83_FR_40664 83 FR 40506 - Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization

83 FR 40506 - Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 158 (August 15, 2018)

Page Range40506-40507
FR Document2018-17506

Federal Register, Volume 83 Issue 158 (Wednesday, August 15, 2018)
[Federal Register Volume 83, Number 158 (Wednesday, August 15, 2018)]
[Notices]
[Pages 40506-40507]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-17506]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-535-000]


Southern Star Central Gas Pipeline, Inc.; Notice of Request Under 
Blanket Authorization

    Take notice that on July 31, 2018, Southern Star Central Gas 
Pipeline, Inc. (Southern Star) 4700 State Highway 56, Owensboro, 
Kentucky 42301, filed in Docket No. CP18-535-000 a prior notice request 
pursuant to sections 157.205 and 157.208 of the Commission's 
regulations under the Natural Gas Act (NGA), and Southern Star's 
blanket certificate issued in Docket No. CP82-479-000, to increase the 
maximum allowable operating pressure (MAOP) and maximum operating 
pressure (MOP) on Southern Star's QB Pipeline (Line QB) in Johnson 
County, Kansas.
    Southern Star states that Line QB is a 26-inch pipeline that runs 
between the South Glavin Station and the Glavin Station in Johnson 
County, Kansas, serving the Kansas City Metropolitan area in Kansas and 
Missouri. Most of Line QB was installed in the late 1940's. Due to the 
age of the line, the MAOP of Line QB was established under the 
``Grandfather Clause'' of the regulations of the United States 
Department of Transportation (U.S. DOT), Pipeline and Hazardous 
Materials Safety Administration (PHMSA). The MAOP of Line QB 
established under the Grandfather Clause is 260 pounds per square inch 
gauge (psig). Southern Star avers that Line QB was unintentionally 
over-pressured due to the failure of a regulator. In response to the 
increase in pressure above the grandfathered MAOP, Southern Star 
conducted a hydrostatic pressure test meeting the requirements of 
PHMSA's regulations. The results of that pressure test support an MAOP 
of 280 psig, an increase from the 260 psig grandfathered MAOP. Southern 
Star requests to increase both the MAOP and the MOP of Line QB to 280 
psig to match the new MAOP supported by the recent pressure test under 
PHMSA's regulations.
    Southern Star asserts that, like Line QB, its 26-inch Line QC also 
begins at the South Glavin Station. Line QC has an MAOP/MOP of 280 
psig, and both lines have a common source of gas, Southern Star's 26-
inch Line Q. Therefore, uprating Line QB to match the pressure on Line 
QC will allow Southern Star to equalize pressure in Line QB and Line QC 
to share regulation and essentially be operated as one system and more 
efficiently.
    Southern Star states that no increased capacity is expected to 
occur, and no additional costs are required to increase the MAOP/MOP of 
Southern Star's Line QB, all as more fully set forth in the application 
which is on file with the Commission and open to public inspection. The 
filing may also be viewed on the web at http://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Any questions concerning this application may be directed to Cindy 
Thompson, Manager, Regulatory, Southern Star Central Gas Pipeline, 
Inc., 4700 Highway 56, Owensboro, Kentucky 42301, by telephone at (270) 
852-4655, or by email at [email protected].
    Any person or the Commission's staff may, within 60 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to section 157.205 of 
the regulations under the NGA (18 CFR 157.205), a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be

[[Page 40507]]

authorized effective the day after the time allowed for filing a 
protest. If a protest is filed and not withdrawn within 30 days after 
the allowed time for filing a protest, the instant request shall be 
treated as an application for authorization pursuant to section 7 of 
the NGA.
    Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9), 
within 90 days of this Notice, the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the EA for this proposal. The filing of the EA in the Commission's 
public record for this proceeding or the issuance of a Notice of 
Schedule for Environmental Review will serve to notify federal and 
state agencies of the timing for the completion of all necessary 
reviews, and the subsequent need to complete all federal authorizations 
within 90 days of the date of issuance of the Commission staff's EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters, will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original and seven copies of the protest or intervention to 
the Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426.

    Dated: August 8, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-17506 Filed 8-14-18; 8:45 am]
 BILLING CODE 6717-01-P



                                               40506                      Federal Register / Vol. 83, No. 158 / Wednesday, August 15, 2018 / Notices

                                               align its modified expiration date with                 basis and otherwise comply with the                   Hazardous Materials Safety
                                               that of the licensee’s adjacent Feeder                  requirements of 18 CFR 4.34(b). All                   Administration (PHMSA). The MAOP of
                                               Dam Hydropower Project No. 2554,                        comments, motions to intervene, or                    Line QB established under the
                                               which has an expiration date of August                  protests should relate to the request to              Grandfather Clause is 260 pounds per
                                               31, 2042. The sole purpose of the                       extend the license term. Agencies may                 square inch gauge (psig). Southern Star
                                               transmission line project is to transmit                obtain copies of the application directly             avers that Line QB was unintentionally
                                               the net power produced by the 6.0-                      from the applicant. A copy of any                     over-pressured due to the failure of a
                                               megawatt hydropower project located                     protest or motion to intervene must be                regulator. In response to the increase in
                                               on the Hudson River. The licensee’s                     served upon each representative of the                pressure above the grandfathered
                                               request includes correspondence from                    applicant specified in the particular                 MAOP, Southern Star conducted a
                                               the U.S. Fish and Wildlife Service and                  application. If an intervener files                   hydrostatic pressure test meeting the
                                               New York Department of Environmental                    comments or documents with the                        requirements of PHMSA’s regulations.
                                               Conservation supporting the extension                   Commission relating to the merits of an               The results of that pressure test support
                                               of the license term.                                    issue that may affect the responsibilities            an MAOP of 280 psig, an increase from
                                                  k. This notice is available for review               of a particular resource agency, they                 the 260 psig grandfathered MAOP.
                                               and reproduction at the Commission in                   must also serve a copy of the document                Southern Star requests to increase both
                                               the Public Reference Room, Room 2A,                     on that resource agency. A copy of all                the MAOP and the MOP of Line QB to
                                               888 First Street NE, Washington, DC                     other filings in reference to this                    280 psig to match the new MAOP
                                               20426. The filing may also be viewed on                 application must be accompanied by                    supported by the recent pressure test
                                               the Commission’s website at http://                     proof of service on all persons listed in             under PHMSA’s regulations.
                                               www.ferc.gov/docs-filing/elibrary.asp.                  the service list prepared by the                         Southern Star asserts that, like Line
                                               Enter the Docket number (P–2641–010)                    Commission in this proceeding, in                     QB, its 26-inch Line QC also begins at
                                               excluding the last three digits in the                  accordance with 18 CFR 4.34(b) and                    the South Glavin Station. Line QC has
                                               docket number field to access the                       385.2010.                                             an MAOP/MOP of 280 psig, and both
                                               notice. You may also register online at                                                                       lines have a common source of gas,
                                               http://www.ferc.gov/docs-filing/                          Dated: August 9, 2018.                              Southern Star’s 26-inch Line Q.
                                               esubscription.asp to be notified via                    Nathaniel J. Davis, Sr.,                              Therefore, uprating Line QB to match
                                               email of new filings and issuances                      Deputy Secretary.                                     the pressure on Line QC will allow
                                               related to this or other pending projects.              [FR Doc. 2018–17544 Filed 8–14–18; 8:45 am]           Southern Star to equalize pressure in
                                               For assistance, call toll-free 1–866–208–               BILLING CODE 6717–01–P                                Line QB and Line QC to share regulation
                                               3676 or email FERCOnlineSupport@                                                                              and essentially be operated as one
                                               ferc.gov. For TTY, call (202) 502–8659.                                                                       system and more efficiently.
                                                  l. Individuals desiring to be included               DEPARTMENT OF ENERGY                                     Southern Star states that no increased
                                               on the Commission’s mailing list should                                                                       capacity is expected to occur, and no
                                               so indicate by writing to the Secretary                 Federal Energy Regulatory                             additional costs are required to increase
                                               of the Commission.                                      Commission                                            the MAOP/MOP of Southern Star’s Line
                                                  m. Comments, Protests, or Motions to                 [Docket No. CP18–535–000]                             QB, all as more fully set forth in the
                                               Intervene: Anyone may submit                                                                                  application which is on file with the
                                               comments, a protest, or a motion to                     Southern Star Central Gas Pipeline,                   Commission and open to public
                                               intervene in accordance with the                        Inc.; Notice of Request Under Blanket                 inspection. The filing may also be
                                               requirements of Rules of Practice and                   Authorization                                         viewed on the web at http://
                                               Procedure, 18 CFR 385.210, .211, and                                                                          www.ferc.gov using the ‘‘eLibrary’’ link.
                                               .214. In determining the appropriate                       Take notice that on July 31, 2018,                 Enter the docket number excluding the
                                               action to take, the Commission will                     Southern Star Central Gas Pipeline, Inc.              last three digits in the docket number
                                               consider all protests or other comments                 (Southern Star) 4700 State Highway 56,                field to access the document. For
                                               filed, but only those who file a motion                 Owensboro, Kentucky 42301, filed in                   assistance, please contact FERC Online
                                               to intervene in accordance with the                     Docket No. CP18–535–000 a prior notice                Support at FERCOnlineSupport@
                                               Commission’s Rules may become a                         request pursuant to sections 157.205                  ferc.gov or toll free at (866) 208–3676, or
                                               party to the proceeding. Any comments,                  and 157.208 of the Commission’s                       TTY, contact (202) 502–8659.
                                               protests, or motions to intervene must                  regulations under the Natural Gas Act                    Any questions concerning this
                                               be received on or before the specified                  (NGA), and Southern Star’s blanket                    application may be directed to Cindy
                                               comment date for the particular                         certificate issued in Docket No. CP82–                Thompson, Manager, Regulatory,
                                               application.                                            479–000, to increase the maximum                      Southern Star Central Gas Pipeline, Inc.,
                                                  n. Filing and Service of Responsive                  allowable operating pressure (MAOP)                   4700 Highway 56, Owensboro,
                                               Documents: Any filing must (1) bear in                  and maximum operating pressure                        Kentucky 42301, by telephone at (270)
                                               all capital letters the title                           (MOP) on Southern Star’s QB Pipeline                  852–4655, or by email at
                                               ‘‘COMMENTS’’, ‘‘PROTEST’’, or                           (Line QB) in Johnson County, Kansas.                  Cindy.C.Thompson@sscgp.com.
                                               ‘‘MOTION TO INTERVENE’’ as                                 Southern Star states that Line QB is a                Any person or the Commission’s staff
                                               applicable; (2) set forth in the heading                26-inch pipeline that runs between the                may, within 60 days after issuance of
                                               the name of the applicant and the                       South Glavin Station and the Glavin                   the instant notice by the Commission,
                                               project number of the application to                    Station in Johnson County, Kansas,                    file pursuant to Rule 214 of the
                                               which the filing responds; (3) furnish                  serving the Kansas City Metropolitan                  Commission’s Procedural Rules (18 CFR
daltland on DSKBBV9HB2PROD with NOTICES




                                               the name, address, and telephone                        area in Kansas and Missouri. Most of                  385.214) a motion to intervene or notice
                                               number of the person protesting or                      Line QB was installed in the late 1940’s.             of intervention and pursuant to section
                                               intervening; and (4) otherwise comply                   Due to the age of the line, the MAOP of               157.205 of the regulations under the
                                               with the requirements of 18 CFR                         Line QB was established under the                     NGA (18 CFR 157.205), a protest to the
                                               385.2001 through 385.2005. All                          ‘‘Grandfather Clause’’ of the regulations             request. If no protest is filed within the
                                               comments, motions to intervene, or                      of the United States Department of                    time allowed therefore, the proposed
                                               protests must set forth their evidentiary               Transportation (U.S. DOT), Pipeline and               activity shall be deemed to be


                                          VerDate Sep<11>2014   18:28 Aug 14, 2018   Jkt 244001   PO 00000   Frm 00008   Fmt 4703   Sfmt 4703   E:\FR\FM\15AUN1.SGM   15AUN1


                                                                          Federal Register / Vol. 83, No. 158 / Wednesday, August 15, 2018 / Notices                                                 40507

                                               authorized effective the day after the                    Dated: August 8, 2018.                              Background
                                               time allowed for filing a protest. If a                 Nathaniel J. Davis, Sr.,
                                               protest is filed and not withdrawn                      Deputy Secretary.                                        On June 7, 2018, the Commission
                                               within 30 days after the allowed time                   [FR Doc. 2018–17506 Filed 8–14–18; 8:45 am]
                                                                                                                                                             issued a Notice of Intent to Prepare an
                                               for filing a protest, the instant request                                                                     Environmental Assessment for the
                                                                                                       BILLING CODE 6717–01–P
                                               shall be treated as an application for                                                                        Proposed South Mainline Expansion
                                               authorization pursuant to section 7 of                                                                        Project and Request for Comments on
                                               the NGA.                                                DEPARTMENT OF ENERGY                                  Environmental Issues (NOI). The NOI
                                                                                                                                                             was sent to affected landowners; federal,
                                                  Pursuant to section 157.9 of the                     Federal Energy Regulatory                             state, and local government agencies;
                                               Commission’s rules (18 CFR 157.9),                      Commission                                            elected officials; environmental and
                                               within 90 days of this Notice, the                                                                            public interest groups; Native American
                                               Commission staff will either: complete                  [Docket No. CP18–332–000]                             tribes; other interested parties; and local
                                               its environmental assessment (EA) and                                                                         libraries and newspapers. In response to
                                               place it into the Commission’s public                   El Paso Natural Gas Company, L.L.C.;                  the NOI, the Commission received
                                               record (eLibrary) for this proceeding; or               Notice of Schedule for Environmental                  comments from the El Paso Water
                                               issue a Notice of Schedule for                          Review of the South Mainline                          Company, White Mountain Apache
                                               Environmental Review. If a Notice of                    Expansion Project                                     Tribe, and the Ysleta Del Sur Pueblo
                                               Schedule for Environmental Review is                                                                          Tribal Council. The primary issues
                                               issued, it will indicate, among other                      On April 26, 2018, El Paso Natural
                                                                                                       Gas Company L.L.C. (El Paso) filed an                 raised by the commenters are the
                                               milestones, the anticipated date for the                                                                      avoidance of impacts on public water
                                               Commission staff’s issuance of the EA                   application in Docket No. CP18–332–
                                                                                                       000 requesting a Certificate of Public                system facilities and the need for
                                               for this proposal. The filing of the EA                                                                       consultation should any human remains
                                                                                                       Convenience and Necessity pursuant to
                                               in the Commission’s public record for                                                                         or artifacts be unearthed during Project
                                                                                                       Section 7(c) of the Natural Gas Act to
                                               this proceeding or the issuance of a                                                                          construction. All substantive comments
                                                                                                       construct and operate certain natural gas
                                               Notice of Schedule for Environmental                    pipeline facilities. The proposed project             will be addressed in the EA.
                                               Review will serve to notify federal and                 is known as the South Mainline
                                               state agencies of the timing for the                                                                          Additional Information
                                                                                                       Expansion Project (Project), and would
                                               completion of all necessary reviews, and                increase the design capacity on El Paso’s                In order to receive notification of the
                                               the subsequent need to complete all                     South Mainline system by 321,000                      issuance of the EA and to keep track of
                                               federal authorizations within 90 days of                dekatherms of natural gas per day to                  all formal issuances and submittals in
                                               the date of issuance of the Commission                  Arizona and California delivery points.               specific dockets, the Commission offers
                                               staff’s EA.                                                On May 9, 2018, the Federal Energy                 a free service called eSubscription. This
                                                  Persons who wish to comment only                     Regulatory Commission (Commission or                  can reduce the amount of time you
                                               on the environmental review of this                     FERC) issued its Notice of Application                spend researching proceedings by
                                               project should submit an original and                   for the Project. Among other things, that             automatically providing you with
                                               two copies of their comments to the                     notice alerted agencies issuing federal
                                                                                                                                                             notification of these filings, document
                                               Secretary of the Commission.                            authorizations of the requirement to
                                                                                                                                                             summaries, and direct links to the
                                               Environmental commenters will be                        complete all necessary reviews and to
                                                                                                       reach a final decision on a request for               documents. Go to www.ferc.gov/docs-
                                               placed on the Commission’s                                                                                    filing/esubscription.asp.
                                               environmental mailing list, will receive                a federal authorization within 90 days of
                                                                                                       the date of issuance of the Commission                   Additional information about the
                                               copies of the environmental documents,
                                                                                                       staff’s Environmental Assessment (EA)                 Project is available from the
                                               and will be notified of meetings
                                                                                                       for the Project. This instant notice                  Commission’s Office of External Affairs
                                               associated with the Commission’s
                                                                                                       identifies the FERC staff’s planned                   at (866) 208–FERC or on the FERC
                                               environmental review process.
                                                                                                       schedule for the completion of the EA                 website (www.ferc.gov). Using the
                                               Environmental commenters will not be
                                                                                                       for the Project.                                      ‘‘eLibrary’’ link, select ‘‘General Search’’
                                               required to serve copies of filed
                                               documents on all other parties.                         Schedule for Environmental Review                     from the eLibrary menu, enter the
                                               However, the non-party commenters,                                                                            selected date range and ‘‘Docket
                                                                                                       Issuance of EA—November 14, 2018                      Number’’ excluding the last three digits
                                               will not receive copies of all documents
                                                                                                       90-day Federal Authorization Decision                 (i.e., CP18–332), and follow the
                                               filed by other parties or issued by the                    Deadline—February 12, 2019
                                               Commission (except for the mailing of                                                                         instructions. For assistance with access
                                               environmental documents issued by the                      If a schedule change becomes                       to eLibrary, the helpline can be reached
                                               Commission) and will not have the right                 necessary, additional notice will be                  at (866) 208–3676, TTY (202) 502–8659,
                                               to seek court review of the                             provided so that the relevant agencies                or at FERCOnlineSupport@ferc.gov. The
                                               Commission’s final order.                               are kept informed of the Project’s                    eLibrary link on the FERC website also
                                                                                                       progress.                                             provides access to the texts of formal
                                                  The Commission strongly encourages                                                                         documents issued by the Commission,
                                               electronic filings of comments, protests,               Project Description
                                                                                                                                                             such as orders, notices, and rule
                                               and interventions in lieu of paper using                  EPNG has requested authorization to                 makings.
daltland on DSKBBV9HB2PROD with NOTICES




                                               the ‘‘eFiling’’ link at http://                         construct two new natural gas
                                               www.ferc.gov. Persons unable to file                    compressor stations on its existing                     Dated: August 9, 2018.
                                               electronically should submit an original                South Mainline pipeline system in Luna                Nathaniel J. Davis, Sr.,
                                               and seven copies of the protest or                      County, New Mexico and Cochise                        Deputy Secretary.
                                               intervention to the Federal Energy                      County, Arizona; as well as a 17-mile-                [FR Doc. 2018–17542 Filed 8–14–18; 8:45 am]
                                               Regulatory Commission, 888 First Street                 long, 30-inch-diameter loop line in El                BILLING CODE 6717–01–P
                                               NE, Washington, DC 20426.                               Paso and Hudspeth Counties, Texas.


                                          VerDate Sep<11>2014   18:28 Aug 14, 2018   Jkt 244001   PO 00000   Frm 00009   Fmt 4703   Sfmt 9990   E:\FR\FM\15AUN1.SGM   15AUN1



Document Created: 2018-08-15 01:25:14
Document Modified: 2018-08-15 01:25:14
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 40506 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR