83_FR_50111 83 FR 49919 - Notice of Availability of Draft Environmental Assessment: KEI (Maine) Power Management (III) LLC

83 FR 49919 - Notice of Availability of Draft Environmental Assessment: KEI (Maine) Power Management (III) LLC

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 192 (October 3, 2018)

Page Range49919-49920
FR Document2018-21496

Federal Register, Volume 83 Issue 192 (Wednesday, October 3, 2018)
[Federal Register Volume 83, Number 192 (Wednesday, October 3, 2018)]
[Notices]
[Pages 49919-49920]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-21496]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2808-017]


Notice of Availability of Draft Environmental Assessment: KEI 
(Maine) Power Management (III) LLC

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's (Commission) 
regulations, 18 CFR part 380, the Office of Energy Projects has 
reviewed the subsequent license application for the Barker's Mill 
Hydroelectric Project, located on the Little Androscoggin River in 
Androscoggin County, Maine, and has prepared a draft Environmental 
Assessment (EA) for the project. The project does not occupy lands of 
the United States.
    The draft EA contains staff's analysis of the potential effects of 
continued operation and maintenance of the project and concludes that 
licensing the project, with appropriate environmental protection 
measures, would not constitute a major federal action that would 
significantly affect the quality of the human environment.
    A copy of the draft EA is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's website 
at http://www.ferc.gov/ using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits, in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
[email protected] or toll-free at 1-866-208-3676, or for TTY, 
(202) 502-8659.
    You may also register online at http://www.ferc.gov/docs-filing/ferconline.asp to be notified via email of new filings and issuances 
related to these or other pending projects. For assistance, contact 
FERC Online Support.
    Any comments should be filed within 30 days from the date of this 
notice.
    The Commission strongly encourages electronic filing. Please file 
comments using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 
6,000 characters,

[[Page 49920]]

without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and 
contact information at the end of your comments. For assistance, please 
contact FERC Online Support. In lieu of electronic filing, please send 
a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 
First Street NE, Washington, DC 20426. The first page of any filing 
should include docket number 2808-017.
    For further information, please contact Karen Sughrue at (202) 502-
8556 or by email at [email protected].

Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-21496 Filed 10-2-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                          Federal Register / Vol. 83, No. 192 / Wednesday, October 3, 2018 / Notices                                                 49919

                                                  Description: § 205(d) Rate Filing:                      Filed Date: 9/27/18.                               other information, call (866) 208–3676
                                               MAIT submits four ECSAs, Service                           Accession Number: 20180927–5074.                   (toll free). For TTY, call (202) 502–8659.
                                               Agreement Nos. 5024, 5025, 5027, and                       Comments Due: 5 p.m. ET 10/18/18.                    Dated: September 27, 2018.
                                               5031 to be effective 11/26/2018.                           Docket Numbers: ER18–2493–000.                     Nathaniel J. Davis, Sr.,
                                                  Filed Date: 9/26/18.                                    Applicants: Midcontinent                           Deputy Secretary.
                                                  Accession Number: 20180926–5157.                     Independent System Operator, Inc.
                                                  Comments Due: 5 p.m. ET 10/17/18.                                                                          [FR Doc. 2018–21495 Filed 10–2–18; 8:45 am]
                                                                                                          Description: § 205(d) Rate Filing:
                                                                                                                                                             BILLING CODE 6717–01–P
                                                  Docket Numbers: ER18–2486–000.                       2018–09–27_SA 3084 St. Joseph Phase
                                                  Applicants: San Diego Gas & Electric                 II–NIPSCO GIA 1st Rev (J351) to be
                                               Company.                                                effective 6/27/2018.                                  DEPARTMENT OF ENERGY
                                                  Description: § 205(d) Rate Filing:                      Filed Date: 9/27/18.
                                               SDGE IV SOLAR AGMT 57 V 11 LGIA                            Accession Number: 20180927–5079.                   Federal Energy Regulatory
                                               AMENDMENT to be effective 9/27/                            Comments Due: 5 p.m. ET 10/18/18.                  Commission
                                               2018.                                                      Docket Numbers: ER18–2494–000.
                                                  Filed Date: 9/26/18.                                                                                       [Project No. 2808–017]
                                                                                                          Applicants: Southwest Power Pool,
                                                  Accession Number: 20180926–5159.                     Inc.
                                                  Comments Due: 5 p.m. ET 10/17/18.                                                                          Notice of Availability of Draft
                                                                                                          Description: § 205(d) Rate Filing:                 Environmental Assessment: KEI
                                                  Docket Numbers: ER18–2487–000.                       2881R6 City of Chanute, KS NITSA                      (Maine) Power Management (III) LLC
                                                  Applicants: Rail Splitter Wind Farm,                 NOA to be effective 9/1/2018.
                                               LLC.                                                       Filed Date: 9/27/18.                                  In accordance with the National
                                                  Description: Baseline eTariff Filing:                   Accession Number: 20180927–5082.                   Environmental Policy Act of 1969 and
                                               Reactive Power Compensation Filing to                      Comments Due: 5 p.m. ET 10/18/18.                  the Federal Energy Regulatory
                                               be effective 11/26/2018.                                                                                      Commission’s (Commission)
                                                  Filed Date: 9/27/18.                                    Docket Numbers: ER18–2495–000.
                                                                                                          Applicants: PacifiCorp.                            regulations, 18 CFR part 380, the Office
                                                  Accession Number: 20180927–5035.                                                                           of Energy Projects has reviewed the
                                                  Comments Due: 5 p.m. ET 10/18/18.                       Description: § 205(d) Rate Filing:
                                                                                                       Orion Wind E&P Agmt to be effective 9/                subsequent license application for the
                                                  Docket Numbers: ER18–2488–000.                                                                             Barker’s Mill Hydroelectric Project,
                                                                                                       19/2018.
                                                  Applicants: Alabama Power                                                                                  located on the Little Androscoggin River
                                                                                                          Filed Date: 9/27/18.
                                               Company.                                                                                                      in Androscoggin County, Maine, and
                                                                                                          Accession Number: 20180927–5090.
                                                  Description: § 205(d) Rate Filing:                                                                         has prepared a draft Environmental
                                                                                                          Comments Due: 5 p.m. ET 10/18/18.
                                               Urban Grid Solar Projects (Chase Solar)                                                                       Assessment (EA) for the project. The
                                               LGIA Filing to be effective 9/13/2018.                     Take notice that the Commission                    project does not occupy lands of the
                                                  Filed Date: 9/27/18.                                 received the following electric                       United States.
                                                  Accession Number: 20180927–5055.                     reliability filings:                                     The draft EA contains staff’s analysis
                                                  Comments Due: 5 p.m. ET 10/18/18.                       Docket Numbers: RR18–11–000.                       of the potential effects of continued
                                                  Docket Numbers: ER18–2489–000.                          Applicants: North American Electric                operation and maintenance of the
                                                  Applicants: ISO New England Inc.                     Reliability Corporation, ReliabilityFirst             project and concludes that licensing the
                                                  Description: § 205(d) Rate Filing:                   Corporation, Midwest Reliability                      project, with appropriate environmental
                                               Ministerial Filing to Conform Sections                  Organization.                                         protection measures, would not
                                               III.2, III.12, III.13.7 and III.13.8 to be                 Description: Joint Petition of the                 constitute a major federal action that
                                               effective 6/1/2018.                                     North American Electric Reliability                   would significantly affect the quality of
                                                  Filed Date: 9/27/18.                                 Corporation, et al. for Approval of                   the human environment.
                                                  Accession Number: 20180927–5056.                     Registration Transfer Request of                         A copy of the draft EA is available for
                                                  Comments Due: 5 p.m. ET 10/18/18.                    Wisconsin Public Service Corporation                  review at the Commission in the Public
                                                  Docket Numbers: ER18–2490–000.                       and Upper Michigan Energy Resources.                  Reference Room or may be viewed on
                                                  Applicants: Arizona Public Service                      Filed Date: 9/26/18.                               the Commission’s website at http://
                                               Company.                                                   Accession Number: 20180926–5184.                   www.ferc.gov/ using the ‘‘eLibrary’’ link.
                                                  Description: Tariff Cancellation:                       Comments Due: 5 p.m. ET 10/16/18.                  Enter the docket number, excluding the
                                               Cancellation of Service Agreement No.                      The filings are accessible in the                  last three digits, in the docket number
                                               366 to be effective 11/27/2018.                         Commission’s eLibrary system by                       field to access the document. For
                                                  Filed Date: 9/27/18.                                 clicking on the links or querying the                 assistance, contact FERC Online
                                                  Accession Number: 20180927–5061.                     docket number.                                        Support at FERCOnlineSupport@
                                                  Comments Due: 5 p.m. ET 10/18/18.                       Any person desiring to intervene or                ferc.gov or toll-free at 1–866–208–3676,
                                                  Docket Numbers: ER18–2491–000.                       protest in any of the above proceedings               or for TTY, (202) 502–8659.
                                                  Applicants: Arizona Public Service                   must file in accordance with Rules 211                   You may also register online at http://
                                               Company.                                                and 214 of the Commission’s                           www.ferc.gov/docs-filing/ferconline.asp
                                                  Description: § 205(d) Rate Filing:                   Regulations (18 CFR 385.211 and                       to be notified via email of new filings
                                               Service Agreement No. 368—LCWCD to                      385.214) on or before 5:00 p.m. Eastern               and issuances related to these or other
                                               be effective 9/1/2018.                                  time on the specified comment date.                   pending projects. For assistance, contact
                                                  Filed Date: 9/27/18.                                 Protests may be considered, but                       FERC Online Support.
                                                  Accession Number: 20180927–5063.                     intervention is necessary to become a                    Any comments should be filed within
daltland on DSKBBV9HB2PROD with NOTICES




                                                  Comments Due: 5 p.m. ET 10/18/18.                    party to the proceeding.                              30 days from the date of this notice.
                                                  Docket Numbers: ER18–2492–000.                          eFiling is encouraged. More detailed                  The Commission strongly encourages
                                                  Applicants: FTS Master Tenant 2,                     information relating to filing                        electronic filing. Please file comments
                                               LLC.                                                    requirements, interventions, protests,                using the Commission’s eFiling system
                                                  Description: Baseline eTariff Filing:                service, and qualifying facilities filings            at http://www.ferc.gov/docs-filing/
                                               FTS Master Tenant 2 MBR Tariff to be                    can be found at: http://www.ferc.gov/                 efiling.asp. Commenters can submit
                                               effective 10/1/2018.                                    docs-filing/efiling/filing-req.pdf. For               brief comments up to 6,000 characters,


                                          VerDate Sep<11>2014   18:05 Oct 02, 2018   Jkt 247001   PO 00000   Frm 00015   Fmt 4703   Sfmt 4703   E:\FR\FM\03OCN1.SGM   03OCN1


                                               49920                      Federal Register / Vol. 83, No. 192 / Wednesday, October 3, 2018 / Notices

                                               without prior registration, using the                   which is on file with the Commission                  the proceeding. Only parties to the
                                               eComment system at http://                              and open to public inspection.                        proceeding can ask for court review of
                                               www.ferc.gov/docs-filing/                                  The filing is available for review at              Commission orders in the proceeding.
                                               ecomment.asp. You must include your                     the Commission in the Public Reference                   However, a person does not have to
                                               name and contact information at the end                 Room or may be viewed on the                          intervene in order to have comments
                                               of your comments. For assistance,                       Commission’s website at http://                       considered. The second way to
                                               please contact FERC Online Support. In                  www.ferc.gov using the ‘‘eLibrary’’ link.             participate is by filing with the
                                               lieu of electronic filing, please send a                Enter the docket number excluding the                 Secretary of the Commission, as soon as
                                               paper copy to: Secretary, Federal Energy                last three digits in the docket number                possible, an original and two copies of
                                               Regulatory Commission, 888 First Street                 field to access the document. For                     comments in support of or in opposition
                                               NE, Washington, DC 20426. The first                     assistance, contact FERC at                           to this project. The Commission will
                                               page of any filing should include docket                FERCOnlineSupport@ferc.gov or call                    consider these comments in
                                               number 2808–017.                                        toll-free, (886) 208–3676 or TYY, (202)               determining the appropriate action to be
                                                  For further information, please                      502–8659.                                             taken, but the filing of a comment alone
                                               contact Karen Sughrue at (202) 502–                        Any questions regarding this                       will not serve to make the filer a party
                                               8556 or by email at karen.sughrue@                      application should be directed to Mark                to the proceeding. The Commission’s
                                               ferc.gov.                                               C. Parker, P.E., Engineering Manager,                 rules require that persons filing
                                                                                                       Eastern Shore Natural Gas Company;                    comments in opposition to the project
                                               Nathaniel J. Davis, Sr.,                                500 Energy Lane, Suite 200, Dover, DE,
                                               Deputy Secretary.                                                                                             provide copies of their protests only to
                                                                                                       19901 at 1 (844) 366–3764, or by email                the party or parties directly involved in
                                               [FR Doc. 2018–21496 Filed 10–2–18; 8:45 am]             at maparker@esng.com.                                 the protest.
                                               BILLING CODE 6717–01–P                                     Pursuant to section 157.9 of the
                                                                                                       Commission’s rules (18 CFR 157.9),                       Persons who wish to comment only
                                                                                                       within 90 days of this Notice, the                    on the environmental review of this
                                               DEPARTMENT OF ENERGY                                    Commission staff will either: Complete                project should submit an original and
                                                                                                       its environmental assessment (EA) and                 two copies of their comments to the
                                               Federal Energy Regulatory                               place it into the Commission’s public                 Secretary of the Commission.
                                               Commission                                              record (eLibrary) for this proceeding; or             Environmental commentors will be
                                                                                                       issue a Notice of Schedule for                        placed on the Commission’s
                                               [Docket No. CP18–548–000]
                                                                                                       Environmental Review. If a Notice of                  environmental mailing list and will be
                                               Notice of Application: Eastern Shore                    Schedule for Environmental Review is                  notified of any meetings associated with
                                               Natural Gas Company                                     issued, it will indicate, among other                 the Commission’s environmental review
                                                                                                       milestones, the anticipated date for the              process. Environmental commentors
                                                 Take notice that on September 14,                     Commission staff’s issuance of the final              will not be required to serve copies of
                                               2018, Eastern Shore Natural Gas                         environmental impact statement (FEIS)                 filed documents on all other parties.
                                               Company (Eastern Shore), 500 Energy                     or EA for this proposal. The filing of the            However, the non-party commentors
                                               Lane, Suite 200, Dover, Delaware,                       EA in the Commission’s public record                  will not receive copies of all documents
                                               19901, filed in Docket No. CP18–548–                    for this proceeding or the issuance of a              filed by other parties or issued by the
                                               000 an application pursuant to section                  Notice of Schedule for Environmental                  Commission and will not have the right
                                               7(c) of the Natural Gas Act (NGA) and                   Review will serve to notify federal and               to seek court review of the
                                               Part 157 of the Commission’s                            state agencies of the timing for the                  Commission’s final order.
                                               regulations for authorization to                        completion of all necessary reviews, and                 As of the February 27, 2018 date of
                                               construct, own and operate: (i) About                   the subsequent need to complete all                   the Commission’s order in Docket No.
                                               4.9 miles of 16-inch-diameter loop line                 federal authorizations within 90 days of              CP16–4–001, the Commission will
                                               and appurtenant facilities in Kent                      the date of issuance of the Commission                apply its revised practice concerning
                                               County, Delaware; (ii) about 7.39 miles                 staff’s FEIS or EA.                                   out-of-time motions to intervene in any
                                               of 8-inch-diameter mainline extension                      There are two ways to become                       new Natural Gas Act section 3 or section
                                               and appurtenant facilities in Sussex                    involved in the Commission’s review of                7 proceeding.1 Persons desiring to
                                               County, Delaware; (iii) about 6.83 miles                this project. First, any person wishing to            become a party to a certificate
                                               of 10-inch-diameter mainline extension                  obtain legal status by becoming a party               proceeding are to intervene in a timely
                                               in Wicomico and Somerset Counties,                      to the proceedings for this project                   manner. If seeking to intervene out-of-
                                               Maryland; (iv) upgrades to an existing                  should, on or before the comment date                 time, the movant is required to ‘‘show
                                               pressure control facility, including 0.35               stated below, file with the Federal                   good cause why the time limitation
                                               miles of 10-inch-diameter mainline                      Energy Regulatory Commission, 888                     should be waived,’’ and should provide
                                               extension in Sussex County, Delaware;                   First Street NE, Washington, DC 20426,                justification by reference to factors set
                                               and (v) delivery point measurement and                  a motion to intervene in accordance                   forth in Rule 214(d)(1) of the
                                               regulating facilities in Sussex County,                 with the requirements of the                          Commission’s Rules and Regulations.2
                                               Delaware and Somerset County,                           Commission’s Rules of Practice and                       The Commission strongly encourages
                                               Maryland (Del-Mar Energy Pathway                        Procedure (18 CFR 385.214 or 385.211)                 electronic filings of comments, protests
                                               Project). Eastern Shore states that the                 and the Regulations under the NGA (18                 and interventions in lieu of paper using
                                               proposed facilities will result in an                   CFR 157.10). A person obtaining party                 the ‘‘eFiling’’ link at http://
                                               increase of 11,800 dekatherms per day                   status will be placed on the service list             www.ferc.gov. Persons unable to file
daltland on DSKBBV9HB2PROD with NOTICES




                                               of additional firm transportation service               maintained by the Secretary of the                    electronically should submit an original
                                               and 2,500 dekatherms per day of off-                    Commission and will receive copies of                 and 3 copies of the protest or
                                               peak transportation service, or 14,300                  all documents filed by the applicant and              intervention to the Federal Energy
                                               dekatherms per day total. Eastern Shore                 by all other parties. A party must submit
                                               estimates the cost of the Del-Mar Energy                3 copies of filings made with the                       1 Tennessee Gas Pipeline Company, L.L.C., 162
                                               Pathway Project to be $37,100,000, all as               Commission and must provide a copy to                 FERC ¶61,167 at ¶50 (2018).
                                               more fully set forth in the application                 the applicant and to every other party in               2 18 CFR 385.214(d)(1).




                                          VerDate Sep<11>2014   18:05 Oct 02, 2018   Jkt 247001   PO 00000   Frm 00016   Fmt 4703   Sfmt 4703   E:\FR\FM\03OCN1.SGM   03OCN1



Document Created: 2018-10-03 02:30:14
Document Modified: 2018-10-03 02:30:14
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 49919 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR