83_FR_46702 83 FR 46524 - Weld Residual Stress Finite Element Analysis Validation

83 FR 46524 - Weld Residual Stress Finite Element Analysis Validation

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 83, Issue 178 (September 13, 2018)

Page Range46524-46525
FR Document2018-19941

The U.S. Nuclear Regulatory Commission (NRC) is requesting public comment on a draft NUREG entitled, ``Weld Residual Stress Finite Element Analysis Validation: Part II--Acceptance and Guidelines.'' This report proposes a methodology by which analysts can increase confidence in modeling capabilities for regulatory applications involving weld residual stress calculation. Specifically, the NRC staff posed four questions for consideration by the public (see SUPPLEMENTARY INFORMATION).

Federal Register, Volume 83 Issue 178 (Thursday, September 13, 2018)
[Federal Register Volume 83, Number 178 (Thursday, September 13, 2018)]
[Notices]
[Pages 46524-46525]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-19941]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. NRC-2018-0168]


Weld Residual Stress Finite Element Analysis Validation

AGENCY: Nuclear Regulatory Commission.

ACTION: Draft NUREG; request for comment.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is requesting 
public comment on a draft NUREG entitled, ``Weld Residual Stress Finite 
Element Analysis Validation: Part II--Acceptance and Guidelines.'' This 
report proposes a methodology by which analysts can increase confidence 
in modeling capabilities for regulatory applications involving weld 
residual stress calculation. Specifically, the NRC staff posed four 
questions for consideration by the public (see SUPPLEMENTARY 
INFORMATION).

DATES: Submit comments by November 13, 2018. Comments received after 
this date will be considered if it is practical to do so, but the 
Commission is able to ensure consideration only for comments received 
before this date.

ADDRESSES: You may submit comments by any of the following methods:
     Federal Rulemaking Website: Go to http://www.regulations.gov and search for Docket ID NRC-2018-0168. Address 
questions about NRC dockets in Regulations.gov to Jennifer Borges; 
telephone: 301-287-9127; email: [email protected]. For technical 
questions, contact the individual listed in the FOR FURTHER INFORMATION 
CONTACT section of this document.
     Mail comments to: May Ma, Office of Administration, Mail 
Stop: TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Michael Benson, Office of Nuclear 
Regulatory Research, telephone: 301-415-2425, email: 
[email protected]; or Patrick Raynaud, Office of Nuclear 
Regulatory Research, telephone: 301-415-1987, email: 
[email protected]. Both are staff of the U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001.

SUPPLEMENTARY INFORMATION: 

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2018-0168 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly-available information related to this action by any of the 
following methods:
     Federal Rulemaking Website: Go to http://www.regulations.gov and search for Docket ID NRC-2018-0168.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to [email protected]. The draft NUREG on ``Weld Residual 
Stress Validation'' is available in ADAMS under Accession No. 
ML18242A007.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2018-0168 in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at http://www.regulations.gov as well as enter the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Background

    Between 2008-2015, the Electric Power Research Institute and the 
NRC

[[Page 46525]]

conducted a joint research program on weld residual stress (WRS) 
modeling under a memorandum of understanding. This research program 
consisted of several modeling and measurement studies on prototypic 
mockups to represent the residual stress state in safety-related 
nuclear components susceptible to primary water stress corrosion 
cracking, see NUREG-2162 (ADAMS Accession No. ML14087A118). Since then, 
the NRC has made use of the data gained in that research program to 
formulate a potential validation scheme for finite element modeling of 
WRS. The NRC's proposal is documented in a draft NUREG entitled, ``Weld 
Residual Stress Finite Element Analysis Validation: Part II-Proposed 
Validation Procedure'' (ADAMS Accession No. ML18242A007). The NRC is 
requesting public comment on this document. Specifically, the NRC would 
like feedback on four specific technical issues related to the proposed 
validation procedure:
    1. The NRC recommended the use of the average hardening approach in 
the current version of the draft NUREG (``average hardening'' meaning 
the arithmetic mean of isotropic and nonlinear kinematic results). 
Given the discussion in Section 5.2, please comment on the advantages 
and disadvantages of using either the averaging approach or isotropic 
hardening. What initial and recurring costs are foreseen in 
implementing either approach in future analyses?
    2. The NRC introduced four options for benchmark in Section 5.4.2. 
The NRC chose to develop the validation scheme with a benchmark based 
upon the modeling results, rather than the measurements. Please comment 
on the NRC's proposal and whether the justification is adequate.
    3. Please comment on the proposed quality metrics introduced in 
Section 5.4.7. Are these metrics appropriate for their intended 
purpose? Has the NRC presented an appropriate technical justification 
(see Sections 5.4.8 and 5.4.10) for the proposed metrics?
    4. Please comment on the feasibility of the proposed validation 
scheme. What initial (e.g., software and guidance development) and 
recurring (i.e., costs for each analysis) costs are foreseen for 
implementing the validation scheme?

    Dated at Rockville, Maryland, this 10th day of September, 2018.

    For the Nuclear Regulatory Commission.
Raj Iyengar,
Chief, Component Integrity Branch, Division of Engineering, Office of 
Nuclear Regulatory Research.
[FR Doc. 2018-19941 Filed 9-12-18; 8:45 am]
 BILLING CODE 7590-01-P



                                               46524                    Federal Register / Vol. 83, No. 178 / Thursday, September 13, 2018 / Notices

                                                 Place: National Science Foundation,                   5:00 p.m. End of Reverse Site Visit                   Nuclear Regulatory Commission,
                                               2415 Eisenhower Avenue, Alexandria,                     [FR Doc. 2018–19891 Filed 9–12–18; 8:45 am]           Washington, DC 20555–0001.
                                               Virginia 22314.                                         BILLING CODE 7555–01–P                                SUPPLEMENTARY INFORMATION:
                                                 Type of Meeting: Part—Open.
                                                 Contact Person: Cassandra Dudka,                                                                            I. Obtaining Information and
                                               PIRE Program Manager, National                                                                                Submitting Comments
                                                                                                       NUCLEAR REGULATORY
                                               Science Foundation, 2415 Eisenhower                                                                           A. Obtaining Information
                                                                                                       COMMISSION
                                               Avenue, Alexandria, VA 22314;
                                                                                                                                                                Please refer to Docket ID NRC–2018–
                                               Telephone 703/292–7250.                                 [Docket No. NRC–2018–0168]
                                                                                                                                                             0168 when contacting the NRC about
                                                 Purpose of Meeting: NSF reverse site
                                                                                                       Weld Residual Stress Finite Element                   the availability of information for this
                                               visit to conduct a review during year 3
                                                                                                       Analysis Validation                                   action. You may obtain publicly-
                                               of the five-year award period. To
                                                                                                                                                             available information related to this
                                               conduct an in-depth evaluation of                       AGENCY: Nuclear Regulatory                            action by any of the following methods:
                                               performance, to assess progress towards                 Commission.                                              • Federal Rulemaking Website: Go to
                                               goals, and to provide recommendations.                  ACTION: Draft NUREG; request for                      http://www.regulations.gov and search
                                                 Agenda: See attached.                                                                                       for Docket ID NRC–2018–0168.
                                                                                                       comment.
                                                 Reason for Closing: Topics to be                                                                               • NRC’s Agencywide Documents
                                               discussed and evaluated during closed                   SUMMARY:   The U.S. Nuclear Regulatory                Access and Management System
                                               portions of the reverse site review will                Commission (NRC) is requesting public                 (ADAMS): You may obtain publicly-
                                               include information of a proprietary or                 comment on a draft NUREG entitled,                    available documents online in the
                                               confidential nature, including technical                ‘‘Weld Residual Stress Finite Element                 ADAMS Public Documents collection at
                                               information; and information on                         Analysis Validation: Part II—                         http://www.nrc.gov/reading-rm/
                                               personnel. These matters are exempt                     Acceptance and Guidelines.’’ This                     adams.html. To begin the search, select
                                               under 5 U.S.C. 552b(c), (4) and (6) of the              report proposes a methodology by                      ‘‘Begin Web-based ADAMS Search.’’ For
                                               Government in the Sunshine Act.                         which analysts can increase confidence                problems with ADAMS, please contact
                                                 Dated: September 7, 2018.                             in modeling capabilities for regulatory               the NRC’s Public Document Room (PDR)
                                               Crystal Robinson,                                       applications involving weld residual                  reference staff at 1–800–397–4209, 301–
                                               Committee Management Officer.                           stress calculation. Specifically, the NRC             415–4737, or by email to pdr.resource@
                                                                                                       staff posed four questions for                        nrc.gov. The draft NUREG on ‘‘Weld
                                               Partnerships for International Research                 consideration by the public (see                      Residual Stress Validation’’ is available
                                               and Education (PIRE) Reverse Site Visit                 SUPPLEMENTARY INFORMATION).                           in ADAMS under Accession No.
                                               Agenda PIRE–1545684 (PI: Barbara                        DATES: Submit comments by November                    ML18242A007.
                                               Schneider)                                              13, 2018. Comments received after this                   • NRC’s PDR: You may examine and
                                               NSF Room C3080                                          date will be considered if it is practical            purchase copies of public documents at
                                                                                                       to do so, but the Commission is able to               the NRC’s PDR, Room O1–F21, One
                                               Friday, October 12, 2018                                ensure consideration only for comments                White Flint North, 11555 Rockville
                                               8:00 a.m. Panelists arrive. Coffee/light                received before this date.                            Pike, Rockville, Maryland 20852.
                                                   refreshments available                              ADDRESSES: You may submit comments                    B. Submitting Comments
                                               8:15 a.m.–8:45 a.m. Panel Orientation                   by any of the following methods:                        Please include Docket ID NRC–2018–
                                                   (CLOSED), PIRE Rationale and                           • Federal Rulemaking Website: Go to
                                                   Goals, Charge to Panel                                                                                    0168 in your comment submission.
                                                                                                       http://www.regulations.gov and search                   The NRC cautions you not to include
                                               8:45 a.m. PIs arrive. Introductions                     for Docket ID NRC–2018–0168. Address
                                                   (OPEN)                                                                                                    identifying or contact information that
                                                                                                       questions about NRC dockets in                        you do not want to be publicly
                                               9:00 a.m.–11:30 a.m. PIRE Project                       Regulations.gov to Jennifer Borges;
                                                   Presentation should cover the                                                                             disclosed in your comment submission.
                                                                                                       telephone: 301–287–9127; email:                       The NRC will post all comment
                                                   following: (OPEN)                                   Jennifer.Borges@nrc.gov. For technical
                                                 Research                                                                                                    submissions at http://
                                                                                                       questions, contact the individual listed              www.regulations.gov as well as enter the
                                                 Integrating Research & Education                      in the FOR FURTHER INFORMATION
                                                 Students (e.g. involvement in project,                                                                      comment submissions into ADAMS.
                                                                                                       CONTACT section of this document.                     The NRC does not routinely edit
                                                   recruitment, diversity)                                • Mail comments to: May Ma, Office
                                                 Project Management and                                                                                      comment submissions to remove
                                                                                                       of Administration, Mail Stop: TWFN–7–                 identifying or contact information.
                                                   Communication
                                                                                                       A60M, U.S. Nuclear Regulatory                           If you are requesting or aggregating
                                                 Evaluation & Assessment
                                                 Institutional Support                                 Commission, Washington, DC 20555–                     comments from other persons for
                                                 International Partnerships                            0001.                                                 submission to the NRC, then you should
                                               11:30 a.m.–12:30 p.m. Questions and                        For additional direction on obtaining              inform those persons not to include
                                                   Answers                                             information and submitting comments,                  identifying or contact information that
                                               12:30 p.m.–2:00 p.m. Working Lunch—                     see ‘‘Obtaining Information and                       they do not want to be publicly
                                                   Panel Discussion (CLOSED)                           Submitting Comments’’ in the                          disclosed in their comment submission.
                                               2:00 p.m.–2:30 p.m. Initial Feedback to                 SUPPLEMENTARY INFORMATION section of                  Your request should state that the NRC
                                                   Project Team (CLOSED)                               this document.                                        does not routinely edit comment
                                               2:30 p.m. PIRE PI and presenters are                    FOR FURTHER INFORMATION CONTACT:                      submissions to remove such information
daltland on DSKBBV9HB2PROD with NOTICES




                                                   dismissed                                           Michael Benson, Office of Nuclear                     before making the comment
                                               2:30 p.m.–4:30 p.m. Panel meets for                     Regulatory Research, telephone: 301–                  submissions available to the public or
                                                   Reverse Site Visit Report                           415–2425, email: michael.benson@                      entering the comment into ADAMS.
                                                   Preparation (CLOSED)                                nrc.gov; or Patrick Raynaud, Office of
                                               4:30 p.m.–4:45 p.m. Report presented to                 Nuclear Regulatory Research, telephone:               II. Background
                                                   and discussion held with NSF staff                  301–415–1987, email: patrick.raynaud@                    Between 2008–2015, the Electric
                                                   (CLOSED)                                            nrc.gov. Both are staff of the U.S.                   Power Research Institute and the NRC


                                          VerDate Sep<11>2014   19:20 Sep 12, 2018   Jkt 244001   PO 00000   Frm 00049   Fmt 4703   Sfmt 4703   E:\FR\FM\13SEN1.SGM   13SEN1


                                                                        Federal Register / Vol. 83, No. 178 / Thursday, September 13, 2018 / Notices                                                 46525

                                               conducted a joint research program on                   NUCLEAR REGULATORY                                    at: https://www.nrc.gov/waste/spent-
                                               weld residual stress (WRS) modeling                     COMMISSION                                            fuel-storage/cis/waste-control-
                                               under a memorandum of understanding.                                                                          specialist.html.
                                                                                                       [Docket No. 72–1050; NRC–2016–0231]
                                               This research program consisted of                                                                            FOR FURTHER INFORMATION CONTACT:
                                               several modeling and measurement                        Interim Storage Partners LLC’s                        James Park, Office of Nuclear Material
                                               studies on prototypic mockups to                        Consolidated Interim Spent Fuel                       Safety and Safeguards, U.S. Nuclear
                                               represent the residual stress state in                  Storage Facility; Correction                          Regulatory Commission, Washington DC
                                               safety-related nuclear components                                                                             20555–0001; telephone: 301–415–6954;
                                               susceptible to primary water stress                     AGENCY:  Nuclear Regulatory
                                                                                                                                                             email: James.Park@nrc.gov.
                                               corrosion cracking, see NUREG–2162                      Commission.
                                                                                                                                                             SUPPLEMENTARY INFORMATION: In the FR
                                               (ADAMS Accession No. ML14087A118).                      ACTION: Environmental impact
                                               Since then, the NRC has made use of the                                                                       on September 4, 2018, in FR Doc. 2018–
                                                                                                       statement; reopening of scoping
                                               data gained in that research program to                                                                       18067, on page 44923, in column one,
                                                                                                       comment period; correction.
                                               formulate a potential validation scheme                                                                       under the second paragraph, last line in
                                               for finite element modeling of WRS. The                 SUMMARY:    The U.S. Nuclear Regulatory               Section II, ‘‘Discussion,’’ correct the
                                               NRC’s proposal is documented in a draft                 Commission (NRC) is correcting a notice               date from ‘‘October 19, 2018’’ to
                                               NUREG entitled, ‘‘Weld Residual Stress                  that was published in the Federal                     ‘‘September 4, 2018.’’ The scoping
                                               Finite Element Analysis Validation: Part                Register (FR) on September 4, 2018,                   comment period due date was
                                               II–Proposed Validation Procedure’’                      reopening the scoping comment period                  inadvertently added.
                                               (ADAMS Accession No. ML18242A007).                      for the NRC’s Environmental Impact                       The NRC has decided to reopen the
                                               The NRC is requesting public comment                    Statement (EIS) for the Interim Storage               EIS public scoping comment period on
                                               on this document. Specifically, the NRC                 Partners LLC (ISP) proposed                           the application until October 19, 2018,
                                               would like feedback on four specific                    consolidated interim storage facility for             to allow more time for members of the
                                               technical issues related to the proposed                spent nuclear fuel, to be located on the              public to submit their comments.
                                               validation procedure:                                   Waste Control Specialists LLC (WCS)                     Dated at Rockville, Maryland, on
                                                  1. The NRC recommended the use of                    site in Andrews County, Texas.                        September 7, 2018.
                                               the average hardening approach in the                   DATES: The correction is effective                      For the Nuclear Regulatory Commission.
                                               current version of the draft NUREG                      September 13, 2018.                                   Brian W. Smith,
                                               (‘‘average hardening’’ meaning the                      ADDRESSES: Please refer to Docket ID                  Deputy Director, Division of Fuel Cycle Safety,
                                               arithmetic mean of isotropic and                        NRC–2016–0231 when contacting the                     Safeguards, and Environmental Review,
                                               nonlinear kinematic results). Given the                 NRC about the availability of                         Office of Nuclear Material Safety and
                                               discussion in Section 5.2, please                                                                             Safeguards.
                                                                                                       information regarding this document.
                                               comment on the advantages and                           You may obtain publicly-available                     [FR Doc. 2018–19928 Filed 9–12–18; 8:45 am]
                                               disadvantages of using either the                       information related to this document                  BILLING CODE 7590–01–P
                                               averaging approach or isotropic                         using any of the following methods:
                                               hardening. What initial and recurring                      • Federal Rulemaking Website: Go to
                                               costs are foreseen in implementing                      http://www.regulations.gov and search
                                               either approach in future analyses?                     for Docket ID NRC–2016–0231. Address                  POSTAL REGULATORY COMMISSION
                                                  2. The NRC introduced four options                   questions about dockets in
                                               for benchmark in Section 5.4.2. The                     Regulations.gov to Jennifer Borges;                   [Docket No. CP2018–301]
                                               NRC chose to develop the validation                     telephone: 301–287–9127; email:
                                               scheme with a benchmark based upon                                                                            New Postal Products
                                                                                                       Jennifer.Borges@nrc.gov. For technical
                                               the modeling results, rather than the                   questions, contact the individual(s)                  AGENCY:   Postal Regulatory Commission.
                                               measurements. Please comment on the                     listed in the FOR FURTHER INFORMATION
                                               NRC’s proposal and whether the                                                                                ACTION:   Notice.
                                                                                                       CONTACT section of this document.
                                               justification is adequate.                                 • NRC’s Agencywide Documents                       SUMMARY:   The Commission is noticing a
                                                  3. Please comment on the proposed                    Access and Management System                          recent Postal Service filing for the
                                               quality metrics introduced in Section                   (ADAMS): You may obtain publicly-                     Commission’s consideration concerning
                                               5.4.7. Are these metrics appropriate for                available documents online in the                     negotiated service agreements. This
                                               their intended purpose? Has the NRC                     ADAMS Public Documents collection at                  notice informs the public of the filing,
                                               presented an appropriate technical                      http://www.nrc.gov/reading-rm/                        invites public comment, and takes other
                                               justification (see Sections 5.4.8 and                   adams.html. To begin the search, select               administrative steps.
                                               5.4.10) for the proposed metrics?                       ‘‘Begin Web-based ADAMS Search.’’ For
                                                  4. Please comment on the feasibility                                                                       DATES: Comments are due: September
                                                                                                       problems with ADAMS, please contact                   17, 2018.
                                               of the proposed validation scheme.
                                                                                                       the NRC’s Public Document Room (PDR)                  ADDRESSES: Submit comments
                                               What initial (e.g., software and guidance
                                                                                                       reference staff at 1–800–397–4209, 301–               electronically via the Commission’s
                                               development) and recurring (i.e., costs
                                                                                                       415–4737, or by email to pdr.resource@                Filing Online system at http://
                                               for each analysis) costs are foreseen for
                                                                                                       nrc.gov. Documents related to WCS’                    www.prc.gov. Those who cannot submit
                                               implementing the validation scheme?
                                                                                                       license application can be found under                comments electronically should contact
                                                  Dated at Rockville, Maryland, this 10th day          Docket Number 72–1050.                                the person identified in the FOR FURTHER
                                               of September, 2018.                                        • NRC’s PDR: You may examine and                   INFORMATION CONTACT section by
daltland on DSKBBV9HB2PROD with NOTICES




                                                  For the Nuclear Regulatory Commission.               purchase copies of public documents at                telephone for advice on filing
                                               Raj Iyengar,                                            the NRC’s PDR, Room O1–F21, One                       alternatives.
                                               Chief, Component Integrity Branch, Division             White Flint North, 11555 Rockville
                                               of Engineering, Office of Nuclear Regulatory            Pike, Rockville, Maryland 20852.                      FOR FURTHER INFORMATION CONTACT:
                                               Research.                                                  • Project web page: Information                    David A. Trissell, General Counsel, at
                                               [FR Doc. 2018–19941 Filed 9–12–18; 8:45 am]             related to the ISP CISF project can be                202–789–6820.
                                               BILLING CODE 7590–01–P                                  accessed on the NRC’s project web page                SUPPLEMENTARY INFORMATION:



                                          VerDate Sep<11>2014   19:20 Sep 12, 2018   Jkt 244001   PO 00000   Frm 00050   Fmt 4703   Sfmt 4703   E:\FR\FM\13SEN1.SGM   13SEN1



Document Created: 2018-09-13 01:02:09
Document Modified: 2018-09-13 01:02:09
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionDraft NUREG; request for comment.
DatesSubmit comments by November 13, 2018. Comments received after this date will be considered if it is practical to do so, but the Commission is able to ensure consideration only for comments received before this date.
ContactMichael Benson, Office of Nuclear Regulatory Research, telephone: 301-415-2425, email: [email protected]; or Patrick Raynaud, Office of Nuclear Regulatory Research, telephone: 301-415-1987, email: [email protected] Both are staff of the U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
FR Citation83 FR 46524 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR