The Office of Management (OM), Department of Veterans Affairs (VA), is announcing an opportunity for public comment on the proposed collection of certain information by the agency. Under the Paperwork Reduction Act (PRA) of 1995, Federal agencies are required to publish notice in the Federal Register concerning each proposed collection of information, including each proposed extension of a currently approved collection, and allow 60 days for public comment in response to the notice.

Federal Register, Volume 83 Issue 174 (Friday, September 7, 2018)
[Federal Register Volume 83, Number 174 (Friday, September 7, 2018)]
[Notices]
[Pages 45482-45483]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-19400]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF VETERANS AFFAIRS

[OMB Control No. 2900-0208]


Agency Information Collection Activity: Department of Veterans 
Affairs Acquisition Regulation; Architect-Engineer Fee Proposal; 
Contractor Production Report; Daily Log and Contract Progress Report

AGENCY: The Office of Management, Department of Veterans Affairs.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Office of Management (OM), Department of Veterans Affairs 
(VA), is announcing an opportunity for public comment on the proposed 
collection of certain information by the agency. Under the Paperwork 
Reduction Act (PRA) of 1995, Federal agencies are required to publish 
notice in the Federal Register concerning each proposed collection of 
information,

[[Page 45483]]

including each proposed extension of a currently approved collection, 
and allow 60 days for public comment in response to the notice.

DATES: Written comments and recommendations on the proposed collection 
of information should be received on or before November 6, 2018.

ADDRESSES: Submit written comments on the collection of information 
through Federal Docket Management System (FDMS) at www.Regulations.gov 
or to Rafael Taylor, Office of Acquisition and Logistics (003A2A), 
Department of Veterans Affairs, 810 Vermont Avenue NW, Washington, DC 
20420 or email to [email protected]. Please refer to ``OMB Control 
No. 2900-0208'' in any correspondence. During the comment period, 
comments may be viewed online through FDMS.

FOR FURTHER INFORMATION CONTACT: Cynthia Harvey-Pryor at (202) 461-
5870.

SUPPLEMENTARY INFORMATION: Under the PRA of 1995, Federal agencies must 
obtain approval from the Office of Management and Budget (OMB) for each 
collection of information they conduct or sponsor. This request for 
comment is being made pursuant to Section 3506(c)(2)(A) of the PRA.
    With respect to the following collection of information, OM invites 
comments on: (1) Whether the proposed collection of information is 
necessary for the proper performance of OM functions, including whether 
the information will have practical utility; (2) the accuracy of OM 
estimate of the burden of the proposed collection of information; (3) 
ways to enhance the quality, utility, and clarity of the information to 
be collected; and (4) ways to minimize the burden of the collection of 
information on respondents, including through the use of automated 
collection techniques or the use of other forms of information 
technology.
    Authority: Public Law 104-13; 44 U.S.C. 3501-3521.
    Title: Department of Veterans Affairs Acquisition Regulation 
(VAAR): VA Form 6298 (formerly 10-6298), Architect-Engineer Fee 
Proposal; VA Form 10101, Contractor Production Report (formerly VA Form 
10-6131, Daily Log and VA Form 10-6001a, Contract Progress Report).
    OMB Control Number: 2900-0208.
    Type of Review: Renewal with changes of a currently approved 
collection.
    Abstract: This Paperwork Reduction Act (PRA) submission seeks 
renewal with changes of Office of Management and Budget (OMB) approval 
No. 2900-0208 as follows:
     Replace both existing VA forms 10-6131 (Daily Log 
(Contract Progress Report--Formal Contract)) and 10-6001a (Contract 
Progress Report) with one new form, which combines the intended purpose 
for VA Form 10-6131 and VA Form 10-6001a. The new combined form is now 
read: ``VA Form 10101, Contractor Production Report.''
     Renumber VA Form 10-6298 Architect-Engineer Fee Proposal, 
to ``VA Form 6298,'' and revise the contents in the form with updated 
thresholds and FAR citations.
    The above proposed revisions do not change the currently approved 
burden hours. The actual VA forms 10101 and 6298 can be located at VA 
Forms website (http://vaww.va.gov/vaforms/.)
    The Department of Veterans Affairs' Office of Construction and 
Facilities Management (CFM) manage a multi-million-dollar construction 
program that involves the design and construction of medical centers, 
and other VA facilities including building improvements and 
conversions. The actual construction work is contracted out to private 
construction firms.
    VA Form 6298 (formerly 10-6298), Architect-Engineer Fee Proposal: 
The use of this form is mandatory for obtaining the proposal and 
supporting cost or pricing data from the contractor and subcontractor 
in the negotiation of all architect-engineer contracts for design 
services when the contract price is estimated to be $50,000 or more. In 
obtaining architect-engineer services for research study, seismic 
study, master planning study, construction management and other related 
services contracts. A Contractor Production Report is also used but 
supplemented or modified as needed for the particular project type. (VA 
Acquisition Regulation 836.606-71, Architect-engineer's proposal, and 
VAAR 853.236-70.)
    VA Form 10101, Contractor Production Report (formerly VA Form 10-
6131), Daily Log--Formal Contract, and VA Form 10-6001a, Contract 
Progress Report, depending on the size of the contract: Is used to 
record the data necessary to ensure the contractor provides sufficient 
labor and materials to accomplish the contract work. Contractors are 
required to guarantee the performance of the work necessary to complete 
the project. VAAR 852.236-79 details what needs to be addressed by the 
contractor on the Contractor Production Report. Failure to complete 
Contractor Production Report could result in a claim for non-
performance and construction delays against the Government if we were 
unable to collect this information to administer the contract.
    Affected Public: Business or other for-profit and not-for-profit 
institutions.
    Estimated Annual Burden: VA Form 6298--1,000 Burden Hours. VA Form 
10101--4,341 Burden Hours.
    Estimated Average Burden per Respondent: VA Form 6298--4 Hours. VA 
Form 10101--24 Minutes.
    Frequency of Response: On occasion.
    Estimated Number of Respondents: VA Form 6298--250. VA Form 10101--
10,853.

    By direction of the Secretary.
Cynthia D. Harvey-Pryor,
Department Clearance Officer, Office of Quality, Privacy and Risk, 
Department of Veterans Affairs.
[FR Doc. 2018-19400 Filed 9-6-18; 8:45 am]
 BILLING CODE 8320-01-P



                                               45482                       Federal Register / Vol. 83, No. 174 / Friday, September 7, 2018 / Notices

                                               on the meeting website and posted on                    Privacy Act Statement                                    (c) Opportunities to share data,
                                               the E-Gov website, https://                                                                                   including dig verification data between
                                                                                                         DOT may solicit comments from the
                                               www.regulations.gov/, under docket                                                                            operators of pipeline facilities and in-
                                                                                                       public regarding certain general notices.
                                               number PHMSA–2016–0128 within 30                                                                              line inspector vendors to expand
                                                                                                       DOT posts these comments, without
                                               days following the meeting.                                                                                   knowledge of the advantages and
                                                                                                       edit, including any personal information
                                                  Public Participation: This meeting                                                                         disadvantages of the different types of
                                                                                                       the commenter provides, to
                                               will be open to the public. Members of                                                                        in-line inspection technology and
                                                                                                       www.regulations.gov, as described in
                                               the public who attend in person will                                                                          methodologies;
                                                                                                       the system of records notice (DOT/ALL–
                                               also be provided an opportunity to make                                                                          (d) Options to create a secure system
                                                                                                       14 FDMS), which can be reviewed at
                                               a statement during the meetings.                                                                              that protects proprietary data while
                                                                                                       www.dot.gov/privacy.
                                                  Written comments: Persons who wish                                                                         encouraging the exchange of pipeline
                                                                                                         Services for Individuals With                       inspection information and the
                                               to submit written comments on the
                                                                                                       Disabilities: The public meeting will be              development of advanced pipeline
                                               meetings may submit them to the docket
                                                                                                       physically accessible to people with                  inspection technologies and enhanced
                                               in the following ways:
                                                                                                       disabilities. Individuals requiring                   risk analysis;
                                                  E-Gov Website: https://
                                                                                                       accommodations, such as sign language                    (e) Means and best practices for the
                                               www.regulations.gov. This site allows
                                                                                                       interpretation or other ancillary aids, are           protection of safety and security-
                                               the public to enter comments on any
                                                                                                       asked to notify Christie Murray at                    sensitive information and proprietary
                                               Federal Register notice issued by any
                                                                                                       christie.murray@dot.gov.                              information; and
                                               agency.
                                                  Fax: 1–202–493–2251.                                 FOR FURTHER INFORMATION CONTACT: For                     (f) Regulatory, funding, and legal
                                                  Mail: Docket Management Facility;                    information about the meeting, contact                barriers to sharing the information
                                               U.S. Department of Transportation                       Dr. Christie Murray by phone at 202–                  described in paragraphs (a) through (d).
                                               (DOT), 1200 New Jersey Avenue SE,                       366–4996 or by email at                                  The Secretary will publish the VIS
                                               West Building, Room W12–140,                            christie.murray@dot.gov.                              Working Group’s recommendations on a
                                               Washington, DC 20590–0001.                              SUPPLEMENTARY INFORMATION:                            publicly available DOT website and in
                                                  Hand Delivery: Room W12–140 on the                                                                         the docket. The VIS Working Group will
                                                                                                       I. Background                                         fulfill its purpose once its
                                               ground level of the DOT West Building,
                                               1200 New Jersey Avenue SE,                                The VIS Working Group is an                         recommendations are published online.
                                               Washington, DC, between 9:00 a.m. and                   advisory committee established in                        PHMSA will publish the agenda on
                                               5:00 p.m., Monday through Friday,                       accordance with Section 10 of the                     the PHMSA meeting page https://
                                               except on Federal holidays.                             Protecting our Infrastructure of                      primis.phmsa.dot.gov/meetings/
                                                  Instructions: Identify the docket                    Pipelines and Enhancing Safety Act of                 MtgHome.mtg?mtg=138, once it is
                                               number PHMSA–2016–0128 at the                           2016 (Pub. L. 114–183), the Federal                   finalized.
                                               beginning of your comments. Note that                   Advisory Committee Act of 1972 (5                       Issued in Washington, DC, on September 4,
                                               all comments received will be posted                    U.S.C., App. 2, as amended), and 41                   2018, under authority delegated in 49 CFR
                                               without change to https://                              CFR 102–3.50(a).                                      1.97.
                                               www.regulations.gov, including any                                                                            Linda Daugherty,
                                                                                                       II. Meeting Details and Agenda
                                               personal information provided.                                                                                Deputy Associate Administrator for Field
                                                  Anyone can search the electronic                        The VIS Working Group agenda will                  Operations.
                                               form of all comments received into any                  include briefings on topics such as                   [FR Doc. 2018–19429 Filed 9–6–18; 8:45 am]
                                               of our dockets by the name of the                       mandate requirements, integrity                       BILLING CODE 4910–60–P
                                               individual submitting the comment (or                   management, data types and tools, in-
                                               signing the comment, if submitted on                    line inspection and other direct
                                               behalf of an association, business, labor               assessment methods, geographic                        DEPARTMENT OF VETERANS
                                               union, etc.). Therefore, consider                       information system implementation,                    AFFAIRS
                                               reviewing DOT’s complete Privacy Act                    subcommittee considerations, lessons
                                               Statement in the Federal Register                       learned, examples of existing                         [OMB Control No. 2900–0208]
                                               published on April 11, 2000, (65 FR                     information-sharing systems, safety
                                                                                                       management systems, and more. As part                 Agency Information Collection
                                               19477), or view the Privacy Notice at
                                                                                                       of its work, the committee will                       Activity: Department of Veterans
                                               https://www.regulations.gov before
                                                                                                       ultimately provide recommendations to                 Affairs Acquisition Regulation;
                                               submitting comments.
                                                                                                       the Secretary, as required and                        Architect-Engineer Fee Proposal;
                                                  Docket: For docket access or to read
                                                                                                       specifically outlined in Section 10 of                Contractor Production Report; Daily
                                               background documents or comments, go
                                                                                                       Public Law 114–183, addressing:                       Log and Contract Progress Report
                                               to https://www.regulations.gov at any
                                               time or to Room W12–140 on the                             (a) The need for, and the                          AGENCY: The Office of Management,
                                               ground level of the DOT West Building,                  identification of, a system to ensure that            Department of Veterans Affairs.
                                               1200 New Jersey Avenue SE,                              dig verification data are shared with in-             ACTION: Notice.
                                               Washington, DC, between 9:00 a.m. and                   line inspection operators to the extent
                                               5:00 p.m., Monday through Friday,                       consistent with the need to maintain                  SUMMARY:   The Office of Management
                                               except Federal holidays.                                proprietary and security-sensitive data               (OM), Department of Veterans Affairs
                                                  If you wish to receive confirmation of               in a confidential manner to improve                   (VA), is announcing an opportunity for
daltland on DSKBBV9HB2PROD with NOTICES




                                               receipt of your written comments,                       pipeline safety and inspection                        public comment on the proposed
                                               please include a self-addressed,                        technology;                                           collection of certain information by the
                                               stamped postcard with the following                        (b) Ways to encourage the exchange of              agency. Under the Paperwork Reduction
                                               statement: ‘‘Comments on PHMSA–                         pipeline inspection information and the               Act (PRA) of 1995, Federal agencies are
                                               2016- 0128.’’ The docket clerk will date                development of advanced pipeline                      required to publish notice in the
                                               stamp the postcard prior to returning it                inspection technologies and enhanced                  Federal Register concerning each
                                               to you via the U.S. mail.                               risk analysis;                                        proposed collection of information,


                                          VerDate Sep<11>2014   17:55 Sep 06, 2018   Jkt 244001   PO 00000   Frm 00072   Fmt 4703   Sfmt 4703   E:\FR\FM\07SEN1.SGM   07SEN1


                                                                           Federal Register / Vol. 83, No. 174 / Friday, September 7, 2018 / Notices                                                 45483

                                               including each proposed extension of a                  and Budget (OMB) approval No. 2900–                   Government if we were unable to collect
                                               currently approved collection, and                      0208 as follows:                                      this information to administer the
                                               allow 60 days for public comment in                        • Replace both existing VA forms 10–               contract.
                                               response to the notice.                                 6131 (Daily Log (Contract Progress                      Affected Public: Business or other for-
                                               DATES: Written comments and                             Report—Formal Contract)) and 10–                      profit and not-for-profit institutions.
                                               recommendations on the proposed                         6001a (Contract Progress Report) with                   Estimated Annual Burden: VA Form
                                               collection of information should be                     one new form, which combines the                      6298—1,000 Burden Hours. VA Form
                                               received on or before November 6, 2018.                 intended purpose for VA Form 10–6131                  10101—4,341 Burden Hours.
                                                                                                       and VA Form 10–6001a. The new                           Estimated Average Burden per
                                               ADDRESSES: Submit written comments                                                                            Respondent: VA Form 6298—4 Hours.
                                                                                                       combined form is now read: ‘‘VA Form
                                               on the collection of information through                10101, Contractor Production Report.’’                VA Form 10101—24 Minutes.
                                               Federal Docket Management System                           • Renumber VA Form 10–6298                           Frequency of Response: On occasion.
                                               (FDMS) at www.Regulations.gov or to                     Architect-Engineer Fee Proposal, to ‘‘VA                Estimated Number of Respondents:
                                               Rafael Taylor, Office of Acquisition and                Form 6298,’’ and revise the contents in               VA Form 6298—250. VA Form 10101—
                                               Logistics (003A2A), Department of                       the form with updated thresholds and                  10,853.
                                               Veterans Affairs, 810 Vermont Avenue                    FAR citations.                                          By direction of the Secretary.
                                               NW, Washington, DC 20420 or email to                       The above proposed revisions do not
                                               Rafael.Taylor@va.gov. Please refer to                                                                         Cynthia D. Harvey-Pryor,
                                                                                                       change the currently approved burden
                                               ‘‘OMB Control No. 2900–0208’’ in any                                                                          Department Clearance Officer, Office of
                                                                                                       hours. The actual VA forms 10101 and
                                               correspondence. During the comment                                                                            Quality, Privacy and Risk, Department of
                                                                                                       6298 can be located at VA Forms                       Veterans Affairs.
                                               period, comments may be viewed online                   website (http://vaww.va.gov/vaforms/.)
                                               through FDMS.                                                                                                 [FR Doc. 2018–19400 Filed 9–6–18; 8:45 am]
                                                                                                          The Department of Veterans Affairs’
                                                                                                       Office of Construction and Facilities                 BILLING CODE 8320–01–P
                                               FOR FURTHER INFORMATION CONTACT:
                                               Cynthia Harvey-Pryor at (202) 461–                      Management (CFM) manage a multi-
                                               5870.                                                   million-dollar construction program that
                                                                                                       involves the design and construction of               DEPARTMENT OF VETERANS
                                               SUPPLEMENTARY INFORMATION:       Under the              medical centers, and other VA facilities              AFFAIRS
                                               PRA of 1995, Federal agencies must                      including building improvements and
                                               obtain approval from the Office of                                                                            Advisory Committee on Former
                                                                                                       conversions. The actual construction                  Prisoners of War, Notice of Meeting
                                               Management and Budget (OMB) for each                    work is contracted out to private
                                               collection of information they conduct                  construction firms.                                     The Department of Veterans Affairs
                                               or sponsor. This request for comment is                    VA Form 6298 (formerly 10–6298),                   (VA) gives notice under the Federal
                                               being made pursuant to Section                          Architect-Engineer Fee Proposal: The                  Advisory Committee Act that the
                                               3506(c)(2)(A) of the PRA.                               use of this form is mandatory for                     Advisory Committee on Former
                                                 With respect to the following                         obtaining the proposal and supporting                 Prisoners of War (FPOW) will meet
                                               collection of information, OM invites                   cost or pricing data from the contractor              September 20–23, 2018, from 8 a.m.–
                                               comments on: (1) Whether the proposed                   and subcontractor in the negotiation of               5:30 p.m. PDT at the Loma Linda VA
                                               collection of information is necessary                  all architect-engineer contracts for                  Medical Facility located at 11201
                                               for the proper performance of OM                        design services when the contract price               Benton Street, Loma Linda, CA 92357.
                                               functions, including whether the                        is estimated to be $50,000 or more. In                Sessions are open to the public, except
                                               information will have practical utility;                obtaining architect-engineer services for             when the Committee is conducting a
                                               (2) the accuracy of OM estimate of the                  research study, seismic study, master                 tour of VA facilities. Tours of VA
                                               burden of the proposed collection of                    planning study, construction                          facilities are closed, to protect Veterans’
                                               information; (3) ways to enhance the                    management and other related services                 privacy and personal information.
                                               quality, utility, and clarity of the                    contracts. A Contractor Production                      The purpose of the Committee is to
                                               information to be collected; and (4)                    Report is also used but supplemented or               advise the Secretary of Veterans Affairs
                                               ways to minimize the burden of the                      modified as needed for the particular                 on the administration of benefits for
                                               collection of information on                            project type. (VA Acquisition                         Veterans who are FPOWs, and to make
                                               respondents, including through the use                  Regulation 836.606–71, Architect-                     recommendations on the needs of such
                                               of automated collection techniques or                   engineer’s proposal, and VAAR                         Veterans for compensation, health care,
                                               the use of other forms of information                   853.236–70.)                                          and rehabilitation.
                                               technology.                                                VA Form 10101, Contractor                            On Thursday, September 20th, the
                                                 Authority: Public Law 104–13; 44                      Production Report (formerly VA Form                   Committee will assemble in open
                                               U.S.C. 3501–3521.                                       10–6131), Daily Log—Formal Contract,                  session from 8 a.m. to 5:30 p.m. for
                                                 Title: Department of Veterans Affairs                 and VA Form 10–6001a, Contract                        discussion and briefings from Veterans
                                               Acquisition Regulation (VAAR): VA                       Progress Report, depending on the size                Benefits Administration (VBA) and
                                               Form 6298 (formerly 10–6298),                           of the contract: Is used to record the                Veterans Health Administration (VHA)
                                               Architect-Engineer Fee Proposal; VA                     data necessary to ensure the contractor               officials.
                                               Form 10101, Contractor Production                       provides sufficient labor and materials                 On Friday, September 21st, the
                                               Report (formerly VA Form 10–6131,                       to accomplish the contract work.                      Committee will convene an open
                                               Daily Log and VA Form 10–6001a,                         Contractors are required to guarantee                 session to hear briefings from 8 a.m. to
                                               Contract Progress Report).                              the performance of the work necessary                 11 a.m. From 11:10 a.m. to 2:30 p.m.,
daltland on DSKBBV9HB2PROD with NOTICES




                                                 OMB Control Number: 2900–0208.                        to complete the project. VAAR 852.236–                the Committee will convene a to travel
                                                 Type of Review: Renewal with                          79 details what needs to be addressed                 to and tour the National POW/MIA
                                               changes of a currently approved                         by the contractor on the Contractor                   Memorial. From 2:30 p.m. to 5:30 p.m.,
                                               collection.                                             Production Report. Failure to complete                the Committee will convene a closed
                                                 Abstract: This Paperwork Reduction                    Contractor Production Report could                    session-to meet at the subcommittee
                                               Act (PRA) submission seeks renewal                      result in a claim for non-performance                 level where they will perform prepatory
                                               with changes of Office of Management                    and construction delays against the                   work covering research areas and


                                          VerDate Sep<11>2014   17:55 Sep 06, 2018   Jkt 244001   PO 00000   Frm 00073   Fmt 4703   Sfmt 4703   E:\FR\FM\07SEN1.SGM   07SEN1



Document Created: 2018-09-07 00:15:00
Document Modified: 2018-09-07 00:15:00
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice.
DatesWritten comments and recommendations on the proposed collection of information should be received on or before November 6, 2018.
ContactCynthia Harvey-Pryor at (202) 461- 5870.
FR Citation83 FR 45482 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR