83_FR_45608 83 FR 45434 - Notice of Schedule for Environmental Review of the UGI LNG, Inc. Temple Truck Rack Expansion Project

83 FR 45434 - Notice of Schedule for Environmental Review of the UGI LNG, Inc. Temple Truck Rack Expansion Project

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 174 (September 7, 2018)

Page Range45434-45435
FR Document2018-19391

Federal Register, Volume 83 Issue 174 (Friday, September 7, 2018)
[Federal Register Volume 83, Number 174 (Friday, September 7, 2018)]
[Notices]
[Pages 45434-45435]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-19391]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-14-000]


Notice of Schedule for Environmental Review of the UGI LNG, Inc. 
Temple Truck Rack Expansion Project

    On November 14, 2016, UGI LNG, Inc. filed an application in Docket 
No. CP17-14-000 requesting a Certificate of Public Convenience and 
Necessity pursuant to Section 7(c) of the Natural Gas Act to construct 
and operate certain

[[Page 45435]]

natural gas pipeline facilities at the existing Temple Liquefied 
Natural Gas (LNG) Peak-shaving Facility in Berks County, Pennsylvania. 
The proposed project is known as the Temple Truck Rack Expansion 
Project (Project), and would allow UGI LNG, Inc. to more reliably serve 
the growing demand for truck deliveries by UGI Energy Services.
    On November 29, 2016, the Federal Energy Regulatory Commission 
(Commission or FERC) issued its Notice of Application for the Project. 
Among other things, that notice alerted agencies issuing federal 
authorizations of the requirement to complete all necessary reviews and 
to reach a final decision on a request for a federal authorization 
within 90 days of the date of issuance of the Commission staff's 
Environmental Assessment (EA) for the Project. This instant notice 
identifies the FERC staff's planned schedule for the completion of the 
EA for the Project.

Schedule for Environmental Review

Issuance of EA--September 18, 2018
90-Day Federal Authorization Decision Deadline--December 17, 2018

    If a schedule change becomes necessary, additional notice will be 
provided so that the relevant agencies are kept informed of the 
Project's progress.

Project Description

    UGI LNG, Inc. proposes to expand its existing Temple LNG truck 
loading facility by constructing two additional trailer loading/
unloading racks. The new facilities would consist of two racks with 
scales, trailer loading skid, pump skid, transfer piping, and 
associated equipment. The Project would also include constructing a new 
driveway connecting the expansion to Willow Creek Road. The Project is 
projected to increase truck volumes from an average of one to three 
trucks per day to an average of three to six trucks per day.

Background

    On January 23, 2017, the Commission issued a Notice of Intent to 
Prepare an Environmental Assessment for the Proposed Temple Truck Rack 
Expansion Project and Request for Comments on Environmental Issues 
(NOI). The NOI was sent to affected landowners; federal, state, and 
local government agencies; elected officials; environmental and public 
interest groups; other interested parties; and local libraries and 
newspapers. In response to the NOI, the Commission received one public 
comment concerning increased traffic.
    The U.S. Department of Transportation is a cooperating agencies in 
the preparation of the EA.

Additional Information

    In order to receive notification of the issuance of the EA and to 
keep track of all formal issuances and submittals in specific dockets, 
the Commission offers a free service called eSubscription. This can 
reduce the amount of time you spend researching proceedings by 
automatically providing you with notification of these filings, 
document summaries, and direct links to the documents. Go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Additional information about the Project is available from the 
Commission's Office of External Affairs at (866) 208-FERC or on the 
FERC website (www.ferc.gov). Using the eLibrary link, select General 
Search from the eLibrary menu, enter the selected date range and Docket 
Number excluding the last three digits (i.e., CP17-14), and follow the 
instructions. For assistance with access to eLibrary, the helpline can 
be reached at (866) 208-3676, TTY (202) 502-8659, or at 
[email protected]. The eLibrary link on the FERC website also 
provides access to the texts of formal documents issued by the 
Commission, such as orders, notices, and rule makings.

    Dated: August 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-19391 Filed 9-6-18; 8:45 am]
BILLING CODE 6717-01-P



                                               45434                       Federal Register / Vol. 83, No. 174 / Friday, September 7, 2018 / Notices

                                               Line TL–489 in Clinton County,                          (www.ferc.gov), on the Environmental                  Bose, Secretary, Federal Energy
                                               Pennsylvania to a new point of                          Documents page (https://www.ferc.gov/                 Regulatory Commission, 888 First Street
                                               interconnection between Dominion and                    industries/gas/enviro/eis.asp). In                    NE, Room 1A, Washington, DC 20426.
                                               Tennessee Gas Pipeline in Tuscarawas                    addition, the EA may be accessed by                      Any person seeking to become a party
                                               County, Ohio.                                           using the eLibrary link on the FERC’s                 to the proceeding must file a motion to
                                                  The EA assesses the potential                        website. Click on the eLibrary link                   intervene pursuant to Rule 214 of the
                                               environmental effects of constructing                   (https://www.ferc.gov/docs-filing/                    Commission’s Rules of Practice and
                                               and operating the Project in accordance                 elibrary.asp), click on General Search,               Procedures (18 CFR 385.214). Motions
                                               with the requirements of the National                   and enter the docket number in the                    to intervene are more fully described at
                                               Environmental Policy Act (NEPA). The                    ‘‘Docket Number’’ field, excluding the                http://www.ferc.gov/resources/guides/
                                               FERC staff concludes that approval of                   last three digits (i.e., CP18–45). Be sure            how-to/intervene.asp. Only intervenors
                                               the Project, with appropriate mitigating                you have selected an appropriate date                 have the right to seek rehearing or
                                               measures, would not constitute a major                  range. For assistance, please contact                 judicial review of the Commission’s
                                               federal action significantly affecting the              FERC Online Support at FercOnline                     decision. The Commission may grant
                                               quality of the human environment.                       Support@ferc.gov or toll free at (866)                affected landowners and others with
                                                  The U.S. Army Corps of Engineers                     208–3676, or for TTY, contact (202)                   environmental concerns intervenor
                                               (USACE) participated as cooperating                     502–8659.                                             status upon showing good cause by
                                               agency in the preparation of the EA.                       Any person wishing to comment on                   stating that they have a clear and direct
                                               Cooperating agencies have jurisdiction                  the EA may do so. Your comments                       interest in this proceeding which no
                                               by law or special expertise with respect                should focus on EA’s disclosure and                   other party can adequately represent.
                                               to resources potentially affected by the                discussion of potential environmental                 Simply filing environmental comments
                                               proposal and participate in the NEPA                    effects, reasonable alternatives, and                 will not give you intervenor status, but
                                               analysis. The USACE would adopt the                     measures to avoid or lessen                           you do not need intervenor status to
                                               EA to fulfill their agency’s NEPA                       environmental impacts. The more                       have your comments considered.
                                               obligations and would use the EA and                    specific your comments, the more useful                  Additional information about the
                                               supporting documentation to consider                    they will be. To ensure that the                      project is available from the
                                               the issuance of Clean Water Act Section                 Commission has the opportunity to                     Commission’s Office of External Affairs,
                                               404 permit.                                             consider your comments prior to                       at (866) 208–FERC, or on the FERC
                                                  The Sweden Valley Project would                      making its decision on this project, it is            website (www.ferc.gov) using the
                                               consist of the following actions in Ohio:               important that we receive your                        eLibrary link. The eLibrary link also
                                                  • Install approximately 1.7 miles of                 comments in Washington, DC, on or                     provides access to the texts of all formal
                                               20-inch-diameter pipeline lateral in                    before 5:00 p.m. Eastern Time on                      documents issued by the Commission,
                                               Tuscarawas County;                                      October 1, 2018.                                      such as orders, notices, and
                                                  • Re-wheel the compressors on three-                    For your convenience, there are three
                                                                                                                                                             rulemakings.
                                               existing centrifugal compression sets at                methods you can use to file your
                                                                                                                                                                In addition, the Commission offers a
                                               Dominion’s existing Newark                              comments to the Commission. The
                                                                                                                                                             free service called eSubscription which
                                               Compressor Station in Licking County;                   Commission encourages electronic filing
                                                                                                                                                             allows you to keep track of all formal
                                                  • Construct a new Metering and                       of comments and has staff available to
                                                                                                                                                             issuances and submittals in specific
                                               Regulation (M&R) site in Tuscarawas                     assist you at (866) 208–3676 or Ferc
                                                                                                                                                             dockets. This can reduce the amount of
                                               County; and                                             OnlineSupport@ferc.gov. Please
                                                                                                                                                             time you spend researching proceedings
                                                  • Install a new pig launcher/receiver                carefully follow these instructions so
                                                                                                                                                             by automatically providing you with
                                               on the TL–653 OH Pipeline Lateral in                    that your comments are properly
                                                                                                       recorded.                                             notification of these filings, document
                                               Tuscarawas County.                                                                                            summaries, and direct links to the
                                                  In Pennsylvania, the Project would                      (1) You can file your comments
                                                                                                       electronically using the eComment                     documents. Go to www.ferc.gov/docs-
                                               include:
                                                                                                                                                             filing/esubscription.asp.
                                                  • Installation of approximately 3.2                  feature on the Commission’s website
                                               miles of 24-inch-diameter pipeline                      (www.ferc.gov) under the link to                        Dated: August 31, 2018.
                                               looping in Greene County;                               Documents and Filings. This is an easy                Nathaniel J. Davis, Sr.,
                                                  • Installation of regulation equipment               method for submitting brief, text-only                Deputy Secretary.
                                               at the South Bend Compressor Station                    comments on a project;                                [FR Doc. 2018–19405 Filed 9–6–18; 8:45 am]
                                               in Armstrong County;                                       (2) You can also file your comments                BILLING CODE 6717–01–P
                                                  • Installation of M&R equipment at a                 electronically using the eFiling feature
                                               new interconnect in Clinton County;                     on the Commission’s website
                                               and                                                     (www.ferc.gov) under the link to                      DEPARTMENT OF ENERGY
                                                  • Installation of new mainline gate                  Documents and Filings. With eFiling,
                                               assemblies on the TL–654 Loop in                        you can provide comments in a variety                 Federal Energy Regulatory
                                               Greene County.                                          of formats by attaching them as a file                Commission
                                                  The Commission mailed a copy of the                  with your submission. New eFiling
                                               Notice of Availability to federal, state,                                                                     [Docket No. CP17–14–000]
                                                                                                       users must first create an account by
                                               and local government representatives                    clicking on ‘‘eRegister.’’ You must select            Notice of Schedule for Environmental
                                               and agencies; elected officials;                        the type of filing you are making. If you             Review of the UGI LNG, Inc. Temple
                                               environmental and public interest                       are filing a comment on a particular                  Truck Rack Expansion Project
daltland on DSKBBV9HB2PROD with NOTICES




                                               groups; Native American tribes;                         project, please select ‘‘Comment on a
                                               potentially affected landowners and                     Filing’’; or                                             On November 14, 2016, UGI LNG, Inc.
                                               other interested individuals and groups;                   (3) You can file a paper copy of your              filed an application in Docket No.
                                               and newspapers and libraries in the                     comments by mailing them to the                       CP17–14–000 requesting a Certificate of
                                               project area. The EA is only available in               following address. Be sure to reference               Public Convenience and Necessity
                                               electronic format. It may be viewed and                 the project docket number (CP18–45–                   pursuant to Section 7(c) of the Natural
                                               downloaded from the FERC’s website                      000) with your submission: Kimberly D.                Gas Act to construct and operate certain


                                          VerDate Sep<11>2014   17:55 Sep 06, 2018   Jkt 244001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\07SEN1.SGM   07SEN1


                                                                           Federal Register / Vol. 83, No. 174 / Friday, September 7, 2018 / Notices                                            45435

                                               natural gas pipeline facilities at the                    The U.S. Department of                              Section 3(a) of the NGA to construct and
                                               existing Temple Liquefied Natural Gas                   Transportation is a cooperating agencies              operate liquefied natural gas (LNG)
                                               (LNG) Peak-shaving Facility in Berks                    in the preparation of the EA.                         export facilities. The proposed projects
                                               County, Pennsylvania. The proposed                                                                            are collectively referred to as the Jordan
                                                                                                       Additional Information
                                               project is known as the Temple Truck                                                                          Cove LNG Project (Project). Jordan
                                               Rack Expansion Project (Project), and                      In order to receive notification of the            Cove’s LNG facilities would be designed
                                               would allow UGI LNG, Inc. to more                       issuance of the EA and to keep track of               to liquefy about 7.8 million metric tons
                                               reliably serve the growing demand for                   all formal issuances and submittals in                of natural gas per annum for export to
                                               truck deliveries by UGI Energy Services.                specific dockets, the Commission offers               markets across the Pacific Rim. On
                                                  On November 29, 2016, the Federal                    a free service called eSubscription. This             August 20, 2015, in Order No. 3698, the
                                               Energy Regulatory Commission                            can reduce the amount of time you                     U.S. Department of Energy, Office of
                                               (Commission or FERC) issued its Notice                  spend researching proceedings by                      Fossil Energy, granted to Jordon Cove a
                                               of Application for the Project. Among                   automatically providing you with                      long-term, multi-contract authorization
                                               other things, that notice alerted agencies              notification of these filings, document               to export LNG to Free Trade Agreement
                                               issuing federal authorizations of the                   summaries, and direct links to the                    nations.
                                               requirement to complete all necessary                   documents. Go to www.ferc.gov/docs-                      On October 5, 2017, the Federal
                                               reviews and to reach a final decision on                filing/esubscription.asp.                             Energy Regulatory Commission (FERC
                                                                                                          Additional information about the                   or Commission) issued a Notice of
                                               a request for a federal authorization
                                                                                                       Project is available from the                         Applications for the Projects. Among
                                               within 90 days of the date of issuance
                                                                                                       Commission’s Office of External Affairs               other things, that notice alerted other
                                               of the Commission staff’s Environmental
                                                                                                       at (866) 208–FERC or on the FERC                      agencies issuing federal authorizations
                                               Assessment (EA) for the Project. This
                                                                                                       website (www.ferc.gov). Using the                     of the requirement to complete all
                                               instant notice identifies the FERC staff’s
                                                                                                       eLibrary link, select General Search                  necessary reviews and to reach a final
                                               planned schedule for the completion of
                                                                                                       from the eLibrary menu, enter the                     decision on the request for a federal
                                               the EA for the Project.
                                                                                                       selected date range and Docket Number                 authorization within 90 days of the date
                                               Schedule for Environmental Review                       excluding the last three digits (i.e.,                of issuance of the Commission staff’s
                                                                                                       CP17–14), and follow the instructions.                final Environmental Impact Statement
                                               Issuance of EA—September 18, 2018
                                                                                                       For assistance with access to eLibrary,               (EIS) for the Projects. This instant notice
                                               90-Day Federal Authorization Decision                   the helpline can be reached at (866)
                                                  Deadline—December 17, 2018                                                                                 identifies the FERC staff’s planned
                                                                                                       208–3676, TTY (202) 502–8659, or at                   schedule for completion of the final EIS
                                                  If a schedule change becomes                         FERCOnlineSupport@ferc.gov. The                       for the Projects, which is based on an
                                               necessary, additional notice will be                    eLibrary link on the FERC website also                issuance of the draft EIS in February
                                               provided so that the relevant agencies                  provides access to the texts of formal                2019. The forecasted schedule for both
                                               are kept informed of the Project’s                      documents issued by the Commission,                   the draft and final EIS is based upon
                                               progress.                                               such as orders, notices, and rule                     Jordon Cove and Pacific Connector
                                               Project Description                                     makings.                                              providing complete and timely
                                                                                                         Dated: August 31, 2018.                             responses to any future data requests. In
                                                  UGI LNG, Inc. proposes to expand its                                                                       addition, the schedule assumes that the
                                                                                                       Nathaniel J. Davis, Sr.,
                                               existing Temple LNG truck loading                                                                             cooperating agencies will provide input
                                               facility by constructing two additional                 Deputy Secretary.
                                                                                                       [FR Doc. 2018–19391 Filed 9–6–18; 8:45 am]            on their areas of responsibility on a
                                               trailer loading/unloading racks. The                                                                          timely basis.
                                               new facilities would consist of two                     BILLING CODE 6717–01–P

                                               racks with scales, trailer loading skid,                                                                      Schedule for Environmental Review
                                               pump skid, transfer piping, and                                                                               Issuance of Notice of Availability of the
                                               associated equipment. The Project                       DEPARTMENT OF ENERGY
                                                                                                                                                                final EIS—August 30, 2019
                                               would also include constructing a new                   Federal Energy Regulatory                             90-Day Federal Authorization Decision
                                               driveway connecting the expansion to                    Commission                                               Deadline—November 28, 2019
                                               Willow Creek Road. The Project is                                                                                If a schedule change becomes
                                               projected to increase truck volumes                     [Docket Nos. CP17–494–000; CP17–495–
                                                                                                                                                             necessary for the final EIS, an additional
                                               from an average of one to three trucks                  000]
                                                                                                                                                             notice will be provided so that the
                                               per day to an average of three to six                                                                         relevant agencies are kept informed of
                                                                                                       Pacific Connector Gas Pipeline LP,
                                               trucks per day.                                                                                               the Project’s progress.
                                                                                                       Jordan Cove Energy Project LP; Notice
                                               Background                                              of Schedule for Environmental Review                  Project Description
                                                                                                       Pacific Connector Pipeline Project and
                                                  On January 23, 2017, the Commission                                                                           Jordan Cove proposes to construct and
                                                                                                       Jordan Cove Energy Project
                                               issued a Notice of Intent to Prepare an                                                                       operate an LNG export terminal on the
                                               Environmental Assessment for the                          On September 21, 2017, Pacific                      North Spit of Coos Bay in Coos County,
                                               Proposed Temple Truck Rack                              Connector Gas Pipeline LP (Pacific                    Oregon. The terminal would include
                                               Expansion Project and Request for                       Connector) and Jordan Cove Energy                     five liquefaction trains and associated
                                               Comments on Environmental Issues                        Project L.P. (Jordan Cove) filed                      equipment, two full-containment LNG
                                               (NOI). The NOI was sent to affected                     applications in Docket Nos. CP17–494–                 storage tanks, an LNG transfer line, LNG
                                               landowners; federal, state, and local                   000 and CP17–495–000, respectively.                   ship loading facilities, a marine slip,
daltland on DSKBBV9HB2PROD with NOTICES




                                               government agencies; elected officials;                 Pacific Connector is requesting a                     access channel, and modifications to the
                                               environmental and public interest                       Certificate of Public Convenience and                 Coos Bay Navigation Channel.
                                               groups; other interested parties; and                   Necessity pursuant to Section 7(c) of the                Pacific Connector proposes to
                                               local libraries and newspapers. In                      Natural Gas Act (NGA) to construct,                   construct and operate an approximately
                                               response to the NOI, the Commission                     operate, and maintain certain natural                 230-mile-long, 36-inch-diameter
                                               received one public comment                             gas pipeline facilities. Jordan Cove is               interstate natural gas transmission
                                               concerning increased traffic.                           requesting authorization pursuant to                  pipeline and associated aboveground


                                          VerDate Sep<11>2014   17:55 Sep 06, 2018   Jkt 244001   PO 00000   Frm 00025   Fmt 4703   Sfmt 4703   E:\FR\FM\07SEN1.SGM   07SEN1



Document Created: 2018-09-07 00:15:31
Document Modified: 2018-09-07 00:15:31
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 45434 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR