83_FR_5442 83 FR 5416 - Commission Information Collection Activities (Ferc-725x); Comment Request; Extension

83 FR 5416 - Commission Information Collection Activities (Ferc-725x); Comment Request; Extension

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 26 (February 7, 2018)

Page Range5416-5417
FR Document2018-02408

In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-725X (Mandatory Reliability Standards: Voltage and Reactive (VAR) Standards).

Federal Register, Volume 83 Issue 26 (Wednesday, February 7, 2018)
[Federal Register Volume 83, Number 26 (Wednesday, February 7, 2018)]
[Notices]
[Pages 5416-5417]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-02408]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC18-9-000]


Commission Information Collection Activities (Ferc-725x); Comment 
Request; Extension

AGENCY: Federal Energy Regulatory Commission.

ACTION: Notice of information collection and request for comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is soliciting public comment on the currently approved 
information collection, FERC-725X (Mandatory Reliability Standards: 
Voltage and Reactive (VAR) Standards).

DATES: Comments on the collection of information are due April 9, 2018.

ADDRESSES: You may submit comments (identified by Docket No. IC18-9-
000) by either of the following methods:
     eFiling at Commission's website: http://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE, 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at [email protected], or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT:  Ellen Brown may be reached by email 
at [email protected], telephone at (202) 502-8663, and fax at 
(202) 273-0873.

SUPPLEMENTARY INFORMATION: Title: FERC-725X, Mandatory Reliability 
Standards: Voltage and Reactive (VAR) Standards.
    OMB Control No.: 1902-0278.
    Type of Request: Three-year extension of the FERC-725X information 
collection requirements with no changes to the current reporting 
requirements.
    Abstract: Pursuant to Section 215 of the Federal Power Act (FPA), 
NERC established the Voltage and Reactive (``VAR'') group of 
Reliability Standards, which consists of two continent-wide Reliability 
Standards, VAR-001-4 and VAR-002-3. These two standards were designed 
to maintain voltage stability on the Bulk-Power System, protect 
transmission, generation, distribution, and customer equipment, and 
support the reliable operation of the Bulk-Power System. Voltage 
stability is the ability of a power system to maintain acceptable 
voltage levels throughout the system under normal operating conditions 
and following a disturbance. Failure to maintain acceptable voltage 
levels (i.e., voltage levels become too high or too low) may cause 
violations of System Operating Limits (``SOLs'') and Interconnection 
Reliability Operating Limits (``IROLs''), result in damage to Bulk-
Power System equipment, and thereby threaten the reliable operation of 
the Bulk-Power System.

Reliability Standard VAR-001-4 \1\
---------------------------------------------------------------------------

    \1\ Applies to transmission operators only.
---------------------------------------------------------------------------

     Specify a system-wide voltage schedule (which is either a 
range or a target value with an associated tolerance band) as part of 
its plan to operate within SOLs and IROLs, and to provide the voltage 
schedule to its Reliability Coordinator and adjacent Transmission 
Operators upon request (Requirement R1);
     Schedule sufficient reactive resources to regulate voltage 
levels (Requirement R2);
     Operate or direct the operation of devices to regulate 
transmission voltage and reactive flows (Requirement R3);
     Develop a set of criteria to exempt generators from 
certain requirements under Reliability Standard VAR-002-3 related to 
voltage or Reactive Power schedules, automatic voltage regulations, and 
notification (Requirement R4);
     Specify a voltage or Reactive Power schedule (which is 
either a range or a target value with an associated tolerance band) for 
generators at either the high or low voltage side of the generator 
step-up transformer, provide the schedule to the associated Generator 
Operator, direct the Generator Operator to comply with that schedule in 
automatic voltage control mode, provide the Generator Operator the 
notification requirements for deviating from the schedule, and, if 
requested, provide the Generator Operator the criteria used to develop 
the schedule (Requirement R5); and
     Communicate step-up transformer tap changes, the time 
frame for completion, and the justification for these changes to 
Generator Owners (Requirement R6).

Reliability Standard VAR-002-3 \2\
---------------------------------------------------------------------------

    \2\ Applies to transmission operators only.
---------------------------------------------------------------------------

     Operate each of its generators connected to the 
interconnected transmission system in automatic voltage control mode or 
in a different control mode as instructed by the Transmission Operator, 
unless the Generator Operator (1) is exempted pursuant to the criteria 
developed under VAR-001-4, Requirement R4, or (2) makes certain 
notifications to the Transmission Operator specifying the reasons it 
cannot so operate (Requirement R1);
     Maintain the Transmission Operator's generator voltage or 
Reactive Power schedule, unless the Generator Operator (1) is exempted 
pursuant to the criteria developed under VAR-001-4,

[[Page 5417]]

Requirement R4, or (2) complies with the notification requirements for 
deviations as established by the Transmission Owner pursuant to VAR-
001-4, Requirement R5 (Requirement R2);
     Notify the Transmission Operator of a change in status of 
its voltage controlling device within 30 minutes, unless the status is 
restored within that time period (Requirement R3); and
     Notify the Transmission Operator of a change in reactive 
capability due to factors other than those described in VAR-002-3, 
Requirement R3 within 30 minutes unless the capability has been 
restored during that time period (Requirement R4).
     Provide information on its step-up transformers and 
auxiliary transformers within 30 days of a request from the 
Transmission Operator or Transmission Planner (Requirement R5); and
     Comply with the Transmission Operator's step-up 
transformer tap change directives unless compliance would violate 
safety, an equipment rating, or applicable laws, rules or regulations 
(Requirement R6).
    Type of Respondents: Generator owners and transmission operators.
    Estimate of Annual Burden \3\: The Commission estimates the annual 
public reporting burden for the information collection as:
---------------------------------------------------------------------------

    \3\ The Commission defines burden as the total time, effort, or 
financial resources expended by persons to generate, maintain, 
retain, or disclose or provide information to or for a Federal 
agency. For further explanation of what is included in the 
information collection burden, reference 5 Code of Federal 
Regulations 1320.3.

                                                        FERC-725X, Mandatory Reliability Standards: Voltage and Reactive (VAR) Standards
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                  Annual  number
                                      Number of  respondents \4\   of responses    Total number    Average  burden and cost per response    Total annual burden hours and total      Cost per
                                                                  per respondent   of responses                     \5\                                 annual cost               respondent ($)
                                      (1).......................             (2)     (1) * (2) =  (4)...................................  (3) * (4) = (5).......................       (5) / (1)
                                                                                             (3)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
VAR-001-4...........................  181 (TOP).................               1             181  160 hrs.;.............................  28,960 hrs.;..........................      $10,899.20
(Requirement R1)....................                                                              $10,899.20............................  $1,972,755............................
VAR-002-3...........................  944 (GOP).................               1             944  80 hrs.;..............................  75,520 hrs.;..........................        5,449.60
(Requirement R1)....................                                                              5,449.60..............................  5,144,422.............................
VAR-002-3...........................  944 (GOP).................               1             944  120 hrs.;.............................  113,280 hrs.;.........................        8,174.40
(Requirement R2)....................                                                              8,174.40..............................  7,716,634.............................
                                     -----------------------------------------------------------------------------------------------------------------------------------------------------------
    Total...........................  ..........................           1,932  ..............  217,760 hrs.;.........................  ......................................
                                                                                                  14,833,811............................
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.
---------------------------------------------------------------------------

    \4\ TOP = transmission operator; GOP = generator operators.
    \5\ The estimate for hourly cost is $68.12/hour. This figure is 
the average salary plus benefits for an electrical engineer 
(Occupation Code: 17-2071) from the Bureau of Labor Statistics at 
https://www.bls.gov/oes/current/naics2_22.htm.

    Dated: February 1, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-02408 Filed 2-6-18; 8:45 am]
BILLING CODE 6717-01-P



                                                5416                       Federal Register / Vol. 83, No. 26 / Wednesday, February 7, 2018 / Notices

                                                authorization, under 18 CFR part 34, of                 725X (Mandatory Reliability Standards:                thereby threaten the reliable operation
                                                future issuances of securities and                      Voltage and Reactive (VAR) Standards).                of the Bulk-Power System.
                                                assumptions of liability, is February 21,               DATES: Comments on the collection of                  Reliability Standard VAR–001–4 1
                                                2018.                                                   information are due April 9, 2018.
                                                   The Commission encourages                                                                                    • Specify a system-wide voltage
                                                                                                        ADDRESSES: You may submit comments                    schedule (which is either a range or a
                                                electronic submission of protests and
                                                                                                        (identified by Docket No. IC18–9–000)                 target value with an associated tolerance
                                                interventions in lieu of paper, using the
                                                                                                        by either of the following methods:                   band) as part of its plan to operate
                                                FERC Online links at http://
                                                                                                           • eFiling at Commission’s website:                 within SOLs and IROLs, and to provide
                                                www.ferc.gov. To facilitate electronic
                                                                                                        http://www.ferc.gov/docs-filing/                      the voltage schedule to its Reliability
                                                service, persons with internet access
                                                                                                        efiling.asp.                                          Coordinator and adjacent Transmission
                                                who will eFile a document and/or be
                                                listed as a contact for an intervenor                      • Mail/Hand Delivery/Courier:                      Operators upon request (Requirement
                                                must create and validate an                             Federal Energy Regulatory Commission,                 R1);
                                                eRegistration account using the                         Secretary of the Commission, 888 First                  • Schedule sufficient reactive
                                                eRegistration link. Select the eFiling                  Street NE, Washington, DC 20426.                      resources to regulate voltage levels
                                                link to log on and submit the                              Instructions: All submissions must be              (Requirement R2);
                                                intervention or protests.                               formatted and filed in accordance with                  • Operate or direct the operation of
                                                   Persons unable to file electronically                submission guidelines at: http://                     devices to regulate transmission voltage
                                                should submit an original and 5 copies                  www.ferc.gov/help/submission-                         and reactive flows (Requirement R3);
                                                of the intervention or protest to the                   guide.asp. For user assistance contact                  • Develop a set of criteria to exempt
                                                Federal Energy Regulatory Commission,                   FERC Online Support by email at                       generators from certain requirements
                                                888 First Street NE, Washington, DC                     ferconlinesupport@ferc.gov, or by phone               under Reliability Standard VAR–002–3
                                                20426.                                                  at: (866) 208–3676 (toll-free), or (202)              related to voltage or Reactive Power
                                                   The filings in the above-referenced                  502–8659 for TTY.                                     schedules, automatic voltage
                                                proceeding are accessible in the                           Docket: Users interested in receiving              regulations, and notification
                                                Commission’s eLibrary system by                         automatic notification of activity in this            (Requirement R4);
                                                clicking on the appropriate link in the                 docket or in viewing/downloading                        • Specify a voltage or Reactive Power
                                                above list. They are also available for                 comments and issuances in this docket                 schedule (which is either a range or a
                                                electronic review in the Commission’s                   may do so at http://www.ferc.gov/docs-                target value with an associated tolerance
                                                Public Reference Room in Washington,                    filing/docs-filing.asp.                               band) for generators at either the high or
                                                DC. There is an eSubscription link on                   FOR FURTHER INFORMATION CONTACT:                      low voltage side of the generator step-
                                                the website that enables subscribers to                 Ellen Brown may be reached by email                   up transformer, provide the schedule to
                                                receive email notification when a                       at DataClearance@FERC.gov, telephone                  the associated Generator Operator,
                                                document is added to a subscribed                       at (202) 502–8663, and fax at (202) 273–              direct the Generator Operator to comply
                                                docket(s). For assistance with any FERC                 0873.                                                 with that schedule in automatic voltage
                                                Online service, please email                                                                                  control mode, provide the Generator
                                                                                                        SUPPLEMENTARY INFORMATION: Title:
                                                FERCOnlineSupport@ferc.gov. or call                                                                           Operator the notification requirements
                                                                                                        FERC–725X, Mandatory Reliability
                                                (866) 208–3676 (toll free). For TTY, call                                                                     for deviating from the schedule, and, if
                                                                                                        Standards: Voltage and Reactive (VAR)
                                                (202) 502–8659.                                                                                               requested, provide the Generator
                                                                                                        Standards.
                                                                                                                                                              Operator the criteria used to develop the
                                                  Dated: February 1, 2018.                                 OMB Control No.: 1902–0278.
                                                                                                                                                              schedule (Requirement R5); and
                                                Nathaniel J. Davis, Sr.,                                   Type of Request: Three-year extension                • Communicate step-up transformer
                                                Deputy Secretary.                                       of the FERC–725X information                          tap changes, the time frame for
                                                [FR Doc. 2018–02407 Filed 2–6–18; 8:45 am]
                                                                                                        collection requirements with no changes               completion, and the justification for
                                                                                                        to the current reporting requirements.                these changes to Generator Owners
                                                BILLING CODE 6717–01–P
                                                                                                           Abstract: Pursuant to Section 215 of               (Requirement R6).
                                                                                                        the Federal Power Act (FPA), NERC
                                                                                                        established the Voltage and Reactive                  Reliability Standard VAR–002–3 2
                                                DEPARTMENT OF ENERGY
                                                                                                        (‘‘VAR’’) group of Reliability Standards,                • Operate each of its generators
                                                Federal Energy Regulatory                               which consists of two continent-wide                  connected to the interconnected
                                                Commission                                              Reliability Standards, VAR–001–4 and                  transmission system in automatic
                                                                                                        VAR–002–3. These two standards were                   voltage control mode or in a different
                                                [Docket No. IC18–9–000]                                 designed to maintain voltage stability on             control mode as instructed by the
                                                                                                        the Bulk-Power System, protect                        Transmission Operator, unless the
                                                Commission Information Collection
                                                                                                        transmission, generation, distribution,               Generator Operator (1) is exempted
                                                Activities (Ferc–725x); Comment
                                                                                                        and customer equipment, and support                   pursuant to the criteria developed under
                                                Request; Extension
                                                                                                        the reliable operation of the Bulk-Power              VAR–001–4, Requirement R4, or (2)
                                                AGENCY: Federal Energy Regulatory                       System. Voltage stability is the ability of           makes certain notifications to the
                                                Commission.                                             a power system to maintain acceptable                 Transmission Operator specifying the
                                                ACTION: Notice of information collection                voltage levels throughout the system                  reasons it cannot so operate
                                                and request for comments.                               under normal operating conditions and                 (Requirement R1);
                                                                                                        following a disturbance. Failure to                      • Maintain the Transmission
sradovich on DSK3GMQ082PROD with NOTICES




                                                SUMMARY:  In compliance with the                        maintain acceptable voltage levels (i.e.,             Operator’s generator voltage or Reactive
                                                requirements of the Paperwork                           voltage levels become too high or too                 Power schedule, unless the Generator
                                                Reduction Act of 1995, the Federal                      low) may cause violations of System                   Operator (1) is exempted pursuant to the
                                                Energy Regulatory Commission                            Operating Limits (‘‘SOLs’’) and                       criteria developed under VAR–001–4,
                                                (Commission or FERC) is soliciting                      Interconnection Reliability Operating
                                                public comment on the currently                         Limits (‘‘IROLs’’), result in damage to                 1 Applies   to transmission operators only.
                                                approved information collection, FERC–                  Bulk-Power System equipment, and                        2 Applies   to transmission operators only.



                                           VerDate Sep<11>2014   18:17 Feb 06, 2018   Jkt 244001   PO 00000   Frm 00017   Fmt 4703   Sfmt 4703   E:\FR\FM\07FEN1.SGM   07FEN1


                                                                                Federal Register / Vol. 83, No. 26 / Wednesday, February 7, 2018 / Notices                                                                                  5417

                                                Requirement R4, or (2) complies with                                • Notify the Transmission Operator of                                   • Comply with the Transmission
                                                the notification requirements for                                a change in reactive capability due to                                   Operator’s step-up transformer tap
                                                deviations as established by the                                 factors other than those described in                                    change directives unless compliance
                                                Transmission Owner pursuant to VAR–                              VAR–002–3, Requirement R3 within 30                                      would violate safety, an equipment
                                                001–4, Requirement R5 (Requirement                               minutes unless the capability has been                                   rating, or applicable laws, rules or
                                                R2);                                                             restored during that time period                                         regulations (Requirement R6).
                                                                                                                 (Requirement R4).                                                          Type of Respondents: Generator
                                                  • Notify the Transmission Operator of
                                                                                                                    • Provide information on its step-up                                  owners and transmission operators.
                                                a change in status of its voltage                                transformers and auxiliary transformers                                    Estimate of Annual Burden 3: The
                                                controlling device within 30 minutes,                            within 30 days of a request from the                                     Commission estimates the annual public
                                                unless the status is restored within that                        Transmission Operator or Transmission                                    reporting burden for the information
                                                time period (Requirement R3); and                                Planner (Requirement R5); and                                            collection as:

                                                                   FERC–725X, MANDATORY RELIABILITY STANDARDS: VOLTAGE AND REACTIVE (VAR) STANDARDS
                                                                                                              Annual                                               Average                           Total annual burden
                                                                                 Number of                   number of        Total number                     burden and cost                      hours and total annual             Cost per
                                                                               respondents 4              responses per       of responses                      per response 5                               cost                   respondent ($)
                                                                                                            respondent

                                                                                        (1)                    (2)            (1) * (2) = (3)                            (4)                            (3) * (4) = (5)                (5) ÷ (1)

                                                VAR–001–4 .............        181 (TOP) ......                         1                     181        160 hrs.; .........................    28,960 hrs.; ....................      $10,899.20
                                                (Requirement R1) ...                                                                                     $10,899.20 .....................       $1,972,755 .....................
                                                VAR–002–3 .............        944 (GOP) .....                          1                      944       80 hrs.; ...........................   75,520 hrs.; ....................         5,449.60
                                                (Requirement R1) ...                                                                                     5,449.60 .........................     5,144,422 .......................
                                                VAR–002–3 .............        944 (GOP) .....                          1                      944       120 hrs.; .........................    113,280 hrs.; ..................          8,174.40
                                                (Requirement R2) ...                                                                                     8,174.40 .........................     7,716,634 .......................

                                                     Total .................   ........................              1,932   ........................    217,760 hrs.; ..................       .
                                                                                                                                                         14,833,811 .....................



                                                  Comments: Comments are invited on:                             DEPARTMENT OF ENERGY                                                       Applicants: Atmos Pipeline-Texas.
                                                (1) Whether the collection of                                                                                                               Description: Tariff filing per
                                                information is necessary for the proper                          Federal Energy Regulatory                                                284.123(b),(e)/: Amendment to Non
                                                performance of the functions of the                              Commission                                                               Statutory Filing Jan 2018 to be effective
                                                Commission, including whether the                                                                                                         9/1/2017.
                                                                                                                 Combined Notice of Filings                                                 Filed Date: 1/25/18.
                                                information will have practical utility;
                                                                                                                                                                                            Accession Number: 201801255165.
                                                (2) the accuracy of the agency’s estimate                          Take notice that the Commission has                                      Comments/Protests Due: 5 p.m. ET 2/
                                                of the burden and cost of the collection                         received the following Natural Gas                                       15/18.
                                                of information, including the validity of                        Pipeline Rate and Refund Report filings:
                                                                                                                                                                                            Docket Numbers: RP18–374–000.
                                                the methodology and assumptions used;                            Filings Instituting Proceedings                                            Applicants: Gulf South Pipeline
                                                (3) ways to enhance the quality, utility                                                                                                  Company, LP.
                                                and clarity of the information collection;                         Docket Number: PR18–26–000.
                                                                                                                   Applicants: Southern California Gas                                      Description: Compliance filing
                                                and (4) ways to minimize the burden of                                                                                                    Second Compliance Filing in Docket
                                                the collection of information on those                           Company.
                                                                                                                   Description: Tariff filing per                                         No. CP15–517–000 to be effective 2/1/
                                                who are to respond, including the use                                                                                                     2018.
                                                                                                                 284.123(b),(e)+(g): OSHD Rate Revision
                                                of automated collection techniques or                                                                                                       Filed Date: 1/30/18.
                                                                                                                 Filing to be effective 1/1/2018.
                                                other forms of information technology.                                                                                                      Accession Number: 20180130–5009.
                                                                                                                   Filed Date: 1/30/18.                                                     Comments Due: 5 p.m. ET 2/12/18.
                                                  Dated: February 1, 2018.                                         Accession Number: 201801305012.
                                                                                                                   Comments Due: 5 p.m. ET 2/20/18.                                         Docket Numbers: RP18–375–000.
                                                Kimberly D. Bose,                                                                                                                           Applicants: Rockies Express Pipeline
                                                Secretary.                                                         284.123(g) Protests Due: 5 p.m. ET 4/                                  LLC.
                                                [FR Doc. 2018–02408 Filed 2–6–18; 8:45 am]
                                                                                                                 2/18.                                                                      Description: § 4(d) Rate Filing: Neg
                                                BILLING CODE 6717–01–P
                                                                                                                   Docket Number: PR17–60–001.                                            Rate 2018–01–30 Antero to be effective
                                                                                                                   Applicants: Atmos Pipeline-Texas.                                      2/1/2018.
                                                                                                                   Description: Tariff filing per                                           Filed Date: 1/30/18.
                                                                                                                 284.123(b),(e)/: Amendment to Non                                          Accession Number: 20180130–5155.
                                                                                                                 Statutory Filing Jan 2018.                                                 Comments Due: 5 p.m. ET 2/12/18.
                                                                                                                   Filed Date: 1/25/18.                                                     Docket Numbers: RP18–376–000.
                                                                                                                   Accession Number: 201801255005.                                          Applicants: Natural Gas Pipeline
                                                                                                                   Comments/Protests Due: 5 p.m. ET 2/                                    Company of America.
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                 15/18.                                                                     Description: § 4(d) Rate Filing:
                                                                                                                   Docket Number: PR17–60–002.                                            Amended Negotiated Rate Agreement-
                                                  3 The Commission defines burden as the total                   information collection burden, reference 5 Code of                         5 The estimate for hourly cost is $68.12/hour.

                                                time, effort, or financial resources expended by                 Federal Regulations 1320.3.                                              This figure is the average salary plus benefits for an
                                                persons to generate, maintain, retain, or disclose or              4 TOP = transmission operator; GOP = generator                         electrical engineer (Occupation Code: 17–2071)
                                                provide information to or for a Federal agency. For              operators.                                                               from the Bureau of Labor Statistics at https://
                                                further explanation of what is included in the                                                                                            www.bls.gov/oes/current/naics2_22.htm.



                                           VerDate Sep<11>2014      18:17 Feb 06, 2018        Jkt 244001    PO 00000    Frm 00018      Fmt 4703         Sfmt 4703     E:\FR\FM\07FEN1.SGM            07FEN1



Document Created: 2018-10-26 13:55:59
Document Modified: 2018-10-26 13:55:59
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of information collection and request for comments.
DatesComments on the collection of information are due April 9, 2018.
ContactEllen Brown may be reached by email at [email protected], telephone at (202) 502-8663, and fax at (202) 273-0873.
FR Citation83 FR 5416 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR