From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-24450]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP19-7-000]


Notice of Application; Tennessee Gas Pipeline Company, LLC

    Take notice that on October 19, 2018, Tennessee Gas Pipeline 
Company, LLC (Tennessee), filed an application pursuant to sections 
7(b) and 7(c) of the Natural Gas Act (NGA), and Part 157 of the 
Commission's regulations for authorization to construct, install, 
modify, operate, and maintain certain pipeline and compression 
facilities located in Massachusetts and Connecticut that will increase 
natural gas capacity on its pipeline system by approximately 72,400 
dekatherms per day (Dth/day) (261 Upgrade Projects). The projects 
consist of the following: (1) The construction, installation, 
operation, and maintenance of approximately 2.1 miles of pipeline loop, 
and (2) the abandonment and replacement of two compressor units with a 
new compressor unit at an existing compressor station, all as more 
fully set forth in the application, which is on file with the 
Commission and open for public inspection.
    The filing may also be viewed on the web at http://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, please contact FERC at [email protected] or toll 
free at (866) 208-3676, or TTY, (202) 502-8659.
    Any questions regarding the proposed project should be directed to 
Ben J. Carranza, Director, Regulatory, Tennessee Gas Pipeline Company, 
LLC, 1001 Louisiana Street, Suite 1000, Houston, Texas 77002, or by 
calling (713) 420-5535, by fax (713) 420-1605, or by email at 
[email protected].
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street, NE, Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 3 copies of filings made with the Commission and must provide a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list and will be 
notified of any meetings associated with the Commission's environmental 
review process. Environmental commentors will not be required to serve 
copies of filed documents on all other parties. However, the non-party 
commentors will not receive copies of all documents filed by other 
parties or issued by the Commission and will not have the right to seek 
court review of the Commission's final order.
    As of the February 27, 2018 date of the Commission's order in 
Docket No. CP16-4-001, the Commission will apply its revised practice 
concerning out-of-time motions to intervene in any new Natural Gas Act 
section 3 or section 7 proceeding.\1\ Persons desiring to become a 
party to a certificate proceeding are to intervene in a timely manner. 
If seeking to intervene out-of-time, the movant is required to ``show 
good cause why the time limitation should be waived,'' and should 
provide justification by reference to factors set forth in Rule 
214(d)(1) of the Commission's Rules and Regulations.\2\
---------------------------------------------------------------------------

    \1\ Tennessee Gas Pipeline Company, L.L.C., 162 FERC ]61,167 at 
]50 (2018).
    \2\ 18 CFR 385.214(d)(1).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 3 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street NE, Washington, 
DC 20426.
    Comment Date: November 23, 2018.

    Dated: November 2, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-24450 Filed 11-7-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                          Federal Register / Vol. 83, No. 217 / Thursday, November 8, 2018 / Notices                                                  55879

                                               Perkins Career and Technical Education                  document. For assistance, please contact              possible, an original and two copies of
                                               Act of 2006.                                            FERC at FERCOnlineSupport@ferc.gov                    comments in support of or in opposition
                                                  OMB Control Number: 1830–0569.                       or toll free at (866) 208–3676, or TTY,               to this project. The Commission will
                                                  Type of Review: A revision of an                     (202) 502–8659.                                       consider these comments in
                                               existing information collection.                           Any questions regarding the proposed               determining the appropriate action to be
                                                  Respondents/Affected Public: State,                  project should be directed to Ben J.                  taken, but the filing of a comment alone
                                               Local, and Tribal Governments.                          Carranza, Director, Regulatory,                       will not serve to make the filer a party
                                                  Total Estimated Number of Annual                     Tennessee Gas Pipeline Company, LLC,                  to the proceeding. The Commission’s
                                               Responses: 54.                                          1001 Louisiana Street, Suite 1000,                    rules require that persons filing
                                                  Total Estimated Number of Annual                     Houston, Texas 77002, or by calling                   comments in opposition to the project
                                               Burden Hours: 1,296.                                    (713) 420–5535, by fax (713) 420–1605,                provide copies of their protests only to
                                                  Abstract: This information collection                or by email at ben_carranza@                          the party or parties directly involved in
                                               is used by the U.S. Department of                       kindermorgan.com.                                     the protest.
                                               Education to gather annual performance                     Pursuant to section 157.9 of the                      Persons who wish to comment only
                                               and financial data from eligible agencies               Commission’s rules, 18 CFR 157.9,                     on the environmental review of this
                                               under the Carl D. Perkins Career and                    within 90 days of this Notice the                     project should submit an original and
                                               Technical Education Act of 2006 as                      Commission staff will either: Complete                two copies of their comments to the
                                               amended by the Strengthening Career                     its environmental assessment (EA) and                 Secretary of the Commission.
                                               and Technical Education for the 21st                    place it into the Commission’s public                 Environmental commentors will be
                                               Century Act (Pub. L. 115–224).                          record (eLibrary) for this proceeding; or             placed on the Commission’s
                                                                                                       issue a Notice of Schedule for                        environmental mailing list and will be
                                                 Dated: November 5, 2018.                              Environmental Review. If a Notice of
                                               Tomakie Washington,
                                                                                                                                                             notified of any meetings associated with
                                                                                                       Schedule for Environmental Review is                  the Commission’s environmental review
                                               Acting Director, Information Collection                 issued, it will indicate, among other
                                               Clearance Division, Office of the Chief Privacy
                                                                                                                                                             process. Environmental commentors
                                                                                                       milestones, the anticipated date for the              will not be required to serve copies of
                                               Officer, Office of Management.                          Commission staff’s issuance of the final
                                               [FR Doc. 2018–24457 Filed 11–7–18; 8:45 am]
                                                                                                                                                             filed documents on all other parties.
                                                                                                       environmental impact statement (FEIS)                 However, the non-party commentors
                                               BILLING CODE 4000–01–P                                  or EA for this proposal. The filing of the            will not receive copies of all documents
                                                                                                       EA in the Commission’s public record                  filed by other parties or issued by the
                                                                                                       for this proceeding or the issuance of a              Commission and will not have the right
                                               DEPARTMENT OF ENERGY                                    Notice of Schedule for Environmental                  to seek court review of the
                                                                                                       Review will serve to notify federal and               Commission’s final order.
                                               Federal Energy Regulatory                               state agencies of the timing for the
                                               Commission                                                                                                       As of the February 27, 2018 date of
                                                                                                       completion of all necessary reviews, and              the Commission’s order in Docket No.
                                               [Docket No. CP19–7–000]                                 the subsequent need to complete all                   CP16–4–001, the Commission will
                                                                                                       federal authorizations within 90 days of              apply its revised practice concerning
                                               Notice of Application; Tennessee Gas                    the date of issuance of the Commission                out-of-time motions to intervene in any
                                               Pipeline Company, LLC                                   staff’s FEIS or EA.                                   new Natural Gas Act section 3 or section
                                                                                                          There are two ways to become
                                                  Take notice that on October 19, 2018,                                                                      7 proceeding.1 Persons desiring to
                                                                                                       involved in the Commission’s review of
                                               Tennessee Gas Pipeline Company, LLC                                                                           become a party to a certificate
                                                                                                       this project. First, any person wishing to
                                               (Tennessee), filed an application                                                                             proceeding are to intervene in a timely
                                                                                                       obtain legal status by becoming a party
                                               pursuant to sections 7(b) and 7(c) of the               to the proceedings for this project                   manner. If seeking to intervene out-of-
                                               Natural Gas Act (NGA), and Part 157 of                  should, on or before the comment date                 time, the movant is required to ‘‘show
                                               the Commission’s regulations for                        stated below, file with the Federal                   good cause why the time limitation
                                               authorization to construct, install,                    Energy Regulatory Commission, 888                     should be waived,’’ and should provide
                                               modify, operate, and maintain certain                   First Street, NE, Washington, DC 20426,               justification by reference to factors set
                                               pipeline and compression facilities                     a motion to intervene in accordance                   forth in Rule 214(d)(1) of the
                                               located in Massachusetts and                            with the requirements of the                          Commission’s Rules and Regulations.2
                                               Connecticut that will increase natural                  Commission’s Rules of Practice and                       The Commission strongly encourages
                                               gas capacity on its pipeline system by                  Procedure (18 CFR 385.214 or 385.211)                 electronic filings of comments, protests
                                               approximately 72,400 dekatherms per                     and the Regulations under the NGA (18                 and interventions in lieu of paper using
                                               day (Dth/day) (261 Upgrade Projects).                   CFR 157.10). A person obtaining party                 the ‘‘eFiling’’ link at http://
                                               The projects consist of the following: (1)              status will be placed on the service list             www.ferc.gov. Persons unable to file
                                               The construction, installation,                         maintained by the Secretary of the                    electronically should submit an original
                                               operation, and maintenance of                           Commission and will receive copies of                 and 3 copies of the protest or
                                               approximately 2.1 miles of pipeline                     all documents filed by the applicant and              intervention to the Federal Energy
                                               loop, and (2) the abandonment and                       by all other parties. A party must submit             regulatory Commission, 888 First Street
                                               replacement of two compressor units                     3 copies of filings made with the                     NE, Washington, DC 20426.
                                               with a new compressor unit at an                        Commission and must provide a copy to                    Comment Date: November 23, 2018.
                                               existing compressor station, all as more                the applicant and to every other party in               Dated: November 2, 2018.
                                               fully set forth in the application, which               the proceeding. Only parties to the                   Kimberly D. Bose,
daltland on DSKBBV9HB2PROD with NOTICES




                                               is on file with the Commission and open                 proceeding can ask for court review of                Secretary.
                                               for public inspection.                                  Commission orders in the proceeding.                  [FR Doc. 2018–24450 Filed 11–7–18; 8:45 am]
                                                  The filing may also be viewed on the                    However, a person does not have to                 BILLING CODE 6717–01–P
                                               web at http://www.ferc.gov using the                    intervene in order to have comments
                                               ‘‘eLibrary’’ link. Enter the docket                     considered. The second way to                           1 Tennessee Gas Pipeline Company, L.L.C., 162
                                               number excluding the last three digits in               participate is by filing with the                     FERC ¶61,167 at ¶50 (2018).
                                               the docket number field to access the                   Secretary of the Commission, as soon as                 2 18 CFR 385.214(d)(1).




                                          VerDate Sep<11>2014   16:51 Nov 07, 2018   Jkt 247001   PO 00000   Frm 00029   Fmt 4703   Sfmt 9990   E:\FR\FM\08NON1.SGM   08NON1



Document Created: 2018-11-08 06:22:42
Document Modified: 2018-11-08 06:22:42
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
DatesNovember 23, 2018.
FR Citation83 FR 55879 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR