83_FR_35777 83 FR 35632 - Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization

83 FR 35632 - Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 145 (July 27, 2018)

Page Range35632-35633
FR Document2018-16107

Federal Register, Volume 83 Issue 145 (Friday, July 27, 2018)
[Federal Register Volume 83, Number 145 (Friday, July 27, 2018)]
[Notices]
[Pages 35632-35633]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-16107]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-523-000]


Columbia Gas Transmission, LLC; Notice of Request Under Blanket 
Authorization

    Take notice that on July 13, 2018, Columbia Gas Transmission, LLC 
(Columbia), 700 Louisiana Street, Suite 700, Houston, Texas 77002-2700, 
filed in the above referenced docket, a prior notice request pursuant 
to sections 157.205 and 157.216 of the Commission's regulations under 
the Natural Gas Act (NGA) and Columbia's blanket certificate issued in 
Docket No. CP83-76-000, for authorization to (1) plug and abandon four 
injection/withdrawal (I/W) wells (Benton Well 9507 and Laurel Wells 
9097, 9239, and 9285), (2) abandon and convert one I/W well to an 
observation well (Benton Well 7612), and (3) abandon associated 
pipelines and appurtenances located at Benton and Laurel Storage Fields 
in Hocking County, Ohio, all as more fully set forth in the application 
which is on file with the Commission and open to public inspection.
    The filing may also be viewed on the web at http://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Any questions regarding this application may be directed to Linda 
Farquhar, Manager, Project Determinations & Regulatory Administration, 
Columbia Gas Transmission, LLC, 700 Louisiana Street, Suite 700, 
Houston, Texas 77002-2700, at (832) 320-5685 or fax (832) 320-6685 or 
[email protected].
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the EA for this proposal. The filing of the EA in the Commission's 
public record for this proceeding or the issuance of a Notice of 
Schedule for Environmental Review will serve to notify federal and 
state agencies of the timing for the completion of all necessary 
reviews, and the subsequent need to complete all federal authorizations 
within 90 days of the date of issuance of the Commission staff's EA.
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's Regulations under 
the NGA (18 CFR 157.205) file a protest to the request. If no protest 
is filed within the time allowed therefore, the proposed activity shall 
be deemed to be authorized effective the day after the time allowed for 
protest. If a protest is filed and not withdrawn within 30 days after 
the time allowed for filing a protest, the instant request shall be 
treated as an application for authorization pursuant to section 7 of 
the NGA.

[[Page 35633]]

    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
website (www.ferc.gov) under the ``e-Filing'' link.

    Dated: July 23, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-16107 Filed 7-26-18; 8:45 am]
 BILLING CODE 6717-01-P



                                              35632                            Federal Register / Vol. 83, No. 145 / Friday, July 27, 2018 / Notices

                                                Comments: Comments are invited on:                     appropriate. Such notices, motions, or                Hocking County, Ohio, all as more fully
                                              (1) Whether the collection of                            protests must be filed on or before the               set forth in the application which is on
                                              information is necessary for the proper                  comment date. On or before the                        file with the Commission and open to
                                              performance of the functions of the                      comment date, it is not necessary to                  public inspection.
                                              Commission, including whether the                        serve motions to intervene or protests                   The filing may also be viewed on the
                                              information will have practical utility;                 on persons other than the Applicant.                  web at http://www.ferc.gov using the
                                              (2) the accuracy of the agency’s estimate                   The Commission encourages                          ‘‘eLibrary’’ link. Enter the docket
                                              of the burden and cost of the collection                 electronic submission of protests and                 number excluding the last three digits in
                                              of information, including the validity of                interventions in lieu of paper using the              the docket number field to access the
                                              the methodology and assumptions used;                    ‘‘eFiling’’ link at http://www.ferc.gov.              document. For assistance, please contact
                                              (3) ways to enhance the quality, utility                 Persons unable to file electronically                 FERC Online Support at
                                              and clarity of the information collection;               should submit an original and 5 copies                FERCOnlineSupport@ferc.gov or toll
                                              and (4) ways to minimize the burden of                   of the protest or intervention to the                 free at (866) 208–3676, or TTY, contact
                                              the collection of information on those                   Federal Energy Regulatory Commission,                 (202) 502–8659.
                                              who are to respond, including the use                    888 First Street NE, Washington, DC                      Any questions regarding this
                                              of automated collection techniques or                    20426.                                                application may be directed to Linda
                                              other forms of information technology.                      This filing is accessible on-line at               Farquhar, Manager, Project
                                                Dated: July 19, 2018.                                  http://www.ferc.gov, using the                        Determinations & Regulatory
                                                                                                       ‘‘eLibrary’’ link and is available for                Administration, Columbia Gas
                                              Kimberly D. Bose,
                                                                                                       electronic review in the Commission’s                 Transmission, LLC, 700 Louisiana
                                              Secretary.                                                                                                     Street, Suite 700, Houston, Texas
                                              [FR Doc. 2018–16015 Filed 7–26–18; 8:45 am]
                                                                                                       Public Reference Room in Washington,
                                                                                                       DC. There is an ‘‘eSubscription’’ link on             77002–2700, at (832) 320–5685 or fax
                                              BILLING CODE 6717–01–P
                                                                                                       the website that enables subscribers to               (832) 320–6685 or linda_farquhar@
                                                                                                       receive email notification when a                     transcanada.com.
                                                                                                                                                                Pursuant to section 157.9 of the
                                              DEPARTMENT OF ENERGY                                     document is added to a subscribed
                                                                                                                                                             Commission’s rules, 18 CFR 157.9,
                                                                                                       docket(s). For assistance with any FERC
                                                                                                                                                             within 90 days of this Notice the
                                              Federal Energy Regulatory                                Online service, please email
                                                                                                                                                             Commission staff will either: Complete
                                              Commission                                               FERCOnlineSupport@ferc.gov, or call
                                                                                                                                                             its environmental assessment (EA) and
                                                                                                       (866) 208–3676 (toll free). For TTY, call
                                              [Docket No. ID–8512–000]                                                                                       place it into the Commission’s public
                                                                                                       (202) 502–8659.
                                                                                                                                                             record (eLibrary) for this proceeding; or
                                              Miller, Paul J.; Notice of Filing                           Comment Date: 5:00 p.m. Eastern
                                                                                                                                                             issue a Notice of Schedule for
                                                                                                       Time on August 8, 2018.
                                                Take notice that on July 18, 2018,                                                                           Environmental Review. If a Notice of
                                                                                                         Dated: July 19, 2018.                               Schedule for Environmental Review is
                                              Paul J. Miller, submitted for filing an,
                                              application for authority to hold                        Nathaniel J. Davis, Sr.,                              issued, it will indicate, among other
                                              interlocking positions, pursuant to                      Deputy Secretary.                                     milestones, the anticipated date for the
                                              section 305(b) of the Federal Power Act,                 [FR Doc. 2018–16086 Filed 7–26–18; 8:45 am]           Commission staff’s issuance of the EA
                                              16 U.S.C. 825d(b) and section 45.8 of                    BILLING CODE 6717–01–P                                for this proposal. The filing of the EA
                                              the Federal Energy Regulatory                                                                                  in the Commission’s public record for
                                              Commission’s (Commission) Rules of                                                                             this proceeding or the issuance of a
                                              Practice and Procedure, 18 CFR part                      DEPARTMENT OF ENERGY                                  Notice of Schedule for Environmental
                                              45.8 (2018).                                                                                                   Review will serve to notify federal and
                                                Any person desiring to intervene or to                 Federal Energy Regulatory                             state agencies of the timing for the
                                              protest this filing must file in                         Commission                                            completion of all necessary reviews, and
                                              accordance with Rules 211 and 214 of                                                                           the subsequent need to complete all
                                                                                                       [Docket No. CP18–523–000]
                                              the Commission’s Rules of Practice and                                                                         federal authorizations within 90 days of
                                              Procedure (18 CFR 385.211, 385.214).                     Columbia Gas Transmission, LLC;                       the date of issuance of the Commission
                                              Protests will be considered by the                       Notice of Request Under Blanket                       staff’s EA.
                                              Commission in determining the                            Authorization                                            Any person may, within 60 days after
                                              appropriate action to be taken, but will                                                                       the issuance of the instant notice by the
                                              not serve to make protestants parties to                   Take notice that on July 13, 2018,                  Commission, file pursuant to Rule 214
                                              the proceeding. Any person wishing to                    Columbia Gas Transmission, LLC                        of the Commission’s Procedural Rules
                                              become a party must file a notice of                     (Columbia), 700 Louisiana Street, Suite               (18 CFR 385.214) a motion to intervene
                                              intervention or motion to intervene, as                  700, Houston, Texas 77002–2700, filed                 or notice of intervention. Any person
                                                                                                       in the above referenced docket, a prior               filing to intervene or the Commission’s
                                                7 GO = Generator Owner, DP = Distribution              notice request pursuant to sections                   staff may, pursuant to section 157.205 of
                                              Provider, TO = Transmission Owner, each of which         157.205 and 157.216 of the                            the Commission’s Regulations under the
                                              applies load-responsive protective relays at the         Commission’s regulations under the                    NGA (18 CFR 157.205) file a protest to
                                              terminals of the Elements listed in the proposed
                                              standard at section 3.2 (Facilities).
                                                                                                       Natural Gas Act (NGA) and Columbia’s                  the request. If no protest is filed within
                                                8 The estimated hourly costs (salary plus benefits)    blanket certificate issued in Docket No.              the time allowed therefore, the proposed
                                              are based on Bureau of Labor Statistics (BLS)            CP83–76–000, for authorization to (1)                 activity shall be deemed to be
                                              information May 2014, (at http://bls.gov/oes/            plug and abandon four injection/                      authorized effective the day after the
amozie on DSK3GDR082PROD with NOTICES1




                                              current/naics3_221000.htm#17-0000) for an                withdrawal (I/W) wells (Benton Well                   time allowed for protest. If a protest is
                                              electrical engineer ($59.62/hour for review and
                                              documentation), and for a file clerk ($28.95/hour for    9507 and Laurel Wells 9097, 9239, and                 filed and not withdrawn within 30 days
                                              record retention). Those figures (and the number of      9285), (2) abandon and convert one I/W                after the time allowed for filing a
                                              respondents) were used when the standard was             well to an observation well (Benton                   protest, the instant request shall be
                                              approved and added to the OMB inventory. Hourly
                                              cost for the engineer are used for the one-time costs,
                                                                                                       Well 7612), and (3) abandon associated                treated as an application for
                                              and hourly cost for the file clerk are used for the      pipelines and appurtenances located at                authorization pursuant to section 7 of
                                              ongoing record retention.                                Benton and Laurel Storage Fields in                   the NGA.


                                         VerDate Sep<11>2014   17:38 Jul 26, 2018   Jkt 244001   PO 00000   Frm 00029   Fmt 4703   Sfmt 4703   E:\FR\FM\27JYN1.SGM   27JYN1


                                                                               Federal Register / Vol. 83, No. 145 / Friday, July 27, 2018 / Notices                                                    35633

                                                The Commission strongly encourages                     888 First Street NE, Washington, DC                   Assessment (EA) for the Project. This
                                              electronic filings of comments, protests,                20426.                                                instant notice identifies the FERC staff’s
                                              and interventions via the internet in lieu                  The filings in the above-referenced                planned schedule for the completion of
                                              of paper. See 18 CFR 385.2001(a)(1)(iii)                 proceeding are accessible in the                      the EA for the Project.
                                              and the instructions on the                              Commission’s eLibrary system by
                                                                                                                                                             Schedule for Environmental Review
                                              Commission’s website (www.ferc.gov)                      clicking on the appropriate link in the
                                              under the ‘‘e-Filing’’ link.                             above list. They are also available for               Issuance of EA—August 29, 2018
                                                Dated: July 23, 2018.                                  electronic review in the Commission’s                 90-day Federal Authorization Decision
                                                                                                       Public Reference Room in Washington,                     Deadline—November 27, 2018
                                              Kimberly D. Bose,
                                                                                                       DC. There is an eSubscription link on                    If a schedule change becomes
                                              Secretary.
                                                                                                       the website that enables subscribers to               necessary, additional notice will be
                                              [FR Doc. 2018–16107 Filed 7–26–18; 8:45 am]
                                                                                                       receive email notification when a                     provided so that the relevant agencies
                                              BILLING CODE 6717–01–P                                   document is added to a subscribed                     are kept informed of the Project’s
                                                                                                       docket(s). For assistance with any FERC               progress.
                                                                                                       Online service, please email
                                              DEPARTMENT OF ENERGY                                                                                           Project Description
                                                                                                       FERCOnlineSupport@ferc.gov. or call
                                              Federal Energy Regulatory                                (866) 208–3676 (toll free). For TTY, call               The Line 8000 Replacement Project
                                              Commission                                               (202) 502–8659.                                       would consist of:
                                                                                                         Dated: July 20, 2018.                                 • Replacement of about 13.25 miles of
                                              [Docket No. ER18–2003–000]                                                                                     existing 12-inch-diameter bare steel
                                                                                                       Nathaniel J. Davis, Sr.,
                                                                                                                                                             pipeline, with approximately 13.54
                                              Lorenzo Wind, LLC; Supplemental                          Deputy Secretary.
                                                                                                                                                             miles of new, coated 12-inch-diameter
                                              Notice That Initial Market-Based Rate                    [FR Doc. 2018–16078 Filed 7–26–18; 8:45 am]
                                                                                                                                                             natural gas transmission pipeline in five
                                              Filing Includes Request for Blanket                      BILLING CODE 6717–01–P                                sections and four modification points
                                              Section 204 Authorization                                                                                      along Line 8000 and Lateral Line 8006;
                                                 This is a supplemental notice in the                                                                          • replacement of about 0.54 miles of
                                                                                                       DEPARTMENT OF ENERGY
                                              above-referenced proceeding Lorenzo                                                                            existing 4-inch-diameter bare steel
                                              Wind, LLC’s application for market-                      Federal Energy Regulatory                             pipeline, with approximately 0.67 miles
                                              based rate authority, with an                            Commission                                            of new coated 4-inch-diameter natural
                                              accompanying rate tariff, noting that                                                                          gas transmission pipeline along Lateral
                                              such application includes a request for                  [Docket No. CP18–13–000]                              Lines 8225 and 8244;
                                              blanket authorization, under 18 CFR                                                                              • installation of two new pig 1
                                                                                                       Notice of Schedule for Environmental                  launcher and receiver sites and four
                                              part 34, of future issuances of securities               Review of the Columbia Gas
                                              and assumptions of liability.                                                                                  new mainline valves associated with
                                                                                                       Transmission, Llc Line 8000                           pipeline facilities;
                                                 Any person desiring to intervene or to                Replacement Project
                                              protest should file with the Federal                                                                             • modifications/abandonment of
                                              Energy Regulatory Commission, 888                           On November 3, 2017, Columbia Gas                  three existing mainline valves and three
                                              First Street NE, Washington, DC 20426,                   Transmission, LLC filed an application                existing side tap valve sites;
                                              in accordance with Rules 211 and 214                     in Docket No. CP18–13–000 requesting                    • modification of tie-ins at two
                                              of the Commission’s Rules of Practice                    a Certificate of Public Convenience and               regulator stations; and
                                              and Procedure (18 CFR 385.211 and                        Necessity pursuant to Sections 7(b) and                 • abandonment of 13 active
                                              385.214). Anyone filing a motion to                      (c) of the Natural Gas Act to construct,              residential taps and 109 inactive taps.
                                              intervene or protest must serve a copy                   operate, and abandon certain natural gas              Background
                                              of that document on the Applicant.                       pipeline facilities in Mineral County,
                                                 Notice is hereby given that the                       West Virginia and Allegany County,                       On December 19, 2017, the
                                              deadline for filing protests with regard                 Maryland. The proposed project is                     Commission issued a Notice of Intent to
                                              to the applicant’s request for blanket                   known as the Line 8000 Replacement                    Prepare an Environmental Assessment
                                              authorization, under 18 CFR part 34, of                  Project (Project) and is part of                      for the Proposed Line 8000 Replacement
                                              future issuances of securities and                       Columbia’s multi-year, comprehensive                  Project and Request for Comments on
                                              assumptions of liability, is August 9,                   modernization program. The Project                    Environmental Issues (NOI). The NOI
                                              2018.                                                    would not increase capacity and would                 was sent to affected landowners; federal,
                                                 The Commission encourages                             continue to serve the Maryland                        state, and local government agencies;
                                              electronic submission of protests and                    distribution markets. According to                    elected officials; environmental and
                                              interventions in lieu of paper, using the                Columbia, its Project would increase                  public interest groups; Native American
                                              FERC Online links at http://                             system reliability, thereby greatly                   tribes; other interested parties; and local
                                              www.ferc.gov. To facilitate electronic                   reducing the risk of interruptions to                 libraries and newspapers. In response to
                                              service, persons with internet access                    Columbia’s customers.                                 the NOI, the Commission received
                                              who will eFile a document and/or be                         On November 17, 2017, the Federal                  comments from Columbia Gas of
                                              listed as a contact for an intervenor                    Energy Regulatory Commission                          Maryland, Inc., Direct Energy Business
                                              must create and validate an                              (Commission or FERC) issued its Notice                Marketing, LLC, the West Virginia
                                              eRegistration account using the                          of Application for the Project. Among                 Division of Culture and History, the
amozie on DSK3GDR082PROD with NOTICES1




                                              eRegistration link. Select the eFiling                   other things, that notice alerted agencies            Maryland Department of Environment,
                                              link to log on and submit the                            issuing federal authorizations of the                 and one landowner. The comments
                                              intervention or protests.                                requirement to complete all necessary                 addressed the conversion to an alternate
                                                 Persons unable to file electronically                 reviews and to reach a final decision on                1 A ‘‘pig’’ is a tool that the pipeline company
                                              should submit an original and 5 copies                   a request for a federal authorization                 inserts into and pushes through the pipeline for
                                              of the intervention or protest to the                    within 90 days of the date of issuance                cleaning the pipeline, conducting internal
                                              Federal Energy Regulatory Commission,                    of the Commission staff’s Environmental               inspections, or other purposes.



                                         VerDate Sep<11>2014   17:38 Jul 26, 2018   Jkt 244001   PO 00000   Frm 00030   Fmt 4703   Sfmt 4703   E:\FR\FM\27JYN1.SGM   27JYN1



Document Created: 2018-07-27 04:06:14
Document Modified: 2018-07-27 04:06:14
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 35632 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR