DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 27 (February 8, 2018)

Page Range5619-5620
FR Document2018-02527

Federal Register, Volume 83 Issue 27 (Thursday, February 8, 2018)
[Federal Register Volume 83, Number 27 (Thursday, February 8, 2018)]
[Notices]
[Pages 5619-5620]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-02527]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP18-37-000; CP18-38-000]


Notice of Intent To Prepare an Environmental Assessment for the 
Proposed Sierrita Gas Pipeline LLC Sierrita Compressor Expansion 
Project and Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Sierrita Compressor Expansion 
Project involving construction and operation of facilities by Sierrita 
Gas Pipeline LLC (Sierrita) in Pima County, Arizona. The Commission 
will use this EA in its decision-making process to determine whether 
the project is in the public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. You can make a difference by providing us with 
your specific comments or concerns about the project. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
Your input will help the Commission staff determine what issues they 
need to evaluate in the EA. To ensure that your comments are timely and 
properly recorded, please send your comments so that the Commission 
receives them in Washington, DC on or before March 5, 2018.
    If you sent comments on this project to the Commission before the 
opening of this docket on December 21, 2017, you will need to file 
those comments in Docket No. CP18-37-000 to ensure they are considered 
as part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable agreement. However, if 
the Commission approves the project, that approval conveys with it the 
right of eminent domain. Therefore, if easement negotiations fail to 
produce an agreement, the pipeline company could initiate condemnation 
proceedings where compensation would be determined in accordance with 
state law.
    Sierrita provided landowners with a fact sheet prepared by the FERC 
entitled ``An Interstate Natural Gas Facility On My Land? What Do I 
Need To Know?'' This fact sheet addresses a number of typically asked 
questions, including the use of eminent domain and how to participate 
in the Commission's proceedings. It is also available for viewing on 
the FERC website (www.ferc.gov).

Public Participation

    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has expert staff available to assist you at 
(202) 502-8258 or [email protected]. Please carefully follow 
these instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's website (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's website (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
eRegister. If you are filing a comment on a particular project, please 
select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(CP18-37-000) with your submission: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, 
Washington, DC 20426.

Summary of the Proposed Project

    Sierrita proposes to construct and operate new natural gas 
compression, metering, and pipeline facilities on its existing Line No. 
2177 in Pima County, Arizona. Sierrita is also requesting approval to 
amend its existing Natural Gas Act Section 3 authorization and 
Presidential Permit for the project's increased capacity. Specifically, 
the project would increase Sierrita's authorized capacity of its 
existing international border crossing near Sasabe, Arizona from 
approximately 200,846 Dekatherms per day to 631,389 Dekatherms per day 
(627,000,000 cubic feet per day).
    The Sierrita Compressor Expansion Project would consist of the 
following facilities, all in Pima County:
     One new 15,900 horsepower compressor station (Sierrita 
Compressor Station);
     suction and discharge piping and various station yard 
auxiliary facilities to connect the Sierrita Compressor Station with 
Line No. 2177;
     one new 10-inch Ultrasonic meter at the existing San 
Joaquin Meter Station on Line No. 2177; and
     the relocation of the existing ``Mainline Valve 2'' and an 
associated inspection tool launcher and receiver from milepost 1.2 to 
milepost 6.5 on Line No. 2177.
    The general location of the project facilities is shown in appendix 
1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called eLibrary or from the Commission's Public 
Reference Room, 888 First Street NE, Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed facilities would disturb about 18.7 
acres of land for the aboveground and auxiliary facilities. Following 
construction, Sierrita would maintain about 15.7 acres for permanent 
operation of the compressor station including station piping and 
auxiliary facilities, and about 1.1 acres for operation of the mainline 
valve. The remaining acreage would be restored and revert to former 
uses.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\2\ to discover and address concerns the public may have about 
proposals. This

[[Page 5620]]

process is referred to as scoping. The main goal of the scoping process 
is to focus the analysis in the EA on the important environmental 
issues. By this notice, the Commission requests public comments on the 
scope of the issues to address in the EA. We will consider all filed 
comments during the preparation of the EA.
---------------------------------------------------------------------------

    \2\ We, us, and our refer to the environmental staff of the 
Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the proposed project under these 
general headings:
     Geology and soils;
     land use;
     water resources (including floodplains), fisheries, and 
wetlands;
     cultural resources;
     vegetation and wildlife;
     air quality and noise;
     endangered and threatened species;
     socioeconomics;
     public safety; and
     cumulative impacts
    We will also evaluate reasonable alternatives to the proposed 
project or portions of the project, and make recommendations on how to 
lessen or avoid impacts on the various resource areas.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may also publish 
and distribute the EA to the public for an allotted comment period. We 
will consider all comments on the EA before making our recommendations 
to the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section, beginning on page 2.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues of 
this project to formally cooperate with us in the preparation of the 
EA.\3\ Agencies that would like to request cooperating agency status 
should follow the instructions for filing comments provided under the 
Public Participation section of this notice.
---------------------------------------------------------------------------

    \3\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for Section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the applicable State Historic Preservation Office (SHPO), and to 
solicit their views and those of other government agencies, interested 
Indian tribes, and the public on the project's potential effects on 
historic properties.\4\ We will define the project-specific Area of 
Potential Effects (APE) in consultation with the SHPO as the project 
develops. On natural gas facility projects, the APE at a minimum 
encompasses all areas subject to ground disturbance (examples include 
construction right-of-way, contractor/pipe storage yards, compressor 
stations, and access roads). Our EA for this project will document our 
findings on the impacts on historic properties and summarize the status 
of consultations under Section 106.
---------------------------------------------------------------------------

    \4\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project. We will update the environmental mailing list 
as the analysis proceeds to ensure that we send the information related 
to this environmental review to all individuals, organizations, and 
government entities interested in and/or potentially affected by the 
proposed project.
    If we publish and distribute the EA, copies of the EA will be sent 
to the environmental mailing list for public review and comment. If you 
would prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an intervenor which is an official party to the Commission's 
proceeding. Intervenors play a more formal role in the process and are 
able to file briefs, appear at hearings, and be heard by the courts if 
they choose to appeal the Commission's final ruling. An intervenor 
formally participates in the proceeding by filing a request to 
intervene. Instructions for becoming an intervenor are in the Document-
less Intervention Guide under the e-filing link on the Commission's 
website. Motions to intervene are more fully described at http://www.ferc.gov/resources/guides/how-to/intervene.asp.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website at www.ferc.gov using the ``eLibrary'' link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., CP18-
37). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, public sessions or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: February 2, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-02527 Filed 2-7-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                           Federal Register / Vol. 83, No. 27 / Thursday, February 8, 2018 / Notices                                                     5619

                                                 Dated: February 2, 2018.                              the acquisition of an easement to                     metering, and pipeline facilities on its
                                               Kimberly D. Bose,                                       construct, operate, and maintain the                  existing Line No. 2177 in Pima County,
                                               Secretary.                                              proposed facilities. The company would                Arizona. Sierrita is also requesting
                                               [FR Doc. 2018–02531 Filed 2–7–18; 8:45 am]              seek to negotiate a mutually acceptable               approval to amend its existing Natural
                                               BILLING CODE 6717–01–P                                  agreement. However, if the Commission                 Gas Act Section 3 authorization and
                                                                                                       approves the project, that approval                   Presidential Permit for the project’s
                                                                                                       conveys with it the right of eminent                  increased capacity. Specifically, the
                                               DEPARTMENT OF ENERGY                                    domain. Therefore, if easement                        project would increase Sierrita’s
                                                                                                       negotiations fail to produce an                       authorized capacity of its existing
                                               Federal Energy Regulatory                               agreement, the pipeline company could                 international border crossing near
                                               Commission                                              initiate condemnation proceedings                     Sasabe, Arizona from approximately
                                               [Docket Nos. CP18–37–000; CP18–38–000]                  where compensation would be                           200,846 Dekatherms per day to 631,389
                                                                                                       determined in accordance with state                   Dekatherms per day (627,000,000 cubic
                                               Notice of Intent To Prepare an                          law.                                                  feet per day).
                                               Environmental Assessment for the                           Sierrita provided landowners with a                   The Sierrita Compressor Expansion
                                               Proposed Sierrita Gas Pipeline LLC                      fact sheet prepared by the FERC entitled              Project would consist of the following
                                               Sierrita Compressor Expansion Project                   ‘‘An Interstate Natural Gas Facility On               facilities, all in Pima County:
                                               and Request for Comments on                             My Land? What Do I Need To Know?’’                       • One new 15,900 horsepower
                                               Environmental Issues                                    This fact sheet addresses a number of                 compressor station (Sierrita Compressor
                                                                                                       typically asked questions, including the              Station);
                                                  The staff of the Federal Energy                      use of eminent domain and how to                         • suction and discharge piping and
                                               Regulatory Commission (FERC or                          participate in the Commission’s                       various station yard auxiliary facilities
                                               Commission) will prepare an                             proceedings. It is also available for                 to connect the Sierrita Compressor
                                               environmental assessment (EA) that will                 viewing on the FERC website                           Station with Line No. 2177;
                                               discuss the environmental impacts of                    (www.ferc.gov).                                          • one new 10-inch Ultrasonic meter
                                               the Sierrita Compressor Expansion                                                                             at the existing San Joaquin Meter
                                               Project involving construction and                      Public Participation                                  Station on Line No. 2177; and
                                               operation of facilities by Sierrita Gas                    For your convenience, there are three                 • the relocation of the existing
                                               Pipeline LLC (Sierrita) in Pima County,                 methods you can use to submit your                    ‘‘Mainline Valve 2’’ and an associated
                                               Arizona. The Commission will use this                   comments to the Commission. The                       inspection tool launcher and receiver
                                               EA in its decision-making process to                    Commission encourages electronic filing               from milepost 1.2 to milepost 6.5 on
                                               determine whether the project is in the                 of comments and has expert staff                      Line No. 2177.
                                               public convenience and necessity.                       available to assist you at (202) 502–8258                The general location of the project
                                                  This notice announces the opening of                 or FercOnlineSupport@ferc.gov. Please                 facilities is shown in appendix 1.1
                                               the scoping process the Commission                      carefully follow these instructions so
                                               will use to gather input from the public                                                                      Land Requirements for Construction
                                                                                                       that your comments are properly
                                               and interested agencies on the project.                 recorded.                                               Construction of the proposed facilities
                                               You can make a difference by providing                     (1) You can file your comments                     would disturb about 18.7 acres of land
                                               us with your specific comments or                       electronically using the eComment                     for the aboveground and auxiliary
                                               concerns about the project. Your                        feature on the Commission’s website                   facilities. Following construction,
                                               comments should focus on the potential                  (www.ferc.gov) under the link to                      Sierrita would maintain about 15.7 acres
                                               environmental effects, reasonable                       Documents and Filings. This is an easy                for permanent operation of the
                                               alternatives, and measures to avoid or                  method for submitting brief, text-only                compressor station including station
                                               lessen environmental impacts. Your                      comments on a project;                                piping and auxiliary facilities, and
                                               input will help the Commission staff                       (2) You can file your comments                     about 1.1 acres for operation of the
                                               determine what issues they need to                      electronically by using the eFiling                   mainline valve. The remaining acreage
                                               evaluate in the EA. To ensure that your                 feature on the Commission’s website                   would be restored and revert to former
                                               comments are timely and properly                        (www.ferc.gov) under the link to                      uses.
                                               recorded, please send your comments so                  Documents and Filings. With eFiling,                  The EA Process
                                               that the Commission receives them in                    you can provide comments in a variety
                                               Washington, DC on or before March 5,                    of formats by attaching them as a file                  The National Environmental Policy
                                               2018.                                                   with your submission. New eFiling                     Act (NEPA) requires the Commission to
                                                  If you sent comments on this project                 users must first create an account by                 take into account the environmental
                                               to the Commission before the opening of                 clicking on eRegister. If you are filing a            impacts that could result from an action
                                               this docket on December 21, 2017, you                   comment on a particular project, please               whenever it considers the issuance of a
                                               will need to file those comments in                     select ‘‘Comment on a Filing’’ as the                 Certificate of Public Convenience and
                                               Docket No. CP18–37–000 to ensure they                   filing type; or                                       Necessity. NEPA also requires us 2 to
                                               are considered as part of this                             (3) You can file a paper copy of your              discover and address concerns the
                                               proceeding.                                             comments by mailing them to the                       public may have about proposals. This
                                                  This notice is being sent to the                     following address. Be sure to reference
                                                                                                                                                               1 The appendices referenced in this notice will
                                               Commission’s current environmental                      the project docket number (CP18–37–
                                                                                                                                                             not appear in the Federal Register. Copies of
                                               mailing list for this project. State and                000) with your submission: Kimberly D.
daltland on DSKBBV9HB2PROD with NOTICES




                                                                                                                                                             appendices were sent to all those receiving this
                                               local government representatives should                 Bose, Secretary, Federal Energy                       notice in the mail and are available at www.ferc.gov
                                               notify their constituents of this                       Regulatory Commission, 888 First Street               using the link called eLibrary or from the
                                               proposed project and encourage them to                  NE, Room 1A, Washington, DC 20426.                    Commission’s Public Reference Room, 888 First
                                                                                                                                                             Street NE, Washington, DC 20426, or call (202) 502–
                                               comment on their areas of concern.                                                                            8371. For instructions on connecting to eLibrary,
                                                  If you are a landowner receiving this                Summary of the Proposed Project
                                                                                                                                                             refer to the last page of this notice.
                                               notice, a pipeline company                                Sierrita proposes to construct and                    2 We, us, and our refer to the environmental staff

                                               representative may contact you about                    operate new natural gas compression,                  of the Commission’s Office of Energy Projects.



                                          VerDate Sep<11>2014   17:18 Feb 07, 2018   Jkt 244001   PO 00000   Frm 00017   Fmt 4703   Sfmt 4703   E:\FR\FM\08FEN1.SGM   08FEN1


                                               5620                          Federal Register / Vol. 83, No. 27 / Thursday, February 8, 2018 / Notices

                                               process is referred to as scoping. The                   Preservation Act, we are using this                       proceeding. Intervenors play a more
                                               main goal of the scoping process is to                   notice to initiate consultation with the                  formal role in the process and are able
                                               focus the analysis in the EA on the                      applicable State Historic Preservation                    to file briefs, appear at hearings, and be
                                               important environmental issues. By this                  Office (SHPO), and to solicit their views                 heard by the courts if they choose to
                                               notice, the Commission requests public                   and those of other government agencies,                   appeal the Commission’s final ruling.
                                               comments on the scope of the issues to                   interested Indian tribes, and the public                  An intervenor formally participates in
                                               address in the EA. We will consider all                  on the project’s potential effects on                     the proceeding by filing a request to
                                               filed comments during the preparation                    historic properties.4 We will define the                  intervene. Instructions for becoming an
                                               of the EA.                                               project-specific Area of Potential Effects                intervenor are in the Document-less
                                                  In the EA we will discuss impacts that                (APE) in consultation with the SHPO as                    Intervention Guide under the e-filing
                                               could occur as a result of the                           the project develops. On natural gas
                                                                                                                                                                  link on the Commission’s website.
                                               construction and operation of the                        facility projects, the APE at a minimum
                                                                                                                                                                  Motions to intervene are more fully
                                               proposed project under these general                     encompasses all areas subject to ground
                                                                                                                                                                  described at http://www.ferc.gov/
                                               headings:                                                disturbance (examples include
                                                                                                                                                                  resources/guides/how-to/intervene.asp.
                                                  • Geology and soils;                                  construction right-of-way, contractor/
                                                  • land use;                                           pipe storage yards, compressor stations,                  Additional Information
                                                  • water resources (including                          and access roads). Our EA for this
                                               floodplains), fisheries, and wetlands;                   project will document our findings on                        Additional information about the
                                                  • cultural resources;                                 the impacts on historic properties and                    project is available from the
                                                  • vegetation and wildlife;                            summarize the status of consultations                     Commission’s Office of External Affairs,
                                                  • air quality and noise;                              under Section 106.                                        at (866) 208–FERC, or on the FERC
                                                  • endangered and threatened species;                  Environmental Mailing List                                website at www.ferc.gov using the
                                                  • socioeconomics;                                                                                               ‘‘eLibrary’’ link. Click on the eLibrary
                                                  • public safety; and                                     The environmental mailing list                         link, click on ‘‘General Search’’ and
                                                  • cumulative impacts                                  includes federal, state, and local                        enter the docket number, excluding the
                                                  We will also evaluate reasonable                      government representatives and                            last three digits in the Docket Number
                                               alternatives to the proposed project or                  agencies; elected officials;
                                                                                                                                                                  field (i.e., CP18–37). Be sure you have
                                               portions of the project, and make                        environmental and public interest
                                                                                                                                                                  selected an appropriate date range. For
                                               recommendations on how to lessen or                      groups; Native American Tribes; other
                                                                                                                                                                  assistance, please contact FERC Online
                                               avoid impacts on the various resource                    interested parties; and local libraries
                                                                                                        and newspapers. This list also includes                   Support at FercOnlineSupport@ferc.gov
                                               areas.                                                                                                             or toll free at (866) 208–3676, or for
                                                  The EA will present our independent                   all affected landowners (as defined in
                                                                                                        the Commission’s regulations) who are                     TTY, contact (202) 502–8659. The
                                               analysis of the issues. The EA will be                                                                             eLibrary link also provides access to the
                                               available in the public record through                   potential right-of-way grantors, whose
                                                                                                        property may be used temporarily for                      texts of formal documents issued by the
                                               eLibrary. Depending on the comments
                                                                                                        project purposes, or who own homes                        Commission, such as orders, notices,
                                               received during the scoping process, we
                                               may also publish and distribute the EA                   within certain distances of aboveground                   and rulemakings.
                                               to the public for an allotted comment                    facilities, and anyone who submits                           In addition, the Commission offers a
                                               period. We will consider all comments                    comments on the project. We will                          free service called eSubscription which
                                               on the EA before making our                              update the environmental mailing list as                  allows you to keep track of all formal
                                               recommendations to the Commission.                       the analysis proceeds to ensure that we                   issuances and submittals in specific
                                               To ensure we have the opportunity to                     send the information related to this                      dockets. This can reduce the amount of
                                               consider and address your comments,                      environmental review to all individuals,                  time you spend researching proceedings
                                               please carefully follow the instructions                 organizations, and government entities                    by automatically providing you with
                                               in the Public Participation section,                     interested in and/or potentially affected                 notification of these filings, document
                                               beginning on page 2.                                     by the proposed project.
                                                                                                                                                                  summaries, and direct links to the
                                                  With this notice, we are asking                          If we publish and distribute the EA,
                                                                                                        copies of the EA will be sent to the                      documents. Go to www.ferc.gov/docs-
                                               agencies with jurisdiction by law and/                                                                             filing/esubscription.asp.
                                               or special expertise with respect to the                 environmental mailing list for public
                                               environmental issues of this project to                  review and comment. If you would                             Finally, public sessions or site visits
                                               formally cooperate with us in the                        prefer to receive a paper copy of the                     will be posted on the Commission’s
                                               preparation of the EA.3 Agencies that                    document instead of the CD version or                     calendar located at www.ferc.gov/
                                               would like to request cooperating                        would like to remove your name from                       EventCalendar/EventsList.aspx along
                                               agency status should follow the                          the mailing list, please return the                       with other related information.
                                               instructions for filing comments                         attached Information Request (appendix
                                                                                                                                                                    Dated: February 2, 2018.
                                               provided under the Public Participation                  2).
                                                                                                                                                                  Kimberly D. Bose,
                                               section of this notice.                                  Becoming an Intervenor                                    Secretary.
                                               Consultations Under Section 106 of the                     In addition to involvement in the EA                    [FR Doc. 2018–02527 Filed 2–7–18; 8:45 am]
                                               National Historic Preservation Act                       scoping process, you may want to                          BILLING CODE 6717–01–P
                                                                                                        become an intervenor which is an
                                                 In accordance with the Advisory
                                                                                                        official party to the Commission’s
daltland on DSKBBV9HB2PROD with NOTICES




                                               Council on Historic Preservation’s
                                               implementing regulations for Section                       4 The Advisory Council on Historic Preservation’s
                                               106 of the National Historic                             regulations are at Title 36, Code of Federal
                                                                                                        Regulations, Part 800. Those regulations define
                                                 3 The Council on Environmental Quality                 historic properties as any prehistoric or historic
                                               regulations addressing cooperating agency                district, site, building, structure, or object included
                                               responsibilities are at Title 40, Code of Federal        in or eligible for inclusion in the National Register
                                               Regulations, Part 1501.6.                                of Historic Places.



                                          VerDate Sep<11>2014    17:18 Feb 07, 2018   Jkt 244001   PO 00000   Frm 00018   Fmt 4703   Sfmt 9990   E:\FR\FM\08FEN1.SGM     08FEN1



Document Created: 2018-02-08 00:16:10
Document Modified: 2018-02-08 00:16:10
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 5619 