83_FR_44033 83 FR 43866 - ECOsponsible, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

83 FR 43866 - ECOsponsible, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 167 (August 28, 2018)

Page Range43866-43866
FR Document2018-18600

Federal Register, Volume 83 Issue 167 (Tuesday, August 28, 2018)
[Federal Register Volume 83, Number 167 (Tuesday, August 28, 2018)]
[Notices]
[Page 43866]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-18600]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14880-001]


ECOsponsible, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On June 15, 2018, ECOsponsible, LLC, filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of hydropower at the Mount 
Morris Power Dam located on the Genesee River, near the town of 
Leicester, Livingston County, New York. The sole purpose of a 
preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project would consist of the following: (1) An 
existing 30-foot-high, 334-foot-long concrete gravity dam; (2) an 
existing reservoir with a storage capacity of 250 acre-feet at a normal 
maximum surface elevation of 579.1 feet mean sea level; (3) an existing 
16-foot-wide by 30-foot-long concrete masonry powerhouse containing two 
new submersible turbines each with a rated capacity of 394 kilowatts 
(kW) (4) a new Hydrodynamic Screw turbine with a rated capacity of 62 
kW to be located on the 18-foot-long concrete spillway next to the 
powerhouse; (5) a new 75-foot-long transmission line connecting the 
powerhouse to a nearby 15-kilovolt grid interconnection point; and (6) 
appurtenant facilities. The proposed project would have an average 
annual generation of 5,700 megawatt-hours.
    Applicant Contact: Mr. Dennis Ryan, Manager, ECOsponsible, LLC, 
P.O. Box 114, West Falls, NY 14170; phone: (716) 222-2188.
    FERC Contact: Monir Chowdhury; phone: (202) 502-6736.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-14880-001.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's website at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14880) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: August 22, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-18600 Filed 8-27-18; 8:45 am]
BILLING CODE 6717-01-P



                                               43866                        Federal Register / Vol. 83, No. 167 / Tuesday, August 28, 2018 / Notices

                                               issued, it will indicate, among other                   environmental review process.                         masonry powerhouse containing two
                                               milestones, the anticipated date for the                Environmental commentors will not be                  new submersible turbines each with a
                                               Commission staff’s issuance of the EA                   required to serve copies of filed                     rated capacity of 394 kilowatts (kW) (4)
                                               for this proposal. The filing of the EA                 documents on all other parties.                       a new Hydrodynamic Screw turbine
                                               in the Commission’s public record for                   However, the non-party commentors                     with a rated capacity of 62 kW to be
                                               this proceeding or the issuance of a                    will not receive copies of all documents              located on the 18-foot-long concrete
                                               Notice of Schedule for Environmental                    filed by other parties or issued by the               spillway next to the powerhouse; (5) a
                                               Review will serve to notify federal and                 Commission (except for the mailing of                 new 75-foot-long transmission line
                                               state agencies of the timing for the                    environmental documents issued by the                 connecting the powerhouse to a nearby
                                               completion of all necessary reviews, and                Commission) and will not have the right               15-kilovolt grid interconnection point;
                                               the subsequent need to complete all                     to seek court review of the                           and (6) appurtenant facilities. The
                                               federal authorizations within 90 days of                Commission’s final order.                             proposed project would have an average
                                               the date of issuance of the Commission                     The Commission strongly encourages                 annual generation of 5,700 megawatt-
                                               staff’s EA.                                             electronic filings of comments, protests
                                                  There are two ways to become                                                                               hours.
                                                                                                       and interventions in lieu of paper using
                                               involved in the Commission’s review of                  the ‘‘eFiling’’ link at http://                          Applicant Contact: Mr. Dennis Ryan,
                                               this project. First, any person wishing to              www.ferc.gov. Persons unable to file                  Manager, ECOsponsible, LLC, P.O. Box
                                               obtain legal status by becoming a party                 electronically should submit an original              114, West Falls, NY 14170; phone: (716)
                                               to the proceedings for this project                     and 5 copies of the protest or                        222–2188.
                                               should, on or before the comment date                   intervention to the Federal Energy                       FERC Contact: Monir Chowdhury;
                                               stated below file with the Federal                      regulatory Commission, 888 First Street               phone: (202) 502–6736.
                                               Energy Regulatory Commission, 888                       NE, Washington, DC 20426.
                                               First Street NE, Washington, DC 20426,                                                                           Deadline for filing comments, motions
                                                                                                          Comment Date: 5:00 p.m. Eastern
                                               a motion to intervene in accordance                                                                           to intervene, competing applications
                                                                                                       Time on September 12, 2018.
                                               with the requirements of the                                                                                  (without notices of intent), or notices of
                                               Commission’s Rules of Practice and                        Dated: August 22, 2018.                             intent to file competing applications: 60
                                               Procedure (18 CFR 385.214 or 385.211)                   Nathaniel J. Davis, Sr.,                              days from the issuance of this notice.
                                               and the Regulations under the NGA (18                   Deputy Secretary.                                     Competing applications and notices of
                                               CFR 157.10). A person obtaining party                   [FR Doc. 2018–18604 Filed 8–27–18; 8:45 am]           intent must meet the requirements of 18
                                               status will be placed on the service list               BILLING CODE 6717–01–P                                CFR 4.36.
                                               maintained by the Secretary of the                                                                               The Commission strongly encourages
                                               Commission and will receive copies of                                                                         electronic filing. Please file comments,
                                               all documents filed by the applicant and                DEPARTMENT OF ENERGY
                                                                                                                                                             motions to intervene, notices of intent,
                                               by all other parties. A party must submit
                                                                                                       Federal Energy Regulatory                             and competing applications using the
                                               7 copies of filings made in the
                                                                                                       Commission                                            Commission’s eFiling system at http://
                                               proceeding with the Commission and
                                               must mail a copy to the applicant and                                                                         www.ferc.gov/docs-filing/efiling.asp.
                                                                                                       [Project No. 14880–001]                               Commenters can submit brief comments
                                               to every other party. Only parties to the
                                               proceeding can ask for court review of                  ECOsponsible, LLC; Notice of                          up to 6,000 characters, without prior
                                               Commission orders in the proceeding.                    Preliminary Permit Application                        registration, using the eComment system
                                                  However, a person does not have to                   Accepted for Filing and Soliciting                    at http://www.ferc.gov/docs-filing/
                                               intervene in order to have comments                     Comments, Motions To Intervene, and                   ecomment.asp. You must include your
                                               considered. The second way to                           Competing Applications                                name and contact information at the end
                                               participate is by filing with the                                                                             of your comments. For assistance,
                                               Secretary of the Commission, as soon as                    On June 15, 2018, ECOsponsible, LLC,               please contact FERC Online Support at
                                               possible, an original and two copies of                 filed an application for a preliminary                FERCOnlineSupport@ferc.gov, (866)
                                               comments in support of or in opposition                 permit, pursuant to section 4(f) of the               208–3676 (toll free), or (202) 502–8659
                                               to this project. The Commission will                    Federal Power Act (FPA), proposing to                 (TTY). In lieu of electronic filing, please
                                               consider these comments in                              study the feasibility of hydropower at                send a paper copy to: Secretary, Federal
                                               determining the appropriate action to be                the Mount Morris Power Dam located                    Energy Regulatory Commission, 888
                                               taken, but the filing of a comment alone                on the Genesee River, near the town of                First Street NE, Washington, DC 20426.
                                               will not serve to make the filer a party                Leicester, Livingston County, New York.               The first page of any filing should
                                               to the proceeding. The Commission’s                     The sole purpose of a preliminary                     include docket number P–14880–001.
                                               rules require that persons filing                       permit, if issued, is to grant the permit
                                               comments in opposition to the project                   holder priority to file a license                        More information about this project,
                                               provide copies of their protests only to                application during the permit term. A                 including a copy of the application, can
                                               the party or parties directly involved in               preliminary permit does not authorize                 be viewed or printed on the ‘‘eLibrary’’
                                               the protest.                                            the permit holder to perform any land-                link of the Commission’s website at
                                                  Persons who wish to comment only                     disturbing activities or otherwise enter              http://www.ferc.gov/docs-filing/
                                               on the environmental review of this                     upon lands or waters owned by others                  elibrary.asp. Enter the docket number
                                               project should submit an original and                   without the owners’ express permission.               (P–14880) in the docket number field to
                                               two copies of their comments to the                        The proposed project would consist of              access the document. For assistance,
daltland on DSKBBV9HB2PROD with NOTICES




                                               Secretary of the Commission.                            the following: (1) An existing 30-foot-               contact FERC Online Support.
                                               Environmental commentors will be                        high, 334-foot-long concrete gravity                    Dated: August 22, 2018.
                                               placed on the Commission’s                              dam; (2) an existing reservoir with a
                                                                                                                                                             Nathaniel J. Davis, Sr.,
                                               environmental mailing list, will receive                storage capacity of 250 acre-feet at a
                                               copies of the environmental documents,                  normal maximum surface elevation of                   Deputy Secretary.
                                               and will be notified of meetings                        579.1 feet mean sea level; (3) an existing            [FR Doc. 2018–18600 Filed 8–27–18; 8:45 am]
                                               associated with the Commission’s                        16-foot-wide by 30-foot-long concrete                 BILLING CODE 6717–01–P




                                          VerDate Sep<11>2014   20:00 Aug 27, 2018   Jkt 244001   PO 00000   Frm 00025   Fmt 4703   Sfmt 9990   E:\FR\FM\28AUN1.SGM   28AUN1



Document Created: 2018-08-28 00:22:09
Document Modified: 2018-08-28 00:22:09
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 43866 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR