83_FR_40862 83 FR 40703 - Airworthiness Directives; Bombardier, Inc., Airplanes

83 FR 40703 - Airworthiness Directives; Bombardier, Inc., Airplanes

DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration

Federal Register Volume 83, Issue 159 (August 16, 2018)

Page Range40703-40708
FR Document2018-17622

We propose to adopt a new airworthiness directive (AD) for certain Bombardier, Inc., Model BD-700-1A10 and BD-700-1A11 airplanes. This proposed AD was prompted by in-service findings that a cotter pin at the main fitting joint of the nose landing gear (NLG) retraction actuator to the NLG strut showed evidence of shearing after a NLG retraction-extension cycling. This proposed AD would require revising the maintenance or inspection program, as applicable, a general visual inspection for damage of a certain cotter pin present on certain configurations of the NLG strut assembly and for the modification number shown on the identification plate for the NLG strut, and modification of the NLG retraction actuator hardware on any damaged NLG strut assembly. We are proposing this AD to address the unsafe condition on these products.

Federal Register, Volume 83 Issue 159 (Thursday, August 16, 2018)
[Federal Register Volume 83, Number 159 (Thursday, August 16, 2018)]
[Proposed Rules]
[Pages 40703-40708]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-17622]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. FAA-2018-0710; Product Identifier 2018-NM-079-AD]
RIN 2120-AA64


Airworthiness Directives; Bombardier, Inc., Airplanes

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Notice of proposed rulemaking (NPRM).

-----------------------------------------------------------------------

SUMMARY: We propose to adopt a new airworthiness directive (AD) for 
certain Bombardier, Inc., Model BD-700-1A10 and BD-700-1A11 airplanes. 
This proposed AD was prompted by in-service findings that a cotter pin 
at the main fitting joint of the nose landing gear (NLG) retraction 
actuator to the NLG strut showed evidence of shearing after a NLG 
retraction-extension cycling. This proposed AD would require revising 
the maintenance or inspection program, as applicable, a general visual 
inspection for damage of a certain cotter pin present on certain 
configurations of the NLG strut assembly and for the modification 
number shown on the identification plate for the NLG strut, and 
modification of the NLG retraction actuator hardware on any damaged NLG 
strut assembly. We are proposing this AD to address the unsafe 
condition on these products.

DATES: We must receive comments on this proposed AD by October 1, 2018.

ADDRESSES: You may send comments, using the procedures found in 14 CFR 
11.43 and 11.45, by any of the following methods:
     Federal eRulemaking Portal: Go to http://www.regulations.gov. Follow the instructions for submitting comments.
     Fax: 202-493-2251.
     Mail: U.S. Department of Transportation, Docket 
Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New 
Jersey Avenue SE, Washington, DC 20590.
     Hand Delivery: Deliver to Mail address above between 9 
a.m. and 5 p.m., Monday through Friday, except Federal holidays.
    For service information identified in this NPRM, contact 
Bombardier, Inc., 400 C[ocirc]te-Vertu Road West, Dorval, Qu[eacute]bec 
H4S 1Y9, Canada; telephone 514-855-5000; fax 514-855-7401; email 
[email protected]; internet http://www.bombardier.com. You 
may view this service information at the FAA, Transport Standards 
Branch, 2200 South 216th St., Des Moines, WA. For information on the 
availability of this material at the FAA, call 206-231-3195.

Examining the AD Docket

    You may examine the AD docket on the internet at http://www.regulations.gov by searching for and locating Docket No. FAA-2018-
0710; or in person at Docket Operations between 9 a.m. and 5 p.m., 
Monday through Friday, except Federal holidays. The AD docket contains 
this NPRM, the regulatory evaluation, any comments received, and other 
information. The street address for Docket Operations (phone: 800-647-
5527) is in the ADDRESSES section. Comments will be available in the AD 
docket shortly after receipt.

FOR FURTHER INFORMATION CONTACT: Cesar Gomez, Aerospace Engineer, 
Airframe and Mechanical Systems Section, FAA, New York ACO Branch, 1600 
Stewart Avenue, Suite 410, Westbury, NY 11590; telephone 516-228-7318; 
fax 516-794-5531; email [email protected].

SUPPLEMENTARY INFORMATION: 

Comments Invited

    We invite you to send any written relevant data, views, or 
arguments about this proposal. Send your comments to an address listed 
under the ADDRESSES section. Include ``Docket No. FAA-2018-0710; 
Product Identifier 2018-NM-079-AD'' at the beginning of your comments. 
We specifically invite comments on the overall regulatory, economic, 
environmental, and energy aspects of this NPRM. We will consider all 
comments received by the closing date and may amend this NPRM because 
of those comments.
    We will post all comments we receive, without change, to http://www.regulations.gov, including any personal information you provide. We 
will also post a report summarizing each substantive verbal contact we 
receive about this NPRM.

Discussion

    Transport Canada Civil Aviation (TCCA), which is the aviation 
authority for Canada, has issued Canadian AD CF-2018-05, dated January 
23, 2018 (referred to after this as the Mandatory Continuing 
Airworthiness Information, or ``the MCAI''), to correct an unsafe 
condition for certain Bombardier, Inc., Model BD-700-1A10 and BD-700-
1A11 airplanes. The MCAI states:

    There have been in-service findings whereby the cotter pin at 
the retraction actuator to nose landing gear (NLG) strut main 
fitting was observed to be damaged after a NLG retraction-extension 
cycling. This condition could lead to a loss of hardware and result 
in an actuator disconnect resulting in a failure to retract or 
extend, or in an undamped freefall of the NLG [which could adversely 
affect the airplane's continued safe flight and landing].
    This AD mandates a revision to the approved maintenance 
schedule. This AD also mandates a visual inspection of the cotter 
pin for certain configurations of NLG strut assembly, and if found 
damaged, the incorporation of a modification which introduces a new 
castellated nut, spacer, end plate and sleeve to the NLG retraction 
actuator to main fitting joint.


[[Page 40704]]


    The required actions also include a prohibition on accomplishing 
Liebherr-Aerospace Service Bulletin 1285A-32-07 at any revision level 
on the NLG strut assemblies of any Bombardier, Inc., Model BD-700-1A10 
or BD-700-1A11 airplane in order to prevent the installation of the 
affected configuration of the NLG strut assembly. You may examine the 
MCAI in the AD docket on the internet at http://www.regulations.gov by 
searching for and locating Docket No. FAA-2018-0710.

Related Service Information Under 1 CFR Part 51

    Bombardier has issued the following service information, which 
describes procedures for a general visual inspection for damage of the 
cotter pin retaining the bolt that secures the main fitting joint of 
the NLG retraction actuator to the NLG strut and for the modification 
number shown on the identification plate for the NLG strut, and 
modifying the attachment hardware that secures the NLG retraction 
actuator to the NLG strut. These documents are distinct since they 
apply to different airplane models in different configurations.
     Bombardier Service Bulletin 700-1A11-32-022, Revision 2, 
dated November 6, 2017.
     Bombardier Service Bulletin 700-32-035, Revision 2, dated 
November 6, 2017.
     Bombardier Service Bulletin 700-32-5011, Revision 2, dated 
November 6, 2017.
     Bombardier Service Bulletin 700-32-6011, Revision 2, dated 
November 6, 2017.
    Bombardier has issued the following service information, which 
identifies airworthiness limitation tasks for restoration of the main 
fitting joint of the NLG retraction actuator to the NLG strut. These 
documents are distinct since they apply to different airplane models in 
different configurations.
     Task 32-33-01-111 of Bombardier Global 5000 BD-700 Time 
Limits/Maintenance Checks, Revision 19, dated November 13, 2017, for 
Bombardier Model BD-700-1A11 airplanes.
     Task 32-33-01-111 of Bombardier Global 5000 GL 5000 
Featuring Global Vision Flight Deck--Time Limits/Maintenance Checks, 
Revision 9, dated November 13, 2017, for Bombardier Model BD-700-1A11 
airplanes.
     Task 32-33-01-111 of Bombardier Global Express BD-700 Time 
Limits/Maintenance Checks, Revision 28, dated November 13, 2017, for 
Bombardier Model BD-700-1A10 airplanes.
     Task 32-33-01-111 of Bombardier Global Express XRS BD-700 
Time Limits/Maintenance Checks, Revision 15, dated November 13, 2017, 
for Bombardier Model BD-700-1A10 airplanes.
     Task 32-33-01-111 of Bombardier Global 6000 GL 6000 Time 
Limits/Maintenance Checks, Revision 9, dated November 13, 2017, for 
Bombardier Model BD-700-1A10 airplanes.
    This service information is reasonably available because the 
interested parties have access to it through their normal course of 
business or by the means identified in the ADDRESSES section.

FAA's Determination

    This product has been approved by the aviation authority of another 
country, and is approved for operation in the United States. Pursuant 
to our bilateral agreement with the State of Design Authority, we have 
been notified of the unsafe condition described in the MCAI and service 
information referenced above. We are proposing this AD because we 
evaluated all the relevant information and determined the unsafe 
condition described previously is likely to exist or develop on other 
products of the same type design.
    This proposed AD requires revisions to certain operator maintenance 
documents to include new actions (e.g., inspections). Compliance with 
these actions is required by 14 CFR 91.403(c). For airplanes that have 
been previously modified, altered, or repaired in the areas addressed 
by this proposed AD, the operator may not be able to accomplish the 
actions described in the revisions. In this situation, to comply with 
14 CFR 91.403(c), the operator must request approval for an alternative 
method of compliance according to paragraph (l)(1) of this proposed AD. 
The request should include a description of changes to the required 
actions that will ensure the continued damage tolerance of the affected 
structure.

Proposed Requirements of This NPRM

    This proposed AD would require accomplishing the actions specified 
in the service information described previously.

Explanation of Service Bulletin Effectivity

    Where Bombardier Service Bulletin 700-1A11-32-022 erroneously 
specifies ``BD-700-1A10 aircraft'' in paragraph 1.A, ``Effectivity,'' 
the effectivity should be Bombardier, Inc., Model ``BD-700-1A11 
airplanes'' instead.

Costs of Compliance

    We estimate that this proposed AD affects 60 airplanes of U.S. 
registry. We estimate the following costs to comply with this proposed 
AD:

                                                 Estimated Costs
----------------------------------------------------------------------------------------------------------------
                                                                                    Cost per       Cost on U.S.
                          Labor cost                              Parts cost        product         operators
----------------------------------------------------------------------------------------------------------------
4 work-hours x $85 per hour = $340...........................              $0             $340          $20,400
----------------------------------------------------------------------------------------------------------------

    We have determined that revising the maintenance or inspection 
program takes an average of 90 work-hours per operator, although we 
recognize that this number may vary from operator to operator. In the 
past, we have estimated that this action takes 1 work-hour per 
airplane. Since operators incorporate maintenance or inspection program 
changes for their affected fleet(s), we have determined that a per-
operator estimate is more accurate than a per-airplane estimate. 
Therefore, we estimate the total cost per operator to be $7,650 (90 
work-hours x $85 per work-hour).
    We estimate the following costs to do the necessary on-condition 
action that would be required based on the results of any required 
actions. We have no way of determining the number of aircraft that 
might need this on-condition action:

                 Estimated Costs of On-Condition Action
------------------------------------------------------------------------
                                                               Cost per
                   Labor cost                     Parts cost    product
------------------------------------------------------------------------
1 work-hour x $85 per hour = $85................    $10,487     $10,572
------------------------------------------------------------------------

    According to the manufacturer, some or all of the costs of this 
proposed AD may be covered under warranty, thereby reducing the cost 
impact on affected

[[Page 40705]]

individuals. We do not control warranty coverage for affected 
individuals. As a result, we have included all known costs in our cost 
estimate.

Authority for This Rulemaking

    Title 49 of the United States Code specifies the FAA's authority to 
issue rules on aviation safety. Subtitle I, section 106, describes the 
authority of the FAA Administrator. Subtitle VII: Aviation Programs, 
describes in more detail the scope of the Agency's authority.
    We are issuing this rulemaking under the authority described in 
Subtitle VII, Part A, Subpart III, Section 44701: ``General 
requirements.'' Under that section, Congress charges the FAA with 
promoting safe flight of civil aircraft in air commerce by prescribing 
regulations for practices, methods, and procedures the Administrator 
finds necessary for safety in air commerce. This regulation is within 
the scope of that authority because it addresses an unsafe condition 
that is likely to exist or develop on products identified in this 
rulemaking action.
    This proposed AD is issued in accordance with authority delegated 
by the Executive Director, Aircraft Certification Service, as 
authorized by FAA Order 8000.51C. In accordance with that order, 
issuance of ADs is normally a function of the Compliance and 
Airworthiness Division, but during this transition period, the 
Executive Director has delegated the authority to issue ADs applicable 
to transport category airplanes to the Director of the System Oversight 
Division.

Regulatory Findings

    We determined that this proposed AD would not have federalism 
implications under Executive Order 13132. This proposed AD would not 
have a substantial direct effect on the States, on the relationship 
between the national Government and the States, or on the distribution 
of power and responsibilities among the various levels of government.
    For the reasons discussed above, I certify this proposed 
regulation:
    1. Is not a ``significant regulatory action'' under Executive Order 
12866;
    2. Is not a ``significant rule'' under the DOT Regulatory Policies 
and Procedures (44 FR 11034, February 26, 1979);
    3. Will not affect intrastate aviation in Alaska; and
    4. Will not have a significant economic impact, positive or 
negative, on a substantial number of small entities under the criteria 
of the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

The Proposed Amendment

    Accordingly, under the authority delegated to me by the 
Administrator, the FAA proposes to amend 14 CFR part 39 as follows:

PART 39--AIRWORTHINESS DIRECTIVES

0
1. The authority citation for part 39 continues to read as follows:

    Authority:  49 U.S.C. 106(g), 40113, 44701.


Sec.  39.13  [Amended]

0
2. The FAA amends Sec.  39.13 by adding the following new airworthiness 
directive (AD):

Bombardier, Inc.: Docket No. FAA-2018-0710; Product Identifier 2018-
NM-079-AD.

(a) Comments Due Date

    We must receive comments by October 1, 2018.

(b) Affected ADs

    None.

(c) Applicability

    This AD applies to Bombardier, Inc., Model BD-700-1A10 and BD-
700-1A11 airplanes, certificated in any category, serial numbers 
9002 through 9638 inclusive and 9998.

(d) Subject

    Air Transport Association (ATA) of America Code 32, Landing 
gear.

(e) Reason

    This AD was prompted by in-service findings that a cotter pin at 
the main fitting joint of the nose landing gear (NLG) retraction 
actuator to the NLG strut showed evidence of shearing after a NLG 
retraction-extension cycling. We are issuing this AD to address this 
condition which could lead to a loss of hardware and result in an 
actuator disconnect and the NLG failing to retract or extend, or in 
an undamped freefall, which could adversely affect the airplane's 
continued safe flight and landing.

(f) Compliance

    Comply with this AD within the compliance times specified, 
unless already done.

(g) Maintenance or Inspection Program Revision

    Within 30 days after the effective date of this AD: Revise the 
maintenance or inspection program, as applicable, to incorporate the 
information specified in Airworthiness Limitation (AWL) Task 32-33-
01-111, ``Restoration of the Nose Landing Gear Shock-Strut Assembly 
to Retraction-Actuator Main-Fitting Joint,'' as specified in the 
applicable time limits/maintenance checks (TLMC) manual identified 
in figure 1 to paragraph (g) of this AD, as applicable. The initial 
compliance time for doing the task is at the time specified in the 
applicable TLMC manual listed in figure 1 to paragraph (g) of this 
AD, or within 30 days after the effective date of this AD, whichever 
occurs later.
BILLING CODE 4910-13-P

[[Page 40706]]

[GRAPHIC] [TIFF OMITTED] TP16AU18.000

(h) Inspection and Modification

    (1) Except for airplanes identified in paragraph (h)(2) of this 
AD: Within 6 months from the effective date of this AD, perform a 
general visual inspection for damage of the cotter pin retaining the 
bolt that secures the NLG retraction actuator to the NLG strut, and 
a general visual inspection of the modification number shown on the 
identification plate for the NLG strut, and, if applicable, mark the 
correct modification number on the identification plate of the NLG 
strut, in accordance with the applicable Bombardier service 
information as shown in figure 2 to paragraph (h) of this AD. If 
damage to the cotter pin is present: Before further flight, perform 
the modification of the NLG attachment joint in accordance with the 
Accomplishment Instructions of the applicable Bombardier service 
information as shown in figure 2 to paragraph (h) of this AD.
    (2) The actions specified in paragraph (h)(1) of this AD are not 
required for airplanes that do not have the NLG configuration 
specified in Paragraph 1.A, ``Effectivity'' of the applicable 
Bombardier service information as shown in figure 2 to paragraph (h) 
of this AD.

[[Page 40707]]

[GRAPHIC] [TIFF OMITTED] TP16AU18.001

(i) No Alternative Actions or Intervals

    After the maintenance or inspection program has been revised as 
required by paragraph (g) of this AD, no alternative actions (e.g., 
inspections) or intervals, may be used unless the actions or 
intervals are approved as an alternative method of compliance (AMOC) 
in accordance with the procedures specified in paragraph (l)(1) of 
this AD.

(j) Credit for Previous Actions

    (1) This paragraph provides credit for actions required by 
paragraph (g) of this AD, if those actions were performed before the 
effective date of this AD using the service information specified in 
figure 3 to paragraph (j)(1) of this AD.
[GRAPHIC] [TIFF OMITTED] TP16AU18.002

BILLING CODE 4910-13-C
    (2) This paragraph provides credit for actions required by 
paragraph (h)(1) of this AD, if those actions were performed before 
the effective date of this AD using the service information 
specified in paragraphs (j)(2)(i) through (j)(2)(viii) of this AD, 
provided that it can be confirmed that at least 25 NLG extension-
retraction cycles had been completed on the NLG at the time of 
completion of the Accomplishment Instructions of the applicable 
service information specified in paragraphs (j)(2)(i) through 
(j)(2)(viii) of this AD; and provided neither the NLG nor the NLG 
retract actuator has been replaced or modified since the completion 
of the Accomplishment Instructions of the applicable service 
information specified in paragraphs (j)(2)(i) through (j)(2)(viii) 
of this AD.
    (i) Bombardier Service Bulletin 700-1A11-32-022, dated May 13, 
2015.
    (ii) Bombardier Service Bulletin 700-1A11-32-022, Revision 1, 
dated August 26, 2015.
    (iii) Bombardier Service Bulletin 700-32-035, dated May 13, 
2015.
    (iv) Bombardier Service Bulletin 700-32-035, Revision 1, dated 
August 26, 2015.
    (v) Bombardier Service Bulletin 700-32-5011, dated May 13, 2015.
    (vi) Bombardier Service Bulletin 700-32-5011, Revision 1, dated 
August 26, 2015.
    (vii) Bombardier Service Bulletin 700-32-6011, dated May 13, 
2015.
    (viii) Bombardier Service Bulletin 700-32-6011, Revision 1, 
dated August 26, 2015.

(k) Service Information Prohibition

    As of the effective date of this AD, no person may incorporate 
Liebherr-Aerospace Service Bulletin 1285A-32-07 at any revision 
level on the NLG strut assemblies of any Bombardier, Inc., Model BD-
700-1A10 or BD-700-1A11 airplane.

(l) Other FAA AD Provisions

    The following provisions also apply to this AD:
    (1) Alternative Methods of Compliance (AMOCs): The Manager, New 
York ACO Branch, FAA, has the authority to approve AMOCs for this 
AD, if requested using the procedures found in 14 CFR 39.19. In 
accordance with 14 CFR 39.19, send your request to your principal 
inspector or local Flight Standards District Office, as

[[Page 40708]]

appropriate. If sending information directly to the manager of the 
certification office, send it to ATTN: Program Manager, Continuing 
Operational Safety, FAA, New York ACO Branch, 1600 Stewart Avenue, 
Suite 410, Westbury, NY 11590; telephone 516-228-7300; fax 516-794-
5531. Before using any approved AMOC, notify your appropriate 
principal inspector, or lacking a principal inspector, the manager 
of the local flight standards district office/certificate holding 
district office.
    (2) Contacting the Manufacturer: For any requirement in this AD 
to obtain corrective actions from a manufacturer, the action must be 
accomplished using a method approved by the Manager, New York ACO 
Branch, FAA; or Transport Canada Civil Aviation (TCCA); or 
Bombardier, Inc.'s TCCA Design Approval Organization (DAO). If 
approved by the DAO, the approval must include the DAO-authorized 
signature.

(m) Related Information

    (1) Refer to Mandatory Continuing Airworthiness Information 
(MCAI) Canadian AD CF-2018-05, dated January 23, 2018, for related 
information. This MCAI may be found in the AD docket on the internet 
at http://www.regulations.gov by searching for and locating Docket 
No. FAA-2018-0710.
    (2) For more information about this AD, contact Cesar Gomez, 
Aerospace Engineer, Airframe and Mechanical Systems Section, FAA, 
New York ACO Branch, 1600 Stewart Avenue, Suite 410, Westbury, NY 
11590; telephone 516-228-7318; fax 516-794-5531; email [email protected].
    (3) For service information identified in this AD, contact 
Bombardier, Inc., 400 C[ocirc]te-Vertu Road West, Dorval, 
Qu[eacute]bec H4S 1Y9, Canada; telephone 514-855-5000; fax 514-855-
7401; email [email protected]; internet http://www.bombardier.com. You may view this service information at the 
FAA, Transport Standards Branch, 2200 South 216th St., Des Moines, 
WA. For information on the availability of this material at the FAA, 
call 206-231-3195.

    Issued in Des Moines, Washington, on August 7, 2018.
Michael Kaszycki,
Acting Director, System Oversight Division, Aircraft Certification 
Service.
[FR Doc. 2018-17622 Filed 8-15-18; 8:45 am]
 BILLING CODE 4910-13-P



                                                                        Federal Register / Vol. 83, No. 159 / Thursday, August 16, 2018 / Proposed Rules                                             40703

                                                  Reorganization Act of 1974, secs. 201, 202,                   Notice of proposed rulemaking
                                                                                                          ACTION:                                               street address for Docket Operations
                                                  206, 211 (42 U.S.C. 5841, 5842, 5846, 5851);            (NPRM).                                               (phone: 800–647–5527) is in the
                                                  Nuclear Waste Policy Act of 1982, sec. 306                                                                    ADDRESSES section. Comments will be
                                                  (42 U.S.C. 10226); National Environmental               SUMMARY:   We propose to adopt a new
                                                  Policy Act of 1969 (42 U.S.C. 4332); 44 U.S.C.
                                                                                                                                                                available in the AD docket shortly after
                                                                                                          airworthiness directive (AD) for certain              receipt.
                                                  3504 note; Sec. 109, Pub. L. 96–295, 94 Stat.           Bombardier, Inc., Model BD–700–1A10
                                                  783.                                                                                                          FOR FURTHER INFORMATION CONTACT:
                                                                                                          and BD–700–1A11 airplanes. This
                                                  ■ 2. In § 50.55a:                                       proposed AD was prompted by in-                       Cesar Gomez, Aerospace Engineer,
                                                  ■ a. Remove and reserve paragraphs                      service findings that a cotter pin at the             Airframe and Mechanical Systems
                                                  (a)(1)(iii)(E) and (G);                                 main fitting joint of the nose landing                Section, FAA, New York ACO Branch,
                                                  ■ b. Revise paragraph (a)(3) introductory               gear (NLG) retraction actuator to the                 1600 Stewart Avenue, Suite 410,
                                                  text;                                                   NLG strut showed evidence of shearing                 Westbury, NY 11590; telephone 516–
                                                  ■ c. In paragraph (a)(3)(i), remove the                 after a NLG retraction-extension cycling.             228–7318; fax 516–794–5531; email 9-
                                                  phrase ‘‘Revision 37’’ and add in its                   This proposed AD would require                        avs-nyaco-cos@faa.gov.
                                                  place the phrase ‘‘Revision 38’’;                       revising the maintenance or inspection                SUPPLEMENTARY INFORMATION:
                                                  ■ d. In paragraph (a)(3)(ii), remove the
                                                                                                          program, as applicable, a general visual
                                                  phrase ‘‘Revision 18’’ and add in its                   inspection for damage of a certain cotter             Comments Invited
                                                  place the phrase ‘‘Revision 19’’;                       pin present on certain configurations of
                                                  ■ e. In paragraph (a)(3)(iii), remove the
                                                                                                                                                                  We invite you to send any written
                                                                                                          the NLG strut assembly and for the                    relevant data, views, or arguments about
                                                  phrase ‘‘Revision 2’’ and add in its place
                                                                                                          modification number shown on the                      this proposal. Send your comments to
                                                  the phrase ‘‘Revision 3’’;
                                                                                                          identification plate for the NLG strut,               an address listed under the ADDRESSES
                                                  ■ f. Remove paragraph (b)(2)(xxxvii);
                                                                                                          and modification of the NLG retraction                section. Include ‘‘Docket No. FAA–
                                                  and
                                                  ■ g. Remove and reserve paragraph
                                                                                                          actuator hardware on any damaged NLG                  2018–0710; Product Identifier 2018–
                                                  (b)(3)(x).                                              strut assembly. We are proposing this                 NM–079–AD’’ at the beginning of your
                                                     The revision reads as follows:                       AD to address the unsafe condition on                 comments. We specifically invite
                                                                                                          these products.                                       comments on the overall regulatory,
                                                  § 50.55a   Codes and standards.                         DATES: We must receive comments on                    economic, environmental, and energy
                                                     (3) U.S. Nuclear Regulatory                          this proposed AD by October 1, 2018.                  aspects of this NPRM. We will consider
                                                  Commission (NRC) Public Document                        ADDRESSES: You may send comments,                     all comments received by the closing
                                                  Room, 11555 Rockville Pike, Rockville,                  using the procedures found in 14 CFR                  date and may amend this NPRM
                                                  Maryland 20852; telephone: 1–800–                       11.43 and 11.45, by any of the following              because of those comments.
                                                  397–4209; email: pdr.resource@nrc.gov;                  methods:                                                 We will post all comments we
                                                  http://www.nrc.gov/reading-rm/doc-                         • Federal eRulemaking Portal: Go to                receive, without change, to http://
                                                  collections/reg-guides/. The use of Code                http://www.regulations.gov. Follow the                www.regulations.gov, including any
                                                  Cases listed in the NRC regulatory                      instructions for submitting comments.                 personal information you provide. We
                                                  guides in paragraphs (a)(3)(i) through                     • Fax: 202–493–2251.                               will also post a report summarizing each
                                                  (iii) of this section is acceptable with the               • Mail: U.S. Department of                         substantive verbal contact we receive
                                                  specified conditions in those guides                    Transportation, Docket Operations,                    about this NPRM.
                                                  when implementing the editions and                      M–30, West Building Ground Floor,
                                                  addenda of the ASME BPV Code and                        Room W12–140, 1200 New Jersey                         Discussion
                                                  ASME OM Code incorporated by                            Avenue SE, Washington, DC 20590.                         Transport Canada Civil Aviation
                                                  reference in paragraph (a)(1) of this                      • Hand Delivery: Deliver to Mail                   (TCCA), which is the aviation authority
                                                  section.                                                address above between 9 a.m. and 5                    for Canada, has issued Canadian AD
                                                  *      *      *     *     *                             p.m., Monday through Friday, except                   CF–2018–05, dated January 23, 2018
                                                                                                          Federal holidays.                                     (referred to after this as the Mandatory
                                                    Dated at Rockville, Maryland, this 26th day              For service information identified in
                                                  of July, 2018.                                                                                                Continuing Airworthiness Information,
                                                                                                          this NPRM, contact Bombardier, Inc.,                  or ‘‘the MCAI’’), to correct an unsafe
                                                    For the Nuclear Regulatory Commission.
                                                                                                          400 Côte-Vertu Road West, Dorval,                    condition for certain Bombardier, Inc.,
                                                  Michele G. Evans,                                       Québec H4S 1Y9, Canada; telephone
                                                  Deputy Director, Office of Nuclear Reactor                                                                    Model BD–700–1A10 and BD–700–
                                                                                                          514–855–5000; fax 514–855–7401; email                 1A11 airplanes. The MCAI states:
                                                  Regulation.                                             thd.crj@aero.bombardier.com; internet
                                                  [FR Doc. 2018–17650 Filed 8–15–18; 8:45 am]             http://www.bombardier.com. You may                       There have been in-service findings
                                                  BILLING CODE 7590–01–P                                  view this service information at the                  whereby the cotter pin at the retraction
                                                                                                                                                                actuator to nose landing gear (NLG) strut
                                                                                                          FAA, Transport Standards Branch, 2200                 main fitting was observed to be damaged
                                                                                                          South 216th St., Des Moines, WA. For                  after a NLG retraction-extension cycling. This
                                                  DEPARTMENT OF TRANSPORTATION                            information on the availability of this               condition could lead to a loss of hardware
                                                                                                          material at the FAA, call 206–231–3195.               and result in an actuator disconnect resulting
                                                  Federal Aviation Administration                                                                               in a failure to retract or extend, or in an
                                                                                                          Examining the AD Docket                               undamped freefall of the NLG [which could
                                                  14 CFR Part 39                                            You may examine the AD docket on                    adversely affect the airplane’s continued safe
                                                                                                          the internet at http://                               flight and landing].
sradovich on DSK3GMQ082PROD with PROPOSALS




                                                  [Docket No. FAA–2018–0710; Product
                                                                                                          www.regulations.gov by searching for                     This AD mandates a revision to the
                                                  Identifier 2018–NM–079–AD]
                                                                                                          and locating Docket No. FAA–2018–                     approved maintenance schedule. This AD
                                                  RIN 2120–AA64                                           0710; or in person at Docket Operations               also mandates a visual inspection of the
                                                                                                                                                                cotter pin for certain configurations of NLG
                                                                                                          between 9 a.m. and 5 p.m., Monday                     strut assembly, and if found damaged, the
                                                  Airworthiness Directives; Bombardier,
                                                                                                          through Friday, except Federal holidays.              incorporation of a modification which
                                                  Inc., Airplanes
                                                                                                          The AD docket contains this NPRM, the                 introduces a new castellated nut, spacer, end
                                                  AGENCY:Federal Aviation                                 regulatory evaluation, any comments                   plate and sleeve to the NLG retraction
                                                  Administration (FAA), DOT.                              received, and other information. The                  actuator to main fitting joint.



                                             VerDate Sep<11>2014   16:29 Aug 15, 2018   Jkt 244001   PO 00000   Frm 00019   Fmt 4702   Sfmt 4702   E:\FR\FM\16AUP1.SGM   16AUP1


                                                  40704                     Federal Register / Vol. 83, No. 159 / Thursday, August 16, 2018 / Proposed Rules

                                                    The required actions also include a                            restoration of the main fitting joint of                       AD because we evaluated all the
                                                  prohibition on accomplishing Liebherr-                           the NLG retraction actuator to the NLG                         relevant information and determined
                                                  Aerospace Service Bulletin 1285A–32–                             strut. These documents are distinct                            the unsafe condition described
                                                  07 at any revision level on the NLG strut                        since they apply to different airplane                         previously is likely to exist or develop
                                                  assemblies of any Bombardier, Inc.,                              models in different configurations.                            on other products of the same type
                                                  Model BD–700–1A10 or BD–700–1A11                                    • Task 32–33–01–111 of Bombardier                           design.
                                                  airplane in order to prevent the                                 Global 5000 BD–700 Time Limits/                                   This proposed AD requires revisions
                                                  installation of the affected configuration                       Maintenance Checks, Revision 19, dated                         to certain operator maintenance
                                                  of the NLG strut assembly. You may                               November 13, 2017, for Bombardier                              documents to include new actions (e.g.,
                                                  examine the MCAI in the AD docket on                             Model BD–700–1A11 airplanes.                                   inspections). Compliance with these
                                                  the internet at http://                                             • Task 32–33–01–111 of Bombardier                           actions is required by 14 CFR 91.403(c).
                                                  www.regulations.gov by searching for                             Global 5000 GL 5000 Featuring Global                           For airplanes that have been previously
                                                  and locating Docket No. FAA–2018–                                Vision Flight Deck—Time Limits/                                modified, altered, or repaired in the
                                                  0710.                                                            Maintenance Checks, Revision 9, dated                          areas addressed by this proposed AD,
                                                                                                                   November 13, 2017, for Bombardier                              the operator may not be able to
                                                  Related Service Information Under 1                              Model BD–700–1A11 airplanes.                                   accomplish the actions described in the
                                                  CFR Part 51                                                         • Task 32–33–01–111 of Bombardier
                                                                                                                                                                                  revisions. In this situation, to comply
                                                     Bombardier has issued the following                           Global Express BD–700 Time Limits/
                                                                                                                                                                                  with 14 CFR 91.403(c), the operator
                                                  service information, which describes                             Maintenance Checks, Revision 28, dated
                                                                                                                                                                                  must request approval for an alternative
                                                  procedures for a general visual                                  November 13, 2017, for Bombardier
                                                                                                                                                                                  method of compliance according to
                                                  inspection for damage of the cotter pin                          Model BD–700–1A10 airplanes.
                                                                                                                      • Task 32–33–01–111 of Bombardier                           paragraph (l)(1) of this proposed AD.
                                                  retaining the bolt that secures the main                                                                                        The request should include a
                                                  fitting joint of the NLG retraction                              Global Express XRS BD–700 Time
                                                                                                                   Limits/Maintenance Checks, Revision                            description of changes to the required
                                                  actuator to the NLG strut and for the                                                                                           actions that will ensure the continued
                                                  modification number shown on the                                 15, dated November 13, 2017, for
                                                                                                                   Bombardier Model BD–700–1A10                                   damage tolerance of the affected
                                                  identification plate for the NLG strut,                                                                                         structure.
                                                                                                                   airplanes.
                                                  and modifying the attachment hardware
                                                                                                                      • Task 32–33–01–111 of Bombardier                           Proposed Requirements of This NPRM
                                                  that secures the NLG retraction actuator                         Global 6000 GL 6000 Time Limits/
                                                  to the NLG strut. These documents are                            Maintenance Checks, Revision 9, dated                            This proposed AD would require
                                                  distinct since they apply to different                           November 13, 2017, for Bombardier                              accomplishing the actions specified in
                                                  airplane models in different                                     Model BD–700–1A10 airplanes.                                   the service information described
                                                  configurations.                                                     This service information is reasonably                      previously.
                                                     • Bombardier Service Bulletin 700–                            available because the interested parties
                                                  1A11–32–022, Revision 2, dated                                                                                                  Explanation of Service Bulletin
                                                                                                                   have access to it through their normal                         Effectivity
                                                  November 6, 2017.                                                course of business or by the means
                                                     • Bombardier Service Bulletin 700–                            identified in the ADDRESSES section.                              Where Bombardier Service Bulletin
                                                  32–035, Revision 2, dated November 6,                                                                                           700–1A11–32–022 erroneously specifies
                                                  2017.                                                            FAA’s Determination                                            ‘‘BD–700–1A10 aircraft’’ in paragraph
                                                     • Bombardier Service Bulletin 700–                              This product has been approved by                            1.A, ‘‘Effectivity,’’ the effectivity should
                                                  32–5011, Revision 2, dated November 6,                           the aviation authority of another                              be Bombardier, Inc., Model ‘‘BD–700–
                                                  2017.                                                            country, and is approved for operation                         1A11 airplanes’’ instead.
                                                     • Bombardier Service Bulletin 700–                            in the United States. Pursuant to our
                                                                                                                                                                                  Costs of Compliance
                                                  32–6011, Revision 2, dated November 6,                           bilateral agreement with the State of
                                                  2017.                                                            Design Authority, we have been notified                           We estimate that this proposed AD
                                                     Bombardier has issued the following                           of the unsafe condition described in the                       affects 60 airplanes of U.S. registry. We
                                                  service information, which identifies                            MCAI and service information                                   estimate the following costs to comply
                                                  airworthiness limitation tasks for                               referenced above. We are proposing this                        with this proposed AD:

                                                                                                                                    ESTIMATED COSTS
                                                                                                                                                                                                      Cost per           Cost on U.S.
                                                                                                         Labor cost                                                               Parts cost          product             operators

                                                  4 work-hours × $85 per hour = $340 ..........................................................................................      $0                $340                $20,400



                                                    We have determined that revising the                           airplane estimate. Therefore, we                                ESTIMATED COSTS OF ON-CONDITION
                                                  maintenance or inspection program                                estimate the total cost per operator to be                                  ACTION
                                                  takes an average of 90 work-hours per                            $7,650 (90 work-hours × $85 per work-
                                                  operator, although we recognize that                             hour).                                                                Labor cost              Parts       Cost per
sradovich on DSK3GMQ082PROD with PROPOSALS




                                                  this number may vary from operator to                                                                                                                          cost        product
                                                                                                                     We estimate the following costs to do
                                                  operator. In the past, we have estimated                         the necessary on-condition action that                         1 work-hour × $85
                                                  that this action takes 1 work-hour per                           would be required based on the results                           per hour = $85 ......     $10,487        $10,572
                                                  airplane. Since operators incorporate                            of any required actions. We have no way
                                                  maintenance or inspection program                                of determining the number of aircraft                            According to the manufacturer, some
                                                  changes for their affected fleet(s), we                          that might need this on-condition                              or all of the costs of this proposed AD
                                                  have determined that a per-operator                              action:                                                        may be covered under warranty, thereby
                                                  estimate is more accurate than a per-                                                                                           reducing the cost impact on affected


                                             VerDate Sep<11>2014      16:29 Aug 15, 2018      Jkt 244001    PO 00000      Frm 00020     Fmt 4702     Sfmt 4702     E:\FR\FM\16AUP1.SGM    16AUP1


                                                                        Federal Register / Vol. 83, No. 159 / Thursday, August 16, 2018 / Proposed Rules                                               40705

                                                  individuals. We do not control warranty                 the relationship between the national                 (b) Affected ADs
                                                  coverage for affected individuals. As a                 Government and the States, or on the                    None.
                                                  result, we have included all known                      distribution of power and
                                                                                                                                                                (c) Applicability
                                                  costs in our cost estimate.                             responsibilities among the various
                                                                                                          levels of government.                                   This AD applies to Bombardier, Inc.,
                                                  Authority for This Rulemaking                                                                                 Model BD–700–1A10 and BD–700–1A11
                                                                                                            For the reasons discussed above, I
                                                     Title 49 of the United States Code                                                                         airplanes, certificated in any category, serial
                                                                                                          certify this proposed regulation:
                                                  specifies the FAA’s authority to issue                                                                        numbers 9002 through 9638 inclusive and
                                                                                                            1. Is not a ‘‘significant regulatory                9998.
                                                  rules on aviation safety. Subtitle I,                   action’’ under Executive Order 12866;
                                                  section 106, describes the authority of                   2. Is not a ‘‘significant rule’’ under the          (d) Subject
                                                  the FAA Administrator. Subtitle VII:                    DOT Regulatory Policies and Procedures                 Air Transport Association (ATA) of
                                                  Aviation Programs, describes in more                    (44 FR 11034, February 26, 1979);                     America Code 32, Landing gear.
                                                  detail the scope of the Agency’s                          3. Will not affect intrastate aviation in
                                                  authority.                                                                                                    (e) Reason
                                                                                                          Alaska; and
                                                     We are issuing this rulemaking under                   4. Will not have a significant                         This AD was prompted by in-service
                                                  the authority described in Subtitle VII,                                                                      findings that a cotter pin at the main fitting
                                                                                                          economic impact, positive or negative,                joint of the nose landing gear (NLG)
                                                  Part A, Subpart III, Section 44701:                     on a substantial number of small entities
                                                  ‘‘General requirements.’’ Under that                                                                          retraction actuator to the NLG strut showed
                                                                                                          under the criteria of the Regulatory                  evidence of shearing after a NLG retraction-
                                                  section, Congress charges the FAA with
                                                                                                          Flexibility Act.                                      extension cycling. We are issuing this AD to
                                                  promoting safe flight of civil aircraft in
                                                                                                                                                                address this condition which could lead to a
                                                  air commerce by prescribing regulations                 List of Subjects in 14 CFR Part 39                    loss of hardware and result in an actuator
                                                  for practices, methods, and procedures                    Air transportation, Aircraft, Aviation              disconnect and the NLG failing to retract or
                                                  the Administrator finds necessary for                   safety, Incorporation by reference,                   extend, or in an undamped freefall, which
                                                  safety in air commerce. This regulation                 Safety.                                               could adversely affect the airplane’s
                                                  is within the scope of that authority                                                                         continued safe flight and landing.
                                                  because it addresses an unsafe condition                The Proposed Amendment
                                                                                                                                                                (f) Compliance
                                                  that is likely to exist or develop on                     Accordingly, under the authority
                                                  products identified in this rulemaking                                                                          Comply with this AD within the
                                                                                                          delegated to me by the Administrator,                 compliance times specified, unless already
                                                  action.                                                 the FAA proposes to amend 14 CFR part
                                                     This proposed AD is issued in                                                                              done.
                                                                                                          39 as follows:
                                                  accordance with authority delegated by                                                                        (g) Maintenance or Inspection Program
                                                  the Executive Director, Aircraft                        PART 39—AIRWORTHINESS                                 Revision
                                                  Certification Service, as authorized by                 DIRECTIVES                                               Within 30 days after the effective date of
                                                  FAA Order 8000.51C. In accordance                                                                             this AD: Revise the maintenance or
                                                  with that order, issuance of ADs is                     ■ 1. The authority citation for part 39               inspection program, as applicable, to
                                                  normally a function of the Compliance                   continues to read as follows:                         incorporate the information specified in
                                                  and Airworthiness Division, but during                                                                        Airworthiness Limitation (AWL) Task 32–
                                                                                                              Authority: 49 U.S.C. 106(g), 40113, 44701.        33–01–111, ‘‘Restoration of the Nose Landing
                                                  this transition period, the Executive
                                                  Director has delegated the authority to                 § 39.13   [Amended]                                   Gear Shock-Strut Assembly to Retraction-
                                                                                                                                                                Actuator Main-Fitting Joint,’’ as specified in
                                                  issue ADs applicable to transport                       ■ 2. The FAA amends § 39.13 by adding                 the applicable time limits/maintenance
                                                  category airplanes to the Director of the               the following new airworthiness                       checks (TLMC) manual identified in figure 1
                                                  System Oversight Division.                              directive (AD):                                       to paragraph (g) of this AD, as applicable.
                                                  Regulatory Findings                                     Bombardier, Inc.: Docket No. FAA–2018–                The initial compliance time for doing the
                                                                                                             0710; Product Identifier 2018–NM–079–              task is at the time specified in the applicable
                                                    We determined that this proposed AD                                                                         TLMC manual listed in figure 1 to paragraph
                                                                                                             AD.
                                                  would not have federalism implications                                                                        (g) of this AD, or within 30 days after the
                                                  under Executive Order 13132. This                       (a) Comments Due Date                                 effective date of this AD, whichever occurs
                                                  proposed AD would not have a                              We must receive comments by October 1,              later.
                                                  substantial direct effect on the States, on             2018.                                                 BILLING CODE 4910–13–P
sradovich on DSK3GMQ082PROD with PROPOSALS




                                             VerDate Sep<11>2014   16:29 Aug 15, 2018   Jkt 244001   PO 00000   Frm 00021   Fmt 4702   Sfmt 4702   E:\FR\FM\16AUP1.SGM   16AUP1


                                                  40706                 Federal Register / Vol. 83, No. 159 / Thursday, August 16, 2018 / Proposed Rules




                                                  (h) Inspection and Modification                         identification plate for the NLG strut, and, if       applicable Bombardier service information as
                                                     (1) Except for airplanes identified in               applicable, mark the correct modification             shown in figure 2 to paragraph (h) of this AD.
                                                                                                          number on the identification plate of the                (2) The actions specified in paragraph
                                                  paragraph (h)(2) of this AD: Within 6 months
                                                                                                          NLG strut, in accordance with the applicable          (h)(1) of this AD are not required for
                                                  from the effective date of this AD, perform a           Bombardier service information as shown in
                                                  general visual inspection for damage of the                                                                   airplanes that do not have the NLG
                                                                                                          figure 2 to paragraph (h) of this AD. If
                                                  cotter pin retaining the bolt that secures the          damage to the cotter pin is present: Before           configuration specified in Paragraph 1.A,
                                                  NLG retraction actuator to the NLG strut, and           further flight, perform the modification of the       ‘‘Effectivity’’ of the applicable Bombardier
                                                  a general visual inspection of the                      NLG attachment joint in accordance with the           service information as shown in figure 2 to
                                                  modification number shown on the                        Accomplishment Instructions of the                    paragraph (h) of this AD.
sradovich on DSK3GMQ082PROD with PROPOSALS




                                                                                                                                                                                                                 EP16AU18.000</GPH>




                                             VerDate Sep<11>2014   16:29 Aug 15, 2018   Jkt 244001   PO 00000   Frm 00022   Fmt 4702   Sfmt 4702   E:\FR\FM\16AUP1.SGM   16AUP1


                                                                        Federal Register / Vol. 83, No. 159 / Thursday, August 16, 2018 / Proposed Rules                                              40707




                                                  (i) No Alternative Actions or Intervals                 compliance (AMOC) in accordance with the              if those actions were performed before the
                                                     After the maintenance or inspection                  procedures specified in paragraph (l)(1) of           effective date of this AD using the service
                                                  program has been revised as required by                 this AD.                                              information specified in figure 3 to paragraph
                                                  paragraph (g) of this AD, no alternative                                                                      (j)(1) of this AD.
                                                                                                          (j) Credit for Previous Actions
                                                  actions (e.g., inspections) or intervals, may be
                                                  used unless the actions or intervals are                  (1) This paragraph provides credit for
                                                  approved as an alternative method of                    actions required by paragraph (g) of this AD,




                                                  BILLING CODE 4910–13–C                                    (i) Bombardier Service Bulletin 700–1A11–           (k) Service Information Prohibition
                                                     (2) This paragraph provides credit for               32–022, dated May 13, 2015.                             As of the effective date of this AD, no
                                                  actions required by paragraph (h)(1) of this              (ii) Bombardier Service Bulletin 700–               person may incorporate Liebherr-Aerospace
                                                  AD, if those actions were performed before              1A11–32–022, Revision 1, dated August 26,
                                                  the effective date of this AD using the service                                                               Service Bulletin 1285A–32–07 at any
                                                  information specified in paragraphs (j)(2)(i)           2015.                                                 revision level on the NLG strut assemblies of
                                                  through (j)(2)(viii) of this AD, provided that            (iii) Bombardier Service Bulletin 700–32–           any Bombardier, Inc., Model BD–700–1A10
                                                  it can be confirmed that at least 25 NLG                035, dated May 13, 2015.                              or BD–700–1A11 airplane.
                                                  extension-retraction cycles had been                      (iv) Bombardier Service Bulletin 700–32–            (l) Other FAA AD Provisions
                                                  completed on the NLG at the time of                     035, Revision 1, dated August 26, 2015.
                                                  completion of the Accomplishment                                                                                The following provisions also apply to this
sradovich on DSK3GMQ082PROD with PROPOSALS




                                                                                                            (v) Bombardier Service Bulletin 700–32–
                                                  Instructions of the applicable service                                                                        AD:
                                                                                                          5011, dated May 13, 2015.
                                                  information specified in paragraphs (j)(2)(i)                                                                   (1) Alternative Methods of Compliance
                                                                                                            (vi) Bombardier Service Bulletin 700–32–
                                                  through (j)(2)(viii) of this AD; and provided                                                                 (AMOCs): The Manager, New York ACO
                                                                                                          5011, Revision 1, dated August 26, 2015.
                                                                                                                                                                                                                 EP16AU18.002</GPH>




                                                  neither the NLG nor the NLG retract actuator                                                                  Branch, FAA, has the authority to approve
                                                  has been replaced or modified since the                   (vii) Bombardier Service Bulletin 700–32–           AMOCs for this AD, if requested using the
                                                  completion of the Accomplishment                        6011, dated May 13, 2015.                             procedures found in 14 CFR 39.19. In
                                                  Instructions of the applicable service                    (viii) Bombardier Service Bulletin 700–32–          accordance with 14 CFR 39.19, send your
                                                  information specified in paragraphs (j)(2)(i)           6011, Revision 1, dated August 26, 2015.              request to your principal inspector or local
                                                                                                                                                                                                                 EP16AU18.001</GPH>




                                                  through (j)(2)(viii) of this AD.                                                                              Flight Standards District Office, as



                                             VerDate Sep<11>2014   16:29 Aug 15, 2018   Jkt 244001   PO 00000   Frm 00023   Fmt 4702   Sfmt 4702   E:\FR\FM\16AUP1.SGM   16AUP1


                                                  40708                 Federal Register / Vol. 83, No. 159 / Thursday, August 16, 2018 / Proposed Rules

                                                  appropriate. If sending information directly                  Notice of proposed rulemaking
                                                                                                          ACTION:                                               ADDRESSES section. Comments will be
                                                  to the manager of the certification office,             (NPRM).                                               available in the AD docket shortly after
                                                  send it to ATTN: Program Manager,                                                                             receipt.
                                                  Continuing Operational Safety, FAA, New                 SUMMARY:   We propose to adopt a new                  FOR FURTHER INFORMATION CONTACT:
                                                  York ACO Branch, 1600 Stewart Avenue,                   airworthiness directive (AD) for certain
                                                  Suite 410, Westbury, NY 11590; telephone                                                                      Kathleen Arrigotti, Aerospace Engineer,
                                                                                                          Airbus SAS Model A350–941 airplanes.                  International Section, Transport
                                                  516–228–7300; fax 516–794–5531. Before
                                                                                                          This proposed AD was prompted by a                    Standards Branch, FAA, 2200 South
                                                  using any approved AMOC, notify your
                                                  appropriate principal inspector, or lacking a           review of the Airbus A350 structure                   216th St., Des Moines, WA 98198;
                                                  principal inspector, the manager of the local           design principles database for type                   telephone and fax 206–231–3218.
                                                  flight standards district office/certificate            definition that revealed that the
                                                                                                                                                                SUPPLEMENTARY INFORMATION:
                                                  holding district office.                                balancer fitting part, installed on the tail
                                                     (2) Contacting the Manufacturer: For any             cone, on a certain frame (FR) has several             Comments Invited
                                                  requirement in this AD to obtain corrective             corrosion-resistant stainless steel nuts                We invite you to send any written
                                                  actions from a manufacturer, the action must            that do not meet the requirements for
                                                  be accomplished using a method approved                                                                       relevant data, views, or arguments about
                                                                                                          protection against corrosion. This                    this proposal. Send your comments to
                                                  by the Manager, New York ACO Branch,
                                                                                                          proposed AD would require application                 an address listed under the ADDRESSES
                                                  FAA; or Transport Canada Civil Aviation
                                                  (TCCA); or Bombardier, Inc.’s TCCA Design               of a new additional overcoat sealant and              section. Include ‘‘Docket No. FAA–
                                                  Approval Organization (DAO). If approved by             elastic varnish on the affected nuts and              2018–0758; Product Identifier 2018–
                                                  the DAO, the approval must include the                  fasteners. We are proposing this AD to                NM–093–AD’’ at the beginning of your
                                                  DAO-authorized signature.                               address the unsafe condition on these                 comments. We specifically invite
                                                                                                          products.                                             comments on the overall regulatory,
                                                  (m) Related Information
                                                     (1) Refer to Mandatory Continuing                    DATES:  We must receive comments on                   economic, environmental, and energy
                                                  Airworthiness Information (MCAI) Canadian               this proposed AD by October 1, 2018.                  aspects of this NPRM. We will consider
                                                  AD CF–2018–05, dated January 23, 2018, for              ADDRESSES: You may send comments,                     all comments received by the closing
                                                  related information. This MCAI may be                   using the procedures found in 14 CFR                  date and may amend this NPRM
                                                  found in the AD docket on the internet at               11.43 and 11.45, by any of the following              because of those comments.
                                                  http://www.regulations.gov by searching for             methods:                                                 We will post all comments we
                                                  and locating Docket No. FAA–2018–0710.                                                                        receive, without change, to http://
                                                     (2) For more information about this AD,
                                                                                                            • Federal eRulemaking Portal: Go to
                                                                                                          http://www.regulations.gov. Follow the                www.regulations.gov, including any
                                                  contact Cesar Gomez, Aerospace Engineer,                                                                      personal information you provide. We
                                                  Airframe and Mechanical Systems Section,                instructions for submitting comments.
                                                  FAA, New York ACO Branch, 1600 Stewart                    • Fax: 202–493–2251.                                will also post a report summarizing each
                                                  Avenue, Suite 410, Westbury, NY 11590;                    • Mail: U.S. Department of                          substantive verbal contact we receive
                                                  telephone 516–228–7318; fax 516–794–5531;               Transportation, Docket Operations, M–                 about this NPRM.
                                                  email 9-avs-nyaco-cos@faa.gov.                          30, West Building Ground Floor, Room                  Discussion
                                                     (3) For service information identified in            W12–140, 1200 New Jersey Avenue SE,
                                                  this AD, contact Bombardier, Inc., 400 Côte-                                                                    The European Aviation Safety Agency
                                                                                                          Washington, DC 20590.
                                                  Vertu Road West, Dorval, Québec H4S 1Y9,                                                                     (EASA), which is the Technical Agent
                                                                                                            • Hand Delivery: Deliver to Mail
                                                  Canada; telephone 514–855–5000; fax 514–                                                                      for the Member States of the European
                                                  855–7401; email thd.crj@                                address above between 9 a.m. and 5
                                                                                                                                                                Union, has issued EASA Airworthiness
                                                  aero.bombardier.com; internet http://                   p.m., Monday through Friday, except
                                                                                                                                                                Directive 2018–0123, dated June 4, 2018
                                                  www.bombardier.com. You may view this                   Federal holidays.
                                                                                                                                                                (referred to after this as the Mandatory
                                                  service information at the FAA, Transport                 For service information identified in
                                                  Standards Branch, 2200 South 216th St., Des
                                                                                                                                                                Continuing Airworthiness Information,
                                                                                                          this NPRM, contact Airbus SAS,
                                                  Moines, WA. For information on the                                                                            or ‘‘the MCAI’’), to correct an unsafe
                                                                                                          Airworthiness Office—EAL, Rond-Point
                                                  availability of this material at the FAA, call                                                                condition for certain Airbus SAS Model
                                                                                                          Emile Dewoitine No: 2, 31700 Blagnac
                                                  206–231–3195.                                                                                                 A350–941 airplanes. The MCAI states:
                                                                                                          Cedex, France; telephone +33 5 61 93 36
                                                    Issued in Des Moines, Washington, on                  96; fax +33 5 61 93 45 80; email                         Following a complete review of the Airbus
                                                  August 7, 2018.                                         continued-airworthiness.a350@                         A350 structure design principles database for
                                                                                                                                                                type definition, it was revealed that the
                                                  Michael Kaszycki,                                       airbus.com; internet http://                          balancer fitting part, installed on the tail
                                                  Acting Director, System Oversight Division,             www.airbus.com. You may view this                     cone, lower section of Frame (FR) 103, has
                                                  Aircraft Certification Service.                         service information at the FAA,                       several corrosion resistant stainless steel nuts
                                                  [FR Doc. 2018–17622 Filed 8–15–18; 8:45 am]             Transport Standards Branch, 2200                      installed on elementary aluminium parts,
                                                  BILLING CODE 4910–13–P                                  South 216th St., Des Moines, WA. For                  which does not meet the requirements for
                                                                                                          information on the availability of this               protection against corrosion.
                                                                                                          material at the FAA, call 206–231–3195.                  This condition, if not corrected, could
                                                  DEPARTMENT OF TRANSPORTATION                                                                                  reduce the structural integrity of the
                                                                                                          Examining the AD Docket                               aeroplane.
                                                                                                                                                                   To address this unsafe condition, Airbus
                                                  Federal Aviation Administration                            You may examine the AD docket on                   developed production mod 110319 to
                                                                                                          the internet at http://                               improve protection against corrosion, and
                                                  14 CFR Part 39                                          www.regulations.gov by searching for                  issued the SB [Airbus Service Bulletin A350–
                                                                                                          and locating Docket No. FAA–2018–                     53–P024] to provide modification
sradovich on DSK3GMQ082PROD with PROPOSALS




                                                  [Docket No. FAA–2018–0758; Product
                                                  Identifier 2018–NM–093–AD]                              0758; or in person at Docket Operations               instructions for in-service pre-mod
                                                                                                          between 9 a.m. and 5 p.m., Monday                     aeroplanes. At the same time the production
                                                  RIN 2120–AA64                                           through Friday, except Federal holidays.              mod 110348 is equivalent to in-service
                                                                                                                                                                solution.
                                                  Airworthiness Directives; Airbus SAS                    The AD docket contains this NPRM, the                    For the reasons described above, this
                                                  Airplanes                                               regulatory evaluation, any comments                   [EASA] AD requires a modification, adding
                                                                                                          received, and other information. The                  new additional overcoat sealant and elastic
                                                  AGENCY:Federal Aviation                                 street address for Docket Operations                  varnish on the affected nuts and fastener
                                                  Administration (FAA), DOT.                              (phone: 800–647–5527) is in the                       heads.



                                             VerDate Sep<11>2014   16:29 Aug 15, 2018   Jkt 244001   PO 00000   Frm 00024   Fmt 4702   Sfmt 4702   E:\FR\FM\16AUP1.SGM   16AUP1



Document Created: 2018-08-16 01:01:47
Document Modified: 2018-08-16 01:01:47
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionProposed Rules
ActionNotice of proposed rulemaking (NPRM).
DatesWe must receive comments on this proposed AD by October 1, 2018.
ContactCesar Gomez, Aerospace Engineer, Airframe and Mechanical Systems Section, FAA, New York ACO Branch, 1600 Stewart Avenue, Suite 410, Westbury, NY 11590; telephone 516-228-7318; fax 516-794-5531; email [email protected]
FR Citation83 FR 40703 
RIN Number2120-AA64
CFR AssociatedAir Transportation; Aircraft; Aviation Safety; Incorporation by Reference and Safety

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR