the Code require persons that fail to
                                                  1212–0041, expiring November 30,                         that indicate plan or employer financial              make payments to notify PBGC within
                                                  2018) with modifications. This notice                    problems. PBGC uses the information                   10 days of the due date whenever there
                                                  solicits public comment.                                 provided in determining what, if any,                 is a failure to make a required payment
                                                  DATES: Comments must be submitted by                     action it needs to take. For example,                 and the total of the unpaid balances
                                                  September 24, 2018 to be assured of                      PBGC might need to institute                          (including interest) exceeds $1 million.
                                                  consideration.                                           proceedings to terminate a plan (placing                 PBGC Form 200, Notice of Failure to
                                                                                                           it in trusteeship) under section 4042 of              Make Required Contributions, and
                                                  ADDRESSES:   Comments may be                                                                                   related instructions implement the
                                                  submitted by any of the following                        ERISA to ensure the continued payment
                                                                                                           of benefits to plan participants and their            statutory notification requirement.
                                                  methods:                                                                                                       Submission of Form 200 is required by
                                                    • Federal eRulemaking Portal: http://                  beneficiaries or to prevent unreasonable
                                                                                                           increases in PBGC’s losses.                           29 CFR 4043.81 (Subpart D of PBGC’s
                                                  www.regulations.gov. Follow the                                                                                regulation on Reportable Events and
                                                  website instructions for submitting                         The provisions of section 4043 of
                                                                                                           ERISA have been implemented in                        Other Notification Requirements, 29
                                                  comments.                                                                                                      CFR part 4043).
                                                    • Email: paperwork.comments@                           PBGC’s regulation on Reportable Events
                                                                                                                                                                    OMB has approved this collection of
                                                  pbgc.gov.                                                and Certain Other Notification
                                                                                                                                                                 information under OMB control number
                                                    • Mail or Hand Delivery: Regulatory                    Requirements (29 CFR part 4043).
                                                                                                                                                                 1212–0041, which expires November
                                                  Affairs Division, Office of the General                  Subparts B and C of the regulation deal
                                                                                                                                                                 30, 2018. PBGC intends to request that
                                                  Counsel, Pension Benefit Guaranty                        with reportable events.
                                                                                                                                                                 OMB extend its approval for three years,
                                                  Corporation, 1200 K Street NW,                              PBGC has issued Forms 10 and 10-                   with modifications. An agency may not
                                                  Washington, DC 20005–4026.                               Advance and related instructions under                conduct or sponsor, and a person is not
                                                    All submissions received must                          subparts B and C (approved under OMB                  required to respond to, a collection of
                                                  include the agency’s name (Pension                       control number 1212–0013). OMB                        information unless it displays a
                                                  Benefit Guaranty Corporation, or PBGC)                   approval of this collection of                        currently valid OMB control number.
                                                  and refer to the OMB control number(s)                   information expires November 30, 2018.                   PBGC estimates that it will receive
                                                  they relate to. All comments received                    PBGC intends to request that OMB                      100 Form 200 filings per year and that
                                                  will be posted without change to                         extend its approval for three years, with             the average annual burden of this
                                                  PBGC’s website, http://www.pbgc.gov,                     modifications. An agency may not                      collection of information is 100 hours
                                                  including any personal information                       conduct or sponsor, and a person is not               and $72,500.
                                                                                                           required to respond to, a collection of
jstallworth on DSKBBY8HB2PROD with NOTICES




                                                  provided.                                                                                                         PBGC is soliciting public comments
                                                    Copies of the collections of                           information unless it displays a                      to—
                                                  information and comments may be                          currently valid OMB control number.                      • evaluate whether the proposed
                                                  obtained without charge by writing to                       PBGC estimates that it will receive                collections of information are necessary
                                                  Disclosure Division, Office of the                       590 reportable event notices per year                 for the proper performance of the
                                                  General Counsel, Pension Benefit                         under subparts B and C of the reportable              functions of the agency, including
                                                  Guaranty Corporation, 1200 K Street                      events regulation using Forms 10 and                  whether the information will have
                                                  NW, Washington, DC 20005–4026;                           10-Advance and that the average annual                practical utility;


                                             VerDate Sep<11>2014   13:59 Jul 23, 2018   Jkt 244001   PO 00000   Frm 00051   Fmt 4703   Sfmt 4703   E:\FR\FM\24JYN1.SGM   24JYN1



Document Created: 2018-07-24 00:10:10
Document Modified: 2018-07-24 00:10:10
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionExemption and combined license amendment; issuance.
DatesThe exemption and amendment were issued on June 27, 2018.
ContactChandu Patel, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-3025; email: [email protected]
FR Citation83 FR 35029 