83_FR_54074 83 FR 53867 - Notice of Schedule for Environmental Review of the Adelphia Gateway Project: Adelphia Gateway, LLC

83 FR 53867 - Notice of Schedule for Environmental Review of the Adelphia Gateway Project: Adelphia Gateway, LLC

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 207 (October 25, 2018)

Page Range53867-53868
FR Document2018-23322

Federal Register, Volume 83 Issue 207 (Thursday, October 25, 2018)
[Federal Register Volume 83, Number 207 (Thursday, October 25, 2018)]
[Notices]
[Pages 53867-53868]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-23322]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-46-000]


Notice of Schedule for Environmental Review of the Adelphia 
Gateway Project: Adelphia Gateway, LLC

    On January 12, 2018, Adelphia Gateway, LLC (Adelphia) filed an 
application in Docket No. CP18-46-000 requesting a Certificate of 
Public Convenience and Necessity pursuant to Section 7(c) of the 
Natural Gas Act to construct and operate certain natural gas pipeline 
facilities, as well as acquire and convert an existing oil pipeline 
(southern segment) and an existing dual-phase oil and natural gas 
pipeline (northern segment) to natural gas only. On August 31, 2018, 
Adelphia filed an amendment to the application proposing to increase 
its proposed capacity on the northern segment, but would not result in 
any changes to the proposed facilities. The proposed project is located 
in both Pennsylvania and Delaware and is known as the Adelphia Gateway 
Project (Project). As amended, the Project would provide about 250 and 
350 million standard cubic feet of natural gas per day on the existing 
18-inch-diameter and 20-inch-diameter portions of the northern segment, 
respectively. The Project would also provide 250 million standard cubic 
feet of natural gas per day on the existing 18-inch-diameter southern 
segment to the greater Philadelphia industrial region with potential to 
serve additional markets in the northeast.
    On January 23, 2018, the Federal Energy Regulatory Commission 
(Commission or FERC) issued its Notice of Application for the Project. 
Among other things, that notice alerted agencies issuing federal 
authorizations of the requirement to complete all necessary reviews and 
to reach a final decision on a request for a federal authorization 
within 90 days of the date of issuance of the Commission staff's 
Environmental Assessment (EA) for the Project. This instant notice 
identifies the FERC staff's planned schedule for the completion of the 
EA for the Project.

Schedule for Environmental Review

Issuance of EA--January 4, 2019
90-day Federal Authorization Decision Deadline--April 4, 2019

    If a schedule change becomes necessary, additional notice will be 
provided so that the relevant agencies are kept informed of the 
Project's progress.

[[Page 53868]]

Project Description

    Adelphia Gateway proposes to acquire and convert the above 
referenced northern and southern segments and four existing meter 
stations to natural gas only, and construct and operate about 4.7 miles 
of new 16-inch-diameter natural gas pipeline, five meter stations with 
eight interconnects, seven blowdown assemblies, two mainline valves, 
and appurtenant facilities in Delaware, Bucks, Chester, Montgomery, and 
Northampton Counties, Pennsylvania, and New Castle County, Delaware. 
Additionally, Adelphia proposes to construct two new 5,625 horsepower 
compressor stations in Delaware and Bucks Counties, Pennsylvania.

Background

    On May 1, 2018, the Commission issued a Notice of Intent to Prepare 
an Environmental Assessment for the proposed Adelphia Gateway Project, 
Request for Comments on Environmental Issues, and Notice of Public 
Scoping Sessions (NOI). The NOI was sent to affected landowners; 
federal, state, and local government agencies; elected officials; 
Native American tribes; other interested parties; and local libraries 
and newspapers. In response to the NOI and during Project scoping, the 
Commission received comments from the U.S. Environmental Protection 
Agency, Pennsylvania Department of Transportation, local and state 
governments, non-governmental organizations, and more than 360 comment 
letters from residents. The primary issues raised by the commenters 
relate to safety and health concerns for residents and nearby 
communities, as well as concerns related to environmental impacts 
associated with the repurposing of the existing system to transport 
natural gas and construction of new natural gas infrastructure. Project 
stakeholders also generally expressed Project concerns about the 
following:
     Noise, safety, air quality, and visual impacts of the 
proposed compressor stations;
     effects on local communities, nearby properties, and 
property rights and values;
     direct harm to local communities, cultural and historical 
interests, and open space;
     water quality impacts, including erosion and stormwater 
runoff, and impacts on drinking water supplies;
     contaminated groundwater and soil;
     traffic impacts;
     impacts on tourism; and
     climate change.
    All substantive comments will be addressed in the EA.

Additional Information

    In order to receive notification of the issuance of the EA and to 
keep track of all formal issuances and submittals in specific dockets, 
the Commission offers a free service called eSubscription. This can 
reduce the amount of time you spend researching proceedings by 
automatically providing you with notification of these filings, 
document summaries, and direct links to the documents. Go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Additional information about the Project is available from the 
Commission's Office of External Affairs at (866) 208-FERC or on the 
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select 
``General Search'' from the eLibrary menu, enter the selected date 
range and ``Docket Number'' excluding the last three digits (i.e., 
CP18-46), and follow the instructions. For assistance with access to 
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at [email protected]. The eLibrary link on the FERC 
website also provides access to the texts of formal documents issued by 
the Commission, such as orders, notices, and rule makings.

    Dated: October 19, 2018.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2018-23322 Filed 10-24-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                           Federal Register / Vol. 83, No. 207 / Thursday, October 25, 2018 / Notices                                          53867

                                               ADDRESSES:DoubleTree Crystal City,                      DEPARTMENT OF ENERGY                                  DEPARTMENT OF ENERGY
                                               300 Army Navy Drive, Arlington, VA
                                               22202.                                                  Federal Energy Regulatory                             Federal Energy Regulatory
                                                                                                       Commission                                            Commission
                                               FOR FURTHER INFORMATION CONTACT:     Dr.
                                                                                                       [Docket No. EL18–36–000]                              [Docket No. CP18–46–000]
                                               Ian Rowe, Acting Designated Federal
                                               Officer, Office of Energy Efficiency and                City Water and Light Plant of the City                Notice of Schedule for Environmental
                                               Renewable Energy, U.S. Department of                    of Jonesboro; Notice of Filing                        Review of the Adelphia Gateway
                                               Energy, 1000 Independence Avenue                                                                              Project: Adelphia Gateway, LLC
                                               SW, Washington, DC 20585; at (202)                         Take notice that on October 16, 2018,
                                               586–7720 or email: Ian.Rowe@                            Midcontinent Independent System                          On January 12, 2018, Adelphia
                                                                                                       Operator, Inc. submitted a Compliance                 Gateway, LLC (Adelphia) filed an
                                               ee.doe.gov.
                                                                                                       Refund Report for City Water and Light                application in Docket No. CP18–46–000
                                               SUPPLEMENTARY INFORMATION:                              of the City of Jonesboro, pursuant to the             requesting a Certificate of Public
                                                                                                       Federal Energy Regulatory                             Convenience and Necessity pursuant to
                                                 Purpose of Meeting: To develop                                                                              Section 7(c) of the Natural Gas Act to
                                               advice and guidance that promotes                       Commission’s August 6, 2018 Order.1
                                                                                                          Any person desiring to intervene or to             construct and operate certain natural gas
                                               research and development leading to the                                                                       pipeline facilities, as well as acquire
                                                                                                       protest this filing must file in
                                               production of biobased fuels and                                                                              and convert an existing oil pipeline
                                                                                                       accordance with Rules 211 and 214 of
                                               biobased products.                                                                                            (southern segment) and an existing
                                                                                                       the Commission’s Rules of Practice and
                                                 Tentative Agenda: Agenda will                         Procedure (18 CFR 385.211, 385.214).                  dual-phase oil and natural gas pipeline
                                               include the following:                                  Protests will be considered by the                    (northern segment) to natural gas only.
                                                                                                       Commission in determining the                         On August 31, 2018, Adelphia filed an
                                               • Update on USDA Biomass R&D                                                                                  amendment to the application
                                                                                                       appropriate action to be taken, but will
                                                 Activities                                                                                                  proposing to increase its proposed
                                                                                                       not serve to make protestants parties to
                                               • Update on DOE Biomass R&D                             the proceeding. Any person wishing to                 capacity on the northern segment, but
                                                 Activities                                            become a party must file a notice of                  would not result in any changes to the
                                               • Presentations from government and                     intervention or motion to intervene, as               proposed facilities. The proposed
                                                                                                       appropriate. Such notices, motions, or                project is located in both Pennsylvania
                                                 industry that provide insights on the
                                                                                                       protests must be filed on or before the               and Delaware and is known as the
                                                 regulatory barriers impacting
                                                                                                       comment date. On or before the                        Adelphia Gateway Project (Project). As
                                                 bioenergy growth                                                                                            amended, the Project would provide
                                                                                                       comment date, it is not necessary to
                                                  Public Participation: In keeping with                serve motions to intervene or protests                about 250 and 350 million standard
                                               procedures, members of the public are                   on persons other than the Applicant.                  cubic feet of natural gas per day on the
                                               welcome to observe the business of the                     The Commission encourages                          existing 18-inch-diameter and 20-inch-
                                               Biomass Research and Development                        electronic submission of protests and                 diameter portions of the northern
                                               Technical Advisory Committee. To                        interventions in lieu of paper using the              segment, respectively. The Project
                                               attend the meeting and/or to make oral                  ‘‘eFiling’’ link at http://www.ferc.gov.              would also provide 250 million
                                               statements regarding any of the items on                Persons unable to file electronically                 standard cubic feet of natural gas per
                                               the agenda, you must contact Dr. Ian                    should submit an original and 5 copies                day on the existing 18-inch-diameter
                                               Rowe at (202) 586–7720 or email:                        of the protest or intervention to the                 southern segment to the greater
                                                                                                       Federal Energy Regulatory Commission,                 Philadelphia industrial region with
                                               Ian.Rowe@ee.doe.gov at least 5 business
                                                                                                       888 First Street NE, Washington, DC                   potential to serve additional markets in
                                               days prior to the meeting. Members of
                                                                                                       20426.                                                the northeast.
                                               the public will be heard in the order in                                                                         On January 23, 2018, the Federal
                                               which they sign up at the beginning of                     This filing is accessible on-line at
                                                                                                       http://www.ferc.gov, using the                        Energy Regulatory Commission
                                               the meeting. Reasonable provision will                                                                        (Commission or FERC) issued its Notice
                                               be made to include the scheduled oral                   ‘‘eLibrary’’ link and is available for
                                                                                                       review in the Commission’s Public                     of Application for the Project. Among
                                               statements on the agenda. The Co-chairs                                                                       other things, that notice alerted agencies
                                               of the Committee will make every effort                 Reference Room in Washington, DC.
                                                                                                       There is an ‘‘eSubscription’’ link on the             issuing federal authorizations of the
                                               to hear the views of all interested                                                                           requirement to complete all necessary
                                                                                                       website that enables subscribers to
                                               parties. If you would like to file a                                                                          reviews and to reach a final decision on
                                                                                                       receive email notification when a
                                               written statement with the Committee,                                                                         a request for a federal authorization
                                                                                                       document is added to a subscribed
                                               you may do so either before or after the                docket(s). For assistance with any FERC               within 90 days of the date of issuance
                                               meeting. The Co-chairs will conduct the                 Online service, please email                          of the Commission staff’s Environmental
                                               meeting to facilitate the orderly conduct               FERCOnlineSupport@ferc.gov, or call                   Assessment (EA) for the Project. This
                                               of business.                                            (866) 208–3676 (toll free). For TTY, call             instant notice identifies the FERC staff’s
                                                  Minutes: The summary of the meeting                  (202) 502–8659.                                       planned schedule for the completion of
                                                                                                          Comment Date: 5:00 p.m. Eastern                    the EA for the Project.
                                               will be available for public review and
                                               copying at http://biomassboard.gov/                     Time on November 6, 2018.                             Schedule for Environmental Review
                                               committee/meetings.html.                                  Dated: October 19, 2018.                            Issuance of EA—January 4, 2019
daltland on DSKBBV9HB2PROD with NOTICES




                                                 Signed in Washington, DC, on October 19,              Kimberly D. Bose,                                     90-day Federal Authorization Decision
                                               2018.                                                   Secretary.                                               Deadline—April 4, 2019
                                               LaTanya Butler,                                         [FR Doc. 2018–23321 Filed 10–24–18; 8:45 am]             If a schedule change becomes
                                               Deputy Committee Management Officer.                    BILLING CODE 6717–01–P                                necessary, additional notice will be
                                                                                                                                                             provided so that the relevant agencies
                                               [FR Doc. 2018–23272 Filed 10–24–18; 8:45 am]
                                                                                                         1 City Water and Light Plant of the City of         are kept informed of the Project’s
                                               BILLING CODE 6450–01–P
                                                                                                       Jonesboro, 164 FERC ¶ 61,089 (August 6, 2018).        progress.


                                          VerDate Sep<11>2014   18:10 Oct 24, 2018   Jkt 247001   PO 00000   Frm 00021   Fmt 4703   Sfmt 4703   E:\FR\FM\25OCN1.SGM   25OCN1


                                               53868                       Federal Register / Vol. 83, No. 207 / Thursday, October 25, 2018 / Notices

                                               Project Description                                       All substantive comments will be                    during the permit term. A preliminary
                                                 Adelphia Gateway proposes to                          addressed in the EA.                                  permit does not authorize the permit
                                               acquire and convert the above                                                                                 holder to perform any land-disturbing
                                                                                                       Additional Information
                                               referenced northern and southern                                                                              activities or otherwise enter upon lands
                                                                                                          In order to receive notification of the            or waters owned by others without the
                                               segments and four existing meter
                                                                                                       issuance of the EA and to keep track of               owners’ express permission.
                                               stations to natural gas only, and
                                                                                                       all formal issuances and submittals in                   The proposed project would consist of
                                               construct and operate about 4.7 miles of
                                                                                                       specific dockets, the Commission offers               the following: (1) A 150-foot-long, 25-
                                               new 16-inch-diameter natural gas
                                                                                                       a free service called eSubscription. This             foot-high trash screen; (2) a 180-foot-
                                               pipeline, five meter stations with eight                                                                      long, 80-foot-wide intake channel, at the
                                                                                                       can reduce the amount of time you
                                               interconnects, seven blowdown                                                                                 east abutment of the Corps’ existing
                                                                                                       spend researching proceedings by
                                               assemblies, two mainline valves, and                                                                          spillway; (3) four 10-foot-diameter, 60-
                                                                                                       automatically providing you with
                                               appurtenant facilities in Delaware,                                                                           foot-long steel siphon penstocks; (4) a
                                                                                                       notification of these filings, document
                                               Bucks, Chester, Montgomery, and                                                                               100-foot-long, 50-foot-wide powerhouse
                                                                                                       summaries, and direct links to the
                                               Northampton Counties, Pennsylvania,                                                                           containing four generating units with a
                                                                                                       documents. Go to www.ferc.gov/docs-
                                               and New Castle County, Delaware.                                                                              total combined capacity of 8.0
                                                                                                       filing/esubscription.asp.
                                               Additionally, Adelphia proposes to                                                                            megawatts; (5) a 120-foot-long, 100-foot-
                                                                                                          Additional information about the
                                               construct two new 5,625 horsepower                                                                            wide tailrace; and (6) a 0.6-mile-long
                                                                                                       Project is available from the
                                               compressor stations in Delaware and                                                                           transmission line. The proposed project
                                                                                                       Commission’s Office of External Affairs
                                               Bucks Counties, Pennsylvania.                                                                                 would have an estimated average annual
                                                                                                       at (866) 208–FERC or on the FERC
                                               Background                                              website (www.ferc.gov). Using the                     generation of 52,000 megawatt-hours,
                                                                                                       ‘‘eLibrary’’ link, select ‘‘General Search’’          and operate run-of-river utilizing
                                                  On May 1, 2018, the Commission                                                                             surplus water from the John C. Stennis
                                               issued a Notice of Intent to Prepare an                 from the eLibrary menu, enter the
                                                                                                       selected date range and ‘‘Docket                      Lock & Dam, as directed by the Corps.
                                               Environmental Assessment for the                                                                                 Applicant Contact: Mr. Jeremy Wells,
                                               proposed Adelphia Gateway Project,                      Number’’ excluding the last three digits
                                                                                                       (i.e., CP18–46), and follow the                       Wells Engineering, LLC, 101 Yearwood
                                               Request for Comments on                                                                                       Drive, Macon, Georgia 31206; phone:
                                               Environmental Issues, and Notice of                     instructions. For assistance with access
                                                                                                       to eLibrary, the helpline can be reached              (478) 238–3054.
                                               Public Scoping Sessions (NOI). The NOI                                                                           FERC Contact: Michael Spencer, (202)
                                               was sent to affected landowners; federal,               at (866) 208–3676, TTY (202) 502–8659,
                                                                                                       or at FERCOnlineSupport@ferc.gov. The                 502–6093, michael.spencer@ferc.gov.
                                               state, and local government agencies;                                                                            Deadline for filing comments, motions
                                               elected officials; Native American tribes;              eLibrary link on the FERC website also
                                                                                                                                                             to intervene, competing applications
                                               other interested parties; and local                     provides access to the texts of formal
                                                                                                                                                             (without notices of intent), or notices of
                                               libraries and newspapers. In response to                documents issued by the Commission,
                                                                                                                                                             intent to file competing applications: 60
                                               the NOI and during Project scoping, the                 such as orders, notices, and rule
                                                                                                                                                             days from the issuance of this notice.
                                               Commission received comments from                       makings.
                                                                                                                                                             Competing applications and notices of
                                               the U.S. Environmental Protection                         Dated: October 19, 2018.                            intent must meet the requirements of 18
                                               Agency, Pennsylvania Department of                      Kimberly D. Bose,                                     CFR 4.36.
                                               Transportation, local and state                         Secretary.                                               The Commission strongly encourages
                                               governments, non-governmental                           [FR Doc. 2018–23322 Filed 10–24–18; 8:45 am]          electronic filing. Please file comments,
                                               organizations, and more than 360                        BILLING CODE 6717–01–P
                                                                                                                                                             motions to intervene, notices of intent,
                                               comment letters from residents. The                                                                           and competing applications using the
                                               primary issues raised by the                                                                                  Commission’s eFiling system at http://
                                               commenters relate to safety and health                  DEPARTMENT OF ENERGY                                  www.ferc.gov/docs-filing/efiling.asp.
                                               concerns for residents and nearby                                                                             Commenters can submit brief comments
                                               communities, as well as concerns                        Federal Energy Regulatory                             up to 6,000 characters, without prior
                                               related to environmental impacts                        Commission                                            registration, using the eComment system
                                               associated with the repurposing of the                                                                        at http://www.ferc.gov/docs-filing/
                                                                                                       [Project No. 14882–000]
                                               existing system to transport natural gas                                                                      ecomment.asp. You must include your
                                               and construction of new natural gas                     Notice of Preliminary Permit                          name and contact information at the end
                                               infrastructure. Project stakeholders also               Application Accepted for Filing and                   of your comments. For assistance,
                                               generally expressed Project concerns                    Soliciting Comments, Motions To                       please contact FERC Online Support at
                                               about the following:                                    Intervene, and Competing                              FERCOnlineSupport@ferc.gov, (866)
                                                  • Noise, safety, air quality, and visual             Applications: Tenn-Tom Hydro, LLC                     208–3676 (toll free), or (202) 502–8659
                                               impacts of the proposed compressor                                                                            (TTY). In lieu of electronic filing, please
                                               stations;                                                  On July 5, 2018, Tenn-Tom Hydro,                   send a paper copy to: Secretary, Federal
                                                  • effects on local communities,                      LLC, filed an application for a                       Energy Regulatory Commission, 888
                                               nearby properties, and property rights                  preliminary permit, pursuant to section               First Street NE, Washington, DC 20426.
                                               and values;                                             4(f) of the Federal Power Act (FPA),                  The first page of any filing should
                                                  • direct harm to local communities,                  proposing to study the feasibility of the             include docket number P–14882–000.
                                               cultural and historical interests, and                  Stennis Hydropower Project (Stennis                      More information about this project,
                                               open space;                                             Project or project) to be located at the              including a copy of the application, can
daltland on DSKBBV9HB2PROD with NOTICES




                                                  • water quality impacts, including                   U.S. Army Corps of Engineers’ (Corps)                 be viewed or printed on the ‘‘eLibrary’’
                                               erosion and stormwater runoff, and                      John C. Stennis Lock and Dam on the                   link of Commission’s website at http://
                                               impacts on drinking water supplies;                     Tennessee-Tombigbee Waterway, in                      www.ferc.gov/docs-filing/elibrary.asp.
                                                  • contaminated groundwater and soil;                 Lowndes County, Mississippi. The sole                 Enter the docket number (P–14882) in
                                                  • traffic impacts;                                   purpose of a preliminary permit, if                   the docket number field to access the
                                                  • impacts on tourism; and                            issued, is to grant the permit holder                 document. For assistance, contact FERC
                                                  • climate change.                                    priority to file a license application                Online Support.


                                          VerDate Sep<11>2014   18:10 Oct 24, 2018   Jkt 247001   PO 00000   Frm 00022   Fmt 4703   Sfmt 4703   E:\FR\FM\25OCN1.SGM   25OCN1



Document Created: 2018-10-25 01:43:19
Document Modified: 2018-10-25 01:43:19
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 53867 