83_FR_54075 83 FR 53868 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications: Tenn-Tom Hydro, LLC

83 FR 53868 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications: Tenn-Tom Hydro, LLC

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 207 (October 25, 2018)

Page Range53868-53869
FR Document2018-23324

Federal Register, Volume 83 Issue 207 (Thursday, October 25, 2018)
[Federal Register Volume 83, Number 207 (Thursday, October 25, 2018)]
[Notices]
[Pages 53868-53869]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-23324]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14882-000]


Notice of Preliminary Permit Application Accepted for Filing and 
Soliciting Comments, Motions To Intervene, and Competing Applications: 
Tenn-Tom Hydro, LLC

    On July 5, 2018, Tenn-Tom Hydro, LLC, filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of the Stennis Hydropower 
Project (Stennis Project or project) to be located at the U.S. Army 
Corps of Engineers' (Corps) John C. Stennis Lock and Dam on the 
Tennessee-Tombigbee Waterway, in Lowndes County, Mississippi. The sole 
purpose of a preliminary permit, if issued, is to grant the permit 
holder priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.
    The proposed project would consist of the following: (1) A 150-
foot-long, 25-foot-high trash screen; (2) a 180-foot-long, 80-foot-wide 
intake channel, at the east abutment of the Corps' existing spillway; 
(3) four 10-foot-diameter, 60-foot-long steel siphon penstocks; (4) a 
100-foot-long, 50-foot-wide powerhouse containing four generating units 
with a total combined capacity of 8.0 megawatts; (5) a 120-foot-long, 
100-foot-wide tailrace; and (6) a 0.6-mile-long transmission line. The 
proposed project would have an estimated average annual generation of 
52,000 megawatt-hours, and operate run-of-river utilizing surplus water 
from the John C. Stennis Lock & Dam, as directed by the Corps.
    Applicant Contact: Mr. Jeremy Wells, Wells Engineering, LLC, 101 
Yearwood Drive, Macon, Georgia 31206; phone: (478) 238-3054.
    FERC Contact: Michael Spencer, (202) 502-6093, 
[email protected].
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-14882-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's website at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14882) in the docket number field to access 
the document. For assistance, contact FERC Online Support.


[[Page 53869]]


    Dated: October 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-23324 Filed 10-24-18; 8:45 am]
 BILLING CODE 6717-01-P



                                               53868                       Federal Register / Vol. 83, No. 207 / Thursday, October 25, 2018 / Notices

                                               Project Description                                       All substantive comments will be                    during the permit term. A preliminary
                                                 Adelphia Gateway proposes to                          addressed in the EA.                                  permit does not authorize the permit
                                               acquire and convert the above                                                                                 holder to perform any land-disturbing
                                                                                                       Additional Information
                                               referenced northern and southern                                                                              activities or otherwise enter upon lands
                                                                                                          In order to receive notification of the            or waters owned by others without the
                                               segments and four existing meter
                                                                                                       issuance of the EA and to keep track of               owners’ express permission.
                                               stations to natural gas only, and
                                                                                                       all formal issuances and submittals in                   The proposed project would consist of
                                               construct and operate about 4.7 miles of
                                                                                                       specific dockets, the Commission offers               the following: (1) A 150-foot-long, 25-
                                               new 16-inch-diameter natural gas
                                                                                                       a free service called eSubscription. This             foot-high trash screen; (2) a 180-foot-
                                               pipeline, five meter stations with eight                                                                      long, 80-foot-wide intake channel, at the
                                                                                                       can reduce the amount of time you
                                               interconnects, seven blowdown                                                                                 east abutment of the Corps’ existing
                                                                                                       spend researching proceedings by
                                               assemblies, two mainline valves, and                                                                          spillway; (3) four 10-foot-diameter, 60-
                                                                                                       automatically providing you with
                                               appurtenant facilities in Delaware,                                                                           foot-long steel siphon penstocks; (4) a
                                                                                                       notification of these filings, document
                                               Bucks, Chester, Montgomery, and                                                                               100-foot-long, 50-foot-wide powerhouse
                                                                                                       summaries, and direct links to the
                                               Northampton Counties, Pennsylvania,                                                                           containing four generating units with a
                                                                                                       documents. Go to www.ferc.gov/docs-
                                               and New Castle County, Delaware.                                                                              total combined capacity of 8.0
                                                                                                       filing/esubscription.asp.
                                               Additionally, Adelphia proposes to                                                                            megawatts; (5) a 120-foot-long, 100-foot-
                                                                                                          Additional information about the
                                               construct two new 5,625 horsepower                                                                            wide tailrace; and (6) a 0.6-mile-long
                                                                                                       Project is available from the
                                               compressor stations in Delaware and                                                                           transmission line. The proposed project
                                                                                                       Commission’s Office of External Affairs
                                               Bucks Counties, Pennsylvania.                                                                                 would have an estimated average annual
                                                                                                       at (866) 208–FERC or on the FERC
                                               Background                                              website (www.ferc.gov). Using the                     generation of 52,000 megawatt-hours,
                                                                                                       ‘‘eLibrary’’ link, select ‘‘General Search’’          and operate run-of-river utilizing
                                                  On May 1, 2018, the Commission                                                                             surplus water from the John C. Stennis
                                               issued a Notice of Intent to Prepare an                 from the eLibrary menu, enter the
                                                                                                       selected date range and ‘‘Docket                      Lock & Dam, as directed by the Corps.
                                               Environmental Assessment for the                                                                                 Applicant Contact: Mr. Jeremy Wells,
                                               proposed Adelphia Gateway Project,                      Number’’ excluding the last three digits
                                                                                                       (i.e., CP18–46), and follow the                       Wells Engineering, LLC, 101 Yearwood
                                               Request for Comments on                                                                                       Drive, Macon, Georgia 31206; phone:
                                               Environmental Issues, and Notice of                     instructions. For assistance with access
                                                                                                       to eLibrary, the helpline can be reached              (478) 238–3054.
                                               Public Scoping Sessions (NOI). The NOI                                                                           FERC Contact: Michael Spencer, (202)
                                               was sent to affected landowners; federal,               at (866) 208–3676, TTY (202) 502–8659,
                                                                                                       or at FERCOnlineSupport@ferc.gov. The                 502–6093, michael.spencer@ferc.gov.
                                               state, and local government agencies;                                                                            Deadline for filing comments, motions
                                               elected officials; Native American tribes;              eLibrary link on the FERC website also
                                                                                                                                                             to intervene, competing applications
                                               other interested parties; and local                     provides access to the texts of formal
                                                                                                                                                             (without notices of intent), or notices of
                                               libraries and newspapers. In response to                documents issued by the Commission,
                                                                                                                                                             intent to file competing applications: 60
                                               the NOI and during Project scoping, the                 such as orders, notices, and rule
                                                                                                                                                             days from the issuance of this notice.
                                               Commission received comments from                       makings.
                                                                                                                                                             Competing applications and notices of
                                               the U.S. Environmental Protection                         Dated: October 19, 2018.                            intent must meet the requirements of 18
                                               Agency, Pennsylvania Department of                      Kimberly D. Bose,                                     CFR 4.36.
                                               Transportation, local and state                         Secretary.                                               The Commission strongly encourages
                                               governments, non-governmental                           [FR Doc. 2018–23322 Filed 10–24–18; 8:45 am]          electronic filing. Please file comments,
                                               organizations, and more than 360                        BILLING CODE 6717–01–P
                                                                                                                                                             motions to intervene, notices of intent,
                                               comment letters from residents. The                                                                           and competing applications using the
                                               primary issues raised by the                                                                                  Commission’s eFiling system at http://
                                               commenters relate to safety and health                  DEPARTMENT OF ENERGY                                  www.ferc.gov/docs-filing/efiling.asp.
                                               concerns for residents and nearby                                                                             Commenters can submit brief comments
                                               communities, as well as concerns                        Federal Energy Regulatory                             up to 6,000 characters, without prior
                                               related to environmental impacts                        Commission                                            registration, using the eComment system
                                               associated with the repurposing of the                                                                        at http://www.ferc.gov/docs-filing/
                                                                                                       [Project No. 14882–000]
                                               existing system to transport natural gas                                                                      ecomment.asp. You must include your
                                               and construction of new natural gas                     Notice of Preliminary Permit                          name and contact information at the end
                                               infrastructure. Project stakeholders also               Application Accepted for Filing and                   of your comments. For assistance,
                                               generally expressed Project concerns                    Soliciting Comments, Motions To                       please contact FERC Online Support at
                                               about the following:                                    Intervene, and Competing                              FERCOnlineSupport@ferc.gov, (866)
                                                  • Noise, safety, air quality, and visual             Applications: Tenn-Tom Hydro, LLC                     208–3676 (toll free), or (202) 502–8659
                                               impacts of the proposed compressor                                                                            (TTY). In lieu of electronic filing, please
                                               stations;                                                  On July 5, 2018, Tenn-Tom Hydro,                   send a paper copy to: Secretary, Federal
                                                  • effects on local communities,                      LLC, filed an application for a                       Energy Regulatory Commission, 888
                                               nearby properties, and property rights                  preliminary permit, pursuant to section               First Street NE, Washington, DC 20426.
                                               and values;                                             4(f) of the Federal Power Act (FPA),                  The first page of any filing should
                                                  • direct harm to local communities,                  proposing to study the feasibility of the             include docket number P–14882–000.
                                               cultural and historical interests, and                  Stennis Hydropower Project (Stennis                      More information about this project,
                                               open space;                                             Project or project) to be located at the              including a copy of the application, can
daltland on DSKBBV9HB2PROD with NOTICES




                                                  • water quality impacts, including                   U.S. Army Corps of Engineers’ (Corps)                 be viewed or printed on the ‘‘eLibrary’’
                                               erosion and stormwater runoff, and                      John C. Stennis Lock and Dam on the                   link of Commission’s website at http://
                                               impacts on drinking water supplies;                     Tennessee-Tombigbee Waterway, in                      www.ferc.gov/docs-filing/elibrary.asp.
                                                  • contaminated groundwater and soil;                 Lowndes County, Mississippi. The sole                 Enter the docket number (P–14882) in
                                                  • traffic impacts;                                   purpose of a preliminary permit, if                   the docket number field to access the
                                                  • impacts on tourism; and                            issued, is to grant the permit holder                 document. For assistance, contact FERC
                                                  • climate change.                                    priority to file a license application                Online Support.


                                          VerDate Sep<11>2014   18:10 Oct 24, 2018   Jkt 247001   PO 00000   Frm 00022   Fmt 4703   Sfmt 4703   E:\FR\FM\25OCN1.SGM   25OCN1


                                                                           Federal Register / Vol. 83, No. 207 / Thursday, October 25, 2018 / Notices                                              53869

                                                 Dated: October 19, 2018.                                 The Commission strongly encourages                    ENVIRONMENTAL PROTECTION
                                               Kimberly D. Bose,                                       electronic filing. Please file comments                  AGENCY
                                               Secretary.                                              using the Commission’s eFiling system
                                                                                                                                                                [EPA–RO7–OW–2018–0678; FRL–9985–46-
                                               [FR Doc. 2018–23324 Filed 10–24–18; 8:45 am]            at http://www.ferc.gov/docs-filing/                      Region 7]
                                               BILLING CODE 6717–01–P                                  efiling.asp. Commenters can submit
                                                                                                       brief comments up to 6,000 characters,                   Notice of Approval of the Primacy
                                                                                                       without prior registration, using the                    Application for National Primary
                                               DEPARTMENT OF ENERGY                                    eComment system at http://www.ferc.                      Drinking Water Regulations for the
                                                                                                       gov/docs-filing/ecomment.asp. You                        State of Nebraska
                                               Federal Energy Regulatory                               must include your name and contact
                                               Commission                                                                                                       AGENCY:   Environmental Protection
                                                                                                       information at the end of your
                                                                                                                                                                Agency (EPA).
                                               [Project No. 13212–005—Alaska]                          comments. For assistance, please
                                                                                                                                                                ACTION: Notice of approval and
                                                                                                       contact FERC Online Support. In lieu of
                                               Notice of Availability of the Draft                     electronic filing, please send a paper                   solicitation of requests for a public
                                               Environmental Impact Statement for                      copy to: Secretary, Federal Energy                       hearing.
                                               the Kenai Hydro, LLC Proposed Grant                     Regulatory Commission, 888 First Street
                                               Lake Hydroelectric Project                                                                                       SUMMARY:   The Environmental Protection
                                                                                                       NE, Washington, DC 20426. The first                      Agency (EPA) is hereby giving notice
                                                  In accordance with the National                      page of any filing should include docket                 that the State of Nebraska is revising its
                                               Environmental Policy Act of 1969 and                    number P–13212–005.                                      approved Public Water System
                                               the Federal Energy Regulatory                              Anyone may intervene in this                          Supervision Program under the
                                               Commission’s (Commission)                               proceeding based on this draft EIS (18                   Nebraska Department of Health and
                                               regulations, 18 CFR part 380, the Office                CFR 380.10). You must file your request                  Human Services. EPA has determined
                                               of Energy Projects has reviewed the                     to intervene as specified above.1 You do                 that these revisions are no less stringent
                                               application for license for the proposed                                                                         than the corresponding Federal
                                                                                                       not need intervenor status to have your
                                               Grant Lake Hydroelectric Project (FERC                                                                           regulations. Therefore, the EPA intends
                                                                                                       comments considered.
                                               No. 13212) and has prepared a draft                                                                              to approve these program revisions. Any
                                               environmental impact statement (EIS)                       Commission staff will hold two public                 interested person, other than Federal
                                               for the project. The proposed project                   meetings for the purpose of receiving                    Agencies, may request a public hearing.
                                               would be located on Grant Lake and                      comments on the draft EIS. The daytime                   If a substantial request for a public
                                               Grant Creek, near the community of                      meeting will focus on resource agency,                   hearing is made within the requested
                                               Moose Pass, in Kenai Peninsula                          Indian tribes, and non-governmental                      thirty-day time frame, a public hearing
                                               Borough, Alaska, and occupy 1,688.7                     organization comments, while the                         will be held and a notice will be given
                                               acres of federal lands within the                       evening meeting is primarily for                         in the Federal Register and a newspaper
                                               Chugach National Forest, administered                   receiving input from the public. All                     of general circulation. Frivolous or
                                               by U.S. Department of Agriculture,                      interested individuals and entities will                 insubstantial requests for a hearing may
                                               Forest Service (Forest Service).                        be invited to attend one or both of the                  be denied by the Regional
                                                  The draft EIS contains staff’s                       public meetings. The times and                           Administrator.
                                               evaluations of the applicant’s proposal                 locations of the meetings are as follows:
                                               and the alternatives for licensing the                                                                           DATES:  This determination shall become
                                               proposed Grant Lake Hydroelectric. The                  Daytime Meeting                                          final and effective on November 26,
                                               draft EIS documents the views of                          Date and Time: Wednesday,                              2018, unless a timely and appropriate
                                               governmental agencies, non-                                                                                      request for a public hearing is received
                                                                                                           November 28, at 1:00 p.m. (Local
                                               governmental organizations, affected                                                                             or the Regional Administrator elects to
                                                                                                           Time)
                                               Indian tribes, the public, the license                                                                           hold a public hearing on his own
                                                                                                         Location: Moose Pass Community                         motion. A request for a public hearing
                                               applicant, and Commission staff.                            Hall, Mile 29.5 Seward Highway,
                                                  A copy of the draft EIS is available for                                                                      must be submitted to the Regional
                                                                                                           Moose Pass, AK 99631                                 Administrator at the address shown
                                               review in the Commission’s Public
                                               Reference Branch, Room 2A, located at                   Evening Meeting                                          below by November 26, 2018. If no
                                               888 First Street NE, Washington, DC                                                                              timely and appropriate request for a
                                                                                                         Date and Time: Wednesday,
                                               20426. The draft EIS also may be viewed                                                                          hearing is received, and the Regional
                                                                                                           November 28, at 7:00 p.m. (Local
                                               on the Commission’s website at http://                                                                           Administrator does not elect to hold a
                                                                                                           Time)
                                               www.ferc.gov under the eLibrary link.                                                                            hearing on his own motion, this
                                                                                                         Location: Moose Pass Community                         determination will become effective on
                                               Enter the docket number excluding the
                                                                                                           Hall, Mile 29.5 Seward Highway,                      November 26, 2018.
                                               last three digits in the docket number
                                               field to access the document. For                           Moose Pass, AK 99631                                 ADDRESSES: Requests for Public Hearing
                                               assistance, contact FERC Online                           For further information, please                        shall be addressed to: Regional
                                               Support at FERCOnlineSupport@                           contact Kenneth Hogan at (202) 502–                      Administrator, Environmental
                                               ferc.gov, (866) 208–3676 (toll free), or                8434 or at kenneth.hogan@ferc.gov.                       Protection Agency, Region 7, 11201
                                               (202) 502–8659 (TTY).                                                                                            Renner Blvd., Lenexa, Kansas 66219.
                                                                                                         Dated: October 19, 2018.                               Requests for a public hearing shall
                                                  You may also register online at http://
                                               www.ferc.gov/docs-filing/                               Kimberly D. Bose,                                        include the following information:
daltland on DSKBBV9HB2PROD with NOTICES




                                               esubscription.asp to be notified via                    Secretary.                                               Name, address and telephone number of
                                               email of new filings and issuances                      [FR Doc. 2018–23323 Filed 10–24–18; 8:45 am]             the individual, organization or other
                                               related to this or other pending projects.              BILLING CODE 6717–01–P
                                                                                                                                                                entity requesting a hearing; a brief
                                               For assistance, contact FERC Online                                                                              statement of the requesting person’s
                                               Support.                                                  1 Interventions may also be filed electronically via   interest in the Regional Administrator’s
                                                  All comments must be filed by                        the internet in lieu of paper. See the previous          determination and a brief statement on
                                               December 10, 2018.                                      discussion on filing comments electronically.            information that the requesting person


                                          VerDate Sep<11>2014   18:10 Oct 24, 2018   Jkt 247001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\25OCN1.SGM   25OCN1



Document Created: 2018-10-25 01:45:47
Document Modified: 2018-10-25 01:45:47
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 53868 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR