83_FR_40922 83 FR 40763 - Grand River Dam Authority; Notice of Modification of Procedural Schedule

83 FR 40763 - Grand River Dam Authority; Notice of Modification of Procedural Schedule

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 159 (August 16, 2018)

Page Range40763-40764
FR Document2018-17655

Federal Register, Volume 83 Issue 159 (Thursday, August 16, 2018)
[Federal Register Volume 83, Number 159 (Thursday, August 16, 2018)]
[Notices]
[Pages 40763-40764]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-17655]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1494-438]


Grand River Dam Authority; Notice of Modification of Procedural 
Schedule

    Take notice that the schedule for processing the following 
hydroelectric application has been modified.
    a. Type of Application: Notice of Intent to File License 
Application for a New License and Commencing Pre-filing Process.
    b. Project No.: 1494-438.
    c. Date Filed: February 1, 2017.
    d. Applicant: Grand River Dam Authority (GRDA).
    e. Name of Project: Pensacola Hydroelectric Project.
    f. Location: The project is located on the Grand (Neosho) River in 
Craig, Delaware, Mayes, and Ottawa Counties, Oklahoma. The project 
occupies federal land.\1\
---------------------------------------------------------------------------

    \1\ In a filing of April 11, 2018, the Bureau of Indian Affairs 
provided documentation that lands held in trust by the BIA for the 
benefit of one or more federally-recognized Indian tribes occur 
within the existing Pensacola Project boundary. The total acreage of 
federal lands within the project boundary is unknown at this time.
---------------------------------------------------------------------------

    g. Filed Pursuant to: 18 CFR part 5 of the Commission's 
Regulations.
    h. Applicant Contact: Dr. Darrell Townsend, Assistant General 
Manager, GRDA, 420 Highway 28, Langley, OK 74359-0070; (918) 256-0616 
or [email protected].
    i. FERC Contact: Rachel McNamara at (202) 502-8340 or 
[email protected].
    j. Procedural Schedule: The Commission's August 10, 2018, letter 
established August 21, 2018, as the new date for the additional Tribal 
Consultation meeting. The revised deadline for filing the Revised 
Proposed Study Plan is now September 24, 2018, and the revised deadline 
for filing comments on the Revised Proposed Study Plan is now October 
24, 2018. As such, the application will be processed according to the 
following revised schedule. Revisions to the schedule may be made as 
appropriate. If a date falls on a weekend or holiday, the due date will 
be the following business day.

------------------------------------------------------------------------
            Milestone                           Target date
------------------------------------------------------------------------
File Revised Proposed Study Plan.  September 24, 2018.
File Comments on Revised Proposed  October 24, 2018.
 Study Plan.

[[Page 40764]]

 
Commission Issues Study Plan       November 8, 2018.
 Determination.
Notice of Formal Study Dispute     November 28, 2018.
 (if necessary).
Commission Issues Study Dispute    February 6, 2019.
 Determination (if necessary).
------------------------------------------------------------------------


    Dated: August 10, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-17655 Filed 8-15-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                   Federal Register / Vol. 83, No. 159 / Thursday, August 16, 2018 / Notices                                                                          40763

                                                   On October 16, 2017, the Commission                               proceeding can ask for court review of                               DEPARTMENT OF ENERGY
                                                staff granted Northern Natural’s request                             Commission orders in the proceeding.
                                                to utilize the Pre-Filing Process and                                   However, a person does not have to                                Federal Energy Regulatory
                                                assigned Docket No. PF18–1–000 to staff                              intervene in order to have comments                                  Commission
                                                activities involved for the above                                    considered. The second way to
                                                referenced projects. Now, as of the filing                           participate is by filing with the                                    [Project No. 1494–438]
                                                of the July 30, 2018 application, the Pre-                           Secretary of the Commission, as soon as
                                                Filing Process for this project has ended.                           possible, an original and two copies of                              Grand River Dam Authority; Notice of
                                                From this time forward, this proceeding                              comments in support of or in opposition                              Modification of Procedural Schedule
                                                will be conducted in Docket No. CP18–                                to this project. The Commission will
                                                534–000, as noted in the caption of this                             consider these comments in                                              Take notice that the schedule for
                                                Notice.                                                              determining the appropriate action to be                             processing the following hydroelectric
                                                   Pursuant to section 157.9 of the                                  taken, but the filing of a comment alone                             application has been modified.
                                                Commission’s rules, 18 CFR 157.9,                                    will not serve to make the filer a party
                                                within 90 days of this Notice the                                    to the proceeding. The Commission’s                                     a. Type of Application: Notice of
                                                Commission staff will either: Complete                               rules require that persons filing                                    Intent to File License Application for a
                                                its environmental assessment (EA) and                                comments in opposition to the project                                New License and Commencing Pre-
                                                place it into the Commission’s public                                provide copies of their protests only to                             filing Process.
                                                record (eLibrary) for this proceeding; or                            the party or parties directly involved in                               b. Project No.: 1494–438.
                                                issue a Notice of Schedule for                                       the protest.
                                                                                                                        Persons who wish to comment only                                     c. Date Filed: February 1, 2017.
                                                Environmental Review. If a Notice of
                                                Schedule for Environmental Review is                                 on the environmental review of this                                     d. Applicant: Grand River Dam
                                                issued, it will indicate, among other                                project should submit an original and                                Authority (GRDA).
                                                milestones, the anticipated date for the                             two copies of their comments to the                                     e. Name of Project: Pensacola
                                                Commission staff’s issuance of the EA                                Secretary of the Commission.                                         Hydroelectric Project.
                                                for this proposal. The filing of the EA                              Environmental commentors will be
                                                                                                                     placed on the Commission’s                                              f. Location: The project is located on
                                                in the Commission’s public record for                                                                                                     the Grand (Neosho) River in Craig,
                                                this proceeding or the issuance of a                                 environmental mailing list, will receive
                                                                                                                     copies of the environmental documents,                               Delaware, Mayes, and Ottawa Counties,
                                                Notice of Schedule for Environmental
                                                                                                                     and will be notified of meetings                                     Oklahoma. The project occupies federal
                                                Review will serve to notify federal and
                                                                                                                     associated with the Commission’s                                     land.1
                                                state agencies of the timing for the
                                                completion of all necessary reviews, and                             environmental review process.                                           g. Filed Pursuant to: 18 CFR part 5 of
                                                the subsequent need to complete all                                  Environmental commentors will not be                                 the Commission’s Regulations.
                                                federal authorizations within 90 days of                             required to serve copies of filed
                                                                                                                     documents on all other parties.                                         h. Applicant Contact: Dr. Darrell
                                                the date of issuance of the Commission                                                                                                    Townsend, Assistant General Manager,
                                                staff’s EA.                                                          However, the non-party commentors
                                                                                                                     will not receive copies of all documents                             GRDA, 420 Highway 28, Langley, OK
                                                   There are two ways to become                                                                                                           74359–0070; (918) 256–0616 or
                                                involved in the Commission’s review of                               filed by other parties or issued by the
                                                                                                                     Commission (except for the mailing of                                dtownsend@grda.com.
                                                this project. First, any person wishing to
                                                obtain legal status by becoming a party                              environmental documents issued by the                                   i. FERC Contact: Rachel McNamara at
                                                to the proceedings for this project                                  Commission) and will not have the right                              (202) 502–8340 or rachel.mcnamara@
                                                should, on or before the comment date                                to seek court review of the                                          ferc.gov.
                                                stated below, file with the Federal                                  Commission’s final order.
                                                                                                                        The Commission strongly encourages                                   j. Procedural Schedule: The
                                                Energy Regulatory Commission, 888                                                                                                         Commission’s August 10, 2018, letter
                                                                                                                     electronic filings of comments, protests
                                                First Street NE, Washington, DC 20426,                                                                                                    established August 21, 2018, as the new
                                                                                                                     and interventions in lieu of paper using
                                                a motion to intervene in accordance                                                                                                       date for the additional Tribal
                                                                                                                     the ‘‘eFiling’’ link at http://
                                                with the requirements of the                                                                                                              Consultation meeting. The revised
                                                                                                                     www.ferc.gov. Persons unable to file
                                                Commission’s Rules of Practice and                                                                                                        deadline for filing the Revised Proposed
                                                                                                                     electronically should submit original
                                                Procedure (18 CFR 385.214 or 385.211)                                                                                                     Study Plan is now September 24, 2018,
                                                                                                                     and five copies of the protest or
                                                and the Regulations under the NGA (18
                                                                                                                     intervention to the Federal Energy                                   and the revised deadline for filing
                                                CFR 157.10). A person obtaining party
                                                                                                                     Regulatory Commission, 888 First Street                              comments on the Revised Proposed
                                                status will be placed on the service list
                                                                                                                     NE, Washington, DC 20426.                                            Study Plan is now October 24, 2018. As
                                                maintained by the Secretary of the                                      Comment Date: 5:00 p.m. Eastern
                                                Commission and will receive copies of                                                                                                     such, the application will be processed
                                                                                                                     Time on August 31, 2018.                                             according to the following revised
                                                all documents filed by the applicant and
                                                by all other parties. A party must submit                              Dated: August 10, 2018.                                            schedule. Revisions to the schedule may
                                                five copies of filings made with the                                 Nathaniel J. Davis, Sr.,                                             be made as appropriate. If a date falls on
                                                Commission and must mail a copy to                                   Deputy Secretary.                                                    a weekend or holiday, the due date will
                                                the applicant and to every other party in                            [FR Doc. 2018–17652 Filed 8–15–18; 8:45 am]                          be the following business day.
                                                the proceeding. Only parties to the                                  BILLING CODE 6717–01–P
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                          Milestone                                                                                         Target date

                                                File Revised Proposed Study Plan .................................................................................................................................   September 24, 2018.
                                                File Comments on Revised Proposed Study Plan .........................................................................................................               October 24, 2018.

                                                  1 In a filing of April 11, 2018, the Bureau of                     more federally-recognized Indian tribes occur                        total acreage of federal lands within the project
                                                Indian Affairs provided documentation that lands                     within the existing Pensacola Project boundary. The                  boundary is unknown at this time.
                                                held in trust by the BIA for the benefit of one or



                                           VerDate Sep<11>2014       17:15 Aug 15, 2018       Jkt 244001     PO 00000       Frm 00020      Fmt 4703     Sfmt 4703      E:\FR\FM\16AUN1.SGM           16AUN1


                                                40764                                    Federal Register / Vol. 83, No. 159 / Thursday, August 16, 2018 / Notices

                                                                                                                               Milestone                                                                              Target date

                                                Commission Issues Study Plan Determination ..............................................................................................................      November 8, 2018.
                                                Notice of Formal Study Dispute (if necessary) ..............................................................................................................   November 28, 2018.
                                                Commission Issues Study Dispute Determination (if necessary) ..................................................................................                February 6, 2019.



                                                  Dated: August 10, 2018.                                                SUMMARY:    This document commences a                       Commission’s national television
                                                Nathaniel J. Davis, Sr.,                                                 hearing to determine whether granting                       multiple ownership rule, as well as the
                                                Deputy Secretary.                                                        the applications filed by Tribune Media                     public interest requirements of the
                                                [FR Doc. 2018–17655 Filed 8–15–18; 8:45 am]                              Company (Tribune) and Sinclair                              Communications Act of 1934, as
                                                BILLING CODE 6717–01–P
                                                                                                                         Broadcast Group, Inc. (Sinclair) seeking                    amended (the Act).
                                                                                                                         to transfer control of Tribune                                 2. Among these applications were
                                                                                                                         subsidiaries to Sinclair would be in the                    three that, rather than transfer broadcast
                                                DEPARTMENT OF ENERGY                                                     public interest. The Commission has                         television licenses in Chicago, Dallas,
                                                                                                                         designated the applications for hearing                     and Houston directly to Sinclair,
                                                Federal Energy Regulatory                                                after finding that there were substantial                   proposed to transfer these licenses to
                                                Commission                                                               and material questions of fact as to                        other entities. According to the
                                                                                                                         whether; Sinclair was a ‘‘real party in                     proposals, Sinclair would divest WGN–
                                                Notice of Effectiveness of Exempt                                        interest’’ to the sale of certain broadcast                 TV, Chicago, Illinois, to WGN TV, LLC,
                                                Wholesale Generator and Foreign                                          stations; Sinclair engaged in                               a newly-created entity by Steve Fader,
                                                Utility Company Status                                                   misrepresentation and/or lack of candor                     an individual with no broadcast
                                                                                                                         in its applications with the Commission;                    experience, for a purchase price of
                                                                                                        Docket Nos.
                                                                                                                         and consummation of the overall                             approximately $60 million. Sinclair
                                                East Hampton Energy Storage                                              transaction would be in the public                          would also divest KDAF(TV), Dallas
                                                  Center, LLC .................................         EG18–80–000      interest, including whether it would
                                                Montauk Energy Storage Center,
                                                                                                                                                                                     Texas, and KIAH(TV), Houston, Texas,
                                                  LLC ..............................................    EG18–81–000
                                                                                                                         comply with § 73.3555 of the                                to Cunningham Broadcast Corporation
                                                Armadillo Flats Wind Project, LLC ..                    EG18–82–000      Commission’s rules.                                         (Cunningham) for a combined purchase
                                                Heartland Divide Wind Project, LLC                      EG18–83–000      DATES: Persons desiring to participate as                   price of approximately $60 million. The
                                                Antelope Expansion 2, LLC ............                  EG18–84–000      parties in the hearing shall file a
                                                Pegasus Wind, LLC ........................              EG18–85–000
                                                                                                                                                                                     Commission notes that the proposed
                                                Thunder Spirit Wind, LLC ...............                EG18–86–000      petition for leave to intervene not later                   transfer applications to Fader and
                                                Pratt Wind, LLC ...............................         EG18–87–000      than September 17, 2018.                                    Cunningham were withdrawn on July
                                                Stoneray Power Partners, LLC .......                    EG18–88–000      ADDRESSES: File documents with the                          18, 2018.
                                                Copenhagen Wind Farm, LLC ........                      EG18–89–000
                                                Rio Bravo Windpower, LLC .............                  EG18–90–000
                                                                                                                         Office of the Secretary, Federal                               3. Multiple formal pleadings have
                                                Minco Wind IV, LLC ........................             EG18–91–000      Communications Commission, 445 12th                         been filed opposing this latest
                                                Minco Wind V, LLC .........................             EG18–92–000      Street SW, Washington, DC 20554, with                       divestiture plan. Most opponents
                                                Lorenzo Wind, LLC .........................             EG18–93–000      a copy mailed to each party to the                          challenge the divestitures as ‘‘shams’’
                                                Wildcat Ranch Wind Project, LLC ...                     EG18–94–000
                                                Enbridge Rampion UK Ltd ..............                   FC18–5–000
                                                                                                                         proceeding. Each document that is filed                     intended to circumvent the local and
                                                                                                                         in this proceeding must display on the                      national television multiple ownership
                                                  Take notice that during the month of                                   front page the docket number of this                        rules and find most egregious the
                                                July 2018, the status of the above-                                      hearing, ‘‘MB Docket No. 17–179.’’                          proposed divestitures to Fader and
                                                captioned entities as Exempt Wholesale                                   FOR FURTHER INFORMATION CONTACT:                            Cunningham. Some parties question
                                                Generators or Foreign Utility Companies                                  David Brown, David.Brown@fcc.gov,                           whether Sinclair will hold de facto
                                                became effective by operation of the                                     Media Bureau, (202) 418–1645.                               control over WGN TV, LLC.
                                                Commission’s regulations. 18 CFR                                         SUPPLEMENTARY INFORMATION: This is a                        Specifically, they question the
                                                366.7(a) (2017).                                                         summary of the Hearing Designation                          reasonableness of the terms of the
                                                                                                                         Order (Order), MB Docket No. 17–139,                        transaction, including a purchase price
                                                  Dated: August 10, 2018.
                                                                                                                         FCC 18–100, adopted July 18, 2018, and                      of only $60 million, and Sinclair’s plans
                                                Nathaniel J. Davis, Sr.,                                                                                                             to enter into a Joint Sales Agreement
                                                                                                                         released July 19, 2018. The full text of
                                                Deputy Secretary.                                                                                                                    (JSA), Shared Services Agreement
                                                                                                                         the Order is available for inspection and
                                                [FR Doc. 2018–17653 Filed 8–15–18; 8:45 am]                                                                                          (SSA), and Option with WGN TV, LLC
                                                                                                                         copying during normal business hours
                                                BILLING CODE 6717–01–P                                                   in the FCC’s Reference Information                          at closing. The parties also question
                                                                                                                         Center at Portals II, CY–A257, 445 12th                     Fader’s independence from Sinclair
                                                                                                                         Street SW, Washington, DC 20554. The                        given that Fader and David Smith,
                                                FEDERAL COMMUNICATIONS                                                   full text is also available online at                       currently a director and controlling
                                                COMMISSION                                                               http://apps.fcc.gov/ecfs/.                                  shareholder of Sinclair and formerly its
                                                                                                                                                                                     CEO, are business partners outside of
                                                [MB Docket No. 17–179; FCC 18–100]                                       Summary of the Hearing Designation                          the broadcast industry. Specifically,
                                                                                                                         Order                                                       Fader is the CEO of Atlantic Automotive
                                                Sinclair Broadcast Group, Inc. and                                          1. On June 28, 2017, Sinclair                            Group (Atlantic), in which David Smith
                                                Tribune Media Company, Applications                                      Broadcast Group, Inc. (Sinclair) and                        has a controlling interest and serves as
sradovich on DSK3GMQ082PROD with NOTICES




                                                for Transfer of Control of Tribune                                       Tribune Media Company (Tribune) filed                       a member of its board of directors, and
                                                Media Company and Certain                                                applications seeking to transfer control                    Atlantic is a Sinclair advertiser and
                                                Subsidiaries, WDCW(TV)                                                   of Tribune subsidiaries to Sinclair.                        tenant. Similarly, some parties argue
                                                AGENCY: Federal Communications                                           Sinclair and Tribune have amended                           that the sale of stations in Dallas and
                                                Commission.                                                              their applications several times                            Houston to Cunningham are in name
                                                ACTION: Notice.
                                                                                                                         thereafter, in an attempt to bring the                      only and warrant a hearing. According
                                                                                                                         transaction into compliance with the                        to the objectors, problematic aspects of


                                           VerDate Sep<11>2014           17:15 Aug 15, 2018            Jkt 244001   PO 00000    Frm 00021   Fmt 4703   Sfmt 4703   E:\FR\FM\16AUN1.SGM         16AUN1



Document Created: 2018-08-16 01:02:22
Document Modified: 2018-08-16 01:02:22
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 40763 