This notice announces actions taken by TxDOT and Federal agencies that are final. The environmental review, consultation, and other actions required by applicable Federal environmental laws for these projects are being, or have been, carried-out by TxDOT and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT. The actions relate to various proposed highway projects in the State of Texas. Those actions grant licenses, permits, and approvals for the projects.

Federal Register, Volume 83 Issue 186 (Tuesday, September 25, 2018)
[Federal Register Volume 83, Number 186 (Tuesday, September 25, 2018)]
[Notices]
[Pages 48510-48516]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-20801]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION


Notice of Final Federal Agency Actions on Proposed Highway 
Projects in Texas

AGENCY: Texas Department of Transportation (TxDOT), Federal Highway 
Administration (FHWA), U.S. Department of Transportation.

ACTION: Notice of limitation on claims for judicial review of actions 
by TxDOT and Federal agencies.

-----------------------------------------------------------------------

SUMMARY: This notice announces actions taken by TxDOT and Federal 
agencies that are final. The environmental review, consultation, and 
other actions required by applicable Federal environmental laws for 
these projects are being, or have been, carried-out by TxDOT and a 
Memorandum of Understanding dated December 16, 2014, and executed by 
FHWA and TxDOT. The actions relate to various proposed highway projects 
in the State of Texas. Those actions grant licenses, permits, and 
approvals for the projects.

DATES: By this notice, TxDOT is advising the public of final agency 
actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review 
of TxDOT and Federal agency actions on the highway project will be 
barred unless the claim is filed on or before February 25, 2019. If the 
Federal law that authorizes judicial review of a claim provides a time 
period of less than 150 days for filing such a claim, then that shorter 
time period still applies.

FOR FURTHER INFORMATION CONTACT: Carlos Swonke, Environmental Affairs 
Division, Texas Department of Transportation, 125 East 11th Street, 
Austin, Texas 78701; telephone: (512) 416-2734; email: 
[email protected]. TxDOT's normal business hours are 8:00 a.m.-
5:00 p.m. (central time), Monday through Friday.

SUPPLEMENTARY INFORMATION: Notice is hereby given that TxDOT and 
Federal agencies have taken final agency actions by issuing licenses, 
permits, and approvals for the highway projects in the State of Texas 
that are listed below.
    The actions by TxDOT and Federal agencies and the laws under which 
such actions were taken are described in the Categorical Exclusion (CE) 
or Environmental Assessment (EA) issued in connection with the projects 
and in other key project documents. The CE or EA, and other key 
documents for the listed projects are available by contacting TxDOT at 
the address provided above.
    This notice applies to all TxDOT and Federal agency decisions as of 
the issuance date of this notice and all laws under which such actions 
were taken, including but not limited to:
    1. General: National Environmental Policy Act (NEPA) [42 U.S.C. 
4321-4351]; Federal-Aid Highway Act [23 U.S.C. 109].
    2. Air: Clean Air Act, 42 U.S.C. 7401-7671(q).
    3. Land: Section 4(f) of the Department of Transportation Act of 
1966 [49 U.S.C. 303]; Landscaping and Scenic Enhancement (Wildflowers), 
23 U.S.C. 319.
    4. Wildlife: Endangered Species Act [16 U.S.C. 1531-1544 and 
Section 1536], Marine Mammal Protection Act [16 U.S.C. 1361], Fish and 
Wildlife Coordination Act [16 U.S.C. 661-667(d)], Migratory Bird Treaty 
Act [16 U.S.C. 703-712].
    5. Historic and Cultural Resources: Section 106 of the National 
Historic Preservation Act of 1966, as amended [54 U.S.C. 300101 et 
seq.]; Archeological Resources Protection Act of 1977 [16 U.S.C. 
470(aa)-11]; Archeological and Historic Preservation Act [54 U.S.C. 
312501 et seq.]; Native American Grave Protection and Repatriation Act 
(NAGPRA) [25 U.S.C. 3001-3013].
    6. Social and Economic: Civil Rights Act of 1964 [42 U.S.C. 
2000(d)-2000(d)(1)]; American Indian Religious Freedom Act [42 U.S.C. 
1996]; Farmland Protection Policy Act (FPPA) [7 U.S.C. 4201-4209].

[[Page 48511]]

    7. Wetlands and Water Resources: Clean Water Act, 33 U.S.C. 1251-
1377 (Section 404, Section 401, Section 319); Land and Water 
Conservation Fund (LWCF), 16 U.S.C. 4601-4604; Safe Drinking Water Act 
(SDWA), 42 U.S.C. 300(f)-300(j)(6); Rivers and Harbors Act of 1899, 33 
U.S.C. 401-406; Wild and Scenic Rivers Act, 16 U.S.C. 1271-1287; 
Emergency Wetlands Resources Act, 16 U.S.C. 3921, 3931; TEA-21 Wetlands 
Mitigation, 23 U.S.C. 103(b)(6)(m), 133(b)(11); Flood Disaster 
Protection Act, 42 U.S.C. 4001-4128.
    8. Executive Orders: E.O. 11990 Protection of Wetlands; E.O. 11988 
Floodplain Management; E.O. 12898, Federal Actions to Address 
Environmental Justice in Minority Populations and Low Income 
Populations; E.O. 11593 Protection and Enhancement of Cultural 
Resources; E.O. 13007 Indian Sacred Sites; E.O. 13287 Preserve America; 
E.O. 13175 Consultation and Coordination with Indian Tribal 
Governments; E.O. 11514 Protection and Enhancement of Environmental 
Quality; E.O. 13112 Invasive Species. (Catalog of Federal Domestic 
Assistance Program Number 20.205, Highway Planning and Construction.)
    The projects subject to this notice are:
    1. I-10 Connect, from Yandell Drive to Loop 375 (Cesar Chavez 
Border Highway) in El Paso County. This project will construct or 
modify six direct connectors between I-10 and various other highways 
and one direct connector from U.S. 54 to I-110, and would reconfigure 
the I-110/U.S. 62 (Paisano Drive) interchange. The six I-10 direct 
connectors are Eastbound I-10 to Southbound U.S. 54 Direct Connector, 
Eastbound Loop 375 (Cesar Chavez Border Highway) to Eastbound I-10 
Direct Connector, Westbound I-10 to Southbound U.S. 54 Direct 
Connector, Southbound U.S. 54 to Westbound I-110 Direct Connector, 
Eastbound I-10 to Westbound I-110 Direct Connector, Westbound I-10 to 
Westbound I-110 Direct Connector. Along with these improvements, the 
proposed project would also include reconfiguring some of the merging 
lanes along I-110 and U.S. 54. The proposed improvements would require 
0.14 acre of additional right-of-way and approximately 0.81 acre of 
temporary construction easements. The actions by TxDOT and Federal 
agencies and the laws under which such actions were taken are described 
in the Final Environmental Assessment (EA) approved on August 23, 2018, 
the Finding of No Significant Impact (FONSI) issued on August 28, 2018, 
and other documents in the TxDOT project file. The EA, FONSI and other 
documents in the TxDOT project file are available by contacting TxDOT 
at the address provided above or the TxDOT El Paso District, 13301 
Gateway West, El Paso, Texas 79928; telephone (915) 790-4340. The Final 
EA and FONSI can also be viewed and downloaded from the following 
website: https://www.txdot.gov/inside-txdot/projects/studies/el-paso/i10-connect.html.
    2. Zaragoza Port-of-Entry, Pan American Drive & Winn Road Build 
Improvements, TxDOT El Paso District with Camino Real Regional Mobility 
Authority and the City of El Paso, El Paso County. The proposed project 
would consist of widening the existing Winn Road between Pan American 
Drive and Southside Road to a 90-foot-wide four-lane divided facility 
with concrete pavement, raised medians, sidewalks, illumination, and 
drainage improvements. The proposed project would also involve 
construction of a new location roadway extension heading west and then 
north from Southside Road to connect the existing Winn Road to Rio Del 
Norte Drive. Proposed improvements to Pan American Drive would entail 
adding raised medians where none exist, adding illumination, 
landscaping, resurfacing the existing pavement, and restriping to four 
lanes. The actions by TxDOT and Federal agencies and the laws under 
which such actions were taken are described in the Final Environmental 
Assessment (EA) approved on August 15, 2018, the Finding of No 
Significant Impact (FONSI) issued on August 15, 2018, and EA, FONSI, 
and other documents in the TxDOT project file are available by 
contacting TxDOT at the address provided above or the TxDOT El Paso 
District Office, 13301 Gateway Blvd. West, El Paso, Texas 79928; 
telephone 915-790-4340. The Final EA and FONSI can also be viewed and 
downloaded from the following website: https://www.elpasotexas.gov/capital-improvement.
    3. Amistad Acres Road, Val Verde County. The project would replace 
an existing 2.6 mile unpaved road (known as Holman Road) by 
constructing an approximately 2.0 mile paved roadway consisting of two 
10-foot wide travel lanes and two 4-foot wide shoulders (28 feet total 
pavement width) from Box Canyon Road to the Amistad Acres Subdivision 
near the Amistad Reservoir, northwest of Del Rio, in Val Verde County, 
Texas. The proposed roadway would include a portion of the current 
access roadway for approximately 0.7 miles, and a section of new 
location roadway for approximately 1.3 miles. The actions by the TxDOT 
and Federal agencies and the laws under which such actions were taken 
are described in the Final Environmental Assessment (EA) approved on 
June 9, 2015, in the Finding of No Significant Impact (FONSI) issued on 
June 12, 2015, and in documents in the TxDOT administrative record. The 
EA, FONSI, and other documents in the TxDOT administrative record are 
available by contacting TxDOT at the addresses provided above or the 
TxDOT Laredo District Office, 1817 Bob Bullock Loop, Laredo, TX 78043; 
telephone (956) 712-7400.
    4. I-35 Northeast Expansion Project in Bexar, Comal and Guadalupe 
Counties. The project includes the construction of four elevated 
managed lanes (two in each direction) generally between the existing I-
35 main lanes and frontage roads along I-35 from I-410 South in San 
Antonio to FM 1103 in Schertz. Direct connectors at the I-35/I-410 
South, I-35/I-410 West and I-35/Loop 1604 interchanges and operational 
improvements at the FM 2252, Old Wiederstein Road, and FM 1103 
intersections are also included. The project is approximately 15.4 
miles in length. The actions by TxDOT and Federal agencies and the laws 
under which such actions were taken are described in the Final EA 
approved on July 2, 2015, the Finding of No Significant Impact (FONSI) 
issued on July 2, 2015 and other documents in the TxDOT project file. 
The EA, FONSI and other documents in the TxDOT project file are 
available by contacting TxDOT at the address provided above or the 
TxDOT San Antonio District Office, 4615 NW Loop 410, San Antonio, TX 
78229; telephone (210) 615-5839.
    5. FM 1626 from RM 967 to FM 2770, Hays County. The build 
alternative consists of four 12-foot-wide travel lanes (two in each 
direction), a 14-foot-wide center left turn lane, and outside shoulders 
of varying widths. The project also includes improvements to the 
bridges at Onion Creek and Mustang Branch. The project is approximately 
3.3 miles in length. The actions by TxDOT and Federal agencies and the 
laws under which such actions were taken are described in the Final EA 
approved on July 1, 2015, the Finding of No Significant Impact (FONSI) 
issued on July 1, 2015, and other documents in the TxDOT project file. 
The EA, FONSI and other documents in the TxDOT project file are 
available by contacting TxDOT at the address provided above or the 
TxDOT Austin District Office, 7901 North I-35, Austin, TX 78753; 
telephone (512) 832-7000.
    6. FM 1626 from Brodie Lane to Manchaca Road (FM 2304), Travis

[[Page 48512]]

County. The build alternative consists of four 12-foot-wide travel 
lanes (two in each direction) separated by a continuous left turn lane. 
The continuous left turn lane would range in width from 14 feet (usual) 
to 23.5 feet at the intersection with Brodie Lane. The project is 
approximately 1.3 miles in length. The actions by TxDOT and Federal 
agencies and the laws under which such actions were taken are described 
in the Final EA approved on February 24, 2016, the Finding of No 
Significant Impact (FONSI) issued on February 24, 2016, and other 
documents in the TxDOT project file. The EA, FONSI and other documents 
in the TxDOT project file are available by contacting TxDOT at the 
address provided above or the TxDOT Austin District Office, 7901 North 
I-35, Austin, TX 78753; telephone (512) 832-7000.
    7. US 183 from US 290 to SH 71, Travis County. The project would 
include six tolled main lanes and four to six non-tolled access road 
lanes. Direct connections to SH 71 west of US 183 would be tolled and 
would provide two lanes of travel in each direction. Throughout the 
corridor, a shared use path, bike lanes and sidewalks are included. The 
project is approximately 8 miles in length. The actions by TxDOT and 
Federal agencies and the laws under which such actions were taken are 
described in the Final EA approved on March 6, 2015, the Finding of No 
Significant Impact (FONSI) issued on March 6, 2015, and other documents 
in the TxDOT project file. The EA, FONSI and other documents in the 
TxDOT project file are available by contacting TxDOT at the address 
provided above or the TxDOT Austin District Office, 7901 North I-35, 
Austin, TX 78753; telephone (512) 832-7000.
    8. Callaghan Road from IH 410 to Spur 421 (Bandera Road) in Bexar 
County. The project includes widening Callaghan Road to a four-lane 
roadway with a continuous left center turn lane, including the 
installation of curbs, sidewalks and a shared-use path. The project is 
approximately 1.1 miles in length. The actions by TxDOT and Federal 
agencies and the laws under which such actions were taken are described 
in the Final EA approved on July 1, 2015, the Finding of No Significant 
Impact (FONSI) issued on July 1, 2015 and other documents in the TxDOT 
project file. The EA, FONSI and other documents in the TxDOT project 
file are available by contacting TxDOT at the address provided above or 
the TxDOT San Antonio District Office, 4615 NW Loop 410, San Antonio, 
TX 78229; telephone (210) 615-5839.
    9. FM 1560 from SH 16 to Loop 1604 in Bexar County. The project 
would widen this section of FM 1560 from two to four lanes, including a 
center turn lane, raised medians at the approaches to SH 16 and Loop 
1604, bike lanes, and sidewalks. The project is approximately 2 miles 
in length. The actions by TxDOT and Federal agencies and the laws under 
which such actions were taken are described in the Final EA approved on 
July 2, 2015, the Finding of No Significant Impact (FONSI) issued on 
July 2, 2015 and other documents in the TxDOT project file. The EA, 
FONSI and other documents in the TxDOT project file are available by 
contacting TxDOT at the address provided above or the TxDOT San Antonio 
District Office, 4615 NW Loop 410, San Antonio, TX 78229; (210) 615-
5839.
    10. FM 1516 from FM 78 to FM 1976 in Bexar County. The project 
includes reconstructing existing FM 1516 to four main lanes with bike 
lanes, a continuous center turn lane, adding sidewalks, constructing a 
storm sewer system between FM 78 and Gibbs Sprawl Road/FM 3502, and 
extending FM 1516 from the Gibbs Sprawl Road/FM 3502 intersection to FM 
1976 at Hilltop Avenue. The project is approximately 0.76 mile in 
length. The actions by TxDOT and Federal agencies and the laws under 
which such actions were taken are described in the Final EA approved on 
February 17, 2015, the Finding of No Significant Impact (FONSI) issued 
on February 17, 2015 and other documents in the TxDOT project file. The 
EA, FONSI and other documents in the TxDOT project file are available 
by contacting TxDOT at the address provided above or the TxDOT San 
Antonio District Office, 4615 NW Loop 410, San Antonio, TX 78229; 
telephone (210) 615-5839.
    11. FM 664 from Westmoreland Road to IH 35E in Ellis County, Texas. 
The proposed improvements would include the expansion of the existing 
facility from a two-lane rural roadway to a six-lane urban, divided 
roadway. The project also includes bicycle and pedestrian 
accommodations. The length of the proposed project is approximately 
3.13 miles. The purpose of the proposed project is to improve mobility 
and safety and manage congestion. The actions by TxDOT and Federal 
agencies and the laws under which such actions were taken are described 
in the Final Environmental Assessment (EA) approved on June 10, 2015, 
Finding of No Significant Impact (FONSI) issued on June 10, 2015, and 
other documents in the TxDOT project file. The EA and other documents 
in the TxDOT project file are available by contacting TxDOT at the 
address provided above or the TxDOT Dallas District Office, 4777 E 
Highway 80, Mesquite, TX 75150; telephone (214) 320-4480.
    12. FM 3549 from IH 30 to North of SH 66 in Rockwall County, Texas. 
The proposed improvements would include widening the existing two-lane 
rural roadway to a four-lane urban section. The project would consist 
of a four-lane urban divided section with selected left-turn lanes. The 
proposed typical section provides one additional 12-foot travel lane, 
one 14-foot multipurpose lane for bicycle use, and 2-foot offset to a 
concrete curb. A raised median is also provided to control ingress and 
egress. The length of the proposed project is approximately 1.3 miles. 
The actions by TxDOT and Federal agencies and the laws under which such 
actions were taken are described in the Final Environmental Assessment 
(EA) approved on March 8, 2016, Finding of No Significant Impact 
(FONSI) issued on March 8, 2016, and other documents in the TxDOT 
project file. The EA and other documents in the TxDOT project file are 
available by contacting TxDOT at the address provided above or the 
TxDOT Dallas District Office, 4777 E. Highway 80, Mesquite, TX 75150; 
telephone (214) 320-4480.
    13. IH 20 from SH 161/Lake Ridge Parkway to FM 1382/Belt Line Road 
in Dallas County, Texas. The proposed improvements would include the 
construction of new frontage roads and ramps; reconstruction and 
reconfiguration of the intersections at Robinson Road and Carrier 
Parkway; reconstruction and reconfiguration of a section of Westchase 
Drive south of IH 20; construction of U-turns at Carrier Parkway and 
Belt Line Road; and other improvements along IH 20. The length of the 
proposed project is approximately 2.318 miles. The actions by TxDOT and 
Federal agencies and the laws under which such actions were taken are 
described in the Final Environmental Assessment (EA) approved on 
November 2, 2015, Finding of No Significant Impact (FONSI) issued on 
November 2, 2015, and other documents in the TxDOT project file. The EA 
and other documents in the TxDOT project file are available by 
contacting TxDOT at the address provided above or the TxDOT Dallas 
District Office, 4777 E Highway 80, Mesquite, TX 75150; telephone (214) 
320-4480.
    14. Medical District Drive from IH 35 to Harry Hines Boulevard in 
Dallas County, Texas. The proposed improvements would include the 
reconstruction and widening of the current Medical District Drive from 
a four-lane section to a six-lane divided

[[Page 48513]]

thoroughfare with turn lanes. The project also proposes to relocate a 
driveway providing access to the Trinity Railway Express station and to 
construct right and left-turn lanes from Medical District Drive. The 
length of the proposed project is approximately 1,380 feet. The actions 
by TxDOT and Federal agencies and the laws under which such actions 
were taken are described in the Final Environmental Assessment (EA) 
approved on April 2, 2015, Finding of No Significant Impact (FONSI) 
issued on April 2, 2015, and other documents in the TxDOT project file. 
The EA and other documents in the TxDOT project file are available by 
contacting TxDOT at the address provided above or the TxDOT Dallas 
District Office, 4777 E Highway 80, Mesquite, TX 75150; telephone (214) 
320-4480.
    15. SH 276 from SH 205 to East of FM 549 in Rockwall County, Texas. 
The proposed improvements would include widening SH 276 from a two-lane 
rural roadway to a four-lane divided urban arterial that would 
ultimately accommodate a six-lane divided with urban minor arterial. 
The limits of the widening begin at the intersection of the realignment 
with the existing alignment at Wildrose Drive and continues east to 
approximately FM 549. SH 276 would be realigned between SH 205 and 
Wildrose Drive through an existing reserved roadway corridor. The 
existing SH 205/SH 276 intersection would be relocated to Sids Road, 
approximately 0.5 miles south of its current location. SH 276 would 
accommodate one 11-foot travel lane and one 14-foot shared use lane in 
each direction, a 40-foot median, and five-foot sidewalks with two-foot 
buffers on each side of the roadway. The proposed section would also 
accommodate an ultimate six-lane facility. The length of the proposed 
project is approximately 1.96 miles. The actions by TxDOT and Federal 
agencies and the laws under which such actions were taken are described 
in the Final Environmental Assessment (EA) approved on February 24, 
2016, Finding of No Significant Impact (FONSI) issued on February 24, 
2016, and other documents in the TxDOT project file. The EA and other 
documents in the TxDOT project file are available by contacting TxDOT 
at the address provided above or the TxDOT Dallas District Office, 4777 
E. Highway 80, Mesquite, TX 75150; telephone (214) 320-4480.
    16. U.S. 80 from Interstate IH 635 to Galloway Avenue and IH 635 
from South of Gross Road to Eastbound U.S. 80 Frontage Road in Dallas 
County, Texas. The proposed U.S. 80 improvements would include 
reconstruction of the eastbound frontage road and relocation of the 
North Galloway Avenue exit ramp; and the improvements to IH 635 would 
include the addition of a new northbound frontage road and the widening 
of the exit ramp at Gross Road. The actions by TxDOT and Federal 
agencies and the laws under which such actions were taken are described 
in the Final Environmental Assessment (EA) approved on December 28, 
2015, Finding of No Significant Impact (FONSI) issued on December 28, 
2015, and other documents in the TxDOT project file. The EA and other 
documents in the TxDOT project file are available by contacting TxDOT 
at the address provided above or the TxDOT Dallas District Office, 4777 
E Highway 80, Mesquite, TX 75150; telephone (214) 320-4480.
    17. U.S. 287 from SH 34 to IH 45 in Ellis County, Texas. The 
proposed improvements would include the reconstruction and widening of 
U.S. 287 to accommodate the addition of mainlanes, ramps, and frontage 
road lanes throughout the project limits. The proposed project would 
also include the addition of grade-separated intersections as well as 
entrance and exit ramps along the existing facility. The length of the 
proposed project is approximately 4.51 miles. The actions by TxDOT and 
Federal agencies and the laws under which such actions were taken are 
described in the Final Environmental Assessment (EA) approved on July 
8, 2015, Finding of No Significant Impact (FONSI) issued on July 8, 
2015, and other documents in the TxDOT project file. The EA and other 
documents in the TxDOT project file are available by contacting TxDOT 
at the address provided above or the TxDOT Dallas District Office, 4777 
E Highway 80, Mesquite, TX 75150; telephone (214) 320-4480.
    18. U.S. 377 from Henrietta Creek Road to SH 114 in Denton County, 
Texas. The proposed improvements would include the reconstruction and 
widening of U.S. 377 from a two-lane rural section to a four-lane 
divided urban section with a raised median between Henrietta Creek Road 
and James Street. The project would also construct left-turn bays at 
Crockett, Denton, and Main Streets. The length of the proposed project 
is approximately one mile. The actions by TxDOT and Federal agencies 
and the laws under which such actions were taken are described in the 
Final Environmental Assessment (EA) approved on August 6, 2015, Finding 
of No Significant Impact (FONSI) issued on August 6, 2015, and other 
documents in the TxDOT project file. The EA and other documents in the 
TxDOT project file are available by contacting TxDOT at the address 
provided above or the TxDOT Dallas District Office, 4777 E Highway 80, 
Mesquite, TX 75150; telephone (214) 320-4480.
    19. Max Road from FM 518 to Hughes Ranch Road, Brazoria County. 
This project would widen Max Road from a two-lane undivided roadway 
with open ditches to a four-lane divided boulevard facility with curb 
and gutter. A portion of the project would be on new location to 
connect Max Road to the current terminus of Reid Boulevard, just north 
of FM 518. A cul-de-sac is proposed on existing Max Road approximately 
875 feet north of FM 518. Included in the project is construction of a 
shared-use hike and bike trail along the west side of the roadway, new 
twin bridge structures at Hickory Slough, improved drainage including a 
detention pond, and a traffic signal at Hughes Ranch Road. The project 
length is approximately 4,500 feet. The actions by TxDOT and Federal 
agencies and the laws under which such actions were taken are described 
in the Final Environmental Assessment (EA) approved on July 16, 2015, 
the Finding of No Significant Impact (FONSI) issued on July 16, 2015, 
and other documents in the TxDOT project file. The EA, FONSI, and other 
documents in the TxDOT project file are available by contacting TxDOT 
at the address provided above or the TxDOT Houston District Office, 
7600 Washington Avenue, Houston, Texas 77007; telephone (713) 802-5000.
    20. Hurricane Lane/Lake Olympia Parkway from Fort Bend Parkway to 
Trammel-Fresno Road, Fort Bend County. This project would construct 
Hurricane Lane from its present terminus as a two-lane, undivided urban 
section from Trammel-Fresno Road to a point along Lake Olympia Parkway 
approximately 685 feet east of Fort Bend Parkway. Construction of two 
linear detention ponds is included. The typical cross-sections 
incorporate two 11-foot travel lanes with 1-foot curb offsets on 
Hurricane Lane and Lake Olympia Parkway. The intersections of Hurricane 
Lane at Trammel-Fresno Road and of Lake Olympia Parkway at Fort Bend 
Parkway would each consist of a four-lane divided roadway containing 
11- to 12-foot lanes and a 0- to 24-foot raised landscaped median. A 
10-foot wide shared use path is proposed along the west side of 
Hurricane Lane and along the southern side of Lake Olympia Parkway. A 
5-foot wide sidewalk segment is proposed on the east side of Hurricane 
Lane at its

[[Page 48514]]

southern terminus at Trammel-Fresno Road and along the north side of 
Lake Olympia Parkway's transitional section to four lanes. The project 
length is approximately 1.5 mile. The actions by TxDOT and Federal 
agencies and the laws under which such actions were taken are described 
in the Final Environmental Assessment (EA) approved on August 24, 2015, 
the Finding of No Significant Impact (FONSI) issued on August 24, 2015, 
and other documents in the TxDOT project file. The EA, FONSI, and other 
documents in the TxDOT project file are available by contacting TxDOT 
at the address provided above or the TxDOT Houston District Office at 
7600 Washington Avenue, Houston, Texas 77007; telephone (713) 802-5000.
    21. FM 2978, from FM 1488 to Conroe-Huffsmith Road, Montgomery 
County. This project involves widening the existing two-lane undivided 
roadway to a four-lane roadway with an intermittent two-way turn lane. 
The proposed facility consists of four travel lanes (two 11-foot lanes 
in each direction), five-foot outside shoulders which would accommodate 
bicycles, and a four-foot sidewalk in various locations on the east 
side of FM 2978. The project includes the construction of four 
detention ponds. The project is approximately 6.5 miles in length. The 
actions by TxDOT and Federal agencies and the laws under which such 
actions were taken are described in the Final Environmental Assessment 
(EA) approved on December 1, 2015, the Finding of No Significant Impact 
(FONSI) issued on December 1, 2015, and other documents in the TxDOT 
project file. The EA, FONSI, and other documents in the TxDOT project 
file are available by contacting TxDOT at the address provided above or 
the TxDOT Houston District Office, 7600 Washington Avenue, Houston, 
Texas 77007; telephone (713) 802-5000.
    22. FM 528 from SH 35B (Gordon Street) to SH 6, Brazoria County. 
This project extends FM 528 from SH 35B (Gordon Street) to SH 6. The 
proposed undivided, curb and gutter facility would include two 14-foot 
lanes (one 12-foot lane in each direction), accommodations for bicycle 
traffic and a five-foot sidewalk on the north side of FM 528. The 
proposed facility would also include a grade separation at the 
Burlington Northern Santa Fe (BNSF) Railway, new signalized 
intersections at SH 35B (Gordon Street) and SH 6, and left turn lanes 
at SH 35B (Gordon Street). The project is approximately 0.9 miles in 
length. The actions by TxDOT and Federal agencies and the laws under 
which such actions were taken are described in the Final Environmental 
Assessment (EA) approved on February 5, 2016, the Finding of No 
Significant Impact (FONSI) issued on February 5, 2016, and other 
documents in the TxDOT project file. The EA, FONSI, and other documents 
in the TxDOT project file are available by contacting TxDOT at the 
address provided above or the TxDOT Houston District Office, 7600 
Washington Avenue, Houston, Texas 77007; telephone (713) 802-5000.
    23. IH 10 Exit 365 EB Ramp Relocation, from 0.25 miles west of Rio 
Grande Street to SH 163, in Crockett County. The project is designed to 
relocate the IH10 eastbound exit ramp 365 approximately 0.8 miles west 
of the existing location, construct new frontage roadway to tie into 
the new exit ramp, and includes the construction of a new bridge over 
Johnson Draw. The project will convert the traffic on the existing 
frontage road from two-way traffic to one-way traffic. Total project 
length is approximately 1 mile. The actions by TxDOT and Federal 
agencies and the laws under which such actions were taken are described 
in the Categorical Exclusion Determination approved on June 15, 2018, 
and other documents in the TxDOT project file. The Categorical 
Exclusion Determination and other documents in the TxDOT project file 
are available by contacting TxDOT at the address provided above or the 
TxDOT San Angelo District Office, 4502 Knickerbocker Road, San Angelo, 
Texas 76904; telephone (325) 947-9205.
    24. U.S. 380 from State Loop (SL) 288 to West of County Road (CR) 
26 in Denton County, Texas. The proposed improvements would include 
reconstruction and widening of existing U.S. 380 from a four-lane 
undivided rural to a six-lane divided urban roadway consisting of two 
11- to 12-foot wide inside travel lanes and 14-foot wide outside 
shared-use lanes (for bicycle accommodation), with raised medians and 
curb and gutter in each direction. The proposed roadway would also 
include intersection improvements and left and right turn lanes at 
designated locations. In addition, interchange improvements are 
proposed including five new grade separations. A minimum of five-foot 
sidewalks would be located along the outer lanes of the roadway. The 
length of the proposed project is approximately 14.2 miles. The purpose 
of the proposed project is to improve mobility by increasing capacity 
and reducing traffic congestion, and to meet current design standards. 
The actions by TxDOT and Federal agencies and the laws under which such 
actions were taken are described in the Final Environmental Assessment 
(EA) approved on June 29, 2018, Finding of No Significant Impact 
(FONSI) issued on June 29, 2018, and other documents in the TxDOT 
project file. The EA and other documents in the TxDOT project file are 
available by contacting TxDOT at the address provided above or the 
TxDOT Dallas District Office, 4777 E Highway 80, Mesquite, TX 75150; 
telephone (214) 320-6100.
    25. FM 179 from 800 feet north of SH 114 to Donald Preston Drive in 
Lubbock County. TxDOT, Lubbock District, proposes to widen 
approximately 4.1 miles of the existing FM 179 in Lubbock, Texas. 
Interim improvements would consist of a five lane suburban section with 
four 11-foot wide lanes, two eight-foot wide shoulders, and a 14-foot 
wide center left turn lane. The ultimate seven lane section would 
include an additional travel lane in each direction, sidewalks, 
shoulders and curb-and-gutter drainage. The actions by TxDOT and 
Federal agencies and the laws under which such actions were taken are 
described in the Final Environmental Assessment (EA) approved on 
February 24, 2016 the Finding of No Significant Impact (FONSI) issued 
on February 24, 2016 and other documents in the TxDOT project file. The 
EA, FONSI and other documents in the TxDOT project file are available 
by contacting TxDOT at the address provided above or the TxDOT Lubbock 
District Office, 135 Slaton Road, Lubbock, Texas 79404; telephone (806) 
745-4411.
    26. Erskine Street from Texas Tech Parkway to Indiana Avenue in 
Lubbock County. TxDOT, Lubbock District, proposes to widen and improve 
Erskine Street with new right of way to be added at various locations 
on both sides of the roadway. Improvements would consist of a five-lane 
suburban section with two 11-foot wide lanes, two 13.5-foot wide lanes, 
and a 14-foot wide center left turn lane. An additional 11-foot wide 
right turn lane would be located at the northwest corner of the project 
area leading up to the terminus at Texas Tech Boulevard. Additional 
sidewalks would be added on the north side of the project at the 
locations where sidewalks are not present. The project length is 
approximately 1 mile in length. The actions by TxDOT and Federal 
agencies and the laws under which such actions were taken are described 
in the Final Environmental Assessment (EA) approved on April 7, 2016 
the Finding of No Significant Impact (FONSI) issued on April 7, 2016 
and other documents in the TxDOT project file. The EA, FONSI and other 
documents in the TxDOT project file are available by

[[Page 48515]]

contacting TxDOT at the address provided above or the TxDOT Lubbock 
District Office, 135 Slaton Road, Lubbock, Texas 79404; telephone (806) 
745-4411.
    27. SL 88 from 0.5 miles north of U.S. 62/82 to 0.5 miles east of 
U.S. 87 in Lubbock County. TxDOT, Lubbock District, proposes to 
construct a segment (segment three) of a new loop around Lubbock along 
a portion of the existing Farm-to-Market Road (FM) 1585. The project 
length is approximately 12.4 miles in length. The proposed improvements 
would convert the existing two-lane rural FM 1585 roadway section to an 
access-controlled, four-lane divided freeway section with frontage 
roads and ramps. The improved roadway has been designated as SL 88. 
Multiple interchanges are proposed at the crossroad locations. The 
actions by TxDOT and Federal agencies and the laws under which such 
actions were taken are described in the Final Environmental Assessment 
(EA) approved on February 27, 2018, the Finding of No Significant 
Impact (FONSI) issued on February 27, 2018 and other documents in the 
TxDOT project file. The EA, FONSI and other documents in the TxDOT 
project file are available by contacting TxDOT at the address provided 
above or the TxDOT Lubbock District Office, 135 Slaton Road, Lubbock, 
Texas 79404; telephone (806) 745-4411.
    28. U.S. 59 from 3.0 miles south of U.S. 287 to 3.4 miles north of 
U.S. 287 in Polk County. TxDOT, Lufkin District, proposes to build a 
new location controlled access relief route west of U.S. 59 in the town 
of Corrigan, Texas. The proposed relief route would provide a four lane 
controlled access freeway section, ramps, and grade separations on the 
north and south ends at the Union Pacific Railroad and U.S. 287. 
Additional bridges would be construction over several creek crossings 
and Union Springs Road. The proposed project is approximately 6.4 miles 
in length. The purpose of the project is to bring U.S. 59 in the 
Corrigan area up to current interstate design standards by making U.S. 
59 a controlled access roadway within the project limits and reduce 
congestion and increase mobility. The actions by TxDOT and Federal 
agencies and the laws under which such actions were taken are described 
in the Final Environmental Assessment (EA) approved on January 28, 
2018, the Finding of No Significant Impact (FONSI) issued on March 8, 
2018, and other documents in the TxDOT project file. The EA, FONSI and 
other documents in the TxDOT project file are available by contacting 
TxDOT at the address provided above or the TxDOT Lufkin District 
Office, 1805 North Timberland Drive, Lufkin, Texas 75901; telephone 
(936) 634-4433.
    29. Farm-To-Market (FM) 1570 from State Highway (SH) 66 to United 
States Highway (US) 380 in Hunt County. The proposed action is the 
construction of a two-lane roadway from the terminus of Farm-to-Market 
Road (FM) 1570 at State Highway (SH) 66 north for a distance of 1.9 
miles to U.S. 380. The project is located in Hunt County at the west 
edge of the city of Greenville. The proposed project would provide two 
12-foot wide travel lanes with ten-foot outside paved shoulders within 
an approximate 264-foot wide right-of-way (ROW). The project end points 
at SH 66 and U.S. 380, as well as intersections with intervening 
roadways, would be at-grade. The actions by TxDOT and Federal agencies 
and the laws under which such actions were taken are described in the 
Final ``Assessment (EA) approved on June 17, 2015, the Finding of No 
Significant Impact (FONSI) issued on June 24, 2015, and other documents 
in the TxDOT project file. The EA, FONSI and other documents in the 
TxDOT project file are available by contacting TxDOT at the address 
provided above or the TxDOT Paris District Office, 1365 North Main 
Street, Paris, Texas 75460; telephone (903) 737-9300.
    30. Spur 248 from 1.75 Miles West of FM 848 (Old Omen Road), East 
to SH 64, Smith County. The proposed project would widen Spur 248 to a 
4-lane facility with a flush median between Old Omen Road and SH 64. 
The proposed design would consist of a curb and gutter section with two 
12-foot travel lanes, two 12-foot outside lanes with a 5-foot outside 
bike lane, and a 14-foot flush median within a ROW that would vary 140 
to 230 feet in width. The length of the project is 2.17 miles. The 
actions by TxDOT and Federal agencies and the laws under which such 
actions were taken are described in the Final Environmental Assessment 
(EA) approved on January 28, 2015, the Finding of No Significant Impact 
(FONSI) issued on January 30, 2015, and other documents in the TxDOT 
project file. The EA, FONSI and other documents in the TxDOT project 
file are available by contacting TxDOT at the address provided above or 
the TxDOT Tyler District Office, 2709 W Front Street, Tyler, Texas 
75702; telephone (903) 510-9267.
    31. FM 2206 from SH 42 to SL 281, Gregg County. The proposed 
project is a roadway widening and improvement project. Proposed 
improvements would widen approximately 3.7 miles of FM 2206 from an 
existing two-lane road to a four-lane divided highway corridor. 
However, the curve located between Cox Road and Jordan Valley Drive 
would be straightened and the road would be in a new alignment in this 
section. The actions by TxDOT and Federal agencies and the laws under 
which such actions were taken are described in the Final Environmental 
Assessment (EA) approved on December 12, 2016, the Finding of No 
Significant Impact (FONSI) issued on December 20, 2016, and other 
documents in the TxDOT project file. The EA, FONSI and other documents 
in the TxDOT project file are available by contacting TxDOT at the 
address provided above or the TxDOT Tyler District Office, 2709 W Front 
Street, Tyler, Texas 75702; (903) 510-9267.
    32. FM 2493 from FM 2813 in Gresham, south to FM 346 in Flint, 
Smith County. FM 2493 would be widened from its existing 2-lane highway 
configuration to a 4-lane highway divided by a flush median (continuous 
two-way, left-turn lane) in the center. It includes four 12-ft. vehicle 
lanes (two in each direction), two 4-ft. striped bicycle lanes (one in 
each direction) plus 2-ft. curb-and-gutter offsets, and a 16-ft. wide 
flush median. The length of the project is 2.5 miles. The actions by 
TxDOT and Federal agencies and the laws under which such actions were 
taken are described in the Final Environmental Assessment (EA) approved 
on July 20, 2015, the Finding of No Significant Impact (FONSI) issued 
on July 31, 2015, and other documents in the TxDOT project file. The 
EA, FONSI, and other documents in the TxDOT project file are available 
by contacting TxDOT at the address provided above or the TxDOT Tyler 
District Office, 2709 W Front Street, Tyler, Texas 75702; telephone 
(903) 510-9267.
    33. U.S. 59 from FM 2919 to FM 710 in Wharton County. TxDOT, Yoakum 
District, proposes to upgrade U.S. 59 through Wharton County to 
Interstate Highway (IH) standards. The proposed project would consist 
of a four-lane divided freeway facility (two 12-foot lanes in each 
direction) with 12-foot inside shoulders and 12-foot outside shoulders 
divided by a concrete traffic barrier. The freeway facility would have 
continuous frontage roads (two 12-foot lanes in each direction) with 
10-foot outside shoulders and 4-foot inside shoulders. Within the 
proposed construction limits, the intersections along existing U.S. 59 
would be given access to frontage roads or in some areas overpasses 
would be built. The

[[Page 48516]]

proposed construction area is approximately 39.5 miles in length. The 
actions by TxDOT and Federal agencies and the laws under which such 
actions were taken are described in the Final Environmental Assessment 
(EA) approved on May 25, 2017, the Finding of No Significant Impact 
(FONSI) issued on May 25, 2017 and other documents in the TxDOT project 
file. The EA, FONSI and other documents in the TxDOT project file are 
available by contacting TxDOT at the address provided above or the 
TxDOT Yoakum District Office, 403 Huck Street, Yoakum, Texas 77995; 
telephone (361) 293-4300.
    34. U.S. 59 from Business 59 south of El Campo to SH 71 in Wharton 
County. TxDOT, Yoakum District, proposes to provide frontage roads and 
convert the existing lanes of U.S. 59 in El Campo to a controlled 
access facility that meets Interstate standards. Interchanges and/or 
slip ramps would be included to provide necessary access to and around 
the facility. The proposed project length is 2.6 miles. The actions by 
TxDOT and Federal agencies and the laws under which such actions were 
taken are described in the Final Environmental Assessment (EA) approved 
on June 2, 2015, the Finding of No Significant Impact (FONSI) issued on 
June 2, 2015 and other documents in the TxDOT project file. The EA, 
FONSI and other documents in the TxDOT project file are available by 
contacting TxDOT at the address provided above or the TxDOT Yoakum 
District Office, 403 Huck Street, Yoakum, Texas 77995; telephone (361) 
293-4300.
    35. U.S. 59 from SH 71 to Business 59 north of El Campo in Wharton 
County. TxDOT, Yoakum District, proposes to provide frontage roads and 
convert the existing lanes of U.S. 59 in El Campo to a controlled 
access facility that meets Interstate standards. Interchanges and/or 
slip ramps would be included to provide necessary access to and around 
the facility. The proposed project length is 3.1 miles. The actions by 
TxDOT and Federal agencies and the laws under which such actions were 
taken are described in the Final Environmental Assessment (EA) approved 
on February 19, 2016, the Finding of No Significant Impact (FONSI) 
issued on February 19, 2016 and other documents in the TxDOT project 
file. The EA, FONSI and other documents in the TxDOT project file are 
available by contacting TxDOT at the address provided above or the 
TxDOT Yoakum District Office, 403 Huck Street, Yoakum, Texas 77995; 
telephone (361) 293-4300.
    36. FM 457 at the Gulf Intracoastal Waterway (GIWW) in Matagorda 
County. TxDOT, Yoakum District, proposes to replace the FM 457 swing 
bridge that crosses the GIWW near Sargent, Texas. The proposed project 
would replace the existing, at-grade, pontoon barge swing span and 
approach spans with a new fixed-span, high-clearance structure with 
spiral approaches. The actions by TxDOT and Federal agencies and the 
laws under which such actions were taken are described in the Final 
Environmental Assessment (EA) approved on March 1, 2016 the Finding of 
No Significant Impact (FONSI) issued on March 1, 2016 and other 
documents in the TxDOT project file. The EA, FONSI and other documents 
in the TxDOT project file are available by contacting TxDOT at the 
address provided above or the TxDOT Yoakum District Office, 403 Huck 
Street, Yoakum, Texas 77995; telephone (361) 293-4300.
    37. State Highway 31 Relief Route from 3.2 Miles West of FM 2555 to 
3.7 Miles East of Interstate Highway 45 in Corsicana, Navarro County. 
TxDOT, Dallas District, proposes to construct a four-lane divided 
relief route on new location. The proposed roadway would be a grade-
separated facility with frontage roads. The length of the preferred 
alignment is 14 miles. The actions by TxDOT and Federal agencies and 
the laws under which such actions were taken are described in the Final 
Environmental Assessment (EA) approved on December 18, 2014 the Finding 
of No Significant Impact (FONSI) issued on December 18, 2014 and other 
documents in the TxDOT project file. The EA, FONSI and other documents 
in the TxDOT project file are available by contacting TxDOT at the 
address provided above or the TxDOT Dallas District Office, 4777 E 
Highway 80, Mesquite, TX 75150; telephone (214) 320-4480.

    Authority: 23 U.S.C. 139(l)(1).

    Issued on: September 19, 2018.
Michael T. Leary,
Director, Planning and Program Development, Federal Highway 
Administration.
[FR Doc. 2018-20801 Filed 9-24-18; 8:45 am]
BILLING CODE 4910-22-P



                                               48510                           Federal Register / Vol. 83, No. 186 / Tuesday, September 25, 2018 / Notices

                                                 Estimated Number of Respondents:                                  completion of participation                                                  per participant, plus a consent form that
                                               175, after compensating for potential                               approximately 3 months later.                                                will be reviewed prior to participation.
                                               drop-outs.                                                            Number of Responses: Full                                                    Estimated Total Annual Burden
                                                 Frequency: Twice at the start of                                  participation in the study will include                                      Hours: 110 minutes per respondent,
                                               participation (demographic and initial                              3 responses for a total of 92 questions                                      including consent (204 hours total).
                                               CAS technology surveys), once at the                                                                                                               Estimated Total Annual Burden Cost:

                                                                                                       TABLE 1—ESTIMATED TOTAL ANNUAL BURDEN COST
                                                                                                                                                                                                                         Total
                                                                                                                                                                                               Estimated                                 Total
                                                                                                                                                                                                                       estimated
                                                                                                             Number of                 Frequency of                 Number of                  individual                              annualize
                                                                   Instrument                                                                                                                                           burden
                                                                                                           respondents 1                responses                   questions                    burden                                 cost to
                                                                                                                                                                                                                         hours
                                                                                                                                                                                               (minutes)                             respondents 2
                                                                                                                                                                                                                        (hours)

                                               Informed Consent Form ...........................                            175                            1                       N/A                         10              29         $584.64
                                               Demographic questionnaire .....................                              175                            1                        14                         10               29         584.64
                                               Initial CAS Technology Survey ................                               175                            1                        33                         25              73         1471.68
                                               Final CAS Technology Survey .................                                150                            1                        34                         25             62.5        1260.00

                                                    TOTAL ..............................................   ........................   ........................   ........................   ........................         193.5       $ 3900.96
                                                  1 Thenumber of respondents in this table includes drop-out rates.
                                                  2 Estimated
                                                            based on the mean hourly rate nationwide for Heavy and Tractor-Trailer Truck Drivers of $20.16 as reported in the May 2014 Oc-
                                               cupational Employment and Wage Estimates, Bureau of Labor Statistics. http://www.bls.gov/oes/current/oes_nat.htm#35-0000.


                                                 Public Comments Invited: You are          review, consultation, and other actions                                                              other key project documents. The CE or
                                               asked to comment on any aspects of this     required by applicable Federal                                                                       EA, and other key documents for the
                                               information collection, including (a)       environmental laws for these projects                                                                listed projects are available by
                                               whether the proposed collection of          are being, or have been, carried-out by                                                              contacting TxDOT at the address
                                               information is necessary for the proper     TxDOT and a Memorandum of                                                                            provided above.
                                               performance of the functions of the         Understanding dated December 16,                                                                        This notice applies to all TxDOT and
                                               Department, including whether the           2014, and executed by FHWA and                                                                       Federal agency decisions as of the
                                               information will have practical utility;    TxDOT. The actions relate to various                                                                 issuance date of this notice and all laws
                                               (b) the accuracy of the Department’s        proposed highway projects in the State                                                               under which such actions were taken,
                                               estimate of the burden of the proposed      of Texas. Those actions grant licenses,                                                              including but not limited to:
                                               information collection; (c) ways to         permits, and approvals for the projects.                                                                1. General: National Environmental
                                               enhance the quality, utility and clarity    DATES: By this notice, TxDOT is                                                                      Policy Act (NEPA) [42 U.S.C. 4321–
                                               of the information to be collected; and     advising the public of final agency                                                                  4351]; Federal-Aid Highway Act [23
                                               (d) ways to minimize the burden of the      actions subject to 23 U.S.C. 139(l)(1). A                                                            U.S.C. 109].
                                               collection of information on                claim seeking judicial review of TxDOT                                                                  2. Air: Clean Air Act, 42 U.S.C. 7401–
                                               respondents, including the use of           and Federal agency actions on the                                                                    7671(q).
                                               automated collection techniques or          highway project will be barred unless                                                                   3. Land: Section 4(f) of the
                                               other forms of information technology.      the claim is filed on or before February                                                             Department of Transportation Act of
                                                  Authority: The Paperwork Reduction Act   25, 2019. If the Federal law that                                                                    1966 [49 U.S.C. 303]; Landscaping and
                                               of 1995; 44 U.S.C. Chapter 35, as amended;  authorizes judicial review of a claim                                                                Scenic Enhancement (Wildflowers), 23
                                               and 49 CFR 1:48.                            provides a time period of less than 150                                                              U.S.C. 319.
                                               Nathaniel Beuse,                            days for filing such a claim, then that                                                                 4. Wildlife: Endangered Species Act
                                               Associate Administrator, Vehicle Safety     shorter time period still applies.                                                                   [16 U.S.C. 1531–1544 and Section
                                               Research.                                   FOR FURTHER INFORMATION CONTACT:                                                                     1536], Marine Mammal Protection Act
                                               [FR Doc. 2018–20753 Filed 9–24–18; 8:45 am] Carlos Swonke, Environmental Affairs                                                                 [16 U.S.C. 1361], Fish and Wildlife
                                               BILLING CODE 4910–59–P                      Division, Texas Department of                                                                        Coordination Act [16 U.S.C. 661–
                                                                                           Transportation, 125 East 11th Street,                                                                667(d)], Migratory Bird Treaty Act [16
                                                                                           Austin, Texas 78701; telephone: (512)                                                                U.S.C. 703–712].
                                               DEPARTMENT OF TRANSPORTATION 416–2734; email: carlos.swonke@                                                                                        5. Historic and Cultural Resources:
                                                                                           txdot.gov. TxDOT’s normal business                                                                   Section 106 of the National Historic
                                               Notice of Final Federal Agency Actions hours are 8:00 a.m.–5:00 p.m. (central                                                                    Preservation Act of 1966, as amended
                                               on Proposed Highway Projects in             time), Monday through Friday.                                                                        [54 U.S.C. 300101 et seq.]; Archeological
                                               Texas                                       SUPPLEMENTARY INFORMATION: Notice is                                                                 Resources Protection Act of 1977 [16
                                               AGENCY: Texas Department of                 hereby given that TxDOT and Federal                                                                  U.S.C. 470(aa)–11]; Archeological and
                                               Transportation (TxDOT), Federal             agencies have taken final agency actions                                                             Historic Preservation Act [54 U.S.C.
                                               Highway Administration (FHWA), U.S.         by issuing licenses, permits, and                                                                    312501 et seq.]; Native American Grave
                                               Department of Transportation.               approvals for the highway projects in                                                                Protection and Repatriation Act
daltland on DSKBBV9HB2PROD with NOTICES




                                               ACTION: Notice of limitation on claims      the State of Texas that are listed below.                                                            (NAGPRA) [25 U.S.C. 3001–3013].
                                               for judicial review of actions by TxDOT       The actions by TxDOT and Federal                                                                      6. Social and Economic: Civil Rights
                                               and Federal agencies.                       agencies and the laws under which such                                                               Act of 1964 [42 U.S.C. 2000(d)–
                                                                                           actions were taken are described in the                                                              2000(d)(1)]; American Indian Religious
                                               SUMMARY: This notice announces actions Categorical Exclusion (CE) or                                                                             Freedom Act [42 U.S.C. 1996]; Farmland
                                               taken by TxDOT and Federal agencies         Environmental Assessment (EA) issued                                                                 Protection Policy Act (FPPA) [7 U.S.C.
                                               that are final. The environmental           in connection with the projects and in                                                               4201–4209].


                                          VerDate Sep<11>2014      17:40 Sep 24, 2018       Jkt 244001     PO 00000        Frm 00102       Fmt 4703        Sfmt 4703      E:\FR\FM\25SEN1.SGM               25SEN1


                                                                         Federal Register / Vol. 83, No. 186 / Tuesday, September 25, 2018 / Notices                                           48511

                                                 7. Wetlands and Water Resources:                      file. The EA, FONSI and other                         The actions by the TxDOT and Federal
                                               Clean Water Act, 33 U.S.C. 1251–1377                    documents in the TxDOT project file are               agencies and the laws under which such
                                               (Section 404, Section 401, Section 319);                available by contacting TxDOT at the                  actions were taken are described in the
                                               Land and Water Conservation Fund                        address provided above or the TxDOT                   Final Environmental Assessment (EA)
                                               (LWCF), 16 U.S.C. 4601–4604; Safe                       El Paso District, 13301 Gateway West, El              approved on June 9, 2015, in the
                                               Drinking Water Act (SDWA), 42 U.S.C.                    Paso, Texas 79928; telephone (915) 790–               Finding of No Significant Impact
                                               300(f)–300(j)(6); Rivers and Harbors Act                4340. The Final EA and FONSI can also                 (FONSI) issued on June 12, 2015, and in
                                               of 1899, 33 U.S.C. 401–406; Wild and                    be viewed and downloaded from the                     documents in the TxDOT administrative
                                               Scenic Rivers Act, 16 U.S.C. 1271–1287;                 following website: https://                           record. The EA, FONSI, and other
                                               Emergency Wetlands Resources Act, 16                    www.txdot.gov/inside-txdot/projects/                  documents in the TxDOT administrative
                                               U.S.C. 3921, 3931; TEA–21 Wetlands                      studies/el-paso/i10-connect.html.                     record are available by contacting
                                               Mitigation, 23 U.S.C. 103(b)(6)(m),                        2. Zaragoza Port-of-Entry, Pan                     TxDOT at the addresses provided above
                                               133(b)(11); Flood Disaster Protection                   American Drive & Winn Road Build                      or the TxDOT Laredo District Office,
                                               Act, 42 U.S.C. 4001–4128.                               Improvements, TxDOT El Paso District                  1817 Bob Bullock Loop, Laredo, TX
                                                 8. Executive Orders: E.O. 11990                       with Camino Real Regional Mobility                    78043; telephone (956) 712–7400.
                                               Protection of Wetlands; E.O. 11988                      Authority and the City of El Paso, El                    4. I–35 Northeast Expansion Project in
                                               Floodplain Management; E.O. 12898,                      Paso County. The proposed project                     Bexar, Comal and Guadalupe Counties.
                                               Federal Actions to Address                              would consist of widening the existing                The project includes the construction of
                                               Environmental Justice in Minority                       Winn Road between Pan American                        four elevated managed lanes (two in
                                               Populations and Low Income                              Drive and Southside Road to a 90-foot-                each direction) generally between the
                                               Populations; E.O. 11593 Protection and                  wide four-lane divided facility with                  existing I–35 main lanes and frontage
                                               Enhancement of Cultural Resources;                      concrete pavement, raised medians,                    roads along I–35 from I–410 South in
                                               E.O. 13007 Indian Sacred Sites; E.O.                    sidewalks, illumination, and drainage                 San Antonio to FM 1103 in Schertz.
                                               13287 Preserve America; E.O. 13175                      improvements. The proposed project                    Direct connectors at the I–35/I–410
                                               Consultation and Coordination with                      would also involve construction of a                  South, I–35/I–410 West and I–35/Loop
                                               Indian Tribal Governments; E.O. 11514                   new location roadway extension                        1604 interchanges and operational
                                               Protection and Enhancement of                           heading west and then north from                      improvements at the FM 2252, Old
                                               Environmental Quality; E.O. 13112                       Southside Road to connect the existing                Wiederstein Road, and FM 1103
                                               Invasive Species. (Catalog of Federal                   Winn Road to Rio Del Norte Drive.                     intersections are also included. The
                                               Domestic Assistance Program Number                      Proposed improvements to Pan                          project is approximately 15.4 miles in
                                               20.205, Highway Planning and                            American Drive would entail adding                    length. The actions by TxDOT and
                                               Construction.)                                          raised medians where none exist,                      Federal agencies and the laws under
                                                 The projects subject to this notice are:              adding illumination, landscaping,                     which such actions were taken are
                                                 1. I–10 Connect, from Yandell Drive                   resurfacing the existing pavement, and                described in the Final EA approved on
                                               to Loop 375 (Cesar Chavez Border                        restriping to four lanes. The actions by              July 2, 2015, the Finding of No
                                               Highway) in El Paso County. This                        TxDOT and Federal agencies and the                    Significant Impact (FONSI) issued on
                                               project will construct or modify six                    laws under which such actions were                    July 2, 2015 and other documents in the
                                               direct connectors between I–10 and                      taken are described in the Final                      TxDOT project file. The EA, FONSI and
                                               various other highways and one direct                   Environmental Assessment (EA)                         other documents in the TxDOT project
                                               connector from U.S. 54 to I–110, and                    approved on August 15, 2018, the                      file are available by contacting TxDOT
                                               would reconfigure the I–110/U.S. 62                     Finding of No Significant Impact                      at the address provided above or the
                                               (Paisano Drive) interchange. The six I–                 (FONSI) issued on August 15, 2018, and                TxDOT San Antonio District Office,
                                               10 direct connectors are Eastbound I–10                 EA, FONSI, and other documents in the                 4615 NW Loop 410, San Antonio, TX
                                               to Southbound U.S. 54 Direct                            TxDOT project file are available by                   78229; telephone (210) 615–5839.
                                               Connector, Eastbound Loop 375 (Cesar                    contacting TxDOT at the address                          5. FM 1626 from RM 967 to FM 2770,
                                               Chavez Border Highway) to Eastbound                     provided above or the TxDOT El Paso                   Hays County. The build alternative
                                               I–10 Direct Connector, Westbound I–10                   District Office, 13301 Gateway Blvd.                  consists of four 12-foot-wide travel lanes
                                               to Southbound U.S. 54 Direct                            West, El Paso, Texas 79928; telephone                 (two in each direction), a 14-foot-wide
                                               Connector, Southbound U.S. 54 to                        915–790–4340. The Final EA and                        center left turn lane, and outside
                                               Westbound I–110 Direct Connector,                       FONSI can also be viewed and                          shoulders of varying widths. The project
                                               Eastbound I–10 to Westbound I–110                       downloaded from the following website:                also includes improvements to the
                                               Direct Connector, Westbound I–10 to                     https://www.elpasotexas.gov/capital-                  bridges at Onion Creek and Mustang
                                               Westbound I–110 Direct Connector.                       improvement.                                          Branch. The project is approximately
                                               Along with these improvements, the                         3. Amistad Acres Road, Val Verde                   3.3 miles in length. The actions by
                                               proposed project would also include                     County. The project would replace an                  TxDOT and Federal agencies and the
                                               reconfiguring some of the merging lanes                 existing 2.6 mile unpaved road (known                 laws under which such actions were
                                               along I–110 and U.S. 54. The proposed                   as Holman Road) by constructing an                    taken are described in the Final EA
                                               improvements would require 0.14 acre                    approximately 2.0 mile paved roadway                  approved on July 1, 2015, the Finding
                                               of additional right-of-way and                          consisting of two 10-foot wide travel                 of No Significant Impact (FONSI) issued
                                               approximately 0.81 acre of temporary                    lanes and two 4-foot wide shoulders (28               on July 1, 2015, and other documents in
                                               construction easements. The actions by                  feet total pavement width) from Box                   the TxDOT project file. The EA, FONSI
                                               TxDOT and Federal agencies and the                      Canyon Road to the Amistad Acres                      and other documents in the TxDOT
daltland on DSKBBV9HB2PROD with NOTICES




                                               laws under which such actions were                      Subdivision near the Amistad Reservoir,               project file are available by contacting
                                               taken are described in the Final                        northwest of Del Rio, in Val Verde                    TxDOT at the address provided above or
                                               Environmental Assessment (EA)                           County, Texas. The proposed roadway                   the TxDOT Austin District Office, 7901
                                               approved on August 23, 2018, the                        would include a portion of the current                North I–35, Austin, TX 78753;
                                               Finding of No Significant Impact                        access roadway for approximately 0.7                  telephone (512) 832–7000.
                                               (FONSI) issued on August 28, 2018, and                  miles, and a section of new location                     6. FM 1626 from Brodie Lane to
                                               other documents in the TxDOT project                    roadway for approximately 1.3 miles.                  Manchaca Road (FM 2304), Travis


                                          VerDate Sep<11>2014   17:40 Sep 24, 2018   Jkt 244001   PO 00000   Frm 00103   Fmt 4703   Sfmt 4703   E:\FR\FM\25SEN1.SGM   25SEN1


                                               48512                     Federal Register / Vol. 83, No. 186 / Tuesday, September 25, 2018 / Notices

                                               County. The build alternative consists of                  9. FM 1560 from SH 16 to Loop 1604                 at the address provided above or the
                                               four 12-foot-wide travel lanes (two in                  in Bexar County. The project would                    TxDOT Dallas District Office, 4777 E
                                               each direction) separated by a                          widen this section of FM 1560 from two                Highway 80, Mesquite, TX 75150;
                                               continuous left turn lane. The                          to four lanes, including a center turn                telephone (214) 320–4480.
                                               continuous left turn lane would range in                lane, raised medians at the approaches                   12. FM 3549 from IH 30 to North of
                                               width from 14 feet (usual) to 23.5 feet                 to SH 16 and Loop 1604, bike lanes, and               SH 66 in Rockwall County, Texas. The
                                               at the intersection with Brodie Lane.                   sidewalks. The project is approximately               proposed improvements would include
                                               The project is approximately 1.3 miles                  2 miles in length. The actions by TxDOT               widening the existing two-lane rural
                                               in length. The actions by TxDOT and                     and Federal agencies and the laws                     roadway to a four-lane urban section.
                                               Federal agencies and the laws under                     under which such actions were taken                   The project would consist of a four-lane
                                               which such actions were taken are                       are described in the Final EA approved                urban divided section with selected left-
                                               described in the Final EA approved on                   on July 2, 2015, the Finding of No                    turn lanes. The proposed typical section
                                               February 24, 2016, the Finding of No                    Significant Impact (FONSI) issued on                  provides one additional 12-foot travel
                                               Significant Impact (FONSI) issued on                    July 2, 2015 and other documents in the               lane, one 14-foot multipurpose lane for
                                               February 24, 2016, and other documents                  TxDOT project file. The EA, FONSI and                 bicycle use, and 2-foot offset to a
                                               in the TxDOT project file. The EA,                      other documents in the TxDOT project                  concrete curb. A raised median is also
                                               FONSI and other documents in the                        file are available by contacting TxDOT                provided to control ingress and egress.
                                               TxDOT project file are available by                     at the address provided above or the                  The length of the proposed project is
                                               contacting TxDOT at the address                         TxDOT San Antonio District Office,                    approximately 1.3 miles. The actions by
                                               provided above or the TxDOT Austin                      4615 NW Loop 410, San Antonio, TX                     TxDOT and Federal agencies and the
                                               District Office, 7901 North I–35, Austin,               78229; (210) 615–5839.                                laws under which such actions were
                                               TX 78753; telephone (512) 832–7000.                        10. FM 1516 from FM 78 to FM 1976                  taken are described in the Final
                                                  7. US 183 from US 290 to SH 71,                      in Bexar County. The project includes                 Environmental Assessment (EA)
                                               Travis County. The project would                        reconstructing existing FM 1516 to four               approved on March 8, 2016, Finding of
                                               include six tolled main lanes and four                  main lanes with bike lanes, a                         No Significant Impact (FONSI) issued
                                               to six non-tolled access road lanes.                    continuous center turn lane, adding                   on March 8, 2016, and other documents
                                               Direct connections to SH 71 west of US                  sidewalks, constructing a storm sewer                 in the TxDOT project file. The EA and
                                               183 would be tolled and would provide                   system between FM 78 and Gibbs                        other documents in the TxDOT project
                                                                                                       Sprawl Road/FM 3502, and extending                    file are available by contacting TxDOT
                                               two lanes of travel in each direction.
                                                                                                       FM 1516 from the Gibbs Sprawl Road/                   at the address provided above or the
                                               Throughout the corridor, a shared use
                                                                                                       FM 3502 intersection to FM 1976 at                    TxDOT Dallas District Office, 4777 E.
                                               path, bike lanes and sidewalks are
                                                                                                       Hilltop Avenue. The project is                        Highway 80, Mesquite, TX 75150;
                                               included. The project is approximately
                                                                                                       approximately 0.76 mile in length. The                telephone (214) 320–4480.
                                               8 miles in length. The actions by TxDOT                                                                          13. IH 20 from SH 161/Lake Ridge
                                                                                                       actions by TxDOT and Federal agencies
                                               and Federal agencies and the laws                                                                             Parkway to FM 1382/Belt Line Road in
                                                                                                       and the laws under which such actions
                                               under which such actions were taken                                                                           Dallas County, Texas. The proposed
                                                                                                       were taken are described in the Final EA
                                               are described in the Final EA approved                                                                        improvements would include the
                                                                                                       approved on February 17, 2015, the
                                               on March 6, 2015, the Finding of No                                                                           construction of new frontage roads and
                                                                                                       Finding of No Significant Impact
                                               Significant Impact (FONSI) issued on                    (FONSI) issued on February 17, 2015                   ramps; reconstruction and
                                               March 6, 2015, and other documents in                   and other documents in the TxDOT                      reconfiguration of the intersections at
                                               the TxDOT project file. The EA, FONSI                   project file. The EA, FONSI and other                 Robinson Road and Carrier Parkway;
                                               and other documents in the TxDOT                        documents in the TxDOT project file are               reconstruction and reconfiguration of a
                                               project file are available by contacting                available by contacting TxDOT at the                  section of Westchase Drive south of IH
                                               TxDOT at the address provided above or                  address provided above or the TxDOT                   20; construction of U-turns at Carrier
                                               the TxDOT Austin District Office, 7901                  San Antonio District Office, 4615 NW                  Parkway and Belt Line Road; and other
                                               North I–35, Austin, TX 78753;                           Loop 410, San Antonio, TX 78229;                      improvements along IH 20. The length
                                               telephone (512) 832–7000.                               telephone (210) 615–5839.                             of the proposed project is approximately
                                                  8. Callaghan Road from IH 410 to                        11. FM 664 from Westmoreland Road                  2.318 miles. The actions by TxDOT and
                                               Spur 421 (Bandera Road) in Bexar                        to IH 35E in Ellis County, Texas. The                 Federal agencies and the laws under
                                               County. The project includes widening                   proposed improvements would include                   which such actions were taken are
                                               Callaghan Road to a four-lane roadway                   the expansion of the existing facility                described in the Final Environmental
                                               with a continuous left center turn lane,                from a two-lane rural roadway to a six-               Assessment (EA) approved on
                                               including the installation of curbs,                    lane urban, divided roadway. The                      November 2, 2015, Finding of No
                                               sidewalks and a shared-use path. The                    project also includes bicycle and                     Significant Impact (FONSI) issued on
                                               project is approximately 1.1 miles in                   pedestrian accommodations. The length                 November 2, 2015, and other documents
                                               length. The actions by TxDOT and                        of the proposed project is approximately              in the TxDOT project file. The EA and
                                               Federal agencies and the laws under                     3.13 miles. The purpose of the proposed               other documents in the TxDOT project
                                               which such actions were taken are                       project is to improve mobility and safety             file are available by contacting TxDOT
                                               described in the Final EA approved on                   and manage congestion. The actions by                 at the address provided above or the
                                               July 1, 2015, the Finding of No                         TxDOT and Federal agencies and the                    TxDOT Dallas District Office, 4777 E
                                               Significant Impact (FONSI) issued on                    laws under which such actions were                    Highway 80, Mesquite, TX 75150;
                                               July 1, 2015 and other documents in the                 taken are described in the Final                      telephone (214) 320–4480.
daltland on DSKBBV9HB2PROD with NOTICES




                                               TxDOT project file. The EA, FONSI and                   Environmental Assessment (EA)                            14. Medical District Drive from IH 35
                                               other documents in the TxDOT project                    approved on June 10, 2015, Finding of                 to Harry Hines Boulevard in Dallas
                                               file are available by contacting TxDOT                  No Significant Impact (FONSI) issued                  County, Texas. The proposed
                                               at the address provided above or the                    on June 10, 2015, and other documents                 improvements would include the
                                               TxDOT San Antonio District Office,                      in the TxDOT project file. The EA and                 reconstruction and widening of the
                                               4615 NW Loop 410, San Antonio, TX                       other documents in the TxDOT project                  current Medical District Drive from a
                                               78229; telephone (210) 615–5839.                        file are available by contacting TxDOT                four-lane section to a six-lane divided


                                          VerDate Sep<11>2014   17:40 Sep 24, 2018   Jkt 244001   PO 00000   Frm 00104   Fmt 4703   Sfmt 4703   E:\FR\FM\25SEN1.SGM   25SEN1


                                                                         Federal Register / Vol. 83, No. 186 / Tuesday, September 25, 2018 / Notices                                         48513

                                               thoroughfare with turn lanes. The                       reconstruction of the eastbound frontage              file. The EA and other documents in the
                                               project also proposes to relocate a                     road and relocation of the North                      TxDOT project file are available by
                                               driveway providing access to the Trinity                Galloway Avenue exit ramp; and the                    contacting TxDOT at the address
                                               Railway Express station and to construct                improvements to IH 635 would include                  provided above or the TxDOT Dallas
                                               right and left-turn lanes from Medical                  the addition of a new northbound                      District Office, 4777 E Highway 80,
                                               District Drive. The length of the                       frontage road and the widening of the                 Mesquite, TX 75150; telephone (214)
                                               proposed project is approximately 1,380                 exit ramp at Gross Road. The actions by               320–4480.
                                               feet. The actions by TxDOT and Federal                  TxDOT and Federal agencies and the                       19. Max Road from FM 518 to Hughes
                                               agencies and the laws under which such                  laws under which such actions were                    Ranch Road, Brazoria County. This
                                               actions were taken are described in the                 taken are described in the Final                      project would widen Max Road from a
                                               Final Environmental Assessment (EA)                     Environmental Assessment (EA)                         two-lane undivided roadway with open
                                               approved on April 2, 2015, Finding of                   approved on December 28, 2015,                        ditches to a four-lane divided boulevard
                                               No Significant Impact (FONSI) issued                    Finding of No Significant Impact                      facility with curb and gutter. A portion
                                               on April 2, 2015, and other documents                   (FONSI) issued on December 28, 2015,                  of the project would be on new location
                                               in the TxDOT project file. The EA and                   and other documents in the TxDOT                      to connect Max Road to the current
                                               other documents in the TxDOT project                    project file. The EA and other                        terminus of Reid Boulevard, just north
                                               file are available by contacting TxDOT                  documents in the TxDOT project file are               of FM 518. A cul-de-sac is proposed on
                                               at the address provided above or the                    available by contacting TxDOT at the                  existing Max Road approximately 875
                                               TxDOT Dallas District Office, 4777 E                    address provided above or the TxDOT                   feet north of FM 518. Included in the
                                               Highway 80, Mesquite, TX 75150;                         Dallas District Office, 4777 E Highway                project is construction of a shared-use
                                               telephone (214) 320–4480.                               80, Mesquite, TX 75150; telephone (214)               hike and bike trail along the west side
                                                  15. SH 276 from SH 205 to East of FM                 320–4480.                                             of the roadway, new twin bridge
                                               549 in Rockwall County, Texas. The                        17. U.S. 287 from SH 34 to IH 45 in                 structures at Hickory Slough, improved
                                               proposed improvements would include                     Ellis County, Texas. The proposed                     drainage including a detention pond,
                                               widening SH 276 from a two-lane rural                   improvements would include the                        and a traffic signal at Hughes Ranch
                                               roadway to a four-lane divided urban                    reconstruction and widening of U.S. 287               Road. The project length is
                                               arterial that would ultimately                          to accommodate the addition of                        approximately 4,500 feet. The actions by
                                               accommodate a six-lane divided with                     mainlanes, ramps, and frontage road                   TxDOT and Federal agencies and the
                                               urban minor arterial. The limits of the                 lanes throughout the project limits. The              laws under which such actions were
                                               widening begin at the intersection of the               proposed project would also include the               taken are described in the Final
                                               realignment with the existing alignment                 addition of grade-separated                           Environmental Assessment (EA)
                                               at Wildrose Drive and continues east to                 intersections as well as entrance and                 approved on July 16, 2015, the Finding
                                               approximately FM 549. SH 276 would                      exit ramps along the existing facility.               of No Significant Impact (FONSI) issued
                                               be realigned between SH 205 and                         The length of the proposed project is                 on July 16, 2015, and other documents
                                               Wildrose Drive through an existing                      approximately 4.51 miles. The actions                 in the TxDOT project file. The EA,
                                               reserved roadway corridor. The existing                 by TxDOT and Federal agencies and the                 FONSI, and other documents in the
                                               SH 205/SH 276 intersection would be                     laws under which such actions were                    TxDOT project file are available by
                                               relocated to Sids Road, approximately                   taken are described in the Final                      contacting TxDOT at the address
                                               0.5 miles south of its current location.                Environmental Assessment (EA)                         provided above or the TxDOT Houston
                                               SH 276 would accommodate one 11-foot                    approved on July 8, 2015, Finding of No               District Office, 7600 Washington
                                               travel lane and one 14-foot shared use                  Significant Impact (FONSI) issued on                  Avenue, Houston, Texas 77007;
                                               lane in each direction, a 40-foot median,               July 8, 2015, and other documents in the              telephone (713) 802–5000.
                                               and five-foot sidewalks with two-foot                   TxDOT project file. The EA and other                     20. Hurricane Lane/Lake Olympia
                                               buffers on each side of the roadway. The                documents in the TxDOT project file are               Parkway from Fort Bend Parkway to
                                               proposed section would also                             available by contacting TxDOT at the                  Trammel-Fresno Road, Fort Bend
                                               accommodate an ultimate six-lane                        address provided above or the TxDOT                   County. This project would construct
                                               facility. The length of the proposed                    Dallas District Office, 4777 E Highway                Hurricane Lane from its present
                                               project is approximately 1.96 miles. The                80, Mesquite, TX 75150; telephone (214)               terminus as a two-lane, undivided urban
                                               actions by TxDOT and Federal agencies                   320–4480.                                             section from Trammel-Fresno Road to a
                                               and the laws under which such actions                     18. U.S. 377 from Henrietta Creek                   point along Lake Olympia Parkway
                                               were taken are described in the Final                   Road to SH 114 in Denton County,                      approximately 685 feet east of Fort Bend
                                               Environmental Assessment (EA)                           Texas. The proposed improvements                      Parkway. Construction of two linear
                                               approved on February 24, 2016, Finding                  would include the reconstruction and                  detention ponds is included. The
                                               of No Significant Impact (FONSI) issued                 widening of U.S. 377 from a two-lane                  typical cross-sections incorporate two
                                               on February 24, 2016, and other                         rural section to a four-lane divided                  11-foot travel lanes with 1-foot curb
                                               documents in the TxDOT project file.                    urban section with a raised median                    offsets on Hurricane Lane and Lake
                                               The EA and other documents in the                       between Henrietta Creek Road and                      Olympia Parkway. The intersections of
                                               TxDOT project file are available by                     James Street. The project would also                  Hurricane Lane at Trammel-Fresno
                                               contacting TxDOT at the address                         construct left-turn bays at Crockett,                 Road and of Lake Olympia Parkway at
                                               provided above or the TxDOT Dallas                      Denton, and Main Streets. The length of               Fort Bend Parkway would each consist
                                               District Office, 4777 E. Highway 80,                    the proposed project is approximately                 of a four-lane divided roadway
                                               Mesquite, TX 75150; telephone (214)                     one mile. The actions by TxDOT and                    containing 11- to 12-foot lanes and a
daltland on DSKBBV9HB2PROD with NOTICES




                                               320–4480.                                               Federal agencies and the laws under                   0- to 24-foot raised landscaped median.
                                                  16. U.S. 80 from Interstate IH 635 to                which such actions were taken are                     A 10-foot wide shared use path is
                                               Galloway Avenue and IH 635 from                         described in the Final Environmental                  proposed along the west side of
                                               South of Gross Road to Eastbound U.S.                   Assessment (EA) approved on August 6,                 Hurricane Lane and along the southern
                                               80 Frontage Road in Dallas County,                      2015, Finding of No Significant Impact                side of Lake Olympia Parkway. A 5-foot
                                               Texas. The proposed U.S. 80                             (FONSI) issued on August 6, 2015, and                 wide sidewalk segment is proposed on
                                               improvements would include                              other documents in the TxDOT project                  the east side of Hurricane Lane at its


                                          VerDate Sep<11>2014   17:40 Sep 24, 2018   Jkt 244001   PO 00000   Frm 00105   Fmt 4703   Sfmt 4703   E:\FR\FM\25SEN1.SGM   25SEN1


                                               48514                     Federal Register / Vol. 83, No. 186 / Tuesday, September 25, 2018 / Notices

                                               southern terminus at Trammel-Fresno                     are described in the Final                            Environmental Assessment (EA)
                                               Road and along the north side of Lake                   Environmental Assessment (EA)                         approved on June 29, 2018, Finding of
                                               Olympia Parkway’s transitional section                  approved on February 5, 2016, the                     No Significant Impact (FONSI) issued
                                               to four lanes. The project length is                    Finding of No Significant Impact                      on June 29, 2018, and other documents
                                               approximately 1.5 mile. The actions by                  (FONSI) issued on February 5, 2016,                   in the TxDOT project file. The EA and
                                               TxDOT and Federal agencies and the                      and other documents in the TxDOT                      other documents in the TxDOT project
                                               laws under which such actions were                      project file. The EA, FONSI, and other                file are available by contacting TxDOT
                                               taken are described in the Final                        documents in the TxDOT project file are               at the address provided above or the
                                               Environmental Assessment (EA)                           available by contacting TxDOT at the                  TxDOT Dallas District Office, 4777 E
                                               approved on August 24, 2015, the                        address provided above or the TxDOT                   Highway 80, Mesquite, TX 75150;
                                               Finding of No Significant Impact                        Houston District Office, 7600                         telephone (214) 320–6100.
                                               (FONSI) issued on August 24, 2015, and                  Washington Avenue, Houston, Texas                        25. FM 179 from 800 feet north of SH
                                               other documents in the TxDOT project                    77007; telephone (713) 802–5000.                      114 to Donald Preston Drive in Lubbock
                                               file. The EA, FONSI, and other                            23. IH 10 Exit 365 EB Ramp                          County. TxDOT, Lubbock District,
                                               documents in the TxDOT project file are                 Relocation, from 0.25 miles west of Rio               proposes to widen approximately 4.1
                                               available by contacting TxDOT at the                    Grande Street to SH 163, in Crockett                  miles of the existing FM 179 in
                                               address provided above or the TxDOT                     County. The project is designed to                    Lubbock, Texas. Interim improvements
                                               Houston District Office at 7600                         relocate the IH10 eastbound exit ramp                 would consist of a five lane suburban
                                               Washington Avenue, Houston, Texas                       365 approximately 0.8 miles west of the               section with four 11-foot wide lanes,
                                               77007; telephone (713) 802–5000.                        existing location, construct new frontage             two eight-foot wide shoulders, and a 14-
                                                  21. FM 2978, from FM 1488 to                         roadway to tie into the new exit ramp,                foot wide center left turn lane. The
                                               Conroe-Huffsmith Road, Montgomery                       and includes the construction of a new                ultimate seven lane section would
                                               County. This project involves widening                  bridge over Johnson Draw. The project                 include an additional travel lane in each
                                               the existing two-lane undivided                         will convert the traffic on the existing              direction, sidewalks, shoulders and
                                               roadway to a four-lane roadway with an                  frontage road from two-way traffic to                 curb-and-gutter drainage. The actions by
                                               intermittent two-way turn lane. The                     one-way traffic. Total project length is              TxDOT and Federal agencies and the
                                               proposed facility consists of four travel               approximately 1 mile. The actions by                  laws under which such actions were
                                               lanes (two 11-foot lanes in each                        TxDOT and Federal agencies and the                    taken are described in the Final
                                               direction), five-foot outside shoulders                 laws under which such actions were                    Environmental Assessment (EA)
                                               which would accommodate bicycles,                       taken are described in the Categorical                approved on February 24, 2016 the
                                               and a four-foot sidewalk in various                     Exclusion Determination approved on                   Finding of No Significant Impact
                                               locations on the east side of FM 2978.                  June 15, 2018, and other documents in                 (FONSI) issued on February 24, 2016
                                               The project includes the construction of                the TxDOT project file. The Categorical               and other documents in the TxDOT
                                               four detention ponds. The project is                    Exclusion Determination and other                     project file. The EA, FONSI and other
                                               approximately 6.5 miles in length. The                  documents in the TxDOT project file are               documents in the TxDOT project file are
                                               actions by TxDOT and Federal agencies                   available by contacting TxDOT at the                  available by contacting TxDOT at the
                                               and the laws under which such actions                   address provided above or the TxDOT                   address provided above or the TxDOT
                                               were taken are described in the Final                   San Angelo District Office, 4502                      Lubbock District Office, 135 Slaton
                                               Environmental Assessment (EA)                           Knickerbocker Road, San Angelo, Texas                 Road, Lubbock, Texas 79404; telephone
                                               approved on December 1, 2015, the                       76904; telephone (325) 947–9205.                      (806) 745–4411.
                                               Finding of No Significant Impact                          24. U.S. 380 from State Loop (SL) 288                  26. Erskine Street from Texas Tech
                                               (FONSI) issued on December 1, 2015,                     to West of County Road (CR) 26 in                     Parkway to Indiana Avenue in Lubbock
                                               and other documents in the TxDOT                        Denton County, Texas. The proposed                    County. TxDOT, Lubbock District,
                                               project file. The EA, FONSI, and other                  improvements would include                            proposes to widen and improve Erskine
                                               documents in the TxDOT project file are                 reconstruction and widening of existing               Street with new right of way to be added
                                               available by contacting TxDOT at the                    U.S. 380 from a four-lane undivided                   at various locations on both sides of the
                                               address provided above or the TxDOT                     rural to a six-lane divided urban                     roadway. Improvements would consist
                                               Houston District Office, 7600                           roadway consisting of two 11- to 12-foot              of a five-lane suburban section with two
                                               Washington Avenue, Houston, Texas                       wide inside travel lanes and 14-foot                  11-foot wide lanes, two 13.5-foot wide
                                               77007; telephone (713) 802–5000.                        wide outside shared-use lanes (for                    lanes, and a 14-foot wide center left turn
                                                  22. FM 528 from SH 35B (Gordon                       bicycle accommodation), with raised                   lane. An additional 11-foot wide right
                                               Street) to SH 6, Brazoria County. This                  medians and curb and gutter in each                   turn lane would be located at the
                                               project extends FM 528 from SH 35B                      direction. The proposed roadway would                 northwest corner of the project area
                                               (Gordon Street) to SH 6. The proposed                   also include intersection improvements                leading up to the terminus at Texas
                                               undivided, curb and gutter facility                     and left and right turn lanes at                      Tech Boulevard. Additional sidewalks
                                               would include two 14-foot lanes (one                    designated locations. In addition,                    would be added on the north side of the
                                               12-foot lane in each direction),                        interchange improvements are proposed                 project at the locations where sidewalks
                                               accommodations for bicycle traffic and                  including five new grade separations. A               are not present. The project length is
                                               a five-foot sidewalk on the north side of               minimum of five-foot sidewalks would                  approximately 1 mile in length. The
                                               FM 528. The proposed facility would                     be located along the outer lanes of the               actions by TxDOT and Federal agencies
                                               also include a grade separation at the                  roadway. The length of the proposed                   and the laws under which such actions
                                               Burlington Northern Santa Fe (BNSF)                     project is approximately 14.2 miles. The              were taken are described in the Final
daltland on DSKBBV9HB2PROD with NOTICES




                                               Railway, new signalized intersections at                purpose of the proposed project is to                 Environmental Assessment (EA)
                                               SH 35B (Gordon Street) and SH 6, and                    improve mobility by increasing capacity               approved on April 7, 2016 the Finding
                                               left turn lanes at SH 35B (Gordon                       and reducing traffic congestion, and to               of No Significant Impact (FONSI) issued
                                               Street). The project is approximately 0.9               meet current design standards. The                    on April 7, 2016 and other documents
                                               miles in length. The actions by TxDOT                   actions by TxDOT and Federal agencies                 in the TxDOT project file. The EA,
                                               and Federal agencies and the laws                       and the laws under which such actions                 FONSI and other documents in the
                                               under which such actions were taken                     were taken are described in the Final                 TxDOT project file are available by


                                          VerDate Sep<11>2014   17:40 Sep 24, 2018   Jkt 244001   PO 00000   Frm 00106   Fmt 4703   Sfmt 4703   E:\FR\FM\25SEN1.SGM   25SEN1


                                                                         Federal Register / Vol. 83, No. 186 / Tuesday, September 25, 2018 / Notices                                            48515

                                               contacting TxDOT at the address                         available by contacting TxDOT at the                  widen approximately 3.7 miles of FM
                                               provided above or the TxDOT Lubbock                     address provided above or the TxDOT                   2206 from an existing two-lane road to
                                               District Office, 135 Slaton Road,                       Lufkin District Office, 1805 North                    a four-lane divided highway corridor.
                                               Lubbock, Texas 79404; telephone (806)                   Timberland Drive, Lufkin, Texas 75901;                However, the curve located between
                                               745–4411.                                               telephone (936) 634–4433.                             Cox Road and Jordan Valley Drive
                                                  27. SL 88 from 0.5 miles north of U.S.                  29. Farm-To-Market (FM) 1570 from                  would be straightened and the road
                                               62/82 to 0.5 miles east of U.S. 87 in                   State Highway (SH) 66 to United States                would be in a new alignment in this
                                               Lubbock County. TxDOT, Lubbock                          Highway (US) 380 in Hunt County. The                  section. The actions by TxDOT and
                                               District, proposes to construct a segment               proposed action is the construction of a              Federal agencies and the laws under
                                               (segment three) of a new loop around                    two-lane roadway from the terminus of                 which such actions were taken are
                                               Lubbock along a portion of the existing                 Farm-to-Market Road (FM) 1570 at State                described in the Final Environmental
                                               Farm-to-Market Road (FM) 1585. The                      Highway (SH) 66 north for a distance of               Assessment (EA) approved on December
                                               project length is approximately 12.4                    1.9 miles to U.S. 380. The project is                 12, 2016, the Finding of No Significant
                                               miles in length. The proposed                           located in Hunt County at the west edge               Impact (FONSI) issued on December 20,
                                               improvements would convert the                          of the city of Greenville. The proposed               2016, and other documents in the
                                               existing two-lane rural FM 1585                         project would provide two 12-foot wide                TxDOT project file. The EA, FONSI and
                                               roadway section to an access-controlled,                travel lanes with ten-foot outside paved              other documents in the TxDOT project
                                               four-lane divided freeway section with                  shoulders within an approximate 264-                  file are available by contacting TxDOT
                                               frontage roads and ramps. The improved                  foot wide right-of-way (ROW). The                     at the address provided above or the
                                               roadway has been designated as SL 88.                   project end points at SH 66 and U.S.                  TxDOT Tyler District Office, 2709 W
                                               Multiple interchanges are proposed at                   380, as well as intersections with                    Front Street, Tyler, Texas 75702; (903)
                                               the crossroad locations. The actions by                 intervening roadways, would be at-                    510–9267.
                                               TxDOT and Federal agencies and the                      grade. The actions by TxDOT and                          32. FM 2493 from FM 2813 in
                                               laws under which such actions were                      Federal agencies and the laws under                   Gresham, south to FM 346 in Flint,
                                               taken are described in the Final                        which such actions were taken are                     Smith County. FM 2493 would be
                                               Environmental Assessment (EA)                           described in the Final ‘‘Assessment (EA)              widened from its existing 2-lane
                                               approved on February 27, 2018, the                      approved on June 17, 2015, the Finding                highway configuration to a 4-lane
                                               Finding of No Significant Impact                        of No Significant Impact (FONSI) issued               highway divided by a flush median
                                               (FONSI) issued on February 27, 2018                     on June 24, 2015, and other documents                 (continuous two-way, left-turn lane) in
                                               and other documents in the TxDOT                        in the TxDOT project file. The EA,                    the center. It includes four 12-ft. vehicle
                                               project file. The EA, FONSI and other                   FONSI and other documents in the                      lanes (two in each direction), two 4-ft.
                                               documents in the TxDOT project file are                 TxDOT project file are available by                   striped bicycle lanes (one in each
                                               available by contacting TxDOT at the                    contacting TxDOT at the address                       direction) plus 2-ft. curb-and-gutter
                                               address provided above or the TxDOT                     provided above or the TxDOT Paris                     offsets, and a 16-ft. wide flush median.
                                               Lubbock District Office, 135 Slaton                     District Office, 1365 North Main Street,              The length of the project is 2.5 miles.
                                               Road, Lubbock, Texas 79404; telephone                   Paris, Texas 75460; telephone (903)                   The actions by TxDOT and Federal
                                               (806) 745–4411.                                         737–9300.                                             agencies and the laws under which such
                                                  28. U.S. 59 from 3.0 miles south of                     30. Spur 248 from 1.75 Miles West of               actions were taken are described in the
                                               U.S. 287 to 3.4 miles north of U.S. 287                 FM 848 (Old Omen Road), East to SH                    Final Environmental Assessment (EA)
                                               in Polk County. TxDOT, Lufkin District,                 64, Smith County. The proposed project                approved on July 20, 2015, the Finding
                                               proposes to build a new location                        would widen Spur 248 to a 4-lane                      of No Significant Impact (FONSI) issued
                                               controlled access relief route west of                  facility with a flush median between                  on July 31, 2015, and other documents
                                               U.S. 59 in the town of Corrigan, Texas.                 Old Omen Road and SH 64. The                          in the TxDOT project file. The EA,
                                               The proposed relief route would                         proposed design would consist of a curb               FONSI, and other documents in the
                                               provide a four lane controlled access                   and gutter section with two 12-foot                   TxDOT project file are available by
                                               freeway section, ramps, and grade                       travel lanes, two 12-foot outside lanes               contacting TxDOT at the address
                                               separations on the north and south ends                 with a 5-foot outside bike lane, and a                provided above or the TxDOT Tyler
                                               at the Union Pacific Railroad and U.S.                  14-foot flush median within a ROW that                District Office, 2709 W Front Street,
                                               287. Additional bridges would be                        would vary 140 to 230 feet in width.                  Tyler, Texas 75702; telephone (903)
                                               construction over several creek                         The length of the project is 2.17 miles.              510–9267.
                                               crossings and Union Springs Road. The                   The actions by TxDOT and Federal                         33. U.S. 59 from FM 2919 to FM 710
                                               proposed project is approximately 6.4                   agencies and the laws under which such                in Wharton County. TxDOT, Yoakum
                                               miles in length. The purpose of the                     actions were taken are described in the               District, proposes to upgrade U.S. 59
                                               project is to bring U.S. 59 in the                      Final Environmental Assessment (EA)                   through Wharton County to Interstate
                                               Corrigan area up to current interstate                  approved on January 28, 2015, the                     Highway (IH) standards. The proposed
                                               design standards by making U.S. 59 a                    Finding of No Significant Impact                      project would consist of a four-lane
                                               controlled access roadway within the                    (FONSI) issued on January 30, 2015, and               divided freeway facility (two 12-foot
                                               project limits and reduce congestion                    other documents in the TxDOT project                  lanes in each direction) with 12-foot
                                               and increase mobility. The actions by                   file. The EA, FONSI and other                         inside shoulders and 12-foot outside
                                               TxDOT and Federal agencies and the                      documents in the TxDOT project file are               shoulders divided by a concrete traffic
                                               laws under which such actions were                      available by contacting TxDOT at the                  barrier. The freeway facility would have
                                               taken are described in the Final                        address provided above or the TxDOT                   continuous frontage roads (two 12-foot
daltland on DSKBBV9HB2PROD with NOTICES




                                               Environmental Assessment (EA)                           Tyler District Office, 2709 W Front                   lanes in each direction) with 10-foot
                                               approved on January 28, 2018, the                       Street, Tyler, Texas 75702; telephone                 outside shoulders and 4-foot inside
                                               Finding of No Significant Impact                        (903) 510–9267.                                       shoulders. Within the proposed
                                               (FONSI) issued on March 8, 2018, and                       31. FM 2206 from SH 42 to SL 281,                  construction limits, the intersections
                                               other documents in the TxDOT project                    Gregg County. The proposed project is                 along existing U.S. 59 would be given
                                               file. The EA, FONSI and other                           a roadway widening and improvement                    access to frontage roads or in some areas
                                               documents in the TxDOT project file are                 project. Proposed improvements would                  overpasses would be built. The


                                          VerDate Sep<11>2014   17:40 Sep 24, 2018   Jkt 244001   PO 00000   Frm 00107   Fmt 4703   Sfmt 4703   E:\FR\FM\25SEN1.SGM   25SEN1


                                               48516                     Federal Register / Vol. 83, No. 186 / Tuesday, September 25, 2018 / Notices

                                               proposed construction area is                              35. U.S. 59 from SH 71 to Business 59              2016 and other documents in the
                                               approximately 39.5 miles in length. The                 north of El Campo in Wharton County.                  TxDOT project file. The EA, FONSI and
                                               actions by TxDOT and Federal agencies                   TxDOT, Yoakum District, proposes to                   other documents in the TxDOT project
                                               and the laws under which such actions                   provide frontage roads and convert the                file are available by contacting TxDOT
                                               were taken are described in the Final                   existing lanes of U.S. 59 in El Campo to              at the address provided above or the
                                               Environmental Assessment (EA)                           a controlled access facility that meets               TxDOT Yoakum District Office, 403
                                               approved on May 25, 2017, the Finding                   Interstate standards. Interchanges and/               Huck Street, Yoakum, Texas 77995;
                                               of No Significant Impact (FONSI) issued                 or slip ramps would be included to                    telephone (361) 293–4300.
                                               on May 25, 2017 and other documents                     provide necessary access to and around                   37. State Highway 31 Relief Route
                                               in the TxDOT project file. The EA,                      the facility. The proposed project length             from 3.2 Miles West of FM 2555 to 3.7
                                               FONSI and other documents in the                        is 3.1 miles. The actions by TxDOT and
                                                                                                                                                             Miles East of Interstate Highway 45 in
                                               TxDOT project file are available by                     Federal agencies and the laws under
                                                                                                                                                             Corsicana, Navarro County. TxDOT,
                                               contacting TxDOT at the address                         which such actions were taken are
                                                                                                                                                             Dallas District, proposes to construct a
                                               provided above or the TxDOT Yoakum                      described in the Final Environmental
                                                                                                                                                             four-lane divided relief route on new
                                               District Office, 403 Huck Street,                       Assessment (EA) approved on February
                                                                                                                                                             location. The proposed roadway would
                                               Yoakum, Texas 77995; telephone (361)                    19, 2016, the Finding of No Significant
                                                                                                                                                             be a grade-separated facility with
                                               293–4300.                                               Impact (FONSI) issued on February 19,
                                                  34. U.S. 59 from Business 59 south of                                                                      frontage roads. The length of the
                                                                                                       2016 and other documents in the
                                               El Campo to SH 71 in Wharton County.                                                                          preferred alignment is 14 miles. The
                                                                                                       TxDOT project file. The EA, FONSI and
                                               TxDOT, Yoakum District, proposes to                                                                           actions by TxDOT and Federal agencies
                                                                                                       other documents in the TxDOT project
                                               provide frontage roads and convert the                  file are available by contacting TxDOT                and the laws under which such actions
                                               existing lanes of U.S. 59 in El Campo to                at the address provided above or the                  were taken are described in the Final
                                               a controlled access facility that meets                 TxDOT Yoakum District Office, 403                     Environmental Assessment (EA)
                                               Interstate standards. Interchanges and/                 Huck Street, Yoakum, Texas 77995;                     approved on December 18, 2014 the
                                               or slip ramps would be included to                      telephone (361) 293–4300.                             Finding of No Significant Impact
                                               provide necessary access to and around                     36. FM 457 at the Gulf Intracoastal                (FONSI) issued on December 18, 2014
                                               the facility. The proposed project length               Waterway (GIWW) in Matagorda                          and other documents in the TxDOT
                                               is 2.6 miles. The actions by TxDOT and                  County. TxDOT, Yoakum District,                       project file. The EA, FONSI and other
                                               Federal agencies and the laws under                     proposes to replace the FM 457 swing                  documents in the TxDOT project file are
                                               which such actions were taken are                       bridge that crosses the GIWW near                     available by contacting TxDOT at the
                                               described in the Final Environmental                    Sargent, Texas. The proposed project                  address provided above or the TxDOT
                                               Assessment (EA) approved on June 2,                     would replace the existing, at-grade,                 Dallas District Office, 4777 E Highway
                                               2015, the Finding of No Significant                     pontoon barge swing span and approach                 80, Mesquite, TX 75150; telephone (214)
                                               Impact (FONSI) issued on June 2, 2015                   spans with a new fixed-span, high-                    320–4480.
                                               and other documents in the TxDOT                        clearance structure with spiral                         Authority: 23 U.S.C. 139(l)(1).
                                               project file. The EA, FONSI and other                   approaches. The actions by TxDOT and
                                                                                                                                                               Issued on: September 19, 2018.
                                               documents in the TxDOT project file are                 Federal agencies and the laws under
                                               available by contacting TxDOT at the                    which such actions were taken are                     Michael T. Leary,
                                               address provided above or the TxDOT                     described in the Final Environmental                  Director, Planning and Program Development,
                                               Yoakum District Office, 403 Huck                        Assessment (EA) approved on March 1,                  Federal Highway Administration.
                                               Street, Yoakum, Texas 77995; telephone                  2016 the Finding of No Significant                    [FR Doc. 2018–20801 Filed 9–24–18; 8:45 am]
                                               (361) 293–4300.                                         Impact (FONSI) issued on March 1,                     BILLING CODE 4910–22–P
daltland on DSKBBV9HB2PROD with NOTICES




                                          VerDate Sep<11>2014   17:40 Sep 24, 2018   Jkt 244001   PO 00000   Frm 00108   Fmt 4703   Sfmt 9990   E:\FR\FM\25SEN1.SGM   25SEN1



Document Created: 2018-09-25 00:22:13
Document Modified: 2018-09-25 00:22:13
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of limitation on claims for judicial review of actions by TxDOT and Federal agencies.
DatesBy this notice, TxDOT is advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of TxDOT and Federal agency actions on the highway project will be barred unless the claim is filed on or before February 25, 2019. If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such a claim, then that shorter time period still applies.
ContactCarlos Swonke, Environmental Affairs Division, Texas Department of Transportation, 125 East 11th Street, Austin, Texas 78701; telephone: (512) 416-2734; email: [email protected] TxDOT's normal business hours are 8:00 a.m.- 5:00 p.m. (central time), Monday through Friday.
FR Citation83 FR 48510 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR