DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 184 (September 21, 2018)

Page Range47918-47920
FR Document2018-20552

Federal Register, Volume 83 Issue 184 (Friday, September 21, 2018)
[Federal Register Volume 83, Number 184 (Friday, September 21, 2018)]
[Notices]
[Pages 47918-47920]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-20552]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP17-117-000; CP17-118-000]


Driftwood LNG LLC; Driftwood Pipeline; LLC Notice of Availability 
of the Draft Environmental Impact Statement for the Proposed Driftwood 
LNG Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared a draft environmental impact statement (EIS) 
for the Driftwood LNG and Pipeline Projects (Project). Driftwood LNG 
LLC and Driftwood Pipeline LLC, collectively Driftwood, request 
authorization (FERC Docket Nos. CP17-117-000 and CP17-118-000) to site, 
construct, and operate liquefied natural gas (LNG) export facilities 
and certain interstate, natural gas transmission pipeline facilities in 
Evangeline, Acadia, Jefferson Davis, and Calcasieu Parishes, Louisiana. 
The Project would provide gas and processing to produce up to 26 
million tonnes per annum of LNG for export.
    The draft EIS assesses the potential environmental effects of the 
construction and operation of the Driftwood LNG Project in accordance 
with the requirements of the National Environmental Policy Act (NEPA). 
The FERC staff concludes that approval of the Project would result in 
adverse impacts on the environment. However, with the exception of the 
visual impact on the nearby Driftwood Community which we conclude would 
be significant, impacts on the environment would be reduced to 
acceptable levels with the implementation of Driftwood's proposed 
impact avoidance, minimization, and mitigation measures and the 
additional measures recommended by staff in the draft EIS.
    The U.S. Environmental Protection Agency, the U.S. Army Corps of 
Engineers, U.S. Coast Guard, U.S. Department of Energy, and the U.S. 
Department of Transportation participated as cooperating agencies in 
the preparation of the EIS. Cooperating agencies have jurisdiction by 
law or special expertise with respect to resources potentially affected 
by the

[[Page 47919]]

proposal and participate in the NEPA analysis.
    The draft EIS addresses the potential environmental effects of the 
construction and operation of the following project facilities:
     Five LNG plants (each plant consists of one gas pre-
treatment unit, one condensation stabilization unit, and four heavy 
hydrocarbon removal and liquefaction units);
     three LNG storage tanks;
     three marine berths capable of accommodating LNG carriers 
of up to 216,000 cubic meters each;
     74 miles of 48-inch-diameter pipeline, 10.6 miles of 42-
inch-diameter pipeline, and 11.3 miles of 36-inch-diameter pipeline; 
one 3.4-mile-long, 30-inch-diameter lateral pipeline collocated with 
the mainline pipeline;
     three compressor stations providing a total of 
approximately 275,000 horsepower of compression; and
     six pig launchers and receiver facilities,\1\ 15 meter 
stations, and 17 mainline valves.
---------------------------------------------------------------------------

    \1\ A pig is an internal tool that can be used to clean and dry 
a pipeline and/or to inspect it for damage or corrosion.
---------------------------------------------------------------------------

    The Commission mailed a copy of the Notice of Availability to 
federal, state, and local government representatives and agencies; 
elected officials; environmental and public interest groups; Native 
American tribes; potentially affected landowners and other interested 
individuals and groups; and newspapers and libraries in the project 
area. The draft EIS is only available in electronic format. It may be 
viewed and downloaded from the FERC's website (www.ferc.gov), on the 
Environmental Documents page (https://www.ferc.gov/industries/gas/enviro/eis.asp). In addition, the draft EIS may be accessed by using 
the eLibrary link on the FERC's website. Click on the eLibrary link 
(https://www.ferc.gov/docs-filing/elibrary.asp), click on General 
Search, and enter the docket number in the ``Docket Number'' field, 
excluding the last three digits (i.e., CP17-117 or CP17-118). Be sure 
you have selected an appropriate date range. For assistance, please 
contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free 
at (866) 208-3676, or for TTY, contact (202) 502-8659.
    Any person wishing to comment on the draft EIS may do so. Your 
comments should focus on the draft EIS's disclosure and discussion of 
potential environmental effects, reasonable alternatives, and measures 
to avoid or lessen environmental impacts. The more specific your 
comments, the more useful they will be. To ensure consideration of your 
comments on the proposal in the final EIS, it is important that the 
Commission receive your comments on or before 5 p.m. Eastern Time on 
November 5, 2018.
    For your convenience, there are four methods you can use to submit 
your comments to the Commission. The Commission will provide equal 
consideration to all comments received, whether filed in written form 
or provided verbally. The Commission encourages electronic filing of 
comments and has staff available to assist you at (866) 208-3676 or 
FercOnlineSupport@ferc.gov. Please carefully follow these instructions 
so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's website (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on the Project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's website (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' If you are filing a comment on a particular project, 
please select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the Project docket numbers 
(CP17-117-000 and CP17-118-000) with your submission: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Room 1A, Washington, DC 20426.
    (4) In lieu of sending written or electronic comments, the 
Commission invites you to attend one of the public comment sessions its 
staff will conduct in the project area to receive comments on the draft 
EIS, scheduled as follows:

------------------------------------------------------------------------
            Date and time                           Location
------------------------------------------------------------------------
Tuesday, October 9 (5 p.m.-7 p.m.      Seven Clans Hotel, 797 Coushatta
 CST).                                  Drive, Kinder, LA 20648 (800)-
                                        584-7263.
Wednesday, October 10 (5 p.m.-7 p.m.   Holiday Inn Opelousas, 5696O-49
 CST).                                  North Service Road, Opelousas,
                                        LA 70570 (337)-407-0004.
Thursday, October 11 (5 p.m.-7 p.m.    West Cal Event Center, 401 Arena
 CST).                                  Road, Sulphur, LA 70665 (337)-
                                        528-9378.
------------------------------------------------------------------------

    The primary goal of these comment sessions is to have you identify 
the specific environmental issues and concerns with the draft EIS. 
Individual verbal comments will be taken on a one-on-one basis with a 
court reporter. This format is designed to receive the maximum amount 
of verbal comments, in a convenient way during the timeframe allotted.
    Each comment session is scheduled from 5 p.m. to 7 p.m. CST. You 
may arrive at any time after 5 p.m. There will not be a formal 
presentation by Commission staff when the session opens. If you wish to 
speak, the Commission staff will hand out numbers in the order of your 
arrival. Comments will be taken until 7 p.m. However, if no additional 
numbers have been handed out and all individuals who wish to provide 
comments have had an opportunity to do so, staff may conclude the 
session at 6:30 p.m.
    Your verbal comments will be recorded by the court reporter (with 
FERC staff or representative present) and become part of the public 
record for this proceeding. Transcripts will be publicly available on 
FERC's eLibrary system (see below for instructions on using eLibrary). 
If a significant number of people are interested in providing verbal 
comments in the one-on-one settings, a time limit of 5 minutes may be 
implemented for each commentor.
    It is important to note that verbal comments hold the same weight 
as written or electronically submitted comments. Although there will 
not be a formal presentation, Commission staff will be available 
throughout the comment session to answer your questions about the 
environmental review process.
    Any person seeking to become a party to the proceeding must file a 
motion to intervene pursuant to Rule 214 of the

[[Page 47920]]

Commission's Rules of Practice and Procedures (18 CFR 385.214). Motions 
to intervene are more fully described at http://www.ferc.gov/resources/guides/how-to/intervene.asp. Only intervenors have the right to seek 
rehearing or judicial review of the Commission's decision. The 
Commission grants affected landowners and others with environmental 
concerns intervenor status upon showing good cause by stating that they 
have a clear and direct interest in this proceeding which no other 
party can adequately represent. Simply filing environmental comments 
will not give you intervenor status, but you do not need intervenor 
status to have your comments considered.

Questions?

    Additional information about the Projects is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC (www.ferc.gov) using the eLibrary link. The eLibrary link also 
provides access to the texts of all formal documents issued by the 
Commission, such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription that allows you to keep track of all formal issuances and 
submittals in specific dockets. This can reduce the amount of time you 
spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.

    Dated: September 14, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-20552 Filed 9-20-18; 8:45 am]
 BILLING CODE 6717-01-P



                                               47918                       Federal Register / Vol. 83, No. 184 / Friday, September 21, 2018 / Notices

                                               beth.harris@enel.com, or Mr. Kevin                      tailraces; (9) a 567-foot-long, 13.2-                   Dated: September 14, 2018.
                                               Webb, Hydro Licensing Manager, Enel                     kilovolt (kV) transmission line that runs             Nathaniel J. Davis, Sr.,
                                               Green Power North America, Inc., 100                    from the steel powerhouse to the                      Deputy Secretary.
                                               Brickstone Square, Suite 300, Andover,                  interconnection point with the grid; (10)             [FR Doc. 2018–20553 Filed 9–20–18; 8:45 am]
                                               MA 01810, Phone: (978) 935–6039,                        a 130-foot-long transmission line that                BILLING CODE 6717–01–P
                                               Email: kevin.webb@enel.com.                             connects the masonry powerhouse to a
                                                 i. FERC Contact: Brandi Sangunett,                    5,000 kilovolt-amp step-up transformer
                                               Phone: 202–502–8393, Email:                             and an additional 323-foot-long, 13.2-kV              DEPARTMENT OF ENERGY
                                               brandi.sangunett@ferc.gov.                              transmission line leading from the
                                                 j. Deadline for filing motions to                     transformer to the interconnection                    Federal Energy Regulatory
                                               intervene and protests: November 13,                    point; and (11) appurtenant facilities.               Commission
                                               2018.
                                                 The Commission strongly encourages                       The Fries Project is operated in a run-
                                                                                                                                                             [Docket Nos. CP17–117–000; CP17–118–
                                               electronic filing. Please file motions to               of-river mode. For the period 2003                    000]
                                               intervene and protests using the                        through 2016, the average annual
                                               Commission’s eFiling system at http://                  generation at the Fries Project was                   Driftwood LNG LLC; Driftwood
                                               www.ferc.gov/docs-filing/efiling.asp. For               26,150 megawatt-hours.                                Pipeline; LLC Notice of Availability of
                                               assistance, please contact FERC Online                     m. A copy of the application is                    the Draft Environmental Impact
                                               Support at FERCOnlineSupport@                           available for review at the Commission                Statement for the Proposed Driftwood
                                               ferc.gov, (866) 208–3676 (toll free), or                in the Public Reference Room or may be                LNG Project
                                               (202) 502–8659 (TTY). In lieu of                        viewed on the Commission’s website at
                                               electronic filing, please send a paper                                                                           The staff of the Federal Energy
                                                                                                       http://www.ferc.gov using the                         Regulatory Commission (FERC or
                                               copy to: Secretary, Federal Energy                      ‘‘eLibrary’’ link. Enter the docket
                                               Regulatory Commission, 888 First Street                                                                       Commission) has prepared a draft
                                                                                                       number excluding the last three digits in             environmental impact statement (EIS)
                                               NE, Washington, DC 20426. The first                     the docket number field to access the
                                               page of any filing should include docket                                                                      for the Driftwood LNG and Pipeline
                                                                                                       document. For assistance, contact FERC                Projects (Project). Driftwood LNG LLC
                                               number P–2883–009.                                      Online Support. A copy is also available
                                                 The Commission’s Rules of Practice                                                                          and Driftwood Pipeline LLC,
                                                                                                       for inspection and reproduction at the                collectively Driftwood, request
                                               require all intervenors filing documents                address in item h above.
                                               with the Commission to serve a copy of                                                                        authorization (FERC Docket Nos. CP17–
                                               that document on each person on the                        You may also register online at http://            117–000 and CP17–118–000) to site,
                                               official service list for the project.                  www.ferc.gov/docs-filing/                             construct, and operate liquefied natural
                                               Further, if an intervenor files comments                esubscription.asp to be notified via                  gas (LNG) export facilities and certain
                                               or documents with the Commission                        email of new filings and issuances                    interstate, natural gas transmission
                                               relating to the merits of an issue that                 related to this or other pending projects.            pipeline facilities in Evangeline, Acadia,
                                               may affect the responsibilities of a                    For assistance, contact FERC Online                   Jefferson Davis, and Calcasieu Parishes,
                                               particular resource agency, they must                   Support.                                              Louisiana. The Project would provide
                                               also serve a copy of the document on                       n. Anyone may submit a protest or a                gas and processing to produce up to 26
                                               that resource agency.                                   motion to intervene in accordance with                million tonnes per annum of LNG for
                                                 k. This application has been accepted,                the requirements of the Rules of Practice             export.
                                               but is not ready for environmental                      and Procedure, 18 CFR 385.210,                           The draft EIS assesses the potential
                                               analysis at this time.                                  385.211, and 385.214. In determining                  environmental effects of the
                                                 l. The existing Fries Hydroelectric                   the appropriate action to take, the                   construction and operation of the
                                               Project (Fries Project) consists of: (1) A              Commission will consider all protests                 Driftwood LNG Project in accordance
                                               41-foot-high, 610-foot-long rock                                                                              with the requirements of the National
                                                                                                       filed, but only those who file a motion
                                               masonry dam with a 500-foot-long                                                                              Environmental Policy Act (NEPA). The
                                                                                                       to intervene in accordance with the
                                               spillway; (2) an 88-acre impoundment at                                                                       FERC staff concludes that approval of
                                                                                                       Commission’s Rules may become a
                                               the normal pool elevation (spillway                                                                           the Project would result in adverse
                                                                                                       party to the proceeding. Any protests or
                                               crest elevation) of 2,188.27 feet National                                                                    impacts on the environment. However,
                                                                                                       motions to intervene must be received
                                               Geodetic Vertical Datum of 1929; (3) an                                                                       with the exception of the visual impact
                                                                                                       on or before the specified deadline date
                                               approximately 750-foot-long, 110- foot-                                                                       on the nearby Driftwood Community
                                                                                                       for the particular application.
                                               wide intake canal with four 15.5-foot-                                                                        which we conclude would be
                                               high, 6.5-foot-wide headgates; (4) a                       All filings must (1) bear in all capital           significant, impacts on the environment
                                               canal spillway consisting of 10 stoplog                 letters the title PROTEST or MOTION                   would be reduced to acceptable levels
                                               bays totaling 47 feet in length; (5) two                TO INTERVENE; (2) set forth in the                    with the implementation of Driftwood’s
                                               12.5-foot-high, 5.0-foot-wide canal gates;              heading the name of the applicant and                 proposed impact avoidance,
                                               (6) a steel powerhouse that contains a                  the project number of the application to              minimization, and mitigation measures
                                               single vertical Kaplan turbine with a                   which the filing responds; (3) furnish                and the additional measures
                                               capacity of 2.1 megawatts (MW) that                     the name, address, and telephone                      recommended by staff in the draft EIS.
                                               discharges into a 180-foot-long, 75-foot-               number of the person protesting or                       The U.S. Environmental Protection
                                               wide, 12-foot-deep tailrace; (7) a                      intervening; and (4) otherwise comply                 Agency, the U.S. Army Corps of
                                               masonry powerhouse that contains one                    with the requirements of 18 CFR                       Engineers, U.S. Coast Guard, U.S.
daltland on DSKBBV9HB2PROD with NOTICES




                                               vertical and two horizontal Francis                     385.2001 through 385.2005. Agencies                   Department of Energy, and the U.S.
                                               turbines with a total capacity of 3.0 MW                may obtain copies of the application                  Department of Transportation
                                               that discharges into a 180-foot-long,                   directly from the applicant. A copy of                participated as cooperating agencies in
                                               120-foot-wide, 12-foot-deep tailrace; (8)               any protest or motion to intervene must               the preparation of the EIS. Cooperating
                                               a 500-foot-long, 450-foot-wide bypassed                 be served upon each representative of                 agencies have jurisdiction by law or
                                               reach that extends from the toe of the                  the applicant specified in the particular             special expertise with respect to
                                               dam to the confluence with the                          application.                                          resources potentially affected by the


                                          VerDate Sep<11>2014   17:30 Sep 20, 2018   Jkt 244001   PO 00000   Frm 00045   Fmt 4703   Sfmt 4703   E:\FR\FM\21SEN1.SGM   21SEN1


                                                                            Federal Register / Vol. 83, No. 184 / Friday, September 21, 2018 / Notices                                            47919

                                               proposal and participate in the NEPA                     Environmental Documents page (https://                FercOnlineSupport@ferc.gov. Please
                                               analysis.                                                www.ferc.gov/industries/gas/enviro/                   carefully follow these instructions so
                                                  The draft EIS addresses the potential                 eis.asp). In addition, the draft EIS may              that your comments are properly
                                               environmental effects of the                             be accessed by using the eLibrary link                recorded.
                                               construction and operation of the                        on the FERC’s website. Click on the                      (1) You can file your comments
                                               following project facilities:                            eLibrary link (https://www.ferc.gov/                  electronically using the eComment
                                                  • Five LNG plants (each plant                         docs-filing/elibrary.asp), click on                   feature on the Commission’s website
                                               consists of one gas pre-treatment unit,                  General Search, and enter the docket                  (www.ferc.gov) under the link to
                                               one condensation stabilization unit, and                 number in the ‘‘Docket Number’’ field,                Documents and Filings. This is an easy
                                               four heavy hydrocarbon removal and                       excluding the last three digits (i.e.,                method for submitting brief, text-only
                                               liquefaction units);                                     CP17–117 or CP17–118). Be sure you                    comments on the Project;
                                                  • three LNG storage tanks;                            have selected an appropriate date range.
                                                                                                                                                                 (2) You can file your comments
                                                  • three marine berths capable of                      For assistance, please contact FERC
                                                                                                                                                              electronically by using the eFiling
                                               accommodating LNG carriers of up to                      Online Support at FercOnlineSupport@
                                                                                                                                                              feature on the Commission’s website
                                               216,000 cubic meters each;                               ferc.gov or toll free at (866) 208–3676, or
                                                  • 74 miles of 48-inch-diameter                                                                              (www.ferc.gov) under the link to
                                                                                                        for TTY, contact (202) 502–8659.
                                               pipeline, 10.6 miles of 42-inch-diameter                    Any person wishing to comment on                   Documents and Filings. With eFiling,
                                               pipeline, and 11.3 miles of 36-inch-                     the draft EIS may do so. Your comments                you can provide comments in a variety
                                               diameter pipeline; one 3.4-mile-long,                    should focus on the draft EIS’s                       of formats by attaching them as a file
                                               30-inch-diameter lateral pipeline                        disclosure and discussion of potential                with your submission. New eFiling
                                               collocated with the mainline pipeline;                   environmental effects, reasonable                     users must first create an account by
                                                  • three compressor stations providing                 alternatives, and measures to avoid or                clicking on ‘‘eRegister.’’ If you are filing
                                               a total of approximately 275,000                         lessen environmental impacts. The more                a comment on a particular project,
                                               horsepower of compression; and                           specific your comments, the more useful               please select ‘‘Comment on a Filing’’ as
                                                  • six pig launchers and receiver                      they will be. To ensure consideration of              the filing type; or
                                               facilities,1 15 meter stations, and 17                   your comments on the proposal in the                     (3) You can file a paper copy of your
                                               mainline valves.                                         final EIS, it is important that the                   comments by mailing them to the
                                                  The Commission mailed a copy of the                   Commission receive your comments on                   following address. Be sure to reference
                                               Notice of Availability to federal, state,                or before 5 p.m. Eastern Time on                      the Project docket numbers (CP17–117–
                                               and local government representatives                     November 5, 2018.                                     000 and CP17–118–000) with your
                                               and agencies; elected officials;                            For your convenience, there are four               submission: Kimberly D. Bose,
                                               environmental and public interest                        methods you can use to submit your                    Secretary, Federal Energy Regulatory
                                               groups; Native American tribes;                          comments to the Commission. The                       Commission, 888 First Street NE, Room
                                               potentially affected landowners and                      Commission will provide equal                         1A, Washington, DC 20426.
                                               other interested individuals and groups;                 consideration to all comments received,                  (4) In lieu of sending written or
                                               and newspapers and libraries in the                      whether filed in written form or                      electronic comments, the Commission
                                               project area. The draft EIS is only                      provided verbally. The Commission                     invites you to attend one of the public
                                               available in electronic format. It may be                encourages electronic filing of                       comment sessions its staff will conduct
                                               viewed and downloaded from the                           comments and has staff available to                   in the project area to receive comments
                                               FERC’s website (www.ferc.gov), on the                    assist you at (866) 208–3676 or                       on the draft EIS, scheduled as follows:

                                                                     Date and time                                                                          Location

                                               Tuesday, October 9 (5 p.m.–7 p.m. CST) ...................       Seven Clans Hotel, 797 Coushatta Drive, Kinder, LA 20648 (800)–584–7263.
                                               Wednesday, October 10 (5 p.m.–7 p.m. CST) ...........            Holiday Inn Opelousas, 5696O–49 North Service Road, Opelousas, LA 70570 (337)–
                                                                                                                  407–0004.
                                               Thursday, October 11 (5 p.m.–7 p.m. CST) ...............         West Cal Event Center, 401 Arena Road, Sulphur, LA 70665 (337)–528–9378.



                                                  The primary goal of these comment                     Commission staff will hand out                        of people are interested in providing
                                               sessions is to have you identify the                     numbers in the order of your arrival.                 verbal comments in the one-on-one
                                               specific environmental issues and                        Comments will be taken until 7 p.m.                   settings, a time limit of 5 minutes may
                                               concerns with the draft EIS. Individual                  However, if no additional numbers have                be implemented for each commentor.
                                               verbal comments will be taken on a one-                  been handed out and all individuals                     It is important to note that verbal
                                               on-one basis with a court reporter. This                 who wish to provide comments have                     comments hold the same weight as
                                               format is designed to receive the                        had an opportunity to do so, staff may                written or electronically submitted
                                               maximum amount of verbal comments,                       conclude the session at 6:30 p.m.                     comments. Although there will not be a
                                               in a convenient way during the                             Your verbal comments will be                        formal presentation, Commission staff
                                               timeframe allotted.                                      recorded by the court reporter (with                  will be available throughout the
                                                  Each comment session is scheduled                     FERC staff or representative present)                 comment session to answer your
                                               from 5 p.m. to 7 p.m. CST. You may                       and become part of the public record for              questions about the environmental
                                                                                                                                                              review process.
daltland on DSKBBV9HB2PROD with NOTICES




                                               arrive at any time after 5 p.m. There will               this proceeding. Transcripts will be
                                               not be a formal presentation by                          publicly available on FERC’s eLibrary                   Any person seeking to become a party
                                               Commission staff when the session                        system (see below for instructions on                 to the proceeding must file a motion to
                                               opens. If you wish to speak, the                         using eLibrary). If a significant number              intervene pursuant to Rule 214 of the


                                                 1 A pig is an internal tool that can be used to

                                               clean and dry a pipeline and/or to inspect it for
                                               damage or corrosion.

                                          VerDate Sep<11>2014   17:30 Sep 20, 2018   Jkt 244001    PO 00000   Frm 00046   Fmt 4703   Sfmt 4703   E:\FR\FM\21SEN1.SGM   21SEN1


                                               47920                       Federal Register / Vol. 83, No. 184 / Friday, September 21, 2018 / Notices

                                               Commission’s Rules of Practice and                         Docket Numbers: ER18–2009–001.                        Comments Due: 5 p.m. ET 10/5/18.
                                               Procedures (18 CFR 385.214). Motions                       Applicants: Southwest Power Pool,                     Docket Numbers: ER18–2427–000.
                                               to intervene are more fully described at                Inc.                                                     Applicants: Nevada Power Company.
                                               http://www.ferc.gov/resources/guides/                      Description: Tariff Amendment:                        Description: § 205(d) Rate Filing: NPC
                                               how-to/intervene.asp. Only intervenors                  Deficiency Response—Revisions to                      Concurrence to CAISO SA4819 to be
                                               have the right to seek rehearing or                     Enhance Regulation Deployment of                      effective 9/13/2018.
                                               judicial review of the Commission’s                     DVERs to be effective 12/18/2018.                        Filed Date: 9/14/18.
                                               decision. The Commission grants                            Filed Date: 9/14/18.                                  Accession Number: 20180914–5084.
                                               affected landowners and others with                        Accession Number: 20180914–5101.                      Comments Due: 5 p.m. ET 10/5/18.
                                               environmental concerns intervenor                          Comments Due: 5 p.m. ET 10/5/18.                      Docket Numbers: ER18–2428–000.
                                               status upon showing good cause by                          Docket Numbers: ER18–2421–000.                        Applicants: Public Service Company
                                               stating that they have a clear and direct                  Applicants: California Independent                 of Colorado.
                                               interest in this proceeding which no                    System Operator Corporation.                             Description: § 205(d) Rate Filing:
                                               other party can adequately represent.                      Description: § 205(d) Rate Filing:                 2018–09–14 Ministerial Revisions-Att
                                               Simply filing environmental comments                    2018–09–13 Dynamic Transfer                           O–PSCo Tbl 35, Sch 16 to be effective
                                               will not give you intervenor status, but                Balancing Authority Operating Agmt                    4/16/2016.
                                               you do not need intervenor status to                    with Nevada Power to be effective 10/                    Filed Date: 9/14/18.
                                               have your comments considered.                          27/2018.                                                 Accession Number: 20180914–5102.
                                               Questions?                                                 Filed Date: 9/13/18.                                  Comments Due: 5 p.m. ET 10/5/18.
                                                                                                          Accession Number: 20180913–5089.                      Docket Numbers: ER18–2429–000.
                                                  Additional information about the                        Comments Due: 5 p.m. ET 10/4/18.
                                               Projects is available from the                                                                                   Applicants: California Independent
                                                                                                          Docket Numbers: ER18–2422–000.                     System Operator Corporation.
                                               Commission’s Office of External Affairs,
                                                                                                          Applicants: California Independent                    Description: § 205(d) Rate Filing:
                                               at (866) 208–FERC, or on the FERC
                                                                                                       System Operator Corporation.                          2018–09–14 First Amendment to MEEA
                                               (www.ferc.gov) using the eLibrary link.
                                                                                                          Description: § 205(d) Rate Filing:                 between CAISO and SMUD—Sutter
                                               The eLibrary link also provides access
                                                                                                       2018–09–13 Amendment No. 4 to                         Energy to be effective 9/15/2018.
                                               to the texts of all formal documents
                                                                                                       ABAOA with Nevada Power Company                          Filed Date: 9/14/18.
                                               issued by the Commission, such as
                                                                                                       to be effective 11/13/2018.                              Accession Number: 20180914–5110.
                                               orders, notices, and rulemakings.
                                                  In addition, the Commission offers a                    Filed Date: 9/13/18.                                  Comments Due: 5 p.m. ET 10/5/18.
                                               free service called eSubscription that                     Accession Number: 20180913–5090.                      Docket Numbers: ER18–2429–001.
                                               allows you to keep track of all formal                     Comments Due: 5 p.m. ET 10/4/18.                      Applicants: California Independent
                                               issuances and submittals in specific                       Docket Numbers: ER18–2423–000.                     System Operator Corporation.
                                               dockets. This can reduce the amount of                     Applicants: Midcontinent                              Description: Tariff Amendment:
                                               time you spend researching proceedings                  Independent System Operator, Inc.                     2018–09–14 Second Amendment to
                                               by automatically providing you with                        Description: § 205(d) Rate Filing:                 MEEA between CAISO and SMUD—
                                               notification of these filings, document                 2018–09–14_SA 3145 Heartland Wind-                    Sutter Energy to to be effective 11/29/
                                               summaries, and direct links to the                      NSPM E&P (J432) to be effective 9/15/                 2018.
                                               documents. Go to www.ferc.gov/docs-                     2018.                                                    Filed Date: 9/14/18.
                                               filing/esubscription.asp.                                  Filed Date: 9/14/18.                                  Accession Number: 20180914–5142.
                                                                                                          Accession Number: 20180914–5009.                      Comments Due: 5 p.m. ET 10/5/18.
                                                 Dated: September 14, 2018.
                                                                                                          Comments Due: 5 p.m. ET 10/5/18.                      Docket Numbers: ER18–2430–000.
                                               Nathaniel J. Davis, Sr.,
                                                                                                          Docket Numbers: ER18–2424–000.                        Applicants: Otter Tail Power
                                               Deputy Secretary.
                                                                                                          Applicants: Midcontinent                           Company.
                                               [FR Doc. 2018–20552 Filed 9–20–18; 8:45 am]
                                                                                                       Independent System Operator, Inc.                        Description: Tariff Cancellation:
                                               BILLING CODE 6717–01–P                                     Description: § 205(d) Rate Filing:                 Notice of Termination of Fibrominn
                                                                                                       2018–09–14_SA 3147 MMPA–NSP TSR                       CASOT Service Agreement to be
                                                                                                       CPA (F115) to be effective 8/14/2018.                 effective 11/13/2018.
                                               DEPARTMENT OF ENERGY
                                                                                                          Filed Date: 9/14/18.                                  Filed Date: 9/14/18.
                                               Federal Energy Regulatory                                  Accession Number: 20180914–5033.                      Accession Number: 20180914–5116.
                                               Commission                                                 Comments Due: 5 p.m. ET 10/5/18.                      Comments Due: 5 p.m. ET 10/5/18.
                                                                                                          Docket Numbers: ER18–2425–000.                        Docket Numbers: ER18–2431–000.
                                               Combined Notice of Filings #1                              Applicants: Duke Energy Progress,                     Applicants: Southwest Power Pool,
                                                                                                       LLC.                                                  Inc.
                                                  Take notice that the Commission
                                                                                                          Description: § 205(d) Rate Filing: DEP-               Description: § 205(d) Rate Filing:
                                               received the following electric corporate
                                                                                                       Fayetteville PWC PSCA Amendment to                    2198R26 Kansas Power Pool NITSA
                                               filings:
                                                  Docket Numbers: EC18–147–000.                        be effective 11/13/2018.                              NOA to be effective 9/1/2018.
                                                  Applicants: Avista Corporation.                         Filed Date: 9/14/18.                                  Filed Date: 9/14/18.
                                                  Description: Supplement to August                       Accession Number: 20180914–5035.                      Accession Number: 20180914–5159.
                                               31, 2018 Application for Authorization                     Comments Due: 5 p.m. ET 10/5/18.                      Comments Due: 5 p.m. ET 10/5/18.
                                               Under Section 203 of the Federal Power                     Docket Numbers: ER18–2426–000.                        Docket Numbers: ER18–2432–000.
daltland on DSKBBV9HB2PROD with NOTICES




                                               Act, et al. of Avista Corporation.                         Applicants: The Potomac Edison                        Applicants: ISO New England Inc.,
                                                  Filed Date: 9/14/18.                                 Company, PJM Interconnection, L.L.C.                  Central Maine Power Company.
                                                  Accession Number: 20180914–5067.                        Description: § 205(d) Rate Filing:                    Description: § 205(d) Rate Filing:
                                                  Comments Due: 5 p.m. ET 10/5/18.                     Potomac submits IA SA No. 4452 to be                  Second Revised LGIA–ISONE/CMP–08–
                                                  Take notice that the Commission                      effective 11/13/2018.                                 01 under Schedule 22 of ISO–NE OATT
                                               received the following electric rate                       Filed Date: 9/14/18.                               to be effective 8/16/2018.
                                               filings:                                                   Accession Number: 20180914–5038.                      Filed Date: 9/14/18.


                                          VerDate Sep<11>2014   17:30 Sep 20, 2018   Jkt 244001   PO 00000   Frm 00047   Fmt 4703   Sfmt 4703   E:\FR\FM\21SEN1.SGM   21SEN1



Document Created: 2018-09-21 00:23:15
Document Modified: 2018-09-21 00:23:15
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 47918 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR