83_FR_45597 83 FR 45423 - Midwest Hydro, LLC, STS Hydropower, Ltd.; Notice of Application Accepted for Filing, Soliciting Comments, Protests and Motions To Intervene

83 FR 45423 - Midwest Hydro, LLC, STS Hydropower, Ltd.; Notice of Application Accepted for Filing, Soliciting Comments, Protests and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 174 (September 7, 2018)

Page Range45423-45424
FR Document2018-19407

Federal Register, Volume 83 Issue 174 (Friday, September 7, 2018)
[Federal Register Volume 83, Number 174 (Friday, September 7, 2018)]
[Notices]
[Pages 45423-45424]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-19407]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project Nos. 2348-038; 2373-011; 2446-050]


Midwest Hydro, LLC, STS Hydropower, Ltd.; Notice of Application 
Accepted for Filing, Soliciting Comments, Protests and Motions To 
Intervene

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Proceeding: Extension of License Term.
    b. Project Nos.: P-2348-038, P-2373-011, and P-2446-050.
    c. Date Filed: June 27, 2018.
    d. Licensees: Midwest Hydro, LLC and STS Hydropower, Ltd.
    e. Names and Locations of Projects: Beloit Hydroelectric Project 
No. 2348, located on the Rock River, in Rock County, Wisconsin. Rockton 
Hydroelectric Project No. 2373, located on the Rock River, in Winnebago 
County, Illinois. Dixon Hydroelectric Project No. 2446, located on the 
Rock River, in Lee County, Illinois.
    f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    g. Licensee Contact Information: Mr. Michael Scarzello, Regulatory 
Director, Eagle Creek Renewable Energy, 116 North State Street, P.O. 
Box 167, Neshkoro, Wisconsin 54960-0167, Phone: (973) 998-8400, Email: 
[email protected].
    h. FERC Contact: Mr. Ashish Desai, (202) 502-8370, 
[email protected].
    i. Deadline for filing comments, motions to intervene and protests, 
is 30 days from the issuance date of this notice by the Commission. The 
Commission strongly encourages electronic filing. Please file motions 
to intervene, protests, comments, and recommendations, using the 
Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866)

[[Page 45424]]

208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic 
filing, please send a paper copy to: Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426. The 
first page of any filing should include docket numbers P-2348-038, P-
2373-011, and P-2446-050.
    j. Description of Proceeding: Midwest Hydro, LLC, licensee for the 
Beloit and Rockton projects, and STS Hydropower, Ltd., licensee for the 
Dixon Project request that the Commission extend the term of the 
licenses to synchronize license expiration with the nearby Central 
Project No. 2347, also located on the Rock River, in Rock County 
Wisconsin and licensed to Midwest Hydro, LLC. The license for the 
Central Project expires on August 31, 2024 and the licensees request 
eight-month extensions for the Dixon and Rockton projects, currently 
set to expire on December 31, 2023, and a three-month extension of the 
license term for the Beloit Project, which expires on May 31, 2024. The 
licensees requests the license term extensions to coordinate and 
streamline relicensing efforts for the four projects and perform a more 
comprehensive analysis of the resources involved.
    k. This notice is available for review and reproduction at the 
Commission in the Public Reference Room, Room 2A, 888 First Street NE, 
Washington, DC 20426. The filing may also be viewed on the Commission's 
website at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the 
Docket number (P-2348-038, P-2373-011, or P-2446-050) excluding the 
last three digits in the docket number field to access the notice. You 
may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, call toll-
free 1-866-208-3676 or email [email protected]. For TTY, call 
(202) 502-8659.
    l. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    m. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
and .214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    n. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO 
INTERVENE as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions 
to intervene, or protests must set forth their evidentiary basis and 
otherwise comply with the requirements of 18 CFR 4.34(b). All comments, 
motions to intervene, or protests should relate to the license term 
extension requests. Agencies may obtain copies of the application 
directly from the applicant. A copy of any protest or motion to 
intervene must be served upon each representative of the applicant 
specified in the particular application. If an intervener files 
comments or documents with the Commission relating to the merits of an 
issue that may affect the responsibilities of a particular resource 
agency, they must also serve a copy of the document on that resource 
agency. A copy of all other filings in reference to this application 
must be accompanied by proof of service on all persons listed in the 
service list prepared by the Commission in this proceeding, in 
accordance with 18 CFR 4.34(b) and 385.2010.

    Dated: August 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-19407 Filed 9-6-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                           Federal Register / Vol. 83, No. 174 / Friday, September 7, 2018 / Notices                                                 45423

                                               of issuance of the Commission staff’s                   Brownsville Project, Request for                        Dated: August 31, 2018.
                                               final Environmental Impact Statement                    Comments on Environmental Issues,                     Nathaniel J. Davis, Sr.,
                                               (EIS) for the Annova LNG Brownsville                    and Notice of Public Scoping Meeting                  Deputy Secretary.
                                               Project. This instant notice identifies the             (NOI).                                                [FR Doc. 2018–19399 Filed 9–6–18; 8:45 am]
                                               FERC staff’s planned schedule for                          The NOI was issued during the pre-                 BILLING CODE 6717–01–P
                                               completion of the final EIS for the                     filing review of the Project in Docket
                                               Project, which is based on an issuance                  No. PF15–15–000 and was sent to
                                               of the draft EIS in December 2018. The                  federal, state, and local government                  DEPARTMENT OF ENERGY
                                               forecasted schedule for both the draft                  agencies; elected officials; affected
                                               and final EIS is based upon Annova                      landowners; environmental and public                  Federal Energy Regulatory
                                               providing complete and timely                           interest groups; Native American tribes               Commission
                                               responses to any future data requests. In               and regional organizations; commentors                [Project Nos. 2348–038; 2373–011; 2446–
                                               addition, the schedule assumes that the                 and other interested parties; and local               050]
                                               cooperating agencies will provide input                 libraries and newspapers. Major issues
                                               on their areas of responsibility on a                                                                         Midwest Hydro, LLC, STS Hydropower,
                                                                                                       raised during scoping include: The
                                               timely basis.                                                                                                 Ltd.; Notice of Application Accepted
                                                                                                       purpose and need for the Project;
                                               Schedule for Environmental Review                       impacts on recreational areas and users;              for Filing, Soliciting Comments,
                                                                                                       impacts on the socioeconomic                          Protests and Motions To Intervene
                                               Issuance of Notice of Availability of the
                                                  final EIS—April 19, 2019                             conditions of the area; impacts on                       Take notice that the following
                                               90-Day Federal Authorization Decision                   wildlife, wetlands, and vegetation; and               hydroelectric application has been filed
                                                  Deadline—July 18, 2019                               impacts on sensitive areas such as the                with the Commission and is available
                                                  If a schedule change becomes                         Bahia Grande wetland restoration area                 for public inspection:
                                               necessary for the final EIS, an additional              and the Padre Island Seashore.                           a. Type of Proceeding: Extension of
                                               notice will be provided so that the                        The U.S. Army Corps of Engineers;                  License Term.
                                               relevant agencies are kept informed of                  U.S. Coast Guard; U.S. Department of                     b. Project Nos.: P–2348–038, P–2373–
                                               the Project’s progress.                                 Transportation; U.S. Environmental                    011, and P–2446–050.
                                                                                                       Protection Agency; U.S. Fish and                         c. Date Filed: June 27, 2018.
                                               Project Description                                                                                              d. Licensees: Midwest Hydro, LLC
                                                                                                       Wildlife Service; National Park Service;
                                                  The proposed Project would be                        the National Oceanic and Atmospheric                  and STS Hydropower, Ltd.
                                               located on about 364 acres of an                        Administration, National Marine                          e. Names and Locations of Projects:
                                               approximately 731-acre site on the                      Fisheries Service; Federal Aviation                   Beloit Hydroelectric Project No. 2348,
                                               southern bank of the BSC at mile marker                 Administration; and U.S. Department of                located on the Rock River, in Rock
                                               8.2. The site is owned by the Port of                   Energy are cooperating agencies in the                County, Wisconsin. Rockton
                                               Brownsville and Annova has entered                      preparation of the EIS.                               Hydroelectric Project No. 2373, located
                                               into a Lease Option Agreement for                                                                             on the Rock River, in Winnebago
                                               possible use of the site. The BSC has                   Additional Information                                County, Illinois. Dixon Hydroelectric
                                               direct access to the Gulf of Mexico via                                                                       Project No. 2446, located on the Rock
                                                                                                          In order to receive notification of the
                                               the Brazos Santiago Pass.                                                                                     River, in Lee County, Illinois.
                                                                                                       issuance of the EIS and to keep track of                 f. Filed Pursuant to: Federal Power
                                                  The Project would include six
                                                                                                       all formal issuances and submittals in                Act, 16 U.S.C. 791a–825r.
                                               liquefaction trains with a total capacity
                                                                                                       specific dockets, the Commission offers                  g. Licensee Contact Information: Mr.
                                               of 6 million tons per year of LNG. The
                                                                                                       a free service called eSubscription. This             Michael Scarzello, Regulatory Director,
                                               natural gas delivered to the site would
                                                                                                       can reduce the amount of time you                     Eagle Creek Renewable Energy, 116
                                               be treated, liquefied, and stored on site
                                                                                                       spend researching proceedings by                      North State Street, P.O. Box 167,
                                               in two single containment LNG storage
                                                                                                       automatically providing you with                      Neshkoro, Wisconsin 54960–0167,
                                               tanks. The Project would include two
                                                                                                       notification of these filings, document               Phone: (973) 998–8400, Email:
                                               principal parts, the LNG facilities and
                                                                                                       summaries, and direct links to the                    Michael.Scarzello@eaglecreekre.com.
                                               associated marine facilities. The LNG
                                                                                                       documents. Go to www.ferc.gov/docs-                      h. FERC Contact: Mr. Ashish Desai,
                                               facilities would be designed to receive
                                                                                                       filing/esubscription.asp.                             (202) 502–8370, Ashish.Desai@ferc.gov.
                                               0.9 billion cubic feet per day of natural
                                               gas via a planned intrastate pipeline;                     Additional information about the                      i. Deadline for filing comments,
                                               treat the gas to remove constituents that               Project is available from the                         motions to intervene and protests, is 30
                                               affect the cryogenic process; liquefy the               Commission’s Office of External Affairs               days from the issuance date of this
                                               gas; and store the LNG in storage tanks                 at (866) 208–FERC or on the FERC                      notice by the Commission. The
                                               prior to loading for shipment to overseas               website (www.ferc.gov). Using the                     Commission strongly encourages
                                               markets. The marine facilities would                    eLibrary link, select General Search                  electronic filing. Please file motions to
                                               allow access to the site and LNG loading                from the eLibrary menu, enter the                     intervene, protests, comments, and
                                               onto LNG carriers.                                      selected date range and Docket Number                 recommendations, using the
                                                                                                       excluding the last three digits (i.e.,                Commission’s eFiling system at http://
                                               Background                                              CP16–480), and follow the instructions.               www.ferc.gov/docs-filing/efiling.asp.
                                                 On March 27, 2015, the Commission                     For assistance with access to eLibrary,               Commenters can submit brief comments
                                               staff granted Annova’s request to use the               the helpline can be reached at (866)                  up to 6,000 characters, without prior
daltland on DSKBBV9HB2PROD with NOTICES




                                               FERC’s Pre-filing environmental review                  208–3676, TTY (202) 502–8659, or at                   registration, using the eComment system
                                               process and assigned the Annova LNG                     FERCOnlineSupport@ferc.gov. The                       at http://www.ferc.gov/docs-filing/
                                               Brownsville Project Docket No. PF15–                    eLibrary link on the FERC website also                ecomment.asp. You must include your
                                               15–000. On July 23, 2015, the                           provides access to the texts of formal                name and contact information at the end
                                               Commission issued a Notice of Intent to                 documents issued by the Commission,                   of your comments. For assistance,
                                               Prepare an Environmental Impact                         such as orders, notices, and rule                     please contact FERC Online Support at
                                               Statement for the Planned Annova LNG                    makings.                                              FERCOnlineSupport@ferc.gov, (866)


                                          VerDate Sep<11>2014   17:55 Sep 06, 2018   Jkt 244001   PO 00000   Frm 00013   Fmt 4703   Sfmt 4703   E:\FR\FM\07SEN1.SGM   07SEN1


                                               45424                       Federal Register / Vol. 83, No. 174 / Friday, September 7, 2018 / Notices

                                               208–3676 (toll free), or (202) 502–8659                 be received on or before the specified                Commission’s regulations, requesting
                                               (TTY). In lieu of electronic filing, please             comment date for the particular                       authorization to construct and operate
                                               send a paper copy to: Secretary, Federal                application.                                          the Gulf LNG Liquefaction Project
                                               Energy Regulatory Commission, 888                          n. Filing and Service of Responsive                (Project) at Gulf Energy’s liquefied
                                               First Street NE, Washington, DC 20426.                  Documents: Any filing must (1) bear in                natural gas terminal located near
                                               The first page of any filing should                     all capital letters the title COMMENTS,               Pascagoula, Jackson County,
                                               include docket numbers P–2348–038,                      PROTEST, or MOTION TO INTERVENE                       Mississippi. The Project consists of new
                                               P–2373–011, and P–2446–050.                             as applicable; (2) set forth in the                   natural gas liquefaction and export
                                                  j. Description of Proceeding: Midwest                heading the name of the applicant and                 facilities. Additionally, within the same
                                               Hydro, LLC, licensee for the Beloit and                 the project number of the application to              application, Gulf Pipeline requested,
                                               Rockton projects, and STS Hydropower,                   which the filing responds; (3) furnish                pursuant to section 7(c) of the NGA and
                                               Ltd., licensee for the Dixon Project                    the name, address, and telephone                      Part 157 of the Commission’s
                                               request that the Commission extend the                  number of the person protesting or                    regulations, to make modifications to
                                               term of the licenses to synchronize                     intervening; and (4) otherwise comply                 the terminal’s sendout pipeline to allow
                                               license expiration with the nearby                      with the requirements of 18 CFR                       for bi-directional flow. These facilities
                                               Central Project No. 2347, also located on               385.2001 through 385.2005. All                        will enable Gulf Liquefaction to liquefy
                                               the Rock River, in Rock County                          comments, motions to intervene, or                    and export about 11 million metric tons
                                               Wisconsin and licensed to Midwest                       protests must set forth their evidentiary             of LNG per year.
                                               Hydro, LLC. The license for the Central                 basis and otherwise comply with the                      In accordance with Title 41 of the
                                               Project expires on August 31, 2024 and                  requirements of 18 CFR 4.34(b). All                   Fixing America’s Surface Transportation
                                               the licensees request eight-month                       comments, motions to intervene, or                    Act, enacted on December 4, 2015,
                                               extensions for the Dixon and Rockton                    protests should relate to the license term            agencies are to publish completion dates
                                               projects, currently set to expire on                    extension requests. Agencies may obtain               for all federal environmental reviews
                                               December 31, 2023, and a three-month                    copies of the application directly from               and authorizations. This notice
                                               extension of the license term for the                   the applicant. A copy of any protest or               identifies the Commission’s anticipated
                                               Beloit Project, which expires on May 31,                motion to intervene must be served                    schedule for issuance of the final order
                                               2024. The licensees requests the license                upon each representative of the                       for the Project, which is based on the
                                               term extensions to coordinate and                       applicant specified in the particular                 anticipated date of issuance of the final
                                               streamline relicensing efforts for the                  application. If an intervener files                   Environmental Impact Statement.
                                               four projects and perform a more                        comments or documents with the                        Accordingly, we currently anticipate
                                               comprehensive analysis of the resources                 Commission relating to the merits of an               issuing a final order for the Project no
                                               involved.                                               issue that may affect the responsibilities            later than:
                                                  k. This notice is available for review
                                                                                                       of a particular resource agency, they                 Issuance of Final Order—July 16, 2019
                                               and reproduction at the Commission in
                                                                                                       must also serve a copy of the document                   If a schedule change becomes
                                               the Public Reference Room, Room 2A,
                                                                                                       on that resource agency. A copy of all                necessary for the final order, an
                                               888 First Street NE, Washington, DC
                                                                                                       other filings in reference to this                    additional notice will be provided so
                                               20426. The filing may also be viewed on
                                                                                                       application must be accompanied by                    that interested parties and government
                                               the Commission’s website at http://
                                                                                                       proof of service on all persons listed in             agencies are kept informed of the
                                               www.ferc.gov/docs-filing/elibrary.asp.
                                                                                                       the service list prepared by the                      Project’s progress.
                                               Enter the Docket number (P–2348–038,
                                                                                                       Commission in this proceeding, in
                                               P–2373–011, or P–2446–050) excluding                                                                            Dated: August 31, 2018.
                                                                                                       accordance with 18 CFR 4.34(b) and
                                               the last three digits in the docket                                                                           Nathaniel J. Davis, Sr.,
                                               number field to access the notice. You                  385.2010.
                                                                                                                                                             Deputy Secretary.
                                               may also register online at http://                       Dated: August 31, 2018.
                                                                                                                                                             [FR Doc. 2018–19387 Filed 9–6–18; 8:45 am]
                                               www.ferc.gov/docs-filing/                               Nathaniel J. Davis, Sr.,
                                                                                                                                                             BILLING CODE 6717–01–P
                                               esubscription.asp to be notified via                    Deputy Secretary.
                                               email of new filings and issuances                      [FR Doc. 2018–19407 Filed 9–6–18; 8:45 am]
                                               related to this or other pending projects.              BILLING CODE 6717–01–P                                DEPARTMENT OF ENERGY
                                               For assistance, call toll-free 1–866–208–
                                               3676 or email FERCOnlineSupport@                                                                              Federal Energy Regulatory
                                               ferc.gov. For TTY, call (202) 502–8659.                 DEPARTMENT OF ENERGY                                  Commission
                                                  l. Individuals desiring to be included
                                               on the Commission’s mailing list should                 Federal Energy Regulatory                             [Docket Nos. CP15–550–000; CP15–551–
                                                                                                                                                             001]
                                               so indicate by writing to the Secretary                 Commission
                                               of the Commission.                                                                                            Notice of Anticipated Schedule of Final
                                                  m. Comments, Protests, or Motions to                 [Docket No. CP15–521–000]
                                                                                                                                                             Order for the Calcasieu Pass Project:
                                               Intervene: Anyone may submit                            Gulf LNG Liquefaction Company, LLC,                   Venture Global Calcasieu Pass, LLC;
                                               comments, a protest, or a motion to                     Gulf LNG Energy, LLC, Gulf LNG                        TransCameron Pipeline, LLC
                                               intervene in accordance with the                        Pipeline, LLC; Notice of Anticipated
                                               requirements of Rules of Practice and                   Schedule of Final Order for the Gulf                    On September 4, 2015, Venture Global
                                               Procedure, 18 CFR 385.210, .211, and                    LNG Liquefaction Project                              Calcasieu Pass, LLC filed an application
                                               .214. In determining the appropriate                                                                          in Docket No. CP15–550–000, pursuant
daltland on DSKBBV9HB2PROD with NOTICES




                                               action to take, the Commission will                       On June 19, 2015, Gulf LNG                          to section 3 of the Natural Gas Act
                                               consider all protests or other comments                 Liquefaction Company, LLC (Gulf                       (NGA) and Part 153 of the Commission’s
                                               filed, but only those who file a motion                 Liquefaction), Gulf LNG Energy, LLC                   regulations, for authorization to site,
                                               to intervene in accordance with the                     (Gulf Energy), and Gulf LNG Pipeline                  construct, and operate a new liquefied
                                               Commission’s Rules may become a                         LLC (Gulf Pipeline) filed an application              natural gas (LNG) export terminal and
                                               party to the proceeding. Any comments,                  pursuant to section 3(a) of the Natural               associated facilities along the Calcasieu
                                               protests, or motions to intervene must                  Gas Act (NGA) and Part 153 of the                     Ship Channel in Cameron Parish,


                                          VerDate Sep<11>2014   17:55 Sep 06, 2018   Jkt 244001   PO 00000   Frm 00014   Fmt 4703   Sfmt 4703   E:\FR\FM\07SEN1.SGM   07SEN1



Document Created: 2018-09-07 00:15:04
Document Modified: 2018-09-07 00:15:04
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 45423 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR