Boston Energy Trading and Marketing LLC (BETM or Applicant) has applied for authorization to transmit electric energy from the United States to Canada pursuant to the Federal Power Act.

Federal Register, Volume 83 Issue 216 (Wednesday, November 7, 2018)
[Federal Register Volume 83, Number 216 (Wednesday, November 7, 2018)]
[Notices]
[Page 55707]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-24353]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[OE Docket No. EA-463]


Application To Export Electric Energy; Boston Energy Trading and 
Marketing LLC

AGENCY: Office of Electricity, Department of Energy (DOE).

ACTION: Notice of application.

-----------------------------------------------------------------------

SUMMARY: Boston Energy Trading and Marketing LLC (BETM or Applicant) 
has applied for authorization to transmit electric energy from the 
United States to Canada pursuant to the Federal Power Act.

DATES: Comments, protests, or motions to intervene must be submitted on 
or before December 7, 2018.

ADDRESSES: Comments, protests, motions to intervene, or requests for 
more information should be addressed to: Office of Electricity, Mail 
Code: OE-20, U.S. Department of Energy, 1000 Independence Avenue SW, 
Washington, DC 20585-0350. Because of delays in handling conventional 
mail, it is recommended that documents be transmitted by overnight 
mail, by electronic mail to [email protected], or by 
facsimile to 202-586-8008.

SUPPLEMENTARY INFORMATION: Exports of electricity from the United 
States to a foreign country are regulated by the Department of Energy 
(DOE) pursuant to sections 301(b) and 402(f) of the Department of 
Energy Organization Act (42 U.S.C. 7151(b) and 7172(f)) and require 
authorization under section 202(e) of the Federal Power Act (16 U.S.C. 
824a(e)).
    On October 19, 2018, DOE received an application from BETM for 
authorization to transmit electric energy from the United States to 
Canada as a power marketer for a five-year term using existing 
international transmission facilities. BETM is also certified as a 
Qualified Scheduling Entity with the Electric Reliability Council of 
Texas and is registered as a wholesale power marketer with the Public 
Utility Commission of Texas.
    In its application, BETM states that it ``does not own, operate, or 
control any electric power supply system in the United States'' and 
that it ``does not have a franchised service area.'' The electric 
energy that the Applicant proposes to export to Canada would be surplus 
energy purchased from third parties such as electric utilities and 
other suppliers within the United States pursuant to voluntary 
agreements. The existing international transmission facilities to be 
utilized by BETM have previously been authorized by Presidential 
Permits issued pursuant to Executive Order 10485, as amended, and are 
appropriate for open access transmission by third parties.
    Procedural Matters: Any person desiring to be heard in this 
proceeding should file a comment or protest to the application at the 
address provided above. Protests should be filed in accordance with 
Rule 211 of the Federal Energy Regulatory Commission's Rules of 
Practice and Procedure (18 CFR 385.211). Any person desiring to become 
a party to these proceedings should file a motion to intervene at the 
above address in accordance with FERC Rule 214 (18 CFR 385.214). Five 
(5) copies of such comments, protests, or motions to intervene should 
be sent to the address provided above on or before the date listed 
above.
    Comments and other filings concerning BETM's application to export 
electric energy to Canada should be clearly marked with OE Docket No. 
EA-463. An additional copy is to be provided to both Jay Goldman, 
Boston Energy Trading and Marketing LLC, 1 International Place, 9th 
Floor, Boston, MA 02110, and Tracey L. Bradley, Bracewell LLP, 2001 M 
Street NW, Suite 900, Washington, DC 20036.
    A final decision will be made on this application after the 
environmental impacts have been evaluated pursuant to DOE's National 
Environmental Policy Act Implementing Procedures (10 CFR part 1021) and 
after a determination is made by DOE that the proposed action will not 
have an adverse impact on the sufficiency of supply or reliability of 
the U.S. electric power supply system.
    Copies of this application will be made available, upon request, 
for public inspection and copying at the address provided above, by 
accessing the program website at http://energy.gov/node/11845, or by 
emailing Angela Troy at [email protected].

    Signed in Washington, DC, on November 1, 2018.
Christopher Lawrence,
Management and Program Analyst, Transmission Permitting and Technical 
Assistance, Office of Electricity.
[FR Doc. 2018-24353 Filed 11-6-18; 8:45 am]
 BILLING CODE 6450-01-P



                                                                       Federal Register / Vol. 83, No. 216 / Wednesday, November 7, 2018 / Notices                                           55707

                                                Signed in Washington, DC, on November 1,              United States’’ and that it ‘‘does not                DEPARTMENT OF ENERGY
                                              2018.                                                   have a franchised service area.’’ The
                                              Christopher Lawrence,                                   electric energy that the Applicant                    Federal Energy Regulatory
                                              Management and Program Analyst,                         proposes to export to Canada would be                 Commission
                                              Transmission Permitting and Technical                   surplus energy purchased from third                   [Project No. 2883–009]
                                              Assistance, Office of Electricity.                      parties such as electric utilities and
                                              [FR Doc. 2018–24358 Filed 11–6–18; 8:45 am]             other suppliers within the United States              Notice of Scoping Meetings and
                                              BILLING CODE 6450–01–P                                  pursuant to voluntary agreements. The                 Environmental Site Review and
                                                                                                      existing international transmission                   Soliciting Scoping Comments
                                                                                                      facilities to be utilized by BETM have
                                              DEPARTMENT OF ENERGY                                    previously been authorized by                           Take notice that the following
                                                                                                      Presidential Permits issued pursuant to               hydroelectric application has been filed
                                              [OE Docket No. EA–463]
                                                                                                      Executive Order 10485, as amended,                    with the Commission and is available
                                              Application To Export Electric Energy;                  and are appropriate for open access                   for public inspection.
                                              Boston Energy Trading and Marketing                     transmission by third parties.                          a. Type of Application: New Major
                                              LLC                                                        Procedural Matters: Any person                     License.
                                                                                                      desiring to be heard in this proceeding                 b. Project No.: 2883–009.
                                              AGENCY: Office of Electricity,                          should file a comment or protest to the                 c. Date filed: May 30, 2018.
                                              Department of Energy (DOE).                             application at the address provided                     d. Applicant: Aquenergy Systems,
                                              ACTION: Notice of application.                          above. Protests should be filed in                    LLC.
                                                                                                                                                              e. Name of Project: Fries
                                                                                                      accordance with Rule 211 of the Federal
                                              SUMMARY:   Boston Energy Trading and                                                                          Hydroelectric Project.
                                                                                                      Energy Regulatory Commission’s Rules
                                              Marketing LLC (BETM or Applicant) has                                                                           f. Location: On the New River in the
                                                                                                      of Practice and Procedure (18 CFR
                                              applied for authorization to transmit                                                                         Town of Fries, Grayson County,
                                                                                                      385.211). Any person desiring to
                                              electric energy from the United States to                                                                     Virginia. No federal lands are occupied
                                                                                                      become a party to these proceedings
                                              Canada pursuant to the Federal Power                                                                          by the project works or located within
                                                                                                      should file a motion to intervene at the
                                              Act.                                                                                                          the project boundary.
                                                                                                      above address in accordance with FERC
                                                                                                                                                              g. Filed Pursuant to: Federal Power
                                              DATES:   Comments, protests, or motions                 Rule 214 (18 CFR 385.214). Five (5)
                                                                                                                                                            Act, 16 U.S.C. 791(a)–825(r).
                                              to intervene must be submitted on or                    copies of such comments, protests, or                   h. Applicant Contact: Ms. Beth E.
                                              before December 7, 2018.                                motions to intervene should be sent to                Harris, P.E., Southeast Regional
                                              ADDRESSES: Comments, protests,                          the address provided above on or before               Manager, Enel Green Power North
                                              motions to intervene, or requests for                   the date listed above.                                America, Inc., 11 Anderson Street,
                                              more information should be addressed                       Comments and other filings
                                                                                                                                                            Piedmont, SC 29673, Phone: (864) 846–
                                              to: Office of Electricity, Mail Code: OE–               concerning BETM’s application to
                                                                                                                                                            0042 ext. 100, Email: beth.harris@
                                              20, U.S. Department of Energy, 1000                     export electric energy to Canada should
                                                                                                                                                            enel.com, or Mr. Kevin Webb, Hydro
                                              Independence Avenue SW, Washington,                     be clearly marked with OE Docket No.
                                                                                                                                                            Licensing Manager, Enel Green Power
                                              DC 20585–0350. Because of delays in                     EA–463. An additional copy is to be
                                                                                                                                                            North America, Inc., 100 Brickstone
                                              handling conventional mail, it is                       provided to both Jay Goldman, Boston
                                                                                                                                                            Square, Suite 300, Andover, MA 01810,
                                              recommended that documents be                           Energy Trading and Marketing LLC, 1
                                                                                                                                                            Phone: (978) 935–6039, Email:
                                              transmitted by overnight mail, by                       International Place, 9th Floor, Boston,
                                                                                                                                                            kevin.webb@enel.com.
                                              electronic mail to Electricity.Exports@                 MA 02110, and Tracey L. Bradley,                        i. FERC Contact: Brandi Sangunett,
                                              hq.doe.gov, or by facsimile to 202–586–                 Bracewell LLP, 2001 M Street NW, Suite                Phone: 202–502–8393, Email:
                                              8008.                                                   900, Washington, DC 20036.                            brandi.sangunett@ferc.gov.
                                              SUPPLEMENTARY INFORMATION: Exports of
                                                                                                         A final decision will be made on this                j. Deadline for filing scoping
                                              electricity from the United States to a                 application after the environmental                   comments: January 7, 2019.
                                              foreign country are regulated by the                    impacts have been evaluated pursuant                    The Commission strongly encourages
                                              Department of Energy (DOE) pursuant to                  to DOE’s National Environmental Policy                electronic filing. Please file motions to
                                              sections 301(b) and 402(f) of the                       Act Implementing Procedures (10 CFR                   intervene and protests using the
                                              Department of Energy Organization Act                   part 1021) and after a determination is               Commission’s eFiling system at http://
                                              (42 U.S.C. 7151(b) and 7172(f)) and                     made by DOE that the proposed action                  www.ferc.gov/docs-filing/efiling.asp. For
                                              require authorization under section                     will not have an adverse impact on the                assistance, please contact FERC Online
                                              202(e) of the Federal Power Act (16                     sufficiency of supply or reliability of the           Support at FERCOnlineSupport@
                                              U.S.C. 824a(e)).                                        U.S. electric power supply system.                    ferc.gov, (866) 208–3676 (toll free), or
                                                 On October 19, 2018, DOE received an                    Copies of this application will be                 (202) 502–8659 (TTY). In lieu of
                                              application from BETM for                               made available, upon request, for public              electronic filing, please send a paper
                                              authorization to transmit electric energy               inspection and copying at the address                 copy to: Secretary, Federal Energy
                                              from the United States to Canada as a                   provided above, by accessing the                      Regulatory Commission, 888 First Street
                                              power marketer for a five-year term                     program website at http://energy.gov/                 NE, Washington, DC 20426. The first
                                              using existing international                            node/11845, or by emailing Angela Troy                page of any filing should include docket
                                              transmission facilities. BETM is also                   at Angela.Troy@hq.doe.gov.                            number P–2883–009.
                                              certified as a Qualified Scheduling                       Signed in Washington, DC, on November 1,              The Commission’s Rules of Practice
amozie on DSK3GDR082PROD with NOTICES1




                                              Entity with the Electric Reliability                    2018.                                                 require all intervenors filing documents
                                              Council of Texas and is registered as a                 Christopher Lawrence,                                 with the Commission to serve a copy of
                                              wholesale power marketer with the                       Management and Program Analyst,                       that document on each person on the
                                              Public Utility Commission of Texas.                     Transmission Permitting and Technical                 official service list for the project.
                                                 In its application, BETM states that it              Assistance, Office of Electricity.                    Further, if an intervenor files comments
                                              ‘‘does not own, operate, or control any                 [FR Doc. 2018–24353 Filed 11–6–18; 8:45 am]           or documents with the Commission
                                              electric power supply system in the                     BILLING CODE 6450–01–P                                relating to the merits of an issue that


                                         VerDate Sep<11>2014   17:46 Nov 06, 2018   Jkt 247001   PO 00000   Frm 00020   Fmt 4703   Sfmt 4703   E:\FR\FM\07NON1.SGM   07NON1



Document Created: 2018-11-07 00:05:00
Document Modified: 2018-11-07 00:05:00
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of application.
DatesComments, protests, or motions to intervene must be submitted on or before December 7, 2018.
FR Citation83 FR 55707 