83_FR_44477 83 FR 44308 - Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; ITAAC for Pneumatic Testing of VES Air Lines

83 FR 44308 - Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; ITAAC for Pneumatic Testing of VES Air Lines

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 83, Issue 169 (August 30, 2018)

Page Range44308-44309
FR Document2018-18846

The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and has issued License Amendment Nos. 130 and 129 to Combined Licenses (COLs), NPF-91 and NPF-92. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, and the City of Dalton, Georgia (the licensee); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.

Federal Register, Volume 83 Issue 169 (Thursday, August 30, 2018)
[Federal Register Volume 83, Number 169 (Thursday, August 30, 2018)]
[Notices]
[Pages 44308-44309]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-18846]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-025 and 52-026; NRC-2008-0252]


Southern Nuclear Operating Company, Inc., Vogtle Electric 
Generating Plant, Units 3 and 4; ITAAC for Pneumatic Testing of VES Air 
Lines

AGENCY: Nuclear Regulatory Commission.

ACTION: Exemption and combined license amendment; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is granting an 
exemption to allow a departure from the certification information of 
Tier 1 of the generic design control document (DCD) and has issued 
License Amendment Nos. 130 and 129 to Combined Licenses (COLs), NPF-91 
and NPF-92. The COLs were issued to Southern Nuclear Operating Company, 
Inc., and Georgia Power Company, Oglethorpe Power Corporation, MEAG 
Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, and the 
City of Dalton, Georgia (the licensee); for construction and operation 
of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located 
in Burke County, Georgia.
    The granting of the exemption allows the changes to Tier 1 
information asked for in the amendment. Because the acceptability of 
the exemption was determined in part by the acceptability of the 
amendment, the exemption and amendment are being issued concurrently.

DATES: The exemption and amendment were issued on July 10, 2018.

ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Website: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0252. Address 
questions about NRC dockets to Jennifer Borges telephone: 301-287-9127; 
email: [email protected]. For technical questions, contact the 
individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to [email protected]. The ADAMS accession number for each 
document referenced (if it is available in ADAMS) is provided the first 
time that it is mentioned in this document. The request for the 
amendment and exemption was submitted by letter dated December 20, 2017 
and available in ADAMS under Accession No. ML17354A964
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Chandu Patel, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; 
telephone: 301-415-3025; email: [email protected].

SUPPLEMENTARY INFORMATION: 

I. Introduction

    The NRC is granting an exemption from paragraph B of section III, 
``Scope and Contents,'' of appendix D, ``Design Certification Rule for 
the AP1000,'' to part 52 of title 10 of the Code of Federal Regulations 
(10 CFR), and issuing License Amendment Nos. 130 and 129 to COLs, NPF-
91 and NPF-92, to the licensee. The exemption is required by paragraph 
A.4 of section VIII, ``Processes for Changes and Departures,'' appendix 
D, to 10 CFR part 52 to allow the licensee to depart from Tier 1 
information. With the requested amendment, the licensee sought proposed 
changes that would revise the Updated Final Safety Analysis Report in 
the form of changes from the incorporated plant-specific Design Control 
Document (DCD) Tier 2 information. The proposed amendment also involves 
related changes to plant-specific Tier 1 information, with 
corresponding changes to the associated COL Appendix C information. 
Specifically, the licensee requested to allow a pneumatic test to be 
used in lieu a hydrostatic test for the Main Control Room Emergency 
Habitability System consistent with American Society of Mechanical 
Engineers Boiler and Pressure Vessel Code, Section III. Part of the 
justification for granting the exemption was provided by the review of 
the amendment. Because the exemption is necessary in order to issue the 
requested license amendment, the NRC granted the exemption and issued 
the amendment concurrently, rather than in sequence. This included 
issuing a combined safety evaluation containing the NRC staff's review 
of both the

[[Page 44309]]

exemption request and the license amendment. The exemption met all 
applicable regulatory criteria set forth in 10 CFR 50.12, 52.7, and 
section VIII.A.4 of appendix D to 10 CFR part 52. The license amendment 
was found to be acceptable as well. The combined safety evaluation is 
available in ADAMS under Accession No. ML18150A160.
    Identical exemption documents (except for referenced unit numbers 
and license numbers) were issued to the licensee for VEGP Units 3 and 4 
(COLs NPF-91 and NPF-92). The exemption documents for VEGP Units 3 and 
4 can be found in ADAMS under Accession Nos. ML18156A143 and 
ML18156A144 respectively. The exemption is reproduced (with the 
exception of abbreviated titles and additional citations) in Section II 
of this document. The amendment documents for COLs NPF-91 and NPF-92 
are available in ADAMS under Accession Nos. ML18156A145 and ML18156A147 
respectively. A summary of the amendment documents is provided in 
Section III of this document.

II. Exemption

    Reproduced below is the exemption document issued to VEGP Units 3 
and Unit 4. It makes reference to the combined safety evaluation that 
provides the reasoning for the findings made by the NRC (and listed 
under Item 1) in order to grant the exemption:
    1. In an application dated December 20, 2017, SNC requested from 
the Commission an exemption to allow departures from Tier 1 information 
in the certified DCD incorporated by reference in 10 CFR part 52, 
appendix D, as part of license amendment request 17-044, ``ITAAC 
[Inspections, Tests, Analysis, and Acceptance Criteria] for Pneumatic 
Testing of VES Air Lines''
    For the reasons set forth in Section 3.2 of the NRC staff's Safety 
Evaluation, which can be found in ADAMS under Accession No.ML18150A160, 
the Commission finds that:
    A. The exemption is authorized by law;
    B. the exemption presents no undue risk to public health and 
safety;
    C. the exemption is consistent with the common defense and 
security;
    D. special circumstances are present in that the application of the 
rule in this circumstance is not necessary to serve the underlying 
purpose of the rule;
    E. the special circumstances outweigh any decrease in safety that 
may result from the reduction in standardization caused by the 
exemption; and
    F. the exemption will not result in a significant decrease in the 
level of safety otherwise provided by the design.
    2. Accordingly, SNC is granted an exemption from the certified DCD 
Tier 1 information, with corresponding information in COL Appendix C of 
the Facility Combined License as described in the licensee's request 
dated December 20, 2017. This exemption is related to, and necessary 
for the granting of License Amendment No. 130 for Unit 3 and 129 for 
Unit 4, which is being issued concurrently with this exemption.
    3. As explained in Section 5.0 of the NRC staff's Safety Evaluation 
(ADAMS Accession No.ML18150A160), this exemption meets the eligibility 
criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment needs to be prepared in 
connection with the issuance of the exemption.
    4. This exemption is effective as of the date of its issuance.

III. License Amendment Request

    By letter dated December 20, 2017 (ADAMS Accession No.ML17354A964), 
the licensee requested that the NRC amend the COLs for VEGP, Units 3 
and 4, COLs NPF-91 and NPF-92. The proposed amendment is described in 
Section I of this Federal Register notice.
    The Commission has determined for these amendments that the 
application complies with the standards and requirements of the Atomic 
Energy Act of 1954, as amended (the Act), and the Commission's rules 
and regulations. The Commission has made appropriate findings as 
required by the Act and the Commission's rules and regulations in 10 
CFR chapter I, which are set forth in the license amendment.
    A notice of consideration of issuance of amendment to facility 
operating license or COL, as applicable, proposed no significant 
hazards consideration determination, and opportunity for a hearing in 
connection with these actions, was published in the Federal Register on 
March 13, 2018 (83 FR10922). No comments were received during the 30-
day comment period.
    The Commission has determined that these amendments satisfy the 
criteria for categorical exclusion in accordance with 10 CFR 51.22. 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment need be prepared for these 
amendments.

IV. Conclusion

    Using the reasons set forth in the combined safety evaluation, the 
staff granted the exemption and issued the amendment that the licensee 
requested on December 20, 2017.
    The exemption and amendment were issued on July 10, 2018, as part 
of a combined package to the licensee (ADAMS Accession No. 
ML18156A141).

    Dated at Rockville, Maryland, this 27th day of August 2018.

    For the Nuclear Regulatory Commission.
Jennifer Dixon-Herrity,
Chief, Licensing Branch 4, Division of Licensing, Siting, and 
Environmental Analysis Office of New Reactors.
[FR Doc. 2018-18846 Filed 8-29-18; 8:45 am]
 BILLING CODE 7590-01-P



                                              44308                       Federal Register / Vol. 83, No. 169 / Thursday, August 30, 2018 / Notices

                                              such as the Black Lung Benefits Act,                    NUCLEAR REGULATORY                                    the NRC’s Public Document Room (PDR)
                                              Service Contract Act, Longshore and                     COMMISSION                                            reference staff at 1–800–397–4209, 301–
                                              Harbor Workers’ Compensation Act,                                                                             415–4737, or by email to pdr.resource@
                                                                                                      [Docket Nos. 52–025 and 52–026; NRC–
                                              Fair Labor Standards Act, whistleblower                 2008–0252]
                                                                                                                                                            nrc.gov. The ADAMS accession number
                                              protections enforced by the                                                                                   for each document referenced (if it is
                                              Occupational Safety and Health                          Southern Nuclear Operating Company,                   available in ADAMS) is provided the
                                              Administration, or knowledge of other                   Inc., Vogtle Electric Generating Plant,               first time that it is mentioned in this
                                              similar laws.                                           Units 3 and 4; ITAAC for Pneumatic                    document. The request for the
                                                                                                      Testing of VES Air Lines                              amendment and exemption was
                                                 A. Relevant litigation experience can                                                                      submitted by letter dated December 20,
                                              include: Preparing for, participating in,               AGENCY:  Nuclear Regulatory                           2017 and available in ADAMS under
                                              and/or conducting formal hearings,                      Commission.                                           Accession No. ML17354A964
                                              trials, or appeals at the federal, state, or            ACTION: Exemption and combined                           • NRC’s PDR: You may examine and
                                              local level; participating in settlement or             license amendment; issuance.                          purchase copies of public documents at
                                              plea negotiations in advance of such                                                                          the NRC’s PDR, Room O1–F21, One
                                              proceedings; hearing cases; preparing                   SUMMARY:    The U.S. Nuclear Regulatory               White Flint North, 11555 Rockville
                                              opinions; participating in or conducting                Commission (NRC) is granting an                       Pike, Rockville, Maryland 20852.
                                              arbitration, mediation, or other                        exemption to allow a departure from the               FOR FURTHER INFORMATION CONTACT:
                                              alternative dispute resolution.                         certification information of Tier 1 of the            Chandu Patel, Office of New Reactors,
                                                                                                      generic design control document (DCD)                 U.S. Nuclear Regulatory Commission,
                                                 B. Relevant administrative law                       and has issued License Amendment
                                              experience is litigation experience in                                                                        Washington, DC 20555–0001; telephone:
                                                                                                      Nos. 130 and 129 to Combined Licenses                 301–415–3025; email: Chandu.Patel@
                                              cases initiated before a governmental                   (COLs), NPF–91 and NPF–92. The COLs
                                              administrative body.                                                                                          nrc.gov.
                                                                                                      were issued to Southern Nuclear
                                                 7. Appointments. Sitting ALJs and                    Operating Company, Inc., and Georgia                  SUPPLEMENTARY INFORMATION:
                                              ALJ candidates selected under this                      Power Company, Oglethorpe Power                       I. Introduction
                                              Order are appointed Federal officers.                   Corporation, MEAG Power SPVM, LLC,
                                                                                                                                                               The NRC is granting an exemption
                                              Appointment under this Order shall not                  MEAG Power SPVJ, LLC, MEAG Power
                                                                                                                                                            from paragraph B of section III, ‘‘Scope
                                              affect any other authority of the                       SPVP, LLC, and the City of Dalton,
                                                                                                                                                            and Contents,’’ of appendix D, ‘‘Design
                                              Secretary.                                              Georgia (the licensee); for construction
                                                                                                                                                            Certification Rule for the AP1000,’’ to
                                                                                                      and operation of the Vogtle Electric
                                                 8. Privacy. This Order is subject to the                                                                   part 52 of title 10 of the Code of Federal
                                                                                                      Generating Plant (VEGP) Units 3 and 4,
                                              applicable laws, regulations, and                                                                             Regulations (10 CFR), and issuing
                                                                                                      located in Burke County, Georgia.
                                              procedures concerning the privacy of                                                                          License Amendment Nos. 130 and 129
                                                                                                        The granting of the exemption allows
                                              applicants to federal government                                                                              to COLs, NPF–91 and NPF–92, to the
                                                                                                      the changes to Tier 1 information asked
                                              employment.                                                                                                   licensee. The exemption is required by
                                                                                                      for in the amendment. Because the
                                                                                                                                                            paragraph A.4 of section VIII,
                                                 9. Exceptions. The requirements of                   acceptability of the exemption was
                                                                                                                                                            ‘‘Processes for Changes and
                                              this Order are intended to be general in                determined in part by the acceptability
                                                                                                                                                            Departures,’’ appendix D, to 10 CFR part
                                              nature, and accordingly shall be                        of the amendment, the exemption and
                                                                                                                                                            52 to allow the licensee to depart from
                                              construed and implemented consistent                    amendment are being issued
                                                                                                                                                            Tier 1 information. With the requested
                                              with more specific requirements of any                  concurrently.
                                                                                                                                                            amendment, the licensee sought
                                              statute, Executive Order, or other legal                DATES:  The exemption and amendment                   proposed changes that would revise the
                                              authority governing the Department’s                    were issued on July 10, 2018.                         Updated Final Safety Analysis Report in
                                              Office of Administrative Law Judges. In                 ADDRESSES: Please refer to Docket ID                  the form of changes from the
                                              the event of a conflict, the specific                   NRC–2008–0252 when contacting the                     incorporated plant-specific Design
                                              statute, Executive Order, or other legal                NRC about the availability of                         Control Document (DCD) Tier 2
                                              authority shall govern.                                 information regarding this document.                  information. The proposed amendment
                                                 10. Redelegation of Authority. Except                You may obtain publicly-available                     also involves related changes to plant-
                                              as otherwise provided by law, all of the                information related to this document                  specific Tier 1 information, with
                                              authorities delegated in this Order may                 using any of the following methods:                   corresponding changes to the associated
                                              be redelegated in order to serve the                       • Federal Rulemaking Website: Go to                COL Appendix C information.
                                              purposes of this Order.                                 http://www.regulations.gov and search                 Specifically, the licensee requested to
                                                                                                      for Docket ID NRC–2008–0252. Address                  allow a pneumatic test to be used in lieu
                                                 11. Effective Date. This Order is                    questions about NRC dockets to Jennifer               a hydrostatic test for the Main Control
                                              effective immediately. This Order does                  Borges telephone: 301–287–9127; email:                Room Emergency Habitability System
                                              not apply to ongoing ALJ hiring for                     Jennifer.Borges@nrc.gov. For technical                consistent with American Society of
                                              which an interim procedure has been                     questions, contact the individual listed              Mechanical Engineers Boiler and
                                              approved.                                               in the FOR FURTHER INFORMATION                        Pressure Vessel Code, Section III. Part of
                                                Dated: August 16, 2018.                               CONTACT section of this document.                     the justification for granting the
                                              R. Alexander Acosta,
                                                                                                         • NRC’s Agencywide Documents                       exemption was provided by the review
                                                                                                      Access and Management System                          of the amendment. Because the
amozie on DSK3GDR082PROD with NOTICES1




                                              Secretary of Labor.                                     (ADAMS): You may obtain publicly-                     exemption is necessary in order to issue
                                              [FR Doc. 2018–18924 Filed 8–29–18; 8:45 am]             available documents online in the                     the requested license amendment, the
                                              BILLING CODE 4510–04–P                                  ADAMS Public Documents collection at                  NRC granted the exemption and issued
                                                                                                      http://www.nrc.gov/reading-rm/                        the amendment concurrently, rather
                                                                                                      adams.html. To begin the search, select               than in sequence. This included issuing
                                                                                                      ‘‘Begin Web-based ADAMS Search.’’ For                 a combined safety evaluation containing
                                                                                                      problems with ADAMS, please contact                   the NRC staff’s review of both the


                                         VerDate Sep<11>2014   17:25 Aug 29, 2018   Jkt 244001   PO 00000   Frm 00052   Fmt 4703   Sfmt 4703   E:\FR\FM\30AUN1.SGM   30AUN1


                                                                          Federal Register / Vol. 83, No. 169 / Thursday, August 30, 2018 / Notices                                                 44309

                                              exemption request and the license                          2. Accordingly, SNC is granted an                  amendment that the licensee requested
                                              amendment. The exemption met all                        exemption from the certified DCD Tier                 on December 20, 2017.
                                              applicable regulatory criteria set forth in             1 information, with corresponding                        The exemption and amendment were
                                              10 CFR 50.12, 52.7, and section VIII.A.4                information in COL Appendix C of the                  issued on July 10, 2018, as part of a
                                              of appendix D to 10 CFR part 52. The                    Facility Combined License as described                combined package to the licensee
                                              license amendment was found to be                       in the licensee’s request dated December              (ADAMS Accession No. ML18156A141).
                                              acceptable as well. The combined safety                 20, 2017. This exemption is related to,                 Dated at Rockville, Maryland, this 27th day
                                              evaluation is available in ADAMS under                  and necessary for the granting of                     of August 2018.
                                              Accession No. ML18150A160.                              License Amendment No. 130 for Unit 3                    For the Nuclear Regulatory Commission.
                                                 Identical exemption documents                        and 129 for Unit 4, which is being                    Jennifer Dixon-Herrity,
                                              (except for referenced unit numbers and                 issued concurrently with this                         Chief, Licensing Branch 4, Division of
                                              license numbers) were issued to the                     exemption.                                            Licensing, Siting, and Environmental
                                              licensee for VEGP Units 3 and 4 (COLs                      3. As explained in Section 5.0 of the              Analysis Office of New Reactors.
                                              NPF–91 and NPF–92). The exemption                       NRC staff’s Safety Evaluation (ADAMS                  [FR Doc. 2018–18846 Filed 8–29–18; 8:45 am]
                                              documents for VEGP Units 3 and 4 can                    Accession No.ML18150A160), this                       BILLING CODE 7590–01–P
                                              be found in ADAMS under Accession                       exemption meets the eligibility criteria
                                              Nos. ML18156A143 and ML18156A144                        for categorical exclusion set forth in 10
                                              respectively. The exemption is                          CFR 51.22(c)(9). Therefore, pursuant to
                                              reproduced (with the exception of                                                                             OCCUPATIONAL SAFETY AND
                                                                                                      10 CFR 51.22(b), no environmental
                                              abbreviated titles and additional                                                                             HEALTH REVIEW COMMISSION
                                                                                                      impact statement or environmental
                                              citations) in Section II of this document.              assessment needs to be prepared in                    Privacy Act of 1974; System of
                                              The amendment documents for COLs                        connection with the issuance of the                   Records
                                              NPF–91 and NPF–92 are available in                      exemption.
                                              ADAMS under Accession Nos.                                 4. This exemption is effective as of the           AGENCY:  Occupational Safety and Health
                                              ML18156A145 and ML18156A147                             date of its issuance.                                 Review Commission.
                                              respectively. A summary of the                                                                                ACTION: Notice of a modified system of
                                              amendment documents is provided in                      III. License Amendment Request                        records.
                                              Section III of this document.                              By letter dated December 20, 2017
                                                                                                      (ADAMS Accession No.ML17354A964),                     SUMMARY:    In accordance with the
                                              II. Exemption                                                                                                 Privacy Act of 1974, as amended, the
                                                                                                      the licensee requested that the NRC
                                                 Reproduced below is the exemption                    amend the COLs for VEGP, Units 3 and                  Occupational Safety and Health Review
                                              document issued to VEGP Units 3 and                     4, COLs NPF–91 and NPF–92. The                        Commission (OSHRC) is revising the
                                              Unit 4. It makes reference to the                       proposed amendment is described in                    notice for Privacy Act system-of-records
                                              combined safety evaluation that                         Section I of this Federal Register notice.            OSHRC–4.
                                              provides the reasoning for the findings                    The Commission has determined for                  DATES: Comments must be received by
                                              made by the NRC (and listed under Item                  these amendments that the application                 OSHRC on or before October 1, 2018.
                                              1) in order to grant the exemption:                     complies with the standards and                       The revised system of records will
                                                 1. In an application dated December                  requirements of the Atomic Energy Act                 become effective on that date, without
                                              20, 2017, SNC requested from the                        of 1954, as amended (the Act), and the                any further notice in the Federal
                                              Commission an exemption to allow                        Commission’s rules and regulations.                   Register, unless comments or
                                              departures from Tier 1 information in                   The Commission has made appropriate                   government approval procedures
                                              the certified DCD incorporated by                       findings as required by the Act and the               necessitate otherwise.
                                              reference in 10 CFR part 52, appendix                   Commission’s rules and regulations in                 ADDRESSES: You may submit comments
                                              D, as part of license amendment request                 10 CFR chapter I, which are set forth in              by any of the following methods:
                                              17–044, ‘‘ITAAC [Inspections, Tests,                    the license amendment.                                   • Email: rbailey@oshrc.gov. Include
                                              Analysis, and Acceptance Criteria] for                                                                        ‘‘PRIVACY ACT SYSTEM OF
                                                                                                         A notice of consideration of issuance
                                              Pneumatic Testing of VES Air Lines’’                                                                          RECORDS’’ in the subject line of the
                                                 For the reasons set forth in Section 3.2             of amendment to facility operating
                                                                                                      license or COL, as applicable, proposed               message.
                                              of the NRC staff’s Safety Evaluation,
                                                                                                      no significant hazards consideration                     • Fax: (202) 606–5417.
                                              which can be found in ADAMS under
                                                                                                      determination, and opportunity for a                     • Mail: One Lafayette Centre, 1120
                                              Accession No.ML18150A160, the                                                                                 20th Street NW, Ninth Floor,
                                              Commission finds that:                                  hearing in connection with these
                                                                                                      actions, was published in the Federal                 Washington, DC 20036–3457.
                                                 A. The exemption is authorized by
                                                                                                      Register on March 13, 2018 (83                           • Hand Delivery/Courier: Same as
                                              law;                                                                                                          mailing address.
                                                 B. the exemption presents no undue                   FR10922). No comments were received
                                                                                                                                                               Instructions: All submissions must
                                              risk to public health and safety;                       during the 30-day comment period.
                                                                                                                                                            include your name, return address, and
                                                 C. the exemption is consistent with                     The Commission has determined that
                                                                                                                                                            email address, if applicable. Please
                                              the common defense and security;                        these amendments satisfy the criteria for
                                                                                                                                                            clearly label submissions as ‘‘PRIVACY
                                                 D. special circumstances are present                 categorical exclusion in accordance
                                                                                                                                                            ACT SYSTEM OF RECORDS.’’
                                              in that the application of the rule in this             with 10 CFR 51.22. Therefore, pursuant
                                                                                                                                                            FOR FURTHER INFORMATION CONTACT: Ron
                                              circumstance is not necessary to serve                  to 10 CFR 51.22(b), no environmental
                                                                                                      impact statement or environmental                     Bailey, Attorney-Advisor, Office of the
                                              the underlying purpose of the rule;
amozie on DSK3GDR082PROD with NOTICES1




                                                 E. the special circumstances outweigh                assessment need be prepared for these                 General Counsel, via telephone at (202)
                                              any decrease in safety that may result                  amendments.                                           606–5410, or via email at rbailey@
                                              from the reduction in standardization                                                                         oshrc.gov.
                                                                                                      IV. Conclusion
                                              caused by the exemption; and                                                                                  SUPPLEMENTARY INFORMATION:    The
                                                 F. the exemption will not result in a                  Using the reasons set forth in the                  Privacy Act of 1974, 5 U.S.C. 552a(e)(4),
                                              significant decrease in the level of safety             combined safety evaluation, the staff                 requires federal agencies such as
                                              otherwise provided by the design.                       granted the exemption and issued the                  OSHRC to publish in the Federal


                                         VerDate Sep<11>2014   17:25 Aug 29, 2018   Jkt 244001   PO 00000   Frm 00053   Fmt 4703   Sfmt 4703   E:\FR\FM\30AUN1.SGM   30AUN1



Document Created: 2018-08-30 01:21:17
Document Modified: 2018-08-30 01:21:17
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionExemption and combined license amendment; issuance.
DatesThe exemption and amendment were issued on July 10, 2018.
ContactChandu Patel, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-3025; email: [email protected]
FR Citation83 FR 44308 