83_FR_5643 83 FR 5616 - Commission Information Collection Activities; (FERC-582); Comment Request; Extension

83 FR 5616 - Commission Information Collection Activities; (FERC-582); Comment Request; Extension

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 27 (February 8, 2018)

Page Range5616-5617
FR Document2018-02533

In compliance with the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC- 582 (Electric Fees, Annual Charges, Waivers, and Exemptions) which will be submitted to the Office of Management and Budget (OMB) for a review of the information collection requirements.

Federal Register, Volume 83 Issue 27 (Thursday, February 8, 2018)
[Federal Register Volume 83, Number 27 (Thursday, February 8, 2018)]
[Notices]
[Pages 5616-5617]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-02533]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC18-4-000]


Commission Information Collection Activities; (FERC-582); Comment 
Request; Extension

AGENCY: Federal Energy Regulatory Commission, DOE.

ACTION: Notice of information collection and request for comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the Paperwork Reduction Act of 1995, the 
Federal Energy Regulatory Commission (Commission or FERC) is soliciting 
public comment on the currently approved information collection, FERC-
582 (Electric Fees, Annual Charges, Waivers, and Exemptions) which will 
be submitted to the Office of Management and Budget (OMB) for a review 
of the information collection requirements.

DATES: Comments on the collection of information are due April 9, 2018.

ADDRESSES: You may submit comments (identified by Docket No. 18-4-000) 
by either of the following methods:
     eFiling at Commission's website: http://www.ferc.gov/docs-filing/efiling.asp
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE, 
Washington, DC 20426.


[[Page 5617]]


Instructions: All submissions must be formatted and filed in accordance 
with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support by email at 
ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 (toll-free), 
or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
DataClearance@FERC.gov, telephone at (202) 502-8663, and fax at (202) 
273-0873.

SUPPLEMENTARY INFORMATION: 
    Title: Electric Fees, Annual Charges, Waivers, and Exemptions.
    OMB Control No.: 1902-0132
    Type of Request: Three-year extension of the FERC-582 information 
collection requirements with no changes to the current reporting 
requirements.
    Abstract: The information required by FERC-582 is contained within 
18 Code of Federal Regulations (CFR) Part 381 \1\ and Part 382.\2\
---------------------------------------------------------------------------

    \1\ Title 18 CFR, Sections 381.105, 381.106, 381.108, 381.302, 
and 381.305.
    \2\ Title 18 CFR, Sections 382.102, 382.103, 382.105, 382.106, 
and 382.201.
---------------------------------------------------------------------------

    The Commission uses the FERC-582 to implement the statutory 
provisions of the Independent Offices Appropriation Act of 1952 (IOAA) 
\3\ which authorizes the Commission to establish fees for its services. 
In addition, the Omnibus Budget Reconciliation Act of 1986 (OBRA) \4\ 
authorizes the Commission to assess and collect fees and annual charges 
in any fiscal year in amounts equal to all the costs incurred by the 
Commission in that fiscal year.
---------------------------------------------------------------------------

    \3\ 31 U.S.C. 9701.
    \4\ 42 U.S.C. 7178.
---------------------------------------------------------------------------

    To comply with the FERC-582 respondents submit to the Commission 
the sum of the megawatt-hours (MWh) of all unbundled transmission 
(including MWh delivered in wheeling transactions and MWh delivered in 
exchange transactions) and the megawatt-hours of all bundled wholesale 
power sales (to the extent the bundled wholesale power sales were not 
separately reported as unbundled transmission). The data collected 
within the FERC-582 is drawn directly from the FERC Form 1 \5\ 
transmission data. The Commission sums the costs of its electric 
regulatory program and subtracts all electric regulatory program filing 
fee collections to determine the total collectible electric regulatory 
program costs. Then, the Commission uses the data submitted under FERC-
582 to determine the total megawatt-hours of transmission of electric 
energy in interstate commerce.
---------------------------------------------------------------------------

    \5\ Annual Report of Major Electric Utility (OMB Control No. 
1902-0021).
---------------------------------------------------------------------------

    Respondents (e.g. public utilities, power marketers) subject to 
these annual charges must submit FERC-582 data to the Commission by 
April 30 of each year.\6\ The Commission issues bills for annual 
charges to respondents. Then, respondents must pay the charges within 
45 days of the Commission's issuance of the bill.
---------------------------------------------------------------------------

    \6\ 18 CFR 382.201.
---------------------------------------------------------------------------

    Respondents file requests for waivers and exemptions of fees and 
charges \7\ based on need. The Commission's staff uses the filer's 
financial information to evaluate the request for a waiver or exemption 
of the obligation to pay a fee or an annual charge.
---------------------------------------------------------------------------

    \7\ 18 CFR 381 and 382.
---------------------------------------------------------------------------

    Estimate of Annual Burden: \8\ The Commission estimates the total 
Public Reporting Burden for this information collection as:
---------------------------------------------------------------------------

    \8\ Burden is defined as the total time, effort, or financial 
resources expended by persons to generate, maintain, retain, or 
disclose or provide information to or for a Federal agency. For 
further explanation of what is included in the information 
collection burden, refer to 5 Code of Federal Regulations 1320.3.
    \9\ Includes requirements of 18 CFR Part 381.105 (methods of 
payment), Part 381.106 (waiver), Part 381.108 (exemption), Part 
381.302 (declaratory order), Part 381.303 (review of DOE remedial 
order), Part 381.304 (DOE denial of adjustment, and Part 381.305 
(OGC interpretation).
    \10\ The Commission staff thinks that the average respondent for 
this collection is similarly situated to the Commission, in terms of 
salary plus benefits. Based upon FERC's 2017 annual average of 
$158,754 (for salary plus benefits), the average hourly cost is 
$76.50/hour.

                                             FERC-82--Electric Fees; Annual Charges; Waivers; and Exemptions
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                               Annual  number
                                  Number of     of  responses   Total  number     Average burden cost per     Total annual burden hours      Cost per
                                 respondents         per        of  responses             response                 & total annual           respondent
                                                 respondent
                                          (1)             (2)  (1) x (2) = (3)  (4)........................  (3) * (4) = (5)...........  (5) / (1) = (5)
--------------------------------------------------------------------------------------------------------------------------------------------------------
FERC-582 \9\.................              67               1               67  1 hour; $76.50.............  67 hours; $5,125.50.......           $76.50
--------------------------------------------------------------------------------------------------------------------------------------------------------

    The total estimated annual cost burden to respondents is $5,125.50 
[67 hours * $76.50/hour \10\ = $5,125.50]
    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.

    Dated: February 2, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-02533 Filed 2-7-18; 8:45 am]
 BILLING CODE 6717-01-P



                                               5616                        Federal Register / Vol. 83, No. 27 / Thursday, February 8, 2018 / Notices

                                               link to log on and submit the                           Commission’s Notice of Proposed                       www.CapitolConnection.org or call (703)
                                               intervention or protests.                               Rulemaking on the generator                           993–3100.
                                                  Persons unable to file electronically                interconnection process in Docket No.                    Commission conferences are
                                               should submit an original and 5 copies                  RM17–8–000.                                           accessible under section 508 of the
                                               of the intervention or protest to the                      Discussions at the conference may                  Rehabilitation Act of 1973. For
                                               Federal Energy Regulatory Commission,                   involve issues raised in proceedings that             accessibility accommodations, please
                                               888 First Street NE, Washington, DC                     are currently pending before the                      send an email to accessibility@ferc.gov
                                               20426.                                                  Commission. These proceedings                         or call toll free 1–866–208–3372 (voice)
                                                  The filings in the above-referenced                  include, but are not limited to:                      or 202–208–8659 (TTY), or send a fax to
                                               proceeding are accessible in the                        Internal MISO Generators v.                           202–208–2106 with the required
                                               Commission’s eLibrary system by                            Midcontinent Independent System                    accommodations.
                                               clicking on the appropriate link in the                    Operator, Inc., Docket No. EL15–99–                   For more information about this
                                               above list. They are also available for                    000;                                               technical conference, please contact
                                               electronic review in the Commission’s                   EDF Renewable Energy, Inc. v.                         Lina Naik at Lina.Naik@ferc.gov or (202)
                                               Public Reference Room in Washington,                       Midcontinent Independent System                    502–8882, Myra Sinnott at
                                               DC. There is an eSubscription link on                      Operator, Inc., Docket No. EL18–55–                Myra.Sinnott@ferc.gov or (202) 502–
                                               the website that enables subscribers to                    000; Southwest Power Pool, Inc.,                   6033, or Kathleen Ratcliff at
                                               receive email notification when a                          Docket No. ER18–421–000;                           Kathleen.Ratcliff@ferc.gov or (202) 502–
                                               document is added to a subscribed                       Midcontinent Independent System                       8018. For information related to
                                               docket(s). For assistance with any FERC                    Operator, Inc., Docket No. ER18–636–               logistics, please contact Sarah McKinley
                                               Online service, please email                               000;                                               at Sarah.Mckinley@ferc.gov or (202)
                                               FERCOnlineSupport@ferc.gov or call                      Midcontinent Independent System                       502–8368.
                                               (866) 208–3676 (toll free). For TTY, call                  Operator, Inc., Docket No. ER16–                     Dated: February 2, 2018.
                                               (202) 502–8659.                                            1346–003;                                          Kimberly D. Bose,
                                                 Dated: February 2, 2018.                              Midcontinent Independent System                       Secretary.
                                               Kimberly D. Bose,                                          Operator, Inc., Docket No. ER16–
                                                                                                                                                             [FR Doc. 2018–02530 Filed 2–7–18; 8:45 am]
                                               Secretary.
                                                                                                          1817–004;
                                                                                                                                                             BILLING CODE 6717–01–P
                                                                                                       Midcontinent Independent System
                                               [FR Doc. 2018–02528 Filed 2–7–18; 8:45 am]
                                                                                                          Operator, Inc., Docket No. EL18–17–
                                               BILLING CODE 6717–01–P
                                                                                                          000;
                                                                                                                                                             DEPARTMENT OF ENERGY
                                                                                                       Midcontinent Independent System
                                                                                                          Operator, Inc., Docket No. ER17–156–               Federal Energy Regulatory
                                               DEPARTMENT OF ENERGY
                                                                                                          002; and                                           Commission
                                               Federal Energy Regulatory                               TranSource, LLC v. PJM
                                               Commission                                                 Interconnection, L.L.C., Docket No.                [Docket No. IC18–4–000]
                                                                                                          EL15–79–001.
                                               [Docket No. AD18–8–000; Docket No. EL18–                   Additional information regarding the               Commission Information Collection
                                               26–000]
                                                                                                       conference program and speakers will                  Activities; (FERC–582); Comment
                                               Reform of Affected System                               be provided in subsequent                             Request; Extension
                                               Coordination in the Generator                           supplemental notices of technical
                                                                                                       conference.                                           AGENCY: Federal Energy Regulatory
                                               Interconnection Process; EDF                                                                                  Commission, DOE.
                                               Renewable Energy, Inc. v.                                  Those wishing to participate in this
                                                                                                       conference should submit a nomination                 ACTION: Notice of information collection
                                               Midcontinent Independent System
                                                                                                       form online by 5:00 p.m. on March 2,                  and request for comments.
                                               Operator, Inc., Southwest Power Pool,
                                               Inc., and PJM Interconnection, L.L.C.;                  2018 at: http://www.ferc.gov/whats-new/
                                                                                                       registration/04-03-18-speaker-form.asp.               SUMMARY:   In compliance with the
                                               Notice of Technical Conference                                                                                Paperwork Reduction Act of 1995, the
                                                                                                       There is no fee for attendance. In-person
                                                 Take notice that the Federal Energy                   attendees should allow time to pass                   Federal Energy Regulatory Commission
                                               Regulatory Commission (Commission)                      through building security procedures                  (Commission or FERC) is soliciting
                                               will convene a staff-led technical                      before the 9:30 a.m. start time of the                public comment on the currently
                                               conference in the above-referenced                      technical conference. Pre-registration is             approved information collection, FERC–
                                               proceeding on Tuesday and Wednesday,                    encouraged, though not required.                      582 (Electric Fees, Annual Charges,
                                               April 3–4, 2018 from 9:30 a.m. to 4:30                  Attendees may register in advance at the              Waivers, and Exemptions) which will be
                                               p.m. (EDT). The conference will be held                 following web page: http://                           submitted to the Office of Management
                                               in the Commission Meeting Room at                       www.ferc.gov/whats-new/registration/                  and Budget (OMB) for a review of the
                                               Commission headquarters, 888 First                      04-03-18-form.asp                                     information collection requirements.
                                               Street NE, Washington, DC 20426.                           The conference will be transcribed                 DATES: Comments on the collection of
                                               Commissioners may attend and                            and webcast. Transcripts will be                      information are due April 9, 2018.
                                               participate.                                            available immediately for a fee from Ace              ADDRESSES: You may submit comments
                                                 The purpose of this conference is to                  Reporting (202–347–3700). A link to the               (identified by Docket No. 18–4–000) by
                                               discuss issues related to the                           webcast of this event will be available               either of the following methods:
daltland on DSKBBV9HB2PROD with NOTICES




                                               coordination of Affected Systems raised                 in the Commission Calendar of Events at                  • eFiling at Commission’s website:
                                               in (1) the complaint filed by EDF                       www.ferc.gov. The Capitol Connection                  http://www.ferc.gov/docs-filing/
                                               Renewable Energy, Inc. against                          provides technical support for the                    efiling.asp
                                               Midcontinent Independent System                         webcasts and offers the option of                        • Mail/Hand Delivery/Courier:
                                               Operator, Inc., Southwest Power Pool,                   listening to the conferences via phone-               Federal Energy Regulatory Commission,
                                               Inc., and PJM Interconnection, L.L.C. in                bridge for a fee. For additional                      Secretary of the Commission, 888 First
                                               Docket No. EL18–26–000 and (2) the                      information, visit                                    Street NE, Washington, DC 20426.


                                          VerDate Sep<11>2014   17:18 Feb 07, 2018   Jkt 244001   PO 00000   Frm 00014   Fmt 4703   Sfmt 4703   E:\FR\FM\08FEN1.SGM   08FEN1


                                                                              Federal Register / Vol. 83, No. 27 / Thursday, February 8, 2018 / Notices                                                    5617

                                               Instructions: All submissions must be                   of Federal Regulations (CFR) Part 381 1                 subtracts all electric regulatory program
                                               formatted and filed in accordance with                  and Part 382.2                                          filing fee collections to determine the
                                               submission guidelines at: http://                          The Commission uses the FERC–582                     total collectible electric regulatory
                                               www.ferc.gov/help/submission-                           to implement the statutory provisions of                program costs. Then, the Commission
                                               guide.asp. For user assistance contact                  the Independent Offices Appropriation                   uses the data submitted under FERC–
                                               FERC Online Support by email at                         Act of 1952 (IOAA) 3 which authorizes                   582 to determine the total megawatt-
                                               ferconlinesupport@ferc.gov, or by phone                 the Commission to establish fees for its                hours of transmission of electric energy
                                               at: (866) 208–3676 (toll-free), or (202)                services. In addition, the Omnibus                      in interstate commerce.
                                               502–8659 for TTY.                                       Budget Reconciliation Act of 1986
                                                  Docket: Users interested in receiving                (OBRA) 4 authorizes the Commission to                      Respondents (e.g. public utilities,
                                               automatic notification of activity in this              assess and collect fees and annual                      power marketers) subject to these
                                               docket or in viewing/downloading                        charges in any fiscal year in amounts                   annual charges must submit FERC–582
                                               comments and issuances in this docket                   equal to all the costs incurred by the                  data to the Commission by April 30 of
                                               may do so at http://www.ferc.gov/docs-                  Commission in that fiscal year.                         each year.6 The Commission issues bills
                                               filing/docs-filing.asp.                                    To comply with the FERC–582                          for annual charges to respondents.
                                               FOR FURTHER INFORMATION CONTACT:                        respondents submit to the Commission                    Then, respondents must pay the charges
                                               Ellen Brown may be reached by email                     the sum of the megawatt-hours (MWh)                     within 45 days of the Commission’s
                                               at DataClearance@FERC.gov, telephone                    of all unbundled transmission                           issuance of the bill.
                                               at (202) 502–8663, and fax at (202) 273–                (including MWh delivered in wheeling                       Respondents file requests for waivers
                                               0873.                                                   transactions and MWh delivered in                       and exemptions of fees and charges 7
                                               SUPPLEMENTARY INFORMATION:                              exchange transactions) and the
                                                                                                                                                               based on need. The Commission’s staff
                                                  Title: Electric Fees, Annual Charges,                megawatt-hours of all bundled
                                                                                                                                                               uses the filer’s financial information to
                                               Waivers, and Exemptions.                                wholesale power sales (to the extent the
                                                                                                                                                               evaluate the request for a waiver or
                                                  OMB Control No.: 1902–0132                           bundled wholesale power sales were not
                                                                                                       separately reported as unbundled                        exemption of the obligation to pay a fee
                                                  Type of Request: Three-year extension
                                                                                                       transmission). The data collected within                or an annual charge.
                                               of the FERC–582 information collection
                                               requirements with no changes to the                     the FERC–582 is drawn directly from                        Estimate of Annual Burden: 8 The
                                               current reporting requirements.                         the FERC Form 1 5 transmission data.                    Commission estimates the total Public
                                                  Abstract: The information required by                The Commission sums the costs of its                    Reporting Burden for this information
                                               FERC–582 is contained within 18 Code                    electric regulatory program and                         collection as:

                                                                              FERC–82—ELECTRIC FEES; ANNUAL CHARGES; WAIVERS; AND EXEMPTIONS
                                                                                                      Annual                Total         Average burden cost
                                                                                Number of            number of                                                          Total annual burden         Cost per
                                                                                                                         number of                per
                                                                               respondents        responses per                                                         hours & total annual       respondent
                                                                                                                         responses             response
                                                                                                    respondent

                                                                                     (1)               (2)            (1) × (2) = (3)                (4)                   (3) * (4) = (5)        (5) / (1) = (5)

                                               FERC–582 9 .................                67                   1                    67   1 hour; $76.50 ...........   67 hours; $5,125.50 ..              $76.50



                                                 The total estimated annual cost                       who are to respond, including the use                   DEPARTMENT OF ENERGY
                                               burden to respondents is $5,125.50 [67                  of automated collection techniques or
                                               hours * $76.50/hour 10 = $5,125.50]                     other forms of information technology.                  Federal Energy Regulatory
                                                                                                                                                               Commission
                                                 Comments: Comments are invited on:                      Dated: February 2, 2018.
                                               (1) Whether the collection of                           Kimberly D. Bose,                                       Combined Notice of Filings #1
                                               information is necessary for the proper                 Secretary.
                                               performance of the functions of the                                                                                Take notice that the Commission
                                                                                                       [FR Doc. 2018–02533 Filed 2–7–18; 8:45 am]
                                               Commission, including whether the                                                                               received the following electric corporate
                                               information will have practical utility;                BILLING CODE 6717–01–P                                  filings:
                                               (2) the accuracy of the agency’s estimate                                                                          Docket Numbers: EC18–51–000.
                                               of the burden and cost of the collection                                                                           Applicants: MDU Resources Group,
                                               of information, including the validity of                                                                       Inc.
                                               the methodology and assumptions used;                                                                              Description: Application for
                                               (3) ways to enhance the quality, utility                                                                        Authorization Under Section 203 of the
                                               and clarity of the information collection;                                                                      Federal Power Act of MDU Resources
                                               and (4) ways to minimize the burden of                                                                          Group, Inc.
                                               the collection of information on those                                                                             Filed Date: 1/31/18.
                                                 1 Title 18 CFR, Sections 381.105, 381.106,              7 18  CFR 381 and 382.                                381.108 (exemption), Part 381.302 (declaratory
daltland on DSKBBV9HB2PROD with NOTICES




                                               381.108, 381.302, and 381.305.                            8 Burden  is defined as the total time, effort, or    order), Part 381.303 (review of DOE remedial order),
                                                 2 Title 18 CFR, Sections 382.102, 382.103,            financial resources expended by persons to              Part 381.304 (DOE denial of adjustment, and Part
                                               382.105, 382.106, and 382.201.                          generate, maintain, retain, or disclose or provide      381.305 (OGC interpretation).
                                                 3 31 U.S.C. 9701.                                     information to or for a Federal agency. For further       10 The Commission staff thinks that the average

                                                 4 42 U.S.C. 7178.
                                                                                                       explanation of what is included in the information      respondent for this collection is similarly situated
                                                                                                       collection burden, refer to 5 Code of Federal           to the Commission, in terms of salary plus benefits.
                                                 5 Annual Report of Major Electric Utility (OMB
                                                                                                       Regulations 1320.3.                                     Based upon FERC’s 2017 annual average of
                                               Control No. 1902–0021).                                    9 Includes requirements of 18 CFR Part 381.105       $158,754 (for salary plus benefits), the average
                                                 6 18 CFR 382.201.                                     (methods of payment), Part 381.106 (waiver), Part       hourly cost is $76.50/hour.



                                          VerDate Sep<11>2014   17:18 Feb 07, 2018   Jkt 244001   PO 00000   Frm 00015   Fmt 4703   Sfmt 4703   E:\FR\FM\08FEN1.SGM     08FEN1



Document Created: 2018-02-08 00:16:17
Document Modified: 2018-02-08 00:16:17
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of information collection and request for comments.
DatesComments on the collection of information are due April 9, 2018.
ContactEllen Brown may be reached by email at [email protected], telephone at (202) 502-8663, and fax at (202) 273-0873.
FR Citation83 FR 5616 