83_FR_40920 83 FR 40761 - Combined Notice of Filings #1

83 FR 40761 - Combined Notice of Filings #1

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 159 (August 16, 2018)

Page Range40761-40762
FR Document2018-17651

Federal Register, Volume 83 Issue 159 (Thursday, August 16, 2018)
[Federal Register Volume 83, Number 159 (Thursday, August 16, 2018)]
[Notices]
[Pages 40761-40762]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-17651]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC18-133-000.
    Applicants: Union Electric Company, TG High Prairie, LLC.
    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act of Union Electric Company, Inc., et al.
    Filed Date: 8/9/18.
    Accession Number: 20180809-5035.
    Comments Due: 5 p.m. ET 8/30/18.

    Docket Numbers: EC18-134-000.
    Applicants: Boulder Solar III, LLC.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act of Boulder Solar III, LLC.
    Filed Date: 8/9/18.
    Accession Number: 20180809-5140.
    Comments Due: 5 p.m. ET 8/30/18.

    Docket Numbers: EC18-135-000.
    Applicants: 64KT 8me LLC.
    Description: Application for Authorization under Section 203 of the 
Federal Power Act, et al. of 64KT 8me LLC.
    Filed Date: 8/9/18.
    Accession Number: 20180809-5146.
    Comments Due: 5 p.m. ET 8/30/18.

    Docket Numbers: EC18-136-000.
    Applicants: JERA Power Compass, LLC, Dighton Power, LLC, Marco DM 
Holdings, L.L.C., Marcus Hook Energy, L.P., Marcus Hook 50, L.P., 
Milford Power, LLC.
    Description: Joint Application for Authorization under Section 203 
of the Federal Power Act, et al. of JERA Power Compass, LLC, et al.
    Filed Date: 8/9/18.
    Accession Number: 20180809-5148.
    Comments Due: 5 p.m. ET 8/30/18.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER18-2194-000.
    Applicants: Fox Creek Farm Solar, LLC.
    Description: Baseline eTariff Filing: Baseline new to be effective 
9/7/2018.
    Filed Date: 8/10/18.
    Accession Number: 20180810-5003.
    Comments Due: 5 p.m. ET 8/31/18.

    Docket Numbers: ER18-2195-000.
    Applicants: South Carolina Electric & Gas Company.
    Description: Sec.  205(d) Rate Filing: SCPSA Interconnection 
Agreement to be effective 8/10/2018.
    Filed Date: 8/10/18.
    Accession Number: 20180810-5053.
    Comments Due: 5 p.m. ET 8/31/18.

    Docket Numbers: ER18-2196-000.
    Applicants: The Potomac Edison Company, PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Potomac Edison submits a 
Construction Agreement, Service Agreement No. 4799 to be effective 10/
10/2018.
    Filed Date: 8/10/18.
    Accession Number: 20180810-5060.
    Comments Due: 5 p.m. ET 8/31/18.

    Docket Numbers: ER18-2197-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Clean-up to OATT, Schedule 
12--Appendix A (PSEG) to be effective 1/1/2017.
    Filed Date: 8/10/18.
    Accession Number: 20180810-5087.
    Comments Due: 5 p.m. ET 8/31/18.

    Docket Numbers: ER18-2198-000.
    Applicants: Midcontinent Independent System Operator, Inc., ALLETE, 
Inc.
    Description: Sec.  205(d) Rate Filing: 2018-08-10_SA 3146 Minnesota 
Power-GRE (Knife Falls) T-L Interconnection Agrmt to be effective 9/1/
2018.
    Filed Date: 8/10/18.
    Accession Number: 20180810-5091.
    Comments Due: 5 p.m. ET 8/31/18.

    Take notice that the Commission received the following electric 
securities filings:

    Docket Numbers: ES18-55-000.
    Applicants: Citizens Sycamore-Penasquitos Transmission LLC.
    Description: Application for Authorization under Section 204 of the 
Federal Power Act of Citizens Sycamore-Penasquitos Transmission LLC.
    Filed Date: 8/9/18.
    Accession Number: 20180809-5145.
    Comments Due: 5 p.m. ET 8/30/18.

    The filings are accessible in the Commission's eLibrary system by

[[Page 40762]]

clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: http://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: August 10, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-17651 Filed 8-15-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                               Federal Register / Vol. 83, No. 159 / Thursday, August 16, 2018 / Notices                                                                          40761

                                                effort. Industry participants seeking                             appropriate process may take place to                             Type of Respondent: Natural gas
                                                additional or amended standards (to                               amend the standards.                                            pipelines under the jurisdictions of
                                                include principles, definitions,                                    Failure to collect the FERC–549C data                         NGA and NGPA.
                                                standards, data elements, process                                 would prevent the Commission from
                                                                                                                                                                                    Estimate of Annual Burden: The
                                                descriptions, and technical                                       monitoring and properly evaluating
                                                                                                                                                                                  Commission estimates the annual public
                                                implementation instructions) must                                 pipeline transactions and/or meeting
                                                                                                                  statutory obligations under both the                            reporting burden for the information
                                                submit a request to the NAESB office,
                                                detailing the change, so that the                                 NGA and NGPA.                                                   collection as:

                                                                   FERC–549C: STANDARDS FOR BUSINESS PRACTICES OF INTERSTATE NATURAL GAS PIPELINES
                                                                                                                      Average
                                                                                                                     number of                                                                                                    Cost per
                                                                                                Number of                            Total number        Average burden and cost                Total annual burden hours
                                                                                                                     responses                                                                                                   respondent
                                                                                               respondents                           of responses             per response 7                      and total annual cost
                                                                                                                        per                                                                                                          ($)
                                                                                                                    respondent

                                                                                                      (1)               (2)          (1) * (2) = (3)                   (4)                              (3) * (4) = (5)           (5) ÷ (1)

                                                Standards for Business Practices of                         165               2.96              490    96 hrs.; $8,640 .....................   47,040 hrs.; $4,233,600 .......      $25,658
                                                  Interstate Natural Gas Pipelines.



                                                  Dated: August 10, 2018.                                            Filed Date: 8/9/18.                                          Agreement, Service Agreement No. 4799
                                                Nathaniel J. Davis, Sr.,                                             Accession Number: 20180809–5146.                             to be effective 10/10/2018.
                                                Deputy Secretary.                                                    Comments Due: 5 p.m. ET 8/30/18.                                Filed Date: 8/10/18.
                                                [FR Doc. 2018–17656 Filed 8–15–18; 8:45 am]                          Docket Numbers: EC18–136–000.                                   Accession Number: 20180810–5060.
                                                                                                                     Applicants: JERA Power Compass,                                 Comments Due: 5 p.m. ET 8/31/18.
                                                BILLING CODE 6717–01–P
                                                                                                                  LLC, Dighton Power, LLC, Marco DM                                  Docket Numbers: ER18–2197–000.
                                                                                                                  Holdings, L.L.C., Marcus Hook Energy,                              Applicants: PJM Interconnection,
                                                DEPARTMENT OF ENERGY                                              L.P., Marcus Hook 50, L.P., Milford                             L.L.C.
                                                                                                                  Power, LLC.                                                        Description: § 205(d) Rate Filing:
                                                Federal Energy Regulatory                                            Description: Joint Application for                           Clean-up to OATT, Schedule 12—
                                                Commission                                                        Authorization under Section 203 of the                          Appendix A (PSEG) to be effective 1/1/
                                                                                                                  Federal Power Act, et al. of JERA Power                         2017.
                                                Combined Notice of Filings #1                                     Compass, LLC, et al.                                               Filed Date: 8/10/18.
                                                                                                                     Filed Date: 8/9/18.                                             Accession Number: 20180810–5087.
                                                   Take notice that the Commission                                                                                                   Comments Due: 5 p.m. ET 8/31/18.
                                                received the following electric corporate                            Accession Number: 20180809–5148.
                                                                                                                     Comments Due: 5 p.m. ET 8/30/18.                                Docket Numbers: ER18–2198–000.
                                                filings:                                                                                                                             Applicants: Midcontinent
                                                   Docket Numbers: EC18–133–000.                                     Take notice that the Commission
                                                                                                                                                                                  Independent System Operator, Inc.,
                                                   Applicants: Union Electric Company,                            received the following electric rate
                                                                                                                                                                                  ALLETE, Inc.
                                                TG High Prairie, LLC.                                             filings:                                                           Description: § 205(d) Rate Filing:
                                                   Description: Joint Application for                                Docket Numbers: ER18–2194–000.                               2018–08–10_SA 3146 Minnesota Power-
                                                Authorization Under Section 203 of the                               Applicants: Fox Creek Farm Solar,                            GRE (Knife Falls) T–L Interconnection
                                                Federal Power Act of Union Electric                               LLC.                                                            Agrmt to be effective 9/1/2018.
                                                Company, Inc., et al.                                                Description: Baseline eTariff Filing:                           Filed Date: 8/10/18.
                                                   Filed Date: 8/9/18.                                            Baseline new to be effective 9/7/2018.                             Accession Number: 20180810–5091.
                                                   Accession Number: 20180809–5035.                                  Filed Date: 8/10/18.                                            Comments Due: 5 p.m. ET 8/31/18.
                                                   Comments Due: 5 p.m. ET 8/30/18.                                  Accession Number: 20180810–5003.                                Take notice that the Commission
                                                   Docket Numbers: EC18–134–000.                                     Comments Due: 5 p.m. ET 8/31/18.                             received the following electric securities
                                                   Applicants: Boulder Solar III, LLC.                               Docket Numbers: ER18–2195–000.                               filings:
                                                   Description: Application for                                      Applicants: South Carolina Electric &                           Docket Numbers: ES18–55–000.
                                                Authorization Under Section 203 of the                            Gas Company.                                                       Applicants: Citizens Sycamore-
                                                Federal Power Act of Boulder Solar III,                              Description: § 205(d) Rate Filing:                           Penasquitos Transmission LLC.
                                                LLC.                                                              SCPSA Interconnection Agreement to be                              Description: Application for
                                                   Filed Date: 8/9/18.                                            effective 8/10/2018.                                            Authorization under Section 204 of the
                                                   Accession Number: 20180809–5140.                                  Filed Date: 8/10/18.                                         Federal Power Act of Citizens
                                                   Comments Due: 5 p.m. ET 8/30/18.                                  Accession Number: 20180810–5053.                             Sycamore-Penasquitos Transmission
                                                   Docket Numbers: EC18–135–000.                                     Comments Due: 5 p.m. ET 8/31/18.                             LLC.
                                                   Applicants: 64KT 8me LLC.                                         Docket Numbers: ER18–2196–000.                                  Filed Date: 8/9/18.
                                                   Description: Application for                                      Applicants: The Potomac Edison                                  Accession Number: 20180809–5145.
                                                Authorization under Section 203 of the                            Company, PJM Interconnection, L.L.C.                               Comments Due: 5 p.m. ET 8/30/18.
                                                Federal Power Act, et al. of 64KT 8me                                Description: § 205(d) Rate Filing:                              The filings are accessible in the
sradovich on DSK3GMQ082PROD with NOTICES




                                                LLC.                                                              Potomac Edison submits a Construction                           Commission’s eLibrary system by
                                                   7 The estimated hourly cost (salary plus benefits)             compensation from May 2017 (available at https://                 Legal (Occupation Code: 23–0000), $143.68.
                                                provided in this section is based on the salary                   www.bls.gov/oes/current/naics2_22.htm). The                       Economist (Occupation Code: 19–3011), $71.98.
                                                figures for May 2017 posted by the Bureau of Labor                hourly estimates for salary plus benefits are:                    The average hourly cost (salary plus benefits) is
                                                Statistics for the Utilities sector (available at http://           Petroleum Engineer (Occupation Code: 17–2051),                calculated weighting each of the aforementioned
                                                www.bls.gov/oes/current/naics2_22.htm#13-0000)                    $71.62.                                                         wage categories as follows: $71.62 (0.3) + $143.68
                                                and scaled to reflect benefits using the relative                   Computer Systems Analysts (Occupation Code:                   (0.3) + $46.26 (0.15) + $71.98 (0.25) = $89.52. The
                                                importance of employer costs in employee                          15–1120), $46.26.                                               Commission rounds it to $90/hour.



                                           VerDate Sep<11>2014     17:15 Aug 15, 2018    Jkt 244001    PO 00000        Frm 00018     Fmt 4703    Sfmt 4703    E:\FR\FM\16AUN1.SGM              16AUN1


                                                40762                       Federal Register / Vol. 83, No. 159 / Thursday, August 16, 2018 / Notices

                                                clicking on the links or querying the                   FERC Online links at http://                          Project). Combined, the projects will
                                                docket number.                                          www.ferc.gov. To facilitate electronic                increase peak-day service by 138,504
                                                   Any person desiring to intervene or                  service, persons with internet access                 dekatherms per day (Dth/d). Northern
                                                protest in any of the above proceedings                 who will eFile a document and/or be                   Natural is also requesting approval for
                                                must file in accordance with Rules 211                  listed as a contact for an intervenor                 rolled-in rate treatment for the projects,
                                                and 214 of the Commission’s                             must create and validate an                           all as more fully set forth in the
                                                Regulations (18 CFR 385.211 and                         eRegistration account using the                       application which is on file with the
                                                385.214) on or before 5:00 p.m. Eastern                 eRegistration link. Select the eFiling                Commission and open to public
                                                time on the specified comment date.                     link to log on and submit the                         inspection.
                                                Protests may be considered, but                         intervention or protests.                                The filing may also be viewed on the
                                                intervention is necessary to become a                      Persons unable to file electronically              web at http://www.ferc.gov using the
                                                party to the proceeding.                                should submit an original and 5 copies                ‘‘eLibrary’’ link. Enter the docket
                                                   eFiling is encouraged. More detailed                 of the intervention or protest to the                 number excluding the last three digits in
                                                information relating to filing                          Federal Energy Regulatory Commission,                 the docket number field to access the
                                                requirements, interventions, protests,                  888 First Street NE, Washington, DC                   document. For assistance, please contact
                                                service, and qualifying facilities filings              20426.                                                FERC Online Support at
                                                can be found at: http://www.ferc.gov/                      The filings in the above-referenced                FERCOnlineSupport@ferc.gov or toll
                                                docs-filing/efiling/filing-req.pdf. For                 proceeding are accessible in the                      free at (866) 208–3676, or TTY, contact
                                                other information, call (866) 208–3676                  Commission’s eLibrary system by                       (202) 502–8659.
                                                (toll free). For TTY, call (202) 502–8659.              clicking on the appropriate link in the                  Any questions concerning this
                                                  Dated: August 10, 2018.                               above list. They are also available for               application may be directed to Michael
                                                Nathaniel J. Davis, Sr.,
                                                                                                        electronic review in the Commission’s                 T. Loeffler, Senior Director, Certificates
                                                                                                        Public Reference Room in Washington,                  and External Affairs, Northern Natural
                                                Deputy Secretary.
                                                                                                        DC. There is an eSubscription link on                 Gas Company, 1111 South 103rd Street,
                                                [FR Doc. 2018–17651 Filed 8–15–18; 8:45 am]
                                                                                                        the website that enables subscribers to               Omaha, Nebraska 68124, or by calling
                                                BILLING CODE 6717–01–P                                  receive email notification when a                     (402) 398–7103.
                                                                                                        document is added to a subscribed                        Specifically, Northern Natural
                                                                                                        docket(s). For assistance with any FERC               proposes the following facilities as part
                                                DEPARTMENT OF ENERGY
                                                                                                        Online service, please email                          of the Northern Lights 2019 Expansion:
                                                Federal Energy Regulatory                               FERCOnlineSupport@ferc.gov, or call                   (1) 10.0-mile-long, 24-inch-diameter
                                                Commission                                              (866) 208–3676 (toll free). For TTY, call             pipeline in Hennepin and Wright
                                                                                                        (202) 502–8659.                                       Counties; (2) 4.3-mile-long, 8-inch-
                                                [Docket No. ER18–2194–000]                                                                                    diameter extension of the existing
                                                                                                          Dated: August 10, 2018.
                                                                                                        Nathaniel J. Davis, Sr.,                              Alexandria branch line loop in Morrison
                                                Supplemental Notice That Initial
                                                                                                        Deputy Secretary.                                     County; (3) 1.6-mile-long, 6-inch-
                                                Market-Based Rate Filing Includes
                                                                                                                                                              diameter loop of the existing New
                                                Request for Blanket Section 204                         [FR Doc. 2018–17654 Filed 8–15–18; 8:45 am]
                                                                                                                                                              Prague branch line in Le Sueur County;
                                                Authorization: Fox Creek Farm Solar,                    BILLING CODE 6717–01–P
                                                                                                                                                              (4) 3.1-mile-long, 24-inch-diameter
                                                LLC
                                                                                                                                                              extension of the existing Willmar C-line
                                                  This is a supplemental notice in the                  DEPARTMENT OF ENERGY                                  in Carver County; (5) new 11,153
                                                above-referenced proceeding of Fox                                                                            horsepower (HP) Carver compressor
                                                Creek Farm Solar, LLC’s application for                 Federal Energy Regulatory                             station (CS) in Carver County; (6) one
                                                market-based rate authority, with an                    Commission                                            additional 15,900 HP compressor unit at
                                                accompanying rate tariff, noting that                                                                         Faribault CS in Rice County; and (7) one
                                                such application includes a request for                 [Docket No. CP18–534–000]                             15,900 HP compressor unit at Owatonna
                                                blanket authorization, under 18 CFR                                                                           CS in Steele County. The Northern
                                                                                                        Notice of Application: Northern Natural
                                                part 34, of future issuances of securities                                                                    Lights 2019 Expansion project will
                                                                                                        Gas Company
                                                and assumptions of liability.                                                                                 allow Northern Natural to deliver
                                                  Any person desiring to intervene or to                   Take notice that on July 27, 2018,                 101,411 Dth/d of incremental peak day
                                                protest should file with the Federal                    Northern Natural Gas Company                          capacity. The estimated cost for the
                                                Energy Regulatory Commission, 888                       (Northern Natural), 1111 South 103rd                  Northern Lights 2019 Expansion project
                                                First Street NE, Washington, DC 20426,                  Street, Omaha, Nebraska 68124–1000,                   is $158,070,870.
                                                in accordance with Rules 211 and 214                    filed in Docket No. CP18–534–000 an                      As part of the Rochester Project,
                                                of the Commission’s Rules of Practice                   application pursuant to section 7 of the              Northern Natural proposes to: (1)
                                                and Procedure (18 CFR 385.211 and                       Natural Gas Act (NGA) and Part 157 of                 Construct and operate a 12.2-mile-long,
                                                385.214). Anyone filing a motion to                     the Commission’s Regulations,                         16-inch-diameter branch line with a
                                                intervene or protest must serve a copy                  requesting authorization to: (1)                      new delivery point at its terminus in
                                                of that document on the Applicant.                      Construct and operate certain                         Olmsted County; (2) increase the MAOP
                                                  Notice is hereby given that the                       compressor, pipeline and town border                  of an 8-mile-long segment of its 16-inch-
                                                deadline for filing protests with regard                station facilities; (2) upgrade the                   diameter La Crosse branch line in
                                                to the applicant’s request for blanket                  maximum allowable operating pressure                  Freeborn and Mower Counties; and (3)
sradovich on DSK3GMQ082PROD with NOTICES




                                                authorization, under 18 CFR part 34, of                 (MAOP) on a segment of an existing                    relocate am existing MAOP control
                                                future issuances of securities and                      branch line and relocate a MAOP                       valve assembly from Freeborn County to
                                                assumptions of liability, is August 30,                 regulator; and (3) abandon short                      Mower County. The Rochester Project
                                                2018.                                                   segments of pipeline to accommodate                   will generate additional 37,093 Dth/d of
                                                  The Commission encourages                             tie-ins, all located in various counties in           incremental peak day service. The
                                                electronic submission of protests and                   Minnesota (Northern Lights 2019                       estimated cost for the Rochester project
                                                interventions in lieu of paper, using the               Expansion Project and Rochester                       is $31,416,479.


                                           VerDate Sep<11>2014   17:15 Aug 15, 2018   Jkt 244001   PO 00000   Frm 00019   Fmt 4703   Sfmt 4703   E:\FR\FM\16AUN1.SGM   16AUN1



Document Created: 2018-08-16 01:01:54
Document Modified: 2018-08-16 01:01:54
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates8/9/18.
FR Citation83 FR 40761 