83_FR_47116 83 FR 46936 - Columbia Gas Transmission, LLC; Notice of Application

83 FR 46936 - Columbia Gas Transmission, LLC; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 180 (September 17, 2018)

Page Range46936-46937
FR Document2018-20100

Federal Register, Volume 83 Issue 180 (Monday, September 17, 2018)
[Federal Register Volume 83, Number 180 (Monday, September 17, 2018)]
[Notices]
[Pages 46936-46937]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-20100]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-544-000]


Columbia Gas Transmission, LLC; Notice of Application

    Take notice that on September 5, 2018, Columbia Gas Transmission, 
LLC, (Columbia), filed an application in Docket No. CP18-544-000 
pursuant to Section 7(c) of the Natural Gas Act and Part 157.17 of the 
Commission's Regulations, seeking the issuance of a temporary 
certificate authorizing the installation of temporary compression at 
its Petersburg Compressor Station in Prince George County, Virginia 
(Station), in order to maintain uninterrupted service to its customers 
during an unanticipated outage of existing compression due to emergency 
restoration activities required at the Station site.
    Columbia states that subsidence due to poor soil conditions has 
resulted in foundation damage as well as the unsafe buildup of stresses 
on Station piping that presents safety and reliability risks if further 
settlement is not prevented. Columbia states that its plan to stabilize 
further settlement and to repair the Station foundation and piping will 
require a six-to-eight month full Station outage. In order to begin the 
remedial measures, Columbia plans to temporarily install four leased 
1,380 horsepower (hp) compressors approximately 250 feet northeast of 
the Station which will allow the existing compressors to be taken off 
line during restoration activities. The cost of the temporary 
compression, including installation, operation, and removal, is 
approximately $7.6 million.
    Columbia further states that its customers, including the City of 
Norfolk, Virginia and the CALP Power Plant, are dependent on the 
Station compression for their natural gas service and therefore an in-
service date of November 1, 2018 is needed for the temporary 
compression in order to maintain uninterrupted service during the 2018-
2019 winter heating season. Therefore, the Commission will require a 
shortened notice period until September 25, 2018 for this proceeding.
    The filing may be viewed on the web at http://www.ferc.gov using 
the eLibrary link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, contact FERC at [email protected] or call toll-
free, (886) 208-3676 or TYY, (202) 502-8659.
    Any questions regarding this application should be directed to 
Sorana Linder, Director, Modernization & Certificates, Columbia Gas 
Transmission, LLC, 700 Louisiana Street, Suite 700, Houston, TX 77002-
2700 or at phone (832) 320-5209, or via email at 
[email protected].
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 7 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission.

[[Page 46937]]

Environmental commentors will be placed on the Commission's 
environmental mailing list, will receive copies of the environmental 
documents, and will be notified of meetings associated with the 
Commission's environmental review process. Environmental commentors 
will not be required to serve copies of filed documents on all other 
parties. However, the non-party commentors will not receive copies of 
all documents filed by other parties or issued by the Commission 
(except for the mailing of environmental documents issued by the 
Commission) and will not have the right to seek court review of the 
Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the eFiling link at 
http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 7 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426.
    Comment Date: September 25, 2018

    Dated: September 11, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-20100 Filed 9-14-18; 8:45 am]
 BILLING CODE 6717-01-P



                                               46936                     Federal Register / Vol. 83, No. 180 / Monday, September 17, 2018 / Notices

                                                  Description: § 4(d) Rate Filing: 091018              other information, call (866) 208–3676                a shortened notice period until
                                               Negotiated Rates—Equinor Natural Gas                    (toll free). For TTY, call (202) 502–8659.            September 25, 2018 for this proceeding.
                                               LLC R–7120–07 to be effective                             Dated: September 11, 2018.                             The filing may be viewed on the web
                                               11/1/2018.                                                                                                    at http://www.ferc.gov using the
                                                                                                       Nathaniel J. Davis, Sr.
                                                  Filed Date: 9/10/18.                                                                                       eLibrary link. Enter the docket number
                                                                                                       Deputy Secretary.                                     excluding the last three digits in the
                                                  Accession Number: 20180910–5031.
                                                  Comments Due: 5 p.m. ET 9/24/18.                     [FR Doc. 2018–20083 Filed 9–14–18; 8:45 am]           docket number field to access the
                                                  Docket Numbers: RP18–1162–000.                       BILLING CODE 6717–01–P                                document. For assistance, contact FERC
                                                  Applicants: Iroquois Gas                                                                                   at FERCOnlineSupport@ferc.gov or call
                                               Transmission System, L.P.                                                                                     toll-free, (886) 208–3676 or TYY, (202)
                                                                                                       DEPARTMENT OF ENERGY                                  502–8659.
                                                  Description: § 4(d) Rate Filing: 091018
                                               Negotiated Rates—Equinor Natural Gas                                                                             Any questions regarding this
                                                                                                       Federal Energy Regulatory                             application should be directed to Sorana
                                               LLC R–7120–08 to be effective                           Commission
                                               11/1/2018.                                                                                                    Linder, Director, Modernization &
                                                  Filed Date: 9/10/18.                                                                                       Certificates, Columbia Gas
                                                  Accession Number: 20180910–5041.                     [Docket No. CP18–544–000]                             Transmission, LLC, 700 Louisiana
                                                  Comments Due: 5 p.m. ET 9/24/18.                                                                           Street, Suite 700, Houston, TX 77002–
                                                                                                       Columbia Gas Transmission, LLC;                       2700 or at phone (832) 320–5209, or via
                                                  Docket Numbers: RP18–1163–000.                       Notice of Application
                                                  Applicants: Iroquois Gas                                                                                   email at Sorana_linder@
                                               Transmission System, L.P.                                  Take notice that on September 5,                   transcanada.com.
                                                                                                                                                                There are two ways to become
                                                  Description: § 4(d) Rate Filing: 091018              2018, Columbia Gas Transmission, LLC,
                                                                                                                                                             involved in the Commission’s review of
                                               Negotiated Rates—Equinor Natural Gas                    (Columbia), filed an application in
                                                                                                                                                             this project. First, any person wishing to
                                               LLC R–7120–09 to be effective                           Docket No. CP18–544–000 pursuant to
                                                                                                                                                             obtain legal status by becoming a party
                                               11/1/2018.                                              Section 7(c) of the Natural Gas Act and
                                                                                                                                                             to the proceedings for this project
                                                  Filed Date: 9/10/18.                                 Part 157.17 of the Commission’s
                                                  Accession Number: 20180910–5046.                                                                           should, on or before the comment date
                                                                                                       Regulations, seeking the issuance of a
                                                  Comments Due: 5 p.m. ET 9/24/18.                                                                           stated below, file with the Federal
                                                                                                       temporary certificate authorizing the
                                                                                                                                                             Energy Regulatory Commission, 888
                                                  Docket Numbers: RP18–1164–000.                       installation of temporary compression at
                                                                                                                                                             First Street NE, Washington, DC 20426,
                                                  Applicants: Iroquois Gas                             its Petersburg Compressor Station in                  a motion to intervene in accordance
                                               Transmission System, L.P.                               Prince George County, Virginia                        with the requirements of the
                                                  Description: § 4(d) Rate Filing: 091018              (Station), in order to maintain                       Commission’s Rules of Practice and
                                               Negotiated Rates—Equinor Natural Gas                    uninterrupted service to its customers                Procedure (18 CFR 385.214 or 385.211)
                                               LLC R–7120–10 to be effective                           during an unanticipated outage of                     and the Regulations under the NGA (18
                                               11/1/2018.                                              existing compression due to emergency                 CFR 157.10). A person obtaining party
                                                  Filed Date: 9/10/18.                                 restoration activities required at the                status will be placed on the service list
                                                  Accession Number: 20180910–5047.                     Station site.                                         maintained by the Secretary of the
                                                  Comments Due: 5 p.m. ET 9/24/18.                        Columbia states that subsidence due                Commission and will receive copies of
                                                  Docket Numbers: RP18–1165–000.                       to poor soil conditions has resulted in               all documents filed by the applicant and
                                                  Applicants: Rockies Express Pipeline                 foundation damage as well as the unsafe               by all other parties. A party must submit
                                               LLC.                                                    buildup of stresses on Station piping                 7 copies of filings made with the
                                                  Description: Rockies Express Pipeline                that presents safety and reliability risks            Commission and must mail a copy to
                                               LLC submits tariff filing per 154.204:                  if further settlement is not prevented.               the applicant and to every other party in
                                               Errata to Administrative Cleanup to                     Columbia states that its plan to stabilize            the proceeding. Only parties to the
                                               Tariff to be effective 10/1/2018 under                  further settlement and to repair the                  proceeding can ask for court review of
                                               RP18–1165.                                              Station foundation and piping will                    Commission orders in the proceeding.
                                                  Filed Date: 09/10/2018.                              require a six-to-eight month full Station                However, a person does not have to
                                                  Accession Number: 20180910–5134.                     outage. In order to begin the remedial                intervene in order to have comments
                                                  Comment Date: 5:00 p.m. ET 9/24/18.                  measures, Columbia plans to                           considered. The second way to
                                                  The filings are accessible in the                    temporarily install four leased 1,380                 participate is by filing with the
                                               Commission’s eLibrary system by                         horsepower (hp) compressors                           Secretary of the Commission, as soon as
                                               clicking on the links or querying the                   approximately 250 feet northeast of the               possible, an original and two copies of
                                               docket number.                                          Station which will allow the existing                 comments in support of or in opposition
                                                  Any person desiring to intervene or                  compressors to be taken off line during               to this project. The Commission will
                                               protest in any of the above proceedings                 restoration activities. The cost of the               consider these comments in
                                               must file in accordance with Rules 211                  temporary compression, including                      determining the appropriate action to be
                                               and 214 of the Commission’s                             installation, operation, and removal, is              taken, but the filing of a comment alone
                                               Regulations (18 CFR 385.211 and                         approximately $7.6 million.                           will not serve to make the filer a party
                                               385.214) on or before 5:00 p.m. Eastern                    Columbia further states that its                   to the proceeding. The Commission’s
                                               time on the specified comment date.                     customers, including the City of                      rules require that persons filing
                                               Protests may be considered, but                         Norfolk, Virginia and the CALP Power                  comments in opposition to the project
                                               intervention is necessary to become a                   Plant, are dependent on the Station                   provide copies of their protests only to
daltland on DSKBBV9HB2PROD with NOTICES




                                               party to the proceeding.                                compression for their natural gas service             the party or parties directly involved in
                                                  eFiling is encouraged. More detailed                 and therefore an in-service date of                   the protest.
                                               information relating to filing                          November 1, 2018 is needed for the                       Persons who wish to comment only
                                               requirements, interventions, protests,                  temporary compression in order to                     on the environmental review of this
                                               service, and qualifying facilities filings              maintain uninterrupted service during                 project should submit an original and
                                               can be found at: http://www.ferc.gov/                   the 2018–2019 winter heating season.                  two copies of their comments to the
                                               docs-filing/efiling/filing-req.pdf. For                 Therefore, the Commission will require                Secretary of the Commission.


                                          VerDate Sep<11>2014   17:47 Sep 14, 2018   Jkt 244001   PO 00000   Frm 00027   Fmt 4703   Sfmt 4703   E:\FR\FM\17SEN1.SGM   17SEN1


                                                                         Federal Register / Vol. 83, No. 180 / Monday, September 17, 2018 / Notices                                                  46937

                                               Environmental commentors will be                        annual license for the project is issued              River, in the city of Holyoke in
                                               placed on the Commission’s                              to Alabama Power Company for a period                 Hampton County, Massachusetts.
                                               environmental mailing list, will receive                effective August 1, 2007 through July                    The license for Project No. 2387 was
                                               copies of the environmental documents,                  31, 2008, or until the issuance of a new              issued for a period ending August 31,
                                               and will be notified of meetings                        license for the project or other                      2018. Section 15(a)(1) of the FPA, 16
                                               associated with the Commission’s                        disposition under the FPA, whichever                  U.S.C. 808(a)(1), requires the
                                               environmental review process.                           comes first. The Notice of Authorization
                                                                                                                                                             Commission, at the expiration of a
                                               Environmental commentors will not be                    further stated that if issuance of a new
                                                                                                                                                             license term, to issue from year-to-year
                                               required to serve copies of filed                       license (or other disposition) does not
                                                                                                                                                             an annual license to the then licensee
                                               documents on all other parties.                         take place on or before July 31, 2008,
                                               However, the non-party commentors                       notice is hereby given that, pursuant to              under the terms and conditions of the
                                               will not receive copies of all documents                18 CFR 16.18(c), an annual license                    prior license until a new license is
                                               filed by other parties or issued by the                 under section 15(a)(1) of the FPA is                  issued, or the project is otherwise
                                               Commission (except for the mailing of                   renewed automatically without further                 disposed of as provided in section 15 or
                                               environmental documents issued by the                   order or notice by the Commission,                    any other applicable section of the FPA.
                                               Commission) and will not have the right                 unless the Commission orders                          If the project’s prior license waived the
                                               to seek court review of the                             otherwise. The Notice of Authorization                applicability of section 15 of the FPA,
                                               Commission’s final order.                               then stated that if the project is not                then, based on section 9(b) of the
                                                  The Commission strongly encourages                   subject to section 15 of the FPA, notice              Administrative Procedure Act, 5 U.S.C.
                                               electronic filings of comments, protests                is hereby given that Alabama Power                    558(c), and as set forth at 18 CFR
                                               and interventions in lieu of paper using                Company is authorized to continue                     16.21(a), if the licensee of such project
                                               the eFiling link at http://www.ferc.gov.                operation of the project until such time              has filed an application for a subsequent
                                               Persons unable to file electronically                   as the Commission acts on its                         license, the licensee may continue to
                                               should submit an original and 7 copies                  application for a new license.                        operate the project in accordance with
                                               of the protest or intervention to the                      On June 20, 2013, the Commission                   the terms and conditions of the license
                                               Federal Energy Regulatory Commission,                   issued a new license combining the                    after the minor or minor part license
                                               888 First Street NE, Washington, DC                     three projects as one project, the Coosa              expires, until the Commission acts on
                                               20426.                                                  River Project.                                        its application. If the licensee of such a
                                                  Comment Date: September 25, 2018                        On September 7, 2018, the U.S. Court               project has not filed an application for
                                                 Dated: September 11, 2018.                            of Appeals for the District of Columbia               a subsequent license, then it may be
                                               Kimberly D. Bose,                                       Circuit issued a formal mandate                       required, pursuant to 18 CFR 16.21(b),
                                                                                                       vacating and remanding the new license                to continue project operations until the
                                               Secretary.
                                                                                                       to the Commission for further                         Commission issues someone else a
                                               [FR Doc. 2018–20100 Filed 9–14–18; 8:45 am]
                                                                                                       proceedings. Therefore, as of September               license for the project or otherwise
                                               BILLING CODE 6717–01–P
                                                                                                       7, 2018, the Court’s mandate                          orders disposition of the project.
                                                                                                       automatically reinstates the three                       If the project is subject to section 15
                                                                                                       August 8, 2007 Notices of Authorization               of the FPA, notice is hereby given that
                                               DEPARTMENT OF ENERGY
                                                                                                       and returns the July 28, 2005                         an annual license for Project No. 2387
                                               Federal Energy Regulatory                               application to pending status.                        is issued to the licensee for a period
                                               Commission                                                Dated: September 10, 2018.                          effective September 1, 2018 through
                                               [Project Nos. 2146–000]                                 Kimberly D. Bose,                                     August 31, 2019, or until the issuance
                                                                                                       Secretary.                                            of a new license for the project or other
                                               Alabama Power Company; Notice of                        [FR Doc. 2018–20081 Filed 9–14–18; 8:45 am]           disposition under the FPA, whichever
                                               Reinstatement of Authorization for                      BILLING CODE 6717–01–P                                comes first. If issuance of a new license
                                               Continued Project Operation                                                                                   (or other disposition) does not take
                                                                                                                                                             place on or before August 30, 2019,
                                                  On July 28, 2005, Alabama Power                      DEPARTMENT OF ENERGY                                  notice is hereby given that, pursuant to
                                               Company, licensee for the Coosa River                                                                         18 CFR 16.18(c), an annual license
                                               Hydroelectric Project No. 2146 (Coosa                   Federal Energy Regulatory                             under section 15(a)(1) of the FPA is
                                               River Project), Jordan Hydroelectric                    Commission                                            renewed automatically without further
                                               Project No. 618 (Jordan Project), and
                                                                                                                                                             order or notice by the Commission,
                                               Mitchell Hydroelectric Project No. 82                   [Project No. 2387–000]                                unless the Commission orders
                                               (Mitchell Project) filed an application
                                                                                                                                                             otherwise.
                                               for a new license to continue operation                 City of Holyoke Gas and Electric
                                               and maintenance of all three projects as                Department; Notice of Authorization                      If the project is not subject to section
                                               one project, the Coosa River Project,                   for Continued Project Operation                       15 of the FPA, notice is hereby given
                                               pursuant to the Federal Power Act                                                                             that the licensee, City of Holyoke Gas
                                               (FPA) and the Commission’s                                On August 31, 2016, City of Holyoke                 and Electric Department, is authorized
                                               regulations. The projects are located on                Gas and Electric Department, licensee                 to continue operation of the Holyoke
                                               the Coosa River in the states of Alabama                for the Holyoke Number 2 Hydroelectric                Number 2 Hydroelectric Project, until
                                               and Georgia.                                            Project, filed an Application for a New               such time as the Commission acts on its
daltland on DSKBBV9HB2PROD with NOTICES




                                                  On August 8, 2007, the Commission                    License pursuant to the Federal Power                 application for a subsequent license.
                                               issued separate Notices of Authorization                Act (FPA) and the Commission’s                          Dated: September 11, 2018.
                                               for Continued Project Operation (Notice                 regulations thereunder. The Holyoke
                                                                                                                                                             Kimberly D. Bose,
                                               of Authorization) for each project. Each                Number 2 Hydroelectric Project is
                                               Notice of Authorization stated that if the              located between the first and second                  Secretary.
                                               project is subject to section 15 of the                 level canals on the Holyoke Canal                     [FR Doc. 2018–20103 Filed 9–14–18; 8:45 am]
                                               FPA, notice is hereby given that an                     System adjacent to the Connecticut                    BILLING CODE 6717–01–P




                                          VerDate Sep<11>2014   17:47 Sep 14, 2018   Jkt 244001   PO 00000   Frm 00028   Fmt 4703   Sfmt 9990   E:\FR\FM\17SEN1.SGM   17SEN1



Document Created: 2018-09-15 01:38:11
Document Modified: 2018-09-15 01:38:11
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
DatesSeptember 25, 2018
FR Citation83 FR 46936 

2025 Federal Register | Disclaimer | Privacy Policy